Loading...
HomeMy WebLinkAboutR-4354810 �I 04 N ry I U ry Q �I LL al ry ry I N N LL Q ry c 0 a� ry N N U 0 0 Y N m 0 Q I 549.0'i�_ I II LU I II I __JI II w O I I 5 FII A1.2 I II 10'- 0" SIDE YARDt II SETBACK II II II II 549.0'� 6 A1.2 MAINTENANCE BUILDING PLAN BUILDING HEIGHT DIAGRAM 4 Scale: 1" = 40'-0" I- MAINT. BLDG. E/W SECTION - BUILDING HEIGHT DIAGRAM Scale: 1/32" = 1'-0" u u u MAINT. BLDG. N/S SECTION - BUILDING HEIGHT DIAGRAM Scale: 1/32" = V-0" BUILDING HEIGHT CALCULATIONS FIRE STATION 545 0' 6" (P. IILDING IOTPRINT �544.98' ID 544.98 o0 o U - _PROPERTY LINE- - N=? LU 0 U� 3 Q A1.2 o w CD CIO CO 10' - 0" SIDE YARD 537.5' _ _ _ C SETBACK I I B 537.98' 1 540.98' A 537.98'� - - - - I BUILDING FOOTPRINT A1.5 A1.5 I� 4 41 2 L 538' - 0" D 2 A1.2 w J I I w I 1 I 536.25 0-1 I \ E 542.01 - - - - - - - \ /) 537.98' \ 12 A1.6 \ \ I \ J \ 53737 .98' 535.75 I \ � / 1 I 3 ijH G\ F A1.2 537.85' C� \ 537.85' FIRE STATION PLAN 0 40' 80' BUILDINGHEIGHT DIAGRAM 0 1111111111111111111 40' 80, �iy Scale: 1" = 40'-0" ci 5tt3' ti"OgL M (V MB - MAX. ROOF PROJECTION 579' - 0" T.O. BENT CV _ 0 M Cl) M 545' - 8" OIL MB-AVE.GRADE J4J - V MB - T.O. SLAB FIRE STATION E/W SECTION - " BUILDING HEIGHT DIAGRAM Scale: 1/32" = V-0" 583' - 8" M MB MAX. OF PROJECTION V �1 d o bo M I �M CCn WALL PT 1 + PT 2 = AVERAGE A 540.98 + 537.98 = 539.48 B 537.98 + 537.50 = 537.74 C 537.50 + 537.98 = 537.74 D 537.98 + 536.25 = 537.12 E 536.25 + 535.75 = 536.00 F 535.75 + 537.85 = 536.80 G 537.85 + 537.98 = 537.92 H 537.98 + 537.85 = 537.92 J 537.85 + 537.98 = 537.92 K 537.98 + 542.00 = 539.99 L 542.00 + 540.98 = 541.49 5920.1 1 11 = 538.19 ALLOWABLE HEIGHT HT (FT) ELEV ALLOWABLE TOP PLATE 32.00 570.19 ALLOWABLE ROOF SURFACE PROJECTION =5.67"/1.5 = 3.78 (1'4" IN HEIGHT PER V-6" DIST. FROM SETBACK) TOTAL ALLOWABLE ROOF HEIGHT 35.78 573.97 ACTUAL HEIGHT HT (FT) ELEV ACTUAL TOP PLATE (T.O. STEEL) 20.85 559.04 ACTUAL ROOF SURFACE PROJECTION 4.08 TOTAL MAXIMUM ROOF HEIGHT 24.93 563.12 PARKING CALCULATIONS REQUIRED PARKING MAINTENANCE BUILDING REFER TO PAGE 20 OF TRAFFIC IMPACT ANALYSIS PERFORMED BY TRANSPO GROUP DATED AUGUST 2024. FIRE STATION: RMC 4-4-800.F.10.E - NOT DEFINED. SPACES TO BE DETERMINED BY PLANS EXAMINER REFER TO PAGE 20 OF TRAFFIC IMPACT ANALYSIS PERFORMED BY TRANSPO GROUP DATED AUGUST 2024 PROPOSED PARKING FIRE STATION: CREW PARKING (2/ SLEEPING ROOM) 12 SPACES PUBLIC SPACES 3 SPACES (INCLUDES 1 ACCESSIBLE SPACE) MAINTENANCE BUILDING 5 SPACES (INCLUDES 1 ACCESSIBLE SPACE) TOTAL PROPOSED SPACES: 20 SPACES (INCLUDES 2 ACCESSIBLE SPACES) BICYCLE PARKING: REQUIRED SPACES 2 SPACES (10% OFF STREET PARKING SPACES) PROPOSED SPACES 2 SPACES 579' - 0" T.O. BENT 545- 8" MB-AVE.GRADE 545' - 0" MB - T.O. SLAB FIRE STATION - N/S SECTION - BUILDING HEIGHT DIAGRAM Scale: 1/32" = V-0" MAINTENANCE BUILDING WALL PT 1 + PT 2 = AVERAGE A 549.00 + 545.00 = 547.00 B 545.00 + 544.98 = 544.99 C 544.98 + 544.98 = 544.98 D 544.98 + 544.98 = 544.98 E 544.98 + 544.98 = 544.98 F 544.98 + 549.00 = 546.99 3273.92 1 6 = 545.65 ALLOWABLE HEIGHT HT (FT) ELEV ALLOWABLE TOP PLATE 32.00 577.65 ALLOWABLE ROOF SURFACE PROJECTION =671.5 = 6.00 (1'4" IN HEIGHT PER V-6" DIST. FROM SETBACK) TOTAL ALLOWABLE ROOF HEIGHT 38.00 583.65 ACTUAL HEIGHT HT (FT) ELEV ACTUAL TOP PLATE (T.O. STEEL) 32.00 577.65 ACTUAL ROOF SURFACE PROJECTION 5.63 TOTAL MAXIMUM ROOF HEIGHT 37.63 583.28 O 576' - 2 1 /2" 570' - 2 1 /2" FS MAX. TOP PLATE _ 561' - 2" FS T.O. STL - APP BAY 538' - 0" FS T.O. SLAB 0 576' - 2 1 /2" OIL C, FS MAX. ROOF PROJECTION M 570' - 2 1 /2" FS MAX. TOP PLATE 561' - 2" OL FS T.O. STL - APP BAY M M 538' - 2 1 /2" N N FS AVERAGE GRADE _ 538' - 0" OIL N FS T.O. SLAB N AREA CALCULATIONS LOT AREA: SITE NORTH: 66,425 SF SITE SOUTH: 81,643 SF ALLEY AREA: 3,647 SF TOTAL LOT AREA: 151,721 SF (3.4 ACRE) BUILDING AREA: FIRE STATION MAINT. BUILDING BUILDING FOOTPRINT: 13,066 SF 9,964 SF MEZZANINE AREA: 1,290 SF 2,034 SF CANOPIES/OVERHANG: 907 SF 52 SF FUTURE ADDITION: 0 SF 1,352 SF TRASH ENCLOSURE 221 SF 220 SF ALLOWABLE BUILDING AREA: 35% OR 53,100 SF (FOR COMBINED LOT) ACTUAL BUILDING AREA: FIRE STATION: BLDG FOOTPRINT: 13,066 SF CANOPIES/ OVERHANG: 907 SF TRASH ENCLOSURE: 221 SF MAINT. BUILDING: BLDG FOOTPRINT: 9,964 SF CANOPIES/ OVERHANG: 52 SF TRASH ENCLOSURE: 220 SF FUTURE ADDITION: 1,352 SF TOTAL AREA: 25,781 SF OR 17.0% ALLOWABLE IMPERVIOUS AREA: 50% OR 75,861 SF (FOR COMBINED LOT) ACTUAL IMPERVIOUS AREA: BUILDING AREA: 25,781SF PAVEMENT: 44,717 SF FUTURE PAVEMENT: 1,082 SF TOTAL AREA: 71,580 SF OR 47.2% LANDSCAPE AREAS TOTAL LANDSCAPING: 76,554 SF PARKING LOT LANDSCAPING: 849 SF WILDLIFE HABITAT LANDSCAPING: 55,867 SF INTERIOR PARKING LOT LANDSCAPING: NONE REQUIRED NOTE: REFER TO LANDSCAPE PLANS FOR DELINEATION OF LANDSCAPING AREAS AND ADDITIONAL INFORMATION Fi ENT PLANNING 'ing 09/23/2025 T ARCHITECTURE + PLANNING + DESIGN 6211 ROOSEVELT WAY NORTHEAST SEATTLE, WA 98115 tel: (206) 522-3830 fax: (206) 522-2456 6235 REGISTERED ARCHITECT BRIAN J. HARRIS 00 SIIfA7E OF WA3HAl�7�Ipl N 00 Ir- C) N U PERMIT RESUBMITTAL Project Title: 00 Z 0 >- Q J ~ ry, m O W Q O QLU Z Q Z L LL J Q z O_ Z O � Z W L w Of Z Z O W a z w Sheet Title: AREA, PARKING, LANDSCAPE AND BUILDING HEIGHT CALCULATIONS Scale: As indicated Project No.: 21-12 Date : 8/21/25 Sheet Number: Al I O0 0 0 0 O N C / C) C) C) N Q Z) J R-435489