Loading...
HomeMy WebLinkAboutC25004802_Ryder water relocation_CCP_v1 - 857-482-01910/7/2025 Attendees vporter (vporter@rentonwa.gov) SRary (srary@rentonwa.gov) ppierson (ppierson@rentonwa.gov) Abdoul Gafour (agafour@rentonwa.gov) cthomas (cthomas@rentonrfa.org) heatherb (hbray@rentonwa.gov) cclose (cclose@rentonwa.gov) Jvaldez (jvaldez@rentonwa.gov) Documents Civil Construction Permit Application.pdf Geotechnical Report.pdf Easement - Public Utilities (DRAFT).pdf Ryder LC0549 - Waterline Relocation.pdf Easement - Release Process and Submittal Requirements 10022025.pdf Surety - Bond Quantity Worksheet.pdf Easement - Release (DRAFT).pdf Record Message Date Time Document Page Number 1 heatherb: Joined Session 9/22/2025 2:59 PM 2 heatherb: Added 'Civil Construction Permit Application.pdf'9/22/2025 2:59 PM Civil Construction Permit Application.pdf 3 heatherb: Added 'Easement - Public Utilities (DRAFT).pdf'9/22/2025 2:59 PM Easement - Public Utilities (DRAFT).pdf 4 heatherb: Added 'Easement - Release (DRAFT).pdf'9/22/2025 2:59 PM Easement - Release (DRAFT).pdf 5 heatherb: Added 'Geotechnical Report.pdf'9/22/2025 2:59 PM Geotechnical Report.pdf 6 heatherb: Added 'Ryder LC0549 - Waterline Relocation.pdf'9/22/2025 2:59 PM Ryder LC0549 - Waterline Relocation.pdf Message Date Time Document Page Number 7 heatherb: Left Session 9/22/2025 3:02 PM 8 heatherb: Joined Session 9/22/2025 3:19 PM 9 heatherb: Added 'Surety - Bond Quantity Worksheet.pdf'9/22/2025 3:19 PM Surety - Bond Quantity Worksheet.pdf 10 heatherb: Left Session 9/22/2025 3:21 PM 11 heatherb: Joined Session 9/23/2025 7:36 AM 12 heatherb: Left Session 9/23/2025 7:39 AM 13 heatherb: Joined Session 9/23/2025 8:26 AM 14 heatherb: Left Session 9/23/2025 8:40 AM 15 cthomas: Joined Session 9/23/2025 1:56 PM 16 cthomas: Set status to Reviewing 9/23/2025 1:58 PM 17 cthomas: Set status to Finished 9/23/2025 2:03 PM 18 cthomas: Left Session 9/23/2025 2:03 PM 19 cclose: Joined Session 9/24/2025 9:02 AM 20 cclose: Left Session 9/24/2025 9:07 AM 21 vporter: Joined Session 9/26/2025 1:13 PM 22 vporter: Set status to Finished 9/26/2025 1:30 PM 23 vporter: Left Session 9/26/2025 1:30 PM 24 heatherb: Joined Session 9/29/2025 12:03 PM 25 heatherb: Left Session 9/29/2025 3:53 PM 26 heatherb: Joined Session 9/30/2025 7:35 AM 27 heatherb: Left Session 9/30/2025 9:28 AM 28 heatherb: Joined Session 9/30/2025 9:56 AM 29 heatherb: Added Text Box 9/30/2025 10:01 AM Ryder LC0549 - Waterline Relocation.pdf 2 30 heatherb: Edited Text Box (include city of renton water plan general notes std plan 300.0) 9/30/2025 10:02 AM Ryder LC0549 - Waterline Relocation.pdf 2 Message Date Time Document Page Number 31 heatherb: Move Markups 9/30/2025 10:02 AM Ryder LC0549 - Waterline Relocation.pdf 2 32 heatherb: Move Text Box 9/30/2025 10:02 AM Ryder LC0549 - Waterline Relocation.pdf 2 33 heatherb: Delete Text Box 9/30/2025 10:26 AM Ryder LC0549 - Waterline Relocation.pdf 34 heatherb: Added Callout 9/30/2025 10:54 AM Ryder LC0549 - Waterline Relocation.pdf 14 35 heatherb: Add Length Measurement 9/30/2025 11:03 AM Ryder LC0549 - Waterline Relocation.pdf 14 36 heatherb: Add Length Measurement 9/30/2025 11:03 AM Ryder LC0549 - Waterline Relocation.pdf 14 37 heatherb: Delete Length Measurement 9/30/2025 11:03 AM Ryder LC0549 - Waterline Relocation.pdf 38 heatherb: Delete Callout 9/30/2025 11:03 AM Ryder LC0549 - Waterline Relocation.pdf 39 heatherb: Delete Length Measurement 9/30/2025 11:03 AM Ryder LC0549 - Waterline Relocation.pdf 40 heatherb: Add Length Measurement 9/30/2025 11:03 AM Ryder LC0549 - Waterline Relocation.pdf 14 Message Date Time Document Page Number 41 heatherb: Add Length Measurement 9/30/2025 11:03 AM Ryder LC0549 - Waterline Relocation.pdf 14 42 heatherb: Add Length Measurement 9/30/2025 11:04 AM Ryder LC0549 - Waterline Relocation.pdf 14 43 heatherb: Add Length Measurement 9/30/2025 11:04 AM Ryder LC0549 - Waterline Relocation.pdf 14 44 heatherb: Added Callout 9/30/2025 11:08 AM Ryder LC0549 - Waterline Relocation.pdf 14 45 heatherb: Edited Callout (revise there shall be a minimum of 12-inchs of vertical clearance between water and sewer) 9/30/2025 11:09 AM Ryder LC0549 - Waterline Relocation.pdf 14 46 heatherb: Move Markups 9/30/2025 11:09 AM Ryder LC0549 - Waterline Relocation.pdf 14 47 heatherb: Edited Callout (revise there shall be a minimum of 12-inchs of vertical clearance between water and sewer consider shifting watermain up to meet minimum 4-feet of cover) 9/30/2025 11:10 AM Ryder LC0549 - Waterline Relocation.pdf 14 48 heatherb: Delete Length Measurement 9/30/2025 11:10 AM Ryder LC0549 - Waterline Relocation.pdf 49 heatherb: Edited Callout (revise there shall be a minimum of 12-inchs of vertical clearance between water and sewer consider shifting watermain up to meet minimum 4-feet of cover use ethafoam or equivalent if separation is still less than 12-inches) 9/30/2025 11:10 AM Ryder LC0549 - Waterline Relocation.pdf 14 Message Date Time Document Page Number 50 heatherb: Move Markups 9/30/2025 11:10 AM Ryder LC0549 - Waterline Relocation.pdf 14 51 heatherb: Move Callout 9/30/2025 11:11 AM Ryder LC0549 - Waterline Relocation.pdf 14 52 heatherb: Move Markups 9/30/2025 11:11 AM Ryder LC0549 - Waterline Relocation.pdf 14 53 heatherb: Edited Callout (revise there shall be a minimum of 18-inchs of vertical clearance between water and sewer consider shifting watermain up to meet minimum 4-feet of cover use ethafoam or equivalent if separation is still less than 18-inches) 9/30/2025 11:15 AM Ryder LC0549 - Waterline Relocation.pdf 14 54 heatherb: Delete Length Measurement 9/30/2025 11:15 AM Ryder LC0549 - Waterline Relocation.pdf 55 heatherb: Delete Length Measurement 9/30/2025 11:15 AM Ryder LC0549 - Waterline Relocation.pdf 56 heatherb: Delete Length Measurement 9/30/2025 11:15 AM Ryder LC0549 - Waterline Relocation.pdf 57 heatherb: Move Markups 9/30/2025 11:15 AM Ryder LC0549 - Waterline Relocation.pdf 14 58 heatherb: Add Cloud+9/30/2025 11:16 AM Ryder LC0549 - Waterline Relocation.pdf 8 Message Date Time Document Page Number 59 heatherb: Edited Cloud+ (revise note city of renton water mains require 18-inch vertical separation (typ where occurs)) 9/30/2025 11:17 AM Ryder LC0549 - Waterline Relocation.pdf 8 60 heatherb: Edit Cloud+9/30/2025 11:17 AM Ryder LC0549 - Waterline Relocation.pdf 8 61 heatherb: Move Markups 9/30/2025 11:17 AM Ryder LC0549 - Waterline Relocation.pdf 8 62 heatherb: Edit Cloud+9/30/2025 11:17 AM Ryder LC0549 - Waterline Relocation.pdf 8 63 heatherb: Move Markups 9/30/2025 11:17 AM Ryder LC0549 - Waterline Relocation.pdf 8 64 heatherb: Edited Cloud+ (revise note city of renton watermains require 18-inch vertical separation (typ where occurs)) 9/30/2025 11:17 AM Ryder LC0549 - Waterline Relocation.pdf 8 65 heatherb: Move Markups 9/30/2025 11:17 AM Ryder LC0549 - Waterline Relocation.pdf 8 66 heatherb: Left Session 9/30/2025 1:15 PM 67 heatherb: Joined Session 9/30/2025 2:12 PM 68 heatherb: Left Session 9/30/2025 2:26 PM 69 heatherb: Joined Session 10/1/2025 3:49 PM 70 heatherb: Edited Callout (revise there shall be a minimum of 18-inchs of vertical clearance between water and sewer consider shifting watermain up to 4-feet of cover use ethafoam or equivalent if separation is still less than 18-inches) 10/1/2025 3:50 PM Ryder LC0549 - Waterline Relocation.pdf 14 Message Date Time Document Page Number 71 heatherb: Added Callout 10/1/2025 3:50 PM Ryder LC0549 - Waterline Relocation.pdf 13 72 heatherb: Edited Callout (erosion and sediment control shall be per city of federal way) 10/1/2025 3:51 PM Ryder LC0549 - Waterline Relocation.pdf 13 73 heatherb: Move Callout 10/1/2025 3:51 PM Ryder LC0549 - Waterline Relocation.pdf 13 74 heatherb: Move Markups 10/1/2025 3:51 PM Ryder LC0549 - Waterline Relocation.pdf 13 75 heatherb: Move Callout 10/1/2025 3:51 PM Ryder LC0549 - Waterline Relocation.pdf 13 76 heatherb: Edited Callout (erosion and sediment control shall be per city of federal way jurisdiction) 10/1/2025 3:51 PM Ryder LC0549 - Waterline Relocation.pdf 13 77 heatherb: Move Markups 10/1/2025 3:51 PM Ryder LC0549 - Waterline Relocation.pdf 13 78 heatherb: Move Callout 10/1/2025 3:51 PM Ryder LC0549 - Waterline Relocation.pdf 13 79 heatherb: Add Cloud+10/1/2025 3:53 PM Ryder LC0549 - Waterline Relocation.pdf 11 80 heatherb: Edited Cloud+ (for reference only not review) 10/1/2025 3:53 PM Ryder LC0549 - Waterline Relocation.pdf 11 Message Date Time Document Page Number 81 heatherb: Delete Cloud+10/1/2025 3:53 PM Ryder LC0549 - Waterline Relocation.pdf 82 heatherb: Added Text Box 10/1/2025 3:53 PM Ryder LC0549 - Waterline Relocation.pdf 11 83 heatherb: Edited Text Box (not reviewed or approved by city of renton this sheet is for reference only) 10/1/2025 3:53 PM Ryder LC0549 - Waterline Relocation.pdf 11 84 heatherb: Move Markups 10/1/2025 3:53 PM Ryder LC0549 - Waterline Relocation.pdf 11 85 heatherb: Move Text Box 10/1/2025 3:53 PM Ryder LC0549 - Waterline Relocation.pdf 11 86 heatherb: Paste 10/1/2025 3:54 PM Ryder LC0549 - Waterline Relocation.pdf 10 87 heatherb: Paste 10/1/2025 3:54 PM Ryder LC0549 - Waterline Relocation.pdf 9 88 heatherb: Move Text Box 10/1/2025 3:54 PM Ryder LC0549 - Waterline Relocation.pdf 9 89 heatherb: Delete Text Box 10/1/2025 3:54 PM Ryder LC0549 - Waterline Relocation.pdf 90 heatherb: Added Callout 10/1/2025 4:08 PM Ryder LC0549 - Waterline Relocation.pdf 6 Message Date Time Document Page Number 91 heatherb: Edited Callout (verify if this is concrete the survey shows asphalt) 10/1/2025 4:08 PM Ryder LC0549 - Waterline Relocation.pdf 6 92 heatherb: Move Markups 10/1/2025 4:08 PM Ryder LC0549 - Waterline Relocation.pdf 6 93 heatherb: Move Callout 10/1/2025 4:08 PM Ryder LC0549 - Waterline Relocation.pdf 6 94 heatherb: Move Markups 10/1/2025 4:08 PM Ryder LC0549 - Waterline Relocation.pdf 6 95 heatherb: Move Callout 10/1/2025 4:08 PM Ryder LC0549 - Waterline Relocation.pdf 6 96 heatherb: Move Markups 10/1/2025 4:08 PM Ryder LC0549 - Waterline Relocation.pdf 6 97 heatherb: Added Callout 10/1/2025 4:13 PM Ryder LC0549 - Waterline Relocation.pdf 11 98 heatherb: Edited Callout (verify if this is concrete the survey shows asphalt) 10/1/2025 4:13 PM Ryder LC0549 - Waterline Relocation.pdf 11 99 heatherb: Move Markups 10/1/2025 4:14 PM Ryder LC0549 - Waterline Relocation.pdf 11 100 heatherb: Move Callout 10/1/2025 4:14 PM Ryder LC0549 - Waterline Relocation.pdf 11 Message Date Time Document Page Number 101 heatherb: Move Markups 10/1/2025 4:14 PM Ryder LC0549 - Waterline Relocation.pdf 11 102 heatherb: Add Leader 10/1/2025 4:14 PM Ryder LC0549 - Waterline Relocation.pdf 11 103 heatherb: Added Callout 10/1/2025 4:25 PM Ryder LC0549 - Waterline Relocation.pdf 14 104 heatherb: Edited Callout (45 deg. bend)10/1/2025 4:25 PM Ryder LC0549 - Waterline Relocation.pdf 14 105 heatherb: Move Markups 10/1/2025 4:25 PM Ryder LC0549 - Waterline Relocation.pdf 14 106 heatherb: Move Callout 10/1/2025 4:25 PM Ryder LC0549 - Waterline Relocation.pdf 14 107 heatherb: Added Callout 10/1/2025 4:28 PM Ryder LC0549 - Waterline Relocation.pdf 8 108 heatherb: Edited Callout (utility easement must be centered on pipe with a minimum of 7.5-feet on each side) 10/1/2025 4:29 PM Ryder LC0549 - Waterline Relocation.pdf 8 109 heatherb: Move Markups 10/1/2025 4:29 PM Ryder LC0549 - Waterline Relocation.pdf 8 110 heatherb: Move Callout 10/1/2025 4:29 PM Ryder LC0549 - Waterline Relocation.pdf 8 111 heatherb: Left Session 10/1/2025 4:30 PM Message Date Time Document Page Number 112 heatherb: Joined Session 10/2/2025 8:45 AM 113 heatherb: Left Session 10/2/2025 8:46 AM 114 heatherb: Joined Session 10/2/2025 8:51 AM 115 heatherb: Added Callout 10/2/2025 8:53 AM Ryder LC0549 - Waterline Relocation.pdf 9 116 heatherb: Edited Callout (add note "per cor std xxx) 10/2/2025 8:53 AM Ryder LC0549 - Waterline Relocation.pdf 9 117 heatherb: Edited Callout (add note "per cor std 300.4") 10/2/2025 8:54 AM Ryder LC0549 - Waterline Relocation.pdf 9 118 heatherb: Paste 10/2/2025 8:55 AM Ryder LC0549 - Waterline Relocation.pdf 8 119 heatherb: Move Markups 10/2/2025 8:55 AM Ryder LC0549 - Waterline Relocation.pdf 8 120 heatherb: Move Callout 10/2/2025 8:55 AM Ryder LC0549 - Waterline Relocation.pdf 8 121 heatherb: Move Markups 10/2/2025 8:55 AM Ryder LC0549 - Waterline Relocation.pdf 8 122 heatherb: Move Callout 10/2/2025 8:55 AM Ryder LC0549 - Waterline Relocation.pdf 8 123 heatherb: Added Callout 10/2/2025 8:58 AM Ryder LC0549 - Waterline Relocation.pdf 8 Message Date Time Document Page Number 124 heatherb: Edited Callout (note to water: what do we need to see from the applicant to tap an existing watermain at a 45 degree angle?) 10/2/2025 8:58 AM Ryder LC0549 - Waterline Relocation.pdf 8 125 heatherb: Move Markups 10/2/2025 8:58 AM Ryder LC0549 - Waterline Relocation.pdf 8 126 heatherb: Move Callout 10/2/2025 8:58 AM Ryder LC0549 - Waterline Relocation.pdf 8 127 heatherb: Move Markups 10/2/2025 8:58 AM Ryder LC0549 - Waterline Relocation.pdf 8 128 heatherb: Move Callout 10/2/2025 8:59 AM Ryder LC0549 - Waterline Relocation.pdf 8 129 heatherb: Added Callout 10/2/2025 9:03 AM Ryder LC0549 - Waterline Relocation.pdf 8 130 heatherb: Edited Callout (per cor std xxx)10/2/2025 9:03 AM Ryder LC0549 - Waterline Relocation.pdf 8 131 heatherb: Edited Callout (add note "per cor std xxx") 10/2/2025 9:03 AM Ryder LC0549 - Waterline Relocation.pdf 8 132 heatherb: Move Callout 10/2/2025 9:03 AM Ryder LC0549 - Waterline Relocation.pdf 8 133 heatherb: Move Markups 10/2/2025 9:03 AM Ryder LC0549 - Waterline Relocation.pdf 8 Message Date Time Document Page Number 134 heatherb: Edited Callout (add note "concrete bocking per cor std 330.1") 10/2/2025 9:04 AM Ryder LC0549 - Waterline Relocation.pdf 8 135 heatherb: Move Markups 10/2/2025 9:04 AM Ryder LC0549 - Waterline Relocation.pdf 8 136 heatherb: Move Callout 10/2/2025 9:04 AM Ryder LC0549 - Waterline Relocation.pdf 8 137 heatherb: Move Markups 10/2/2025 9:04 AM Ryder LC0549 - Waterline Relocation.pdf 8 138 heatherb: Paste 10/2/2025 9:05 AM Ryder LC0549 - Waterline Relocation.pdf 9 139 heatherb: Move Markups 10/2/2025 9:05 AM Ryder LC0549 - Waterline Relocation.pdf 9 140 heatherb: Move Callout 10/2/2025 9:05 AM Ryder LC0549 - Waterline Relocation.pdf 9 141 heatherb: Move Callout 10/2/2025 9:05 AM Ryder LC0549 - Waterline Relocation.pdf 9 142 heatherb: Move Markups 10/2/2025 9:05 AM Ryder LC0549 - Waterline Relocation.pdf 9 143 heatherb: Add Length Measurement 10/2/2025 9:12 AM Ryder LC0549 - Waterline Relocation.pdf 9 Message Date Time Document Page Number 144 heatherb: Delete Length Measurement 10/2/2025 9:12 AM Ryder LC0549 - Waterline Relocation.pdf 145 heatherb: Add Length Measurement 10/2/2025 9:13 AM Ryder LC0549 - Waterline Relocation.pdf 8 146 heatherb: Delete Length Measurement 10/2/2025 9:13 AM Ryder LC0549 - Waterline Relocation.pdf 147 heatherb: Add Length Measurement 10/2/2025 9:14 AM Ryder LC0549 - Waterline Relocation.pdf 8 148 heatherb: Move Markups 10/2/2025 9:14 AM Ryder LC0549 - Waterline Relocation.pdf 8 149 heatherb: Delete Length Measurement 10/2/2025 9:14 AM Ryder LC0549 - Waterline Relocation.pdf 150 heatherb: Add Length Measurement 10/2/2025 9:15 AM Ryder LC0549 - Waterline Relocation.pdf 8 151 heatherb: Delete Length Measurement 10/2/2025 9:16 AM Ryder LC0549 - Waterline Relocation.pdf 152 heatherb: Added Callout 10/2/2025 9:16 AM Ryder LC0549 - Waterline Relocation.pdf 8 153 heatherb: Edited Callout (ensure scale is accurate to plan view plan view appears to be an obscure scale) 10/2/2025 9:17 AM Ryder LC0549 - Waterline Relocation.pdf 8 Message Date Time Document Page Number 154 heatherb: Move Callout 10/2/2025 9:17 AM Ryder LC0549 - Waterline Relocation.pdf 8 155 heatherb: Move Markups 10/2/2025 9:17 AM Ryder LC0549 - Waterline Relocation.pdf 14 156 heatherb: Edited Callout (ensure scale is accurate to plan view use a typical scale such as 1"=10' plan view appears to be an obscure scale) 10/2/2025 9:18 AM Ryder LC0549 - Waterline Relocation.pdf 8 157 heatherb: Move Callout 10/2/2025 9:18 AM Ryder LC0549 - Waterline Relocation.pdf 8 158 heatherb: Move Markups 10/2/2025 9:18 AM Ryder LC0549 - Waterline Relocation.pdf 14 159 heatherb: Move Callout 10/2/2025 9:18 AM Ryder LC0549 - Waterline Relocation.pdf 8 160 heatherb: Move Callout 10/2/2025 9:18 AM Ryder LC0549 - Waterline Relocation.pdf 14 161 heatherb: Undo 10/2/2025 9:18 AM Ryder LC0549 - Waterline Relocation.pdf 14 162 heatherb: Add Length Measurement 10/2/2025 9:19 AM Ryder LC0549 - Waterline Relocation.pdf 8 163 heatherb: Delete Length Measurement 10/2/2025 9:19 AM Ryder LC0549 - Waterline Relocation.pdf Message Date Time Document Page Number 164 heatherb: Add Length Measurement 10/2/2025 9:19 AM Ryder LC0549 - Waterline Relocation.pdf 8 165 heatherb: Add Length Measurement 10/2/2025 9:20 AM Ryder LC0549 - Waterline Relocation.pdf 8 166 heatherb: Delete Length Measurement 10/2/2025 9:20 AM Ryder LC0549 - Waterline Relocation.pdf 167 heatherb: Delete Length Measurement 10/2/2025 9:20 AM Ryder LC0549 - Waterline Relocation.pdf 168 heatherb: Add Length Measurement 10/2/2025 9:20 AM Ryder LC0549 - Waterline Relocation.pdf 9 169 heatherb: Delete Length Measurement 10/2/2025 9:20 AM Ryder LC0549 - Waterline Relocation.pdf 170 heatherb: Paste 10/2/2025 9:22 AM Ryder LC0549 - Waterline Relocation.pdf 9 171 heatherb: Move Markups 10/2/2025 9:22 AM Ryder LC0549 - Waterline Relocation.pdf 9 172 heatherb: Move Callout 10/2/2025 9:22 AM Ryder LC0549 - Waterline Relocation.pdf 9 173 heatherb: Added Callout 10/2/2025 9:23 AM Ryder LC0549 - Waterline Relocation.pdf 10 Message Date Time Document Page Number 174 heatherb: Edited Callout (the city would prefer to match existing asphalt material within the easement) 10/2/2025 9:24 AM Ryder LC0549 - Waterline Relocation.pdf 10 175 heatherb: Move Markups 10/2/2025 9:24 AM Ryder LC0549 - Waterline Relocation.pdf 10 176 heatherb: Move Callout 10/2/2025 9:24 AM Ryder LC0549 - Waterline Relocation.pdf 10 177 heatherb: Added Text Box 10/2/2025 9:25 AM Ryder LC0549 - Waterline Relocation.pdf 1 178 heatherb: Edited Text Box (this project is located outside of the city of renton limits ) 10/2/2025 9:25 AM Ryder LC0549 - Waterline Relocation.pdf 1 179 heatherb: Edited Text Box (this project is located outside of the city of renton limits any building permit requirements shall be per city of tukwila) 10/2/2025 9:26 AM Ryder LC0549 - Waterline Relocation.pdf 1 180 heatherb: Edited Text Box (this project is located outside of the city of renton any building permit requirements shall be per city of tukwila) 10/2/2025 9:27 AM Ryder LC0549 - Waterline Relocation.pdf 1 181 heatherb: Edited Text Box (this project is located outside of the city of renton any building permits shall be applied for at the city of tukwila) 10/2/2025 9:27 AM Ryder LC0549 - Waterline Relocation.pdf 1 182 heatherb: Move Markups 10/2/2025 9:27 AM Ryder LC0549 - Waterline Relocation.pdf 1 Message Date Time Document Page Number 183 heatherb: Move Text Box 10/2/2025 9:27 AM Ryder LC0549 - Waterline Relocation.pdf 1 184 heatherb: Added Text Box 10/2/2025 9:29 AM Surety - Bond Quantity Worksheet.pdf 2 185 heatherb: Edited Text Box (include stamp)10/2/2025 9:29 AM Surety - Bond Quantity Worksheet.pdf 2 186 heatherb: Move Markups 10/2/2025 9:29 AM Surety - Bond Quantity Worksheet.pdf 2 187 heatherb: Move Text Box 10/2/2025 9:29 AM Surety - Bond Quantity Worksheet.pdf 2 188 heatherb: Added Callout 10/2/2025 9:31 AM Surety - Bond Quantity Worksheet.pdf 2 189 heatherb: Edited Callout (richard hernandez)10/2/2025 9:31 AM Surety - Bond Quantity Worksheet.pdf 2 190 heatherb: Move Callout 10/2/2025 9:31 AM Surety - Bond Quantity Worksheet.pdf 2 191 heatherb: Move Markups 10/2/2025 9:31 AM Surety - Bond Quantity Worksheet.pdf 2 192 heatherb: Edited Callout (richard hernandez, pe)10/2/2025 9:31 AM Surety - Bond Quantity Worksheet.pdf 2 Message Date Time Document Page Number 193 heatherb: Move Markups 10/2/2025 9:31 AM Surety - Bond Quantity Worksheet.pdf 2 194 heatherb: Added Line 10/2/2025 9:31 AM Surety - Bond Quantity Worksheet.pdf 2 195 heatherb: Edited Text Box (include stamp and signature)10/2/2025 9:33 AM Surety - Bond Quantity Worksheet.pdf 2 196 heatherb: Move Text Box 10/2/2025 9:33 AM Surety - Bond Quantity Worksheet.pdf 2 197 heatherb: Added Text Box 10/2/2025 9:33 AM Surety - Bond Quantity Worksheet.pdf 2 198 heatherb: Edited Text Box (c25)10/2/2025 9:33 AM Surety - Bond Quantity Worksheet.pdf 2 199 heatherb: Edited Text Box (c25004802)10/2/2025 9:33 AM Surety - Bond Quantity Worksheet.pdf 2 200 heatherb: Move Text Box 10/2/2025 9:33 AM Surety - Bond Quantity Worksheet.pdf 2 201 heatherb: Edited Text Box (c25004802)10/2/2025 9:33 AM Surety - Bond Quantity Worksheet.pdf 2 202 heatherb: Move Markups 10/2/2025 9:34 AM Surety - Bond Quantity Worksheet.pdf 2 Message Date Time Document Page Number 203 heatherb: Move Text Box 10/2/2025 9:34 AM Surety - Bond Quantity Worksheet.pdf 2 204 heatherb: Move Markups 10/2/2025 9:34 AM Surety - Bond Quantity Worksheet.pdf 2 205 heatherb: Move Text Box 10/2/2025 9:34 AM Surety - Bond Quantity Worksheet.pdf 2 206 heatherb: Paste 10/2/2025 9:40 AM Ryder LC0549 - Waterline Relocation.pdf 8 207 heatherb: Move Markups 10/2/2025 9:40 AM Ryder LC0549 - Waterline Relocation.pdf 8 208 heatherb: Move Callout 10/2/2025 9:40 AM Ryder LC0549 - Waterline Relocation.pdf 8 209 heatherb: Edited Callout (note to water: do we need restrained jointing here?) 10/2/2025 9:41 AM Ryder LC0549 - Waterline Relocation.pdf 8 210 heatherb: Move Markups 10/2/2025 9:41 AM Ryder LC0549 - Waterline Relocation.pdf 8 211 heatherb: Move Callout 10/2/2025 9:41 AM Ryder LC0549 - Waterline Relocation.pdf 8 212 heatherb: Edited Callout (note to water: do we need restrained jointing at this site?) 10/2/2025 9:41 AM Ryder LC0549 - Waterline Relocation.pdf 8 Message Date Time Document Page Number 213 heatherb: Move Markups 10/2/2025 9:41 AM Ryder LC0549 - Waterline Relocation.pdf 8 214 heatherb: Move Callout 10/2/2025 9:41 AM Ryder LC0549 - Waterline Relocation.pdf 8 215 heatherb: Delete Callout 10/2/2025 9:42 AM Ryder LC0549 - Waterline Relocation.pdf 216 SRary: Joined Session 10/2/2025 10:09 AM 217 SRary: Set status to Reviewing 10/2/2025 10:34 AM 218 SRary: Added Callout 10/2/2025 10:38 AM Easement - Public Utilities (DRAFT).pdf 1 219 SRary: Edited Callout (portion of)10/2/2025 10:39 AM Easement - Public Utilities (DRAFT).pdf 1 220 SRary: Move Markups 10/2/2025 10:39 AM Easement - Public Utilities (DRAFT).pdf 1 221 SRary: Added Callout 10/2/2025 10:43 AM Easement - Public Utilities (DRAFT).pdf 1 222 SRary: Edited Callout (4 (or include all necessary pages))10/2/2025 10:43 AM Easement - Public Utilities (DRAFT).pdf 1 223 SRary: Move Markups 10/2/2025 10:43 AM Easement - Public Utilities (DRAFT).pdf 1 224 SRary: Added Text Box 10/2/2025 10:43 AM Easement - Public Utilities (DRAFT).pdf 1 225 SRary: Edited Text Box (must provide metes and bounds description of easement area and depiction of easement area. Please ensure text is at least 8 point font size or larger and a clear 1" margin is on all sides of each page) 10/2/2025 10:45 AM Easement - Public Utilities (DRAFT).pdf 1 Message Date Time Document Page Number 226 SRary: Added Text Box 10/2/2025 10:45 AM Easement - Release (DRAFT).pdf 1 227 SRary: Edited Text Box (release of easement is not part of civil construction permit and requires petition, processing fee, legislation, public notice, public hearing, and city council action. Please see separate process hand out for specifics) 10/2/2025 10:46 AM Easement - Release (DRAFT).pdf 1 228 SRary: Add Cloud+10/2/2025 10:47 AM Easement - Release (DRAFT).pdf 1 229 SRary: Edited Cloud+ (please complete all information)10/2/2025 10:47 AM Easement - Release (DRAFT).pdf 1 230 SRary: Add Cloud+10/2/2025 10:47 AM Easement - Release (DRAFT).pdf 1 231 SRary: Edited Cloud+ (should be description of easement, not property) 10/2/2025 10:47 AM Easement - Release (DRAFT).pdf 1 232 SRary: Edited Cloud+ (should be description of easement, not full property) 10/2/2025 10:47 AM Easement - Release (DRAFT).pdf 1 233 SRary: Move Markups 10/2/2025 10:47 AM Easement - Release (DRAFT).pdf 1 234 SRary: Move Cloud+10/2/2025 10:48 AM Easement - Release (DRAFT).pdf 1 235 SRary: Move Markups 10/2/2025 10:48 AM Easement - Release (DRAFT).pdf 1 236 SRary: Move Markups 10/2/2025 10:49 AM Easement - Release (DRAFT).pdf 1 237 SRary: Move Markups 10/2/2025 10:57 AM Easement - Release (DRAFT).pdf 1 Message Date Time Document Page Number 238 SRary: Edited Text Box (release of easement is not part of civil construction permit and requires petition, processing fee, legislation, public notice, public hearing, and city council action. Please see separate process hand out for specifics) 10/2/2025 10:58 AM Easement - Release (DRAFT).pdf 1 239 heatherb: Disconnected 10/2/2025 11:25 AM 240 heatherb: Disconnected 10/2/2025 11:25 AM 241 heatherb: Disconnected 10/2/2025 11:25 AM 242 heatherb: Disconnected 10/2/2025 11:25 AM 243 heatherb: Joined Session 10/2/2025 11:47 AM 244 heatherb: Left Session 10/2/2025 11:47 AM 245 heatherb: Joined Session 10/2/2025 12:57 PM 246 heatherb: Left Session 10/2/2025 3:27 PM 247 heatherb: Joined Session 10/2/2025 3:34 PM 248 heatherb: Added Text Box 10/2/2025 3:34 PM Ryder LC0549 - Waterline Relocation.pdf 1 249 heatherb: Edited Text Box (note to water: stephanie is drafting a response on the process for relinquishing an easement) 10/2/2025 3:35 PM Ryder LC0549 - Waterline Relocation.pdf 1 250 heatherb: Move Markups 10/2/2025 3:35 PM Ryder LC0549 - Waterline Relocation.pdf 1 251 heatherb: Move Text Box 10/2/2025 3:35 PM Ryder LC0549 - Waterline Relocation.pdf 1 252 heatherb: Left Session 10/2/2025 3:41 PM 253 ppierson: Joined Session 10/2/2025 3:45 PM 254 ppierson: Left Session 10/2/2025 3:49 PM 255 SRary: Left Session 10/2/2025 3:57 PM 256 SRary: Joined Session 10/3/2025 8:41 AM Message Date Time Document Page Number 257 SRary: Added 'Easement - Release Process and Submittal Requirements 10022025.pdf' 10/3/2025 8:45 AM Easement - Release Process and Submittal Requirements 10022025.pdf 258 SRary: Edited Text Box (release of easement is not part of civil construction permit and requires petition, processing fee, legislation, public notice, public hearing, and city council action. Please see separate process hand out for specifics entitled "easement Release Process and Submittal Requirements") 10/3/2025 8:46 AM Easement - Release (DRAFT).pdf 1 259 SRary: Set status to Finished 10/3/2025 8:47 AM 260 SRary: Left Session 10/3/2025 8:47 AM 261 SRary: Joined Session 10/3/2025 9:44 AM 262 SRary: Left Session 10/3/2025 9:44 AM 263 Abdoul Gafour: Joined Session 10/3/2025 1:48 PM 264 Abdoul Gafour: Added Text Box 10/3/2025 1:54 PM Ryder LC0549 - Waterline Relocation.pdf 8 265 Abdoul Gafour: Edited Text Box (THE 18-INCH VERT. SEPARATION IS BETWEEN WATER & SEWER MAIN. 12" SEPARATION IS OK. WE PREFER NOT TO HAVE TO USE VERTICAL BENDS TO GO UNDER THE POWER CONDUITS.) 10/3/2025 1:56 PM Ryder LC0549 - Waterline Relocation.pdf 8 266 Abdoul Gafour: Edited Text Box (NOTE TO HEATHER: THE 18-INCH VERT. SEPARATION IS BETWEEN WATER & SEWER MAIN. 12" SEPARATION IS OK FOR DRY-UTILTIES. WE PREFER NOT TO HAVE TO USE VERTICAL BENDS TO GO UNDER THE POWER CONDUITS.) 10/3/2025 1:57 PM Ryder LC0549 - Waterline Relocation.pdf 8 267 Abdoul Gafour: Add Line 10/3/2025 1:58 PM Ryder LC0549 - Waterline Relocation.pdf 8 Message Date Time Document Page Number 268 Abdoul Gafour: Move Markups 10/3/2025 1:58 PM Ryder LC0549 - Waterline Relocation.pdf 8 269 Abdoul Gafour: Move Markups 10/3/2025 1:59 PM Ryder LC0549 - Waterline Relocation.pdf 8 270 Abdoul Gafour: Move Markups 10/3/2025 1:59 PM Ryder LC0549 - Waterline Relocation.pdf 8 271 Abdoul Gafour: Move Markups 10/3/2025 1:59 PM Ryder LC0549 - Waterline Relocation.pdf 8 272 Abdoul Gafour: Added Callout 10/3/2025 1:59 PM Ryder LC0549 - Waterline Relocation.pdf 8 273 Abdoul Gafour: Edited Callout (INSTALL 12" CAP (MJ) ON END OF WATER WATER MAIN TO BE ABANDONED) 10/3/2025 1:59 PM Ryder LC0549 - Waterline Relocation.pdf 8 274 Abdoul Gafour: Move Markups 10/3/2025 1:59 PM Ryder LC0549 - Waterline Relocation.pdf 8 275 Abdoul Gafour: Autosize Text Box 10/3/2025 1:59 PM Ryder LC0549 - Waterline Relocation.pdf 8 276 Abdoul Gafour: Edit Markups 10/3/2025 2:00 PM Ryder LC0549 - Waterline Relocation.pdf 8 277 Abdoul Gafour: Add Polygon 10/3/2025 2:00 PM Ryder LC0549 - Waterline Relocation.pdf 8 Message Date Time Document Page Number 278 Abdoul Gafour: Move Markups 10/3/2025 2:00 PM Ryder LC0549 - Waterline Relocation.pdf 8 279 Abdoul Gafour: Move Polygon 10/3/2025 2:00 PM Ryder LC0549 - Waterline Relocation.pdf 8 280 Abdoul Gafour: Paste 10/3/2025 2:00 PM Ryder LC0549 - Waterline Relocation.pdf 8 281 Abdoul Gafour: Move Callout 10/3/2025 2:01 PM Ryder LC0549 - Waterline Relocation.pdf 8 282 Abdoul Gafour: Move Markups 10/3/2025 2:01 PM Ryder LC0549 - Waterline Relocation.pdf 8 283 Abdoul Gafour: Add Highlight 10/3/2025 2:01 PM Ryder LC0549 - Waterline Relocation.pdf 8 284 Abdoul Gafour: Add Highlight 10/3/2025 2:01 PM Ryder LC0549 - Waterline Relocation.pdf 8 285 Abdoul Gafour: Added Callout 10/3/2025 2:02 PM Ryder LC0549 - Waterline Relocation.pdf 8 286 Abdoul Gafour: Edited Callout (FINAL CONNECTION TO EXISTNG WATER MAIN (BY CITY-FORCES)) 10/3/2025 2:02 PM Ryder LC0549 - Waterline Relocation.pdf 8 287 Abdoul Gafour: Move Markups 10/3/2025 2:02 PM Ryder LC0549 - Waterline Relocation.pdf 8 Message Date Time Document Page Number 288 Abdoul Gafour: Edited Callout (FINAL CONNECTION TO EXISTNG WATER MAIN (BY CITY-FORCES) CUT-IN: 12" - 45° BEND ( MJ x MJ) WITH MEGALUG RESTRAINT WEDGES 12"- SLEEVE ( MJ x MJ) WITH MEGALUG RESTRAINT WEDGES 12- D.I PIPE SPOOL ) 10/3/2025 2:05 PM Ryder LC0549 - Waterline Relocation.pdf 8 289 Abdoul Gafour: Edited Callout (FINAL CONNECTION TO EXISTNG WATER MAIN (BY CITY-FORCES) CUT-IN: 12" - 45° BEND ( MJ x MJ) WITH MEGALUG RESTRAINT WEDGES 12"- SLEEVE ( MJ x MJ) WITH MEGALUG RESTRAINT WEDGES 12- D.I PIPE SPOOL CONCRETE THRUST BLOCK ) 10/3/2025 2:05 PM Ryder LC0549 - Waterline Relocation.pdf 8 290 Abdoul Gafour: Move Markups 10/3/2025 2:05 PM Ryder LC0549 - Waterline Relocation.pdf 8 291 Abdoul Gafour: Move Callout 10/3/2025 2:05 PM Ryder LC0549 - Waterline Relocation.pdf 8 292 Abdoul Gafour: Move Markups 10/3/2025 2:05 PM Ryder LC0549 - Waterline Relocation.pdf 8 293 Abdoul Gafour: Add Group 10/3/2025 2:05 PM Ryder LC0549 - Waterline Relocation.pdf 8 294 Abdoul Gafour: Move Markups 10/3/2025 2:05 PM Ryder LC0549 - Waterline Relocation.pdf 8 Message Date Time Document Page Number 295 Abdoul Gafour: Added PolyLine 10/3/2025 2:06 PM Ryder LC0549 - Waterline Relocation.pdf 8 296 Abdoul Gafour: Edited PolyLine 10/3/2025 2:06 PM Ryder LC0549 - Waterline Relocation.pdf 8 297 Abdoul Gafour: Move Polygon 10/3/2025 2:06 PM Ryder LC0549 - Waterline Relocation.pdf 8 298 Abdoul Gafour: Added Line 10/3/2025 2:06 PM Ryder LC0549 - Waterline Relocation.pdf 8 299 Abdoul Gafour: Paste 10/3/2025 2:06 PM Ryder LC0549 - Waterline Relocation.pdf 8 300 Abdoul Gafour: Move Markups 10/3/2025 2:06 PM Ryder LC0549 - Waterline Relocation.pdf 8 301 Abdoul Gafour: Move Line 10/3/2025 2:06 PM Ryder LC0549 - Waterline Relocation.pdf 8 302 Abdoul Gafour: Move Markups 10/3/2025 2:07 PM Ryder LC0549 - Waterline Relocation.pdf 8 303 Abdoul Gafour: Edited PolyLine 10/3/2025 2:07 PM Ryder LC0549 - Waterline Relocation.pdf 8 304 Abdoul Gafour: Added Line 10/3/2025 2:07 PM Ryder LC0549 - Waterline Relocation.pdf 8 Message Date Time Document Page Number 305 Abdoul Gafour: Add Group 10/3/2025 2:07 PM Ryder LC0549 - Waterline Relocation.pdf 8 306 Abdoul Gafour: Move Markups 10/3/2025 2:07 PM Ryder LC0549 - Waterline Relocation.pdf 8 307 Abdoul Gafour: Move Markups 10/3/2025 2:07 PM Ryder LC0549 - Waterline Relocation.pdf 8 308 Abdoul Gafour: Edit Markups 10/3/2025 2:07 PM Ryder LC0549 - Waterline Relocation.pdf 8 309 Abdoul Gafour: Move Markups 10/3/2025 2:08 PM Ryder LC0549 - Waterline Relocation.pdf 8 310 Abdoul Gafour: Edited Callout (INSTALL 12" CAP (MJ) ON END OF WATER WATER MAIN TO BE ABANDONED) 10/3/2025 2:08 PM Ryder LC0549 - Waterline Relocation.pdf 8 311 Abdoul Gafour: Format Painter 10/3/2025 2:08 PM Ryder LC0549 - Waterline Relocation.pdf 8 312 Abdoul Gafour: Move Markups 10/3/2025 2:08 PM Ryder LC0549 - Waterline Relocation.pdf 8 313 Abdoul Gafour: Autosize Text Box 10/3/2025 2:08 PM Ryder LC0549 - Waterline Relocation.pdf 8 314 Abdoul Gafour: Move Markups 10/3/2025 2:08 PM Ryder LC0549 - Waterline Relocation.pdf 8 Message Date Time Document Page Number 315 Abdoul Gafour: Autosize Text Box 10/3/2025 2:08 PM Ryder LC0549 - Waterline Relocation.pdf 8 316 Abdoul Gafour: Edited Callout (SHOW CONC. BLOCK)10/3/2025 2:08 PM Ryder LC0549 - Waterline Relocation.pdf 8 317 Abdoul Gafour: Move Markups 10/3/2025 2:08 PM Ryder LC0549 - Waterline Relocation.pdf 8 318 Abdoul Gafour: Move Callout 10/3/2025 2:08 PM Ryder LC0549 - Waterline Relocation.pdf 8 319 Abdoul Gafour: Delete Markups 10/3/2025 2:09 PM Ryder LC0549 - Waterline Relocation.pdf 320 Abdoul Gafour: Added Text Box 10/3/2025 2:09 PM Ryder LC0549 - Waterline Relocation.pdf 8 321 Abdoul Gafour: Edited Text Box (ALL MECHANICLA JOINT-FITTINGS SHALL HAVE MEGALUG RESTRAINT WEDGES AND CONCRETE BLCOKING) 10/3/2025 2:10 PM Ryder LC0549 - Waterline Relocation.pdf 8 322 Abdoul Gafour: Format Painter 10/3/2025 2:10 PM Ryder LC0549 - Waterline Relocation.pdf 8 323 Abdoul Gafour: Move Text Box 10/3/2025 2:10 PM Ryder LC0549 - Waterline Relocation.pdf 8 324 Abdoul Gafour: Edited Text Box (ALL MECHANICAL JOINT (MJ) FITTINGS SHALL HAVE MEGALUG RESTRAINT WEDGES AND CONCRETE BLCOKING) 10/3/2025 2:10 PM Ryder LC0549 - Waterline Relocation.pdf 8 Message Date Time Document Page Number 325 Abdoul Gafour: Edited Text Box (ALL MECHANICAL JOINT (MJ) FITTINGS SHALL HAVE MEGALUG RESTRAINT WEDGES AND CONCRETE BLOCKS) 10/3/2025 2:10 PM Ryder LC0549 - Waterline Relocation.pdf 8 326 Abdoul Gafour: Edit Text Box 10/3/2025 2:10 PM Ryder LC0549 - Waterline Relocation.pdf 8 327 Abdoul Gafour: Move Markups 10/3/2025 2:10 PM Ryder LC0549 - Waterline Relocation.pdf 8 328 Abdoul Gafour: Move Text Box 10/3/2025 2:10 PM Ryder LC0549 - Waterline Relocation.pdf 8 329 Abdoul Gafour: Autosize Text Box 10/3/2025 2:11 PM Ryder LC0549 - Waterline Relocation.pdf 8 330 Abdoul Gafour: Added PolyLine 10/3/2025 2:14 PM Ryder LC0549 - Waterline Relocation.pdf 8 331 Abdoul Gafour: Edited PolyLine 10/3/2025 2:14 PM Ryder LC0549 - Waterline Relocation.pdf 14 332 Abdoul Gafour: Delete PolyLine 10/3/2025 2:20 PM Ryder LC0549 - Waterline Relocation.pdf 333 Abdoul Gafour: Added PolyLine 10/3/2025 2:21 PM Ryder LC0549 - Waterline Relocation.pdf 8 334 Abdoul Gafour: Added Text Box 10/3/2025 2:22 PM Ryder LC0549 - Waterline Relocation.pdf 14 Message Date Time Document Page Number 335 Abdoul Gafour: Edited Text Box (PROTECT)10/3/2025 2:22 PM Ryder LC0549 - Waterline Relocation.pdf 14 336 Abdoul Gafour: Edit Text Box 10/3/2025 2:22 PM Ryder LC0549 - Waterline Relocation.pdf 14 337 Abdoul Gafour: Move Markups 10/3/2025 2:22 PM Ryder LC0549 - Waterline Relocation.pdf 14 338 Abdoul Gafour: Autosize Text Box 10/3/2025 2:22 PM Ryder LC0549 - Waterline Relocation.pdf 14 339 Abdoul Gafour: Edit Text Box 10/3/2025 2:22 PM Ryder LC0549 - Waterline Relocation.pdf 14 340 Abdoul Gafour: Move Text Box 10/3/2025 2:22 PM Ryder LC0549 - Waterline Relocation.pdf 14 341 Abdoul Gafour: Paste 10/3/2025 2:24 PM Ryder LC0549 - Waterline Relocation.pdf 9 342 Abdoul Gafour: Move Markups 10/3/2025 2:24 PM Ryder LC0549 - Waterline Relocation.pdf 9 343 Abdoul Gafour: Move Callout 10/3/2025 2:24 PM Ryder LC0549 - Waterline Relocation.pdf 9 344 Abdoul Gafour: Move Markups 10/3/2025 2:24 PM Ryder LC0549 - Waterline Relocation.pdf 9 Message Date Time Document Page Number 345 Abdoul Gafour: Move Callout 10/3/2025 2:24 PM Ryder LC0549 - Waterline Relocation.pdf 9 346 Abdoul Gafour: Edited Callout (FINAL CONNECTION TO EXISTNG WATER MAIN (BY CITY-FORCES) REMOVE EXISTING 12"-45° BEND AND BLOCKING INSTALL: 12"- SLEEVE ( MJ x MJ) WITH MEGALUG RESTRAINT WEDGES 12- D.I PIPE SPOOL ) 10/3/2025 2:26 PM Ryder LC0549 - Waterline Relocation.pdf 9 347 Abdoul Gafour: Edited Callout (FINAL CONNECTION TO EXISTNG WATER MAIN (BY CITY-FORCES) REMOVE EXISTING 12"-45° BEND AND BLOCKING INSTALL: 12"- SLEEVE ( MJ x MJ) WITH MEGALUG RESTRAINT WEDGES 12- D.I PIPE SPOOL ) 10/3/2025 2:26 PM Ryder LC0549 - Waterline Relocation.pdf 9 348 Abdoul Gafour: Paste 10/3/2025 2:40 PM Ryder LC0549 - Waterline Relocation.pdf 9 349 Abdoul Gafour: Move Markups 10/3/2025 2:40 PM Ryder LC0549 - Waterline Relocation.pdf 9 350 Abdoul Gafour: Move Markups 10/3/2025 2:41 PM Ryder LC0549 - Waterline Relocation.pdf 9 351 Abdoul Gafour: Paste 10/3/2025 2:45 PM Ryder LC0549 - Waterline Relocation.pdf 9 Message Date Time Document Page Number 352 Abdoul Gafour: Move Callout 10/3/2025 2:45 PM Ryder LC0549 - Waterline Relocation.pdf 9 353 Abdoul Gafour: Move Markups 10/3/2025 2:45 PM Ryder LC0549 - Waterline Relocation.pdf 9 354 Abdoul Gafour: Move Callout 10/3/2025 2:45 PM Ryder LC0549 - Waterline Relocation.pdf 9 355 Abdoul Gafour: Move Markups 10/3/2025 2:45 PM Ryder LC0549 - Waterline Relocation.pdf 9 356 Abdoul Gafour: Paste 10/3/2025 2:45 PM Ryder LC0549 - Waterline Relocation.pdf 8 357 Abdoul Gafour: Move Markups 10/3/2025 2:46 PM Ryder LC0549 - Waterline Relocation.pdf 9 358 Abdoul Gafour: Move Markups 10/3/2025 2:46 PM Ryder LC0549 - Waterline Relocation.pdf 9 359 Abdoul Gafour: Move Markups 10/3/2025 2:46 PM Ryder LC0549 - Waterline Relocation.pdf 9 360 Abdoul Gafour: Paste 10/3/2025 2:46 PM Ryder LC0549 - Waterline Relocation.pdf 8 361 Abdoul Gafour: Move Text Box 10/3/2025 2:46 PM Ryder LC0549 - Waterline Relocation.pdf 9 Message Date Time Document Page Number 362 Abdoul Gafour: Move Callout 10/3/2025 2:46 PM Ryder LC0549 - Waterline Relocation.pdf 9 363 Abdoul Gafour: Move Markups 10/3/2025 2:46 PM Ryder LC0549 - Waterline Relocation.pdf 9 364 Abdoul Gafour: Move Markups 10/3/2025 2:46 PM Ryder LC0549 - Waterline Relocation.pdf 9 365 Abdoul Gafour: Added Line 10/3/2025 2:46 PM Ryder LC0549 - Waterline Relocation.pdf 9 366 Abdoul Gafour: Edited Callout (FINAL CONNECTION TO EXISTNG WATER MAIN (BY CITY-FORCES) REMOVE EXISTING 12"-45° BEND AND BLOCKING INSTALL: 12"- SLEEVE ( MJ x MJ) WITH MEGALUG RESTRAINT WEDGES 12- D.I PIPE SPOOL ) 10/3/2025 2:47 PM Ryder LC0549 - Waterline Relocation.pdf 9 367 Abdoul Gafour: Edited Callout (FINAL CONNECTION TO EXISTNG WATER MAIN (BY CITY-FORCES) REMOVE EXISTING 12"-45° BEND AND BLOCKING INSTALL: 12"- SLEEVE ( MJ x MJ) WITH MEGALUG RESTRAINT WEDGES 12- D.I PIPE SPOOL) 10/3/2025 2:47 PM Ryder LC0549 - Waterline Relocation.pdf 9 368 Abdoul Gafour: Paste 10/3/2025 2:47 PM Ryder LC0549 - Waterline Relocation.pdf 8 369 Abdoul Gafour: Move Text Box 10/3/2025 2:47 PM Ryder LC0549 - Waterline Relocation.pdf 8 Message Date Time Document Page Number 370 Abdoul Gafour: Edit Text Box 10/3/2025 2:49 PM Ryder LC0549 - Waterline Relocation.pdf 8 371 Abdoul Gafour: Paste 10/3/2025 2:49 PM Ryder LC0549 - Waterline Relocation.pdf 8 372 Abdoul Gafour: Undo 10/3/2025 2:49 PM Ryder LC0549 - Waterline Relocation.pdf 373 Abdoul Gafour: Paste 10/3/2025 2:49 PM Ryder LC0549 - Waterline Relocation.pdf 8 374 Abdoul Gafour: Move Text Box 10/3/2025 2:49 PM Ryder LC0549 - Waterline Relocation.pdf 8 375 Abdoul Gafour: Edited Text Box (NOTE TO HEATHER: WATER UTILITY PREFERS THE WATER MAIN TO BE OFFSET FROM THE CENTER LINE OF THE EASEMENT. THIS WILL GIVE US MORE ROOM BETWEEN THE WATER PIPE AND THE BUILDING WALL (IF APPLICABLE) FOR EQUIPMENT TO WORK ON PIPE REPAIRS WHEN NEEDED.) 10/3/2025 2:53 PM Ryder LC0549 - Waterline Relocation.pdf 8 376 Abdoul Gafour: Edited Text Box (NOTE TO HEATHER: WATER UTILITY PREFERS THE WATER MAIN TO BE OFFSET FROM THE CENTER LINE OF THE EASEMENT. THIS WILL GIVE US MORE ROOM BETWEEN THE WATER PIPE AND THE BUILDING WALL AND OTHER STRUCTURES (IF APPLICABLE) FOR EQUIPMENT TO WORK ON PIPE REPAIRS WHEN NEEDED.) 10/3/2025 2:53 PM Ryder LC0549 - Waterline Relocation.pdf 8 377 Abdoul Gafour: Paste 10/3/2025 2:54 PM Ryder LC0549 - Waterline Relocation.pdf 8 Message Date Time Document Page Number 378 Abdoul Gafour: Undo 10/3/2025 2:54 PM Ryder LC0549 - Waterline Relocation.pdf 379 Abdoul Gafour: Paste 10/3/2025 2:54 PM Ryder LC0549 - Waterline Relocation.pdf 8 380 Abdoul Gafour: Move Markups 10/3/2025 2:54 PM Ryder LC0549 - Waterline Relocation.pdf 8 381 Abdoul Gafour: Move Polygon 10/3/2025 2:54 PM Ryder LC0549 - Waterline Relocation.pdf 8 382 Abdoul Gafour: Paste 10/3/2025 2:54 PM Ryder LC0549 - Waterline Relocation.pdf 9 383 Abdoul Gafour: Move Markups 10/3/2025 2:54 PM Ryder LC0549 - Waterline Relocation.pdf 9 384 Abdoul Gafour: Move Polygon 10/3/2025 2:54 PM Ryder LC0549 - Waterline Relocation.pdf 9 385 Abdoul Gafour: Move Text Box 10/3/2025 2:54 PM Ryder LC0549 - Waterline Relocation.pdf 9 386 Abdoul Gafour: Edit Text Box 10/3/2025 2:54 PM Ryder LC0549 - Waterline Relocation.pdf 9 387 Abdoul Gafour: Move Markups 10/3/2025 2:55 PM Ryder LC0549 - Waterline Relocation.pdf 9 Message Date Time Document Page Number 388 Abdoul Gafour: Autosize Text Box 10/3/2025 2:55 PM Ryder LC0549 - Waterline Relocation.pdf 9 389 Abdoul Gafour: Added Text Box 10/3/2025 2:56 PM Ryder LC0549 - Waterline Relocation.pdf 7 390 Abdoul Gafour: Edited Text Box (AFTER COMPLETION , TESTING AND DISINFECTION OF NEW WATER MAIN ) 10/3/2025 2:56 PM Ryder LC0549 - Waterline Relocation.pdf 7 391 Abdoul Gafour: Move Text Box 10/3/2025 2:56 PM Ryder LC0549 - Waterline Relocation.pdf 7 392 Abdoul Gafour: Edited Text Box (AFTER COMPLETION , TESTING AND DISINFECTION OF NEW WATER MAIN ) 10/3/2025 2:56 PM Ryder LC0549 - Waterline Relocation.pdf 7 393 Abdoul Gafour: Move Text Box 10/3/2025 2:56 PM Ryder LC0549 - Waterline Relocation.pdf 7 394 Abdoul Gafour: Edit Text Box 10/3/2025 2:57 PM Ryder LC0549 - Waterline Relocation.pdf 7 395 Abdoul Gafour: Move Text Box 10/3/2025 2:57 PM Ryder LC0549 - Waterline Relocation.pdf 7 396 Abdoul Gafour: Add PolyLine 10/3/2025 2:58 PM Ryder LC0549 - Waterline Relocation.pdf 8 397 Abdoul Gafour: Add PolyLine 10/3/2025 2:58 PM Ryder LC0549 - Waterline Relocation.pdf 8 Message Date Time Document Page Number 398 Abdoul Gafour: Add PolyLine 10/3/2025 2:58 PM Ryder LC0549 - Waterline Relocation.pdf 8 399 Abdoul Gafour: Add PolyLine 10/3/2025 2:58 PM Ryder LC0549 - Waterline Relocation.pdf 8 400 Abdoul Gafour: Add PolyLine 10/3/2025 2:58 PM Ryder LC0549 - Waterline Relocation.pdf 8 401 Abdoul Gafour: Add PolyLine 10/3/2025 2:58 PM Ryder LC0549 - Waterline Relocation.pdf 9 402 Abdoul Gafour: Add PolyLine 10/3/2025 2:59 PM Ryder LC0549 - Waterline Relocation.pdf 9 403 Abdoul Gafour: Add PolyLine 10/3/2025 2:59 PM Ryder LC0549 - Waterline Relocation.pdf 9 404 Abdoul Gafour: Added Text Box 10/3/2025 3:01 PM Ryder LC0549 - Waterline Relocation.pdf 13 405 Abdoul Gafour: Edited Text Box (RECYCLED CONCRETE MATERIALS ARE NOT ALLOWED AS TRENCH BEDDING AND BACKFILL MATERIALS FOR WATER MAINS) 10/3/2025 3:01 PM Ryder LC0549 - Waterline Relocation.pdf 13 406 Abdoul Gafour: Move Text Box 10/3/2025 3:01 PM Ryder LC0549 - Waterline Relocation.pdf 13 407 Abdoul Gafour: Edited Text Box (RECYCLED CONCRETE MATERIALS ARE NOT ALLOWED AS TRENCH BEDDING AND TRENCH BACKFILL MATERIALS FOR WATER MAINS) 10/3/2025 3:02 PM Ryder LC0549 - Waterline Relocation.pdf 13 408 Abdoul Gafour: Set status to Reviewing 10/3/2025 3:16 PM Message Date Time Document Page Number 409 Abdoul Gafour: Set status to Finished 10/3/2025 3:16 PM 410 Abdoul Gafour: Left Session 10/3/2025 3:16 PM 411 heatherb: Joined Session 10/3/2025 3:18 PM 412 heatherb: Delete Text Box 10/3/2025 3:18 PM Ryder LC0549 - Waterline Relocation.pdf 413 heatherb: Delete Callout 10/3/2025 3:19 PM Ryder LC0549 - Waterline Relocation.pdf 414 heatherb: Delete Callout 10/3/2025 3:19 PM Ryder LC0549 - Waterline Relocation.pdf 415 heatherb: Delete Cloud+10/3/2025 3:20 PM Ryder LC0549 - Waterline Relocation.pdf 416 heatherb: Added Callout 10/3/2025 3:27 PM Ryder LC0549 - Waterline Relocation.pdf 7 417 heatherb: Edited Callout (revise note: "remove existing 12" 45 degree bend after completion, testing, and disinfection of new watermain) 10/3/2025 3:27 PM Ryder LC0549 - Waterline Relocation.pdf 7 418 heatherb: Edited Callout (revise note: "remove existing 12" 45 degree bend after completion, testing, and disinfection of new watermain") 10/3/2025 3:27 PM Ryder LC0549 - Waterline Relocation.pdf 7 419 heatherb: Move Markups 10/3/2025 3:27 PM Ryder LC0549 - Waterline Relocation.pdf 7 420 heatherb: Move Callout 10/3/2025 3:27 PM Ryder LC0549 - Waterline Relocation.pdf 7 Message Date Time Document Page Number 421 heatherb: Move Markups 10/3/2025 3:27 PM Ryder LC0549 - Waterline Relocation.pdf 7 422 heatherb: Edited Callout (add note final connection to existing watermain per cor std 300.4 (by city forces) remove existing 12"-45 degree bend and blocking install 12" sleeve (mjxmj) with megalug restraint wedges 12" di pipe spool) 10/3/2025 3:30 PM Ryder LC0549 - Waterline Relocation.pdf 9 423 heatherb: Move Callout 10/3/2025 3:30 PM Ryder LC0549 - Waterline Relocation.pdf 9 424 heatherb: Move Markups 10/3/2025 3:30 PM Ryder LC0549 - Waterline Relocation.pdf 9 425 heatherb: Move Callout 10/3/2025 3:30 PM Ryder LC0549 - Waterline Relocation.pdf 9 426 heatherb: Added Text Box 10/3/2025 3:31 PM Ryder LC0549 - Waterline Relocation.pdf 9 427 heatherb: Edited Text Box (all mechanical joint (mj) fittings shall have megalug restraint wedges and concrete blocks) 10/3/2025 3:32 PM Ryder LC0549 - Waterline Relocation.pdf 9 428 heatherb: Move Markups 10/3/2025 3:32 PM Ryder LC0549 - Waterline Relocation.pdf 9 429 heatherb: Move Text Box 10/3/2025 3:32 PM Ryder LC0549 - Waterline Relocation.pdf 9 Message Date Time Document Page Number 430 heatherb: Added Callout 10/3/2025 3:32 PM Ryder LC0549 - Waterline Relocation.pdf 9 431 heatherb: Edited Callout (install 12" cap (mj) on end of water main to be abandoned) 10/3/2025 3:32 PM Ryder LC0549 - Waterline Relocation.pdf 9 432 heatherb: Move Markups 10/3/2025 3:32 PM Ryder LC0549 - Waterline Relocation.pdf 9 433 heatherb: Move Callout 10/3/2025 3:32 PM Ryder LC0549 - Waterline Relocation.pdf 9 434 heatherb: Added Text Box 10/3/2025 3:33 PM Ryder LC0549 - Waterline Relocation.pdf 13 435 heatherb: Edited Text Box (add note: "recycled concrete materials are not allowed as trench bedding and trench backfill materials for watermains.") 10/3/2025 3:33 PM Ryder LC0549 - Waterline Relocation.pdf 13 436 heatherb: Move Markups 10/3/2025 3:33 PM Ryder LC0549 - Waterline Relocation.pdf 13 437 heatherb: Move Text Box 10/3/2025 3:33 PM Ryder LC0549 - Waterline Relocation.pdf 13 438 heatherb: Move Markups 10/3/2025 3:33 PM Ryder LC0549 - Waterline Relocation.pdf 13 439 heatherb: Move Text Box 10/3/2025 3:33 PM Ryder LC0549 - Waterline Relocation.pdf 13 Message Date Time Document Page Number 440 heatherb: Paste 10/3/2025 3:34 PM Ryder LC0549 - Waterline Relocation.pdf 8 441 heatherb: Move Text Box 10/3/2025 3:34 PM Ryder LC0549 - Waterline Relocation.pdf 8 442 heatherb: Edited Text Box (add note: "all mechanical joint (mj) fittings shall have megalug restraint wedges and concrete blocks") 10/3/2025 3:34 PM Ryder LC0549 - Waterline Relocation.pdf 8 443 heatherb: Move Text Box 10/3/2025 3:34 PM Ryder LC0549 - Waterline Relocation.pdf 9 444 heatherb: Edited Text Box (add note: "all mechanical joint (mj) fittings shall have megalug restraint wedges and concrete blocks") 10/3/2025 3:34 PM Ryder LC0549 - Waterline Relocation.pdf 9 445 heatherb: Move Text Box 10/3/2025 3:34 PM Ryder LC0549 - Waterline Relocation.pdf 9 446 heatherb: Added Callout 10/3/2025 3:35 PM Ryder LC0549 - Waterline Relocation.pdf 8 447 heatherb: Edited Callout (final connection to existing watermain (by city-forces) cut-in: 12" 45 degree bend (mjxmj) with megalug restraint wedges 12" sleeve (mjxmj) with megalug restraint wedges 12" di pipe spool concrete thrust block) 10/3/2025 3:36 PM Ryder LC0549 - Waterline Relocation.pdf 8 448 heatherb: Move Markups 10/3/2025 3:36 PM Ryder LC0549 - Waterline Relocation.pdf 8 Message Date Time Document Page Number 449 heatherb: Move Callout 10/3/2025 3:36 PM Ryder LC0549 - Waterline Relocation.pdf 8 450 heatherb: Edited Callout (add note final connection to existing watermain per cor std 300.4 (by city forces) remove existing 12"-45 bend and blocking install 12" sleeve (mjxmj) with megalug restraint wedges 12" di pipe spool) 10/3/2025 3:37 PM Ryder LC0549 - Waterline Relocation.pdf 9 451 heatherb: Undo 10/3/2025 3:37 PM Ryder LC0549 - Waterline Relocation.pdf 9 452 heatherb: Undo 10/3/2025 3:37 PM Ryder LC0549 - Waterline Relocation.pdf 9 453 heatherb: Move Callout 10/3/2025 3:37 PM Ryder LC0549 - Waterline Relocation.pdf 8 454 heatherb: Added Callout 10/3/2025 3:37 PM Ryder LC0549 - Waterline Relocation.pdf 8 455 heatherb: Edited Callout (show concrete blocking in plan view (typical)) 10/3/2025 3:37 PM Ryder LC0549 - Waterline Relocation.pdf 8 456 heatherb: Move Markups 10/3/2025 3:37 PM Ryder LC0549 - Waterline Relocation.pdf 8 457 heatherb: Move Callout 10/3/2025 3:37 PM Ryder LC0549 - Waterline Relocation.pdf 8 Message Date Time Document Page Number 458 heatherb: Added Callout 10/3/2025 3:37 PM Ryder LC0549 - Waterline Relocation.pdf 8 459 heatherb: Edited Callout (install 12" cap (mj) on end of watermain to be abandonded) 10/3/2025 3:38 PM Ryder LC0549 - Waterline Relocation.pdf 8 460 heatherb: Move Callout 10/3/2025 3:38 PM Ryder LC0549 - Waterline Relocation.pdf 8 461 heatherb: Move Markups 10/3/2025 3:38 PM Ryder LC0549 - Waterline Relocation.pdf 8 462 heatherb: Edited Callout (show concrete blocking in plan view (typical for all bends)) 10/3/2025 3:43 PM Ryder LC0549 - Waterline Relocation.pdf 8 463 heatherb: Move Markups 10/3/2025 3:43 PM Ryder LC0549 - Waterline Relocation.pdf 8 464 heatherb: Added Callout 10/3/2025 3:46 PM Ryder LC0549 - Waterline Relocation.pdf 14 465 heatherb: Edited Callout (revise note: "protect existing 6" sanitary sewer line") 10/3/2025 3:46 PM Ryder LC0549 - Waterline Relocation.pdf 14 466 heatherb: Move Callout 10/3/2025 3:46 PM Ryder LC0549 - Waterline Relocation.pdf 14 467 heatherb: Left Session 10/3/2025 3:59 PM 468 Jvaldez: Joined Session 10/6/2025 9:02 AM 469 Jvaldez: Set status to Finished 10/6/2025 9:05 AM 470 Jvaldez: Left Session 10/6/2025 9:05 AM Message Date Time Document Page Number 471 heatherb: Joined Session 10/6/2025 11:04 AM 472 heatherb: Disconnected 10/6/2025 11:41 AM 473 heatherb: Disconnected 10/6/2025 11:41 AM 474 heatherb: Disconnected 10/6/2025 11:41 AM 475 heatherb: Joined Session 10/6/2025 1:54 PM 476 heatherb: Left Session 10/6/2025 3:46 PM 477 heatherb: Joined Session 10/6/2025 4:11 PM 478 heatherb: Left Session 10/6/2025 4:13 PM 479 heatherb: Joined Session 10/7/2025 7:23 AM 480 heatherb: Left Session 10/7/2025 7:28 AM 481 heatherb: Joined Session 10/7/2025 8:36 AM