HomeMy WebLinkAboutERC_Southeast Building Demolition Project_finalDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Project Location Map
ERC_Southeast Building Demolition Project_v1
ENVIRONMENTAL REVIEW COMMITTEE REPORT
ERC Meeting Date: October 6, 2025
Project File Number: PR25-000056
Project Name: Southeast Building Demolition Project
Land Use File Number: LUA25-000296, ECF
Project Manager: Ashley Wragge, Assistant Planner
Owner: William Adams, City of Renton, 243 W Perimeter Rd, Renton, WA 98057
Applicant/ Contact: Michael Stanek, Kimley-Horn, 1201 3rd Ave, Suite 2800, Seattle, WA 98101
Project Location: 295 E Perimeter Rd, Renton, WA 98057 (APN 0723059007)
Project Summary: The applicant is requesting Environmental (SEPA) Review for the removal of
three (3) existing buildings at the Renton Municipal Airport (APN 0723059007)
leaving the foundations of each building for future use. The buildings
proposed for removal are 295 E Perimeter Rd, 330 Airport Way, and 350
Airport Way, which total 29,371 square feet. This project site is located within
the Medium Industrial (IM) zone. A high seismic hazard area, high erosion
hazard area, regulated slopes, Special Flood Hazard Area, and Downtown
Wellhead Protection Area Zones 1 and 2 are mapped on the parcel. A high
seismic hazard area and Wellhead Protection Area Zone 2 are mapped on the
project site. The parcel also has a Shoreline High Intensity designation for
Lake Washington Reach J and Cedar River Reach A. One tree is proposed for
removal and all work would occur outside of the regulated shoreline. An
environmental checklist was submitted as part of the application.
Exist. Bldg. Area SF: 29,371 SF Proposed New Bldg. Area (footprint):
Proposed New Bldg. Area (gross):
None
None
Site Area: 6,640,728 SF Total Building Area GSF: 29,371 GSF
STAFF
RECOMMENDATION:
Staff Recommends that the Environmental Review Committee issue a
Determination of Non-Significance (DNS).
Docusign Envelope ID: 8AED238B-7D7F-4B6D-85CE-622AEE29B9AE
City of Renton Department of Community & Economic Development
Southeast Building Demolition Project
Staff Report to the Environmental Review Committee
LUA25-000296, ECF
Report of October 6, 2025 Page 2 of 4
ERC_Southeast Building Demolition Project_v1
ENVIRONMENTAL REVIEW
In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those project
impacts that are not adequately addressed under existing development standards and environmental
regulations.
A.Environmental Threshold Recommendation
Based on analysis of probable impacts from the proposal, staff recommends that the Responsible
Officials:
Issue a DNS with a 14-day Appeal Period.
B.Mitigation Measures
1.None.
C.Exhibits
Exhibit 1:Environmental Review Committee (ERC) Report
Exhibit 2:Environmental (SEPA) Checklist, dated August 27, 2025
Exhibit 3:Project Narrative
Exhibit 4:Site Plan
Exhibit 5:Duwamish Tribe letter, dated September 11, 2025
Exhibit 6:Advisory Notes
D.Environmental Impacts
The Proposal was circulated and reviewed by various City Departments and Divisions to determine whether
the applicant has adequately identified and addressed environmental impacts anticipated to occur in
conjunction with the proposed development. Staff reviewers have identified that the proposal is likely to have
the following probable impacts:
1.Earth
Impacts: The project site is predominantly flat around all three (3) structures proposed for removal.
The existing buildings are proposed to be demolished with the foundation slabs to remain for future
use. One (1) tree is proposed for removal and no grading activities are proposed. The project work
would occur in areas of existing impervious surfaces and there would be no net increase in
impervious surface after demolition. It is anticipated that the City’s currently adopted erosion
control, construction, and drainage regulations would adequately mitigate for any impacts that
could result from the proposed demolition and removal; therefore, no further mitigation is
recommended.
Mitigation Measures: No further mitigation recommended.
Nexus: Not applicable.
2.Air
Impacts: It is anticipated that some temporary adverse air quality impacts associated with the
demolition of the buildings would occur. Emissions from the heavy equipment and large vehicles
needed to deconstruct and transport the material off-site would be a source of temporary and
localized air pollution. Dust control would be mitigated by temporary erosion control measures,
watering or other best management practices. No further site-specific mitigation for the identified
impacts from typical vehicle and construction exhaust is required.
DocusOgn Envelope ID: 8AED238B-7D7F-4B6D-85CE-622AEE29B9AE
City of Renton Department of Community & Economic Development
Southeast Building Demolition Project
Staff Report to the Environmental Review Committee
LUA25-000296, ECF
Report of October 6, 2025 Page 3 of 4
Mitigation Measures: No further mitigation recommended.
Nexus: Not applicable.
3.Plants
Impacts: The project location has a limited amount of vegetation in addition to a single tree of
significant size. The tree is proposed for removal since it is encroaching on the Angle of Attack (AOA)
fence. The removal would improve safety. The proposed tree removal would be further assessed at
the time of building permit application for the demolition of the structures.
Mitigation Measures: No further mitigation recommended.
Nexus: Not applicable.
4.Environmental Health
a.Noise
Impacts: Temporary short- term noise impacts are anticipated due to the demolition equipment
and the vehicles that would be used to remove the debris from the site. Based on the proposal,
work would be conducted using heavy equipment during the allowed daytime hours in
compliance with the City of Renton’s noise guidelines.
Mitigation Measures: No further mitigation recommended.
Nexus: Not applicable.
5.Historic and Cultural Preservation
Impacts: In the SEPA Environmental Checklist (Exhibit 2), the applicant indicates there are no
buildings, structures or sites that are currently listed on the national, state, or local preservation
registers and that the airport has not been inventoried and evaluated for preservation registers. There
are 22 individual structures that are over 45 years old and three (3) of these buildings have been
previously recorded and determined not eligible for listing on the national register.
A comment letter provided by a representative of the Duwamish Tribe (Exhibit 5) was submitted to
City staff on September 11, 2025 regarding the project’s proximity to areas the Duwamish Tribe
considers culturally significant and has a high probability of unknown archaeological deposits. The
Duwamish Tribe recommends an archaeological or cultural resources assessment if any
groundbreaking activity occurs below fill, topsoil, or other impervious surfaces into native soil. The
project scope does not include any groundbreaking work and the existing foundations are proposed
to remain; therefore, no additional mitigation measures are proposed.
Mitigation Measures: No further mitigation recommended.
Nexus: Not applicable.
E.Comments of Reviewing Departments
The proposal has been circulated to City Department and Division Reviewers. Where applicable, their
comments have been incorporated into the text of this report and/or “Advisory Notes” to the applicant.
✓Copies of all Review Comments are contained in the Official File and may be attached to this
report.
The Environmental Determination decision will become final if the decision is not appealed within the 14-
day appeal period (RCW 43.21.C.075(3); WAC 197-11-680).
Environmental Determination Appeal Process: Appeals of the environmental determination must be filed
in writing on or before 5:00 p.m. on October 21, 2025. Appeals must be submitted electronically to the City
ERC_Southeast Building Demolition Project_v1
DocusOgn Envelope ID: 8AED238B-7D7F-4B6D-85CE-622AEE29B9AE
City of Renton Department of Community & Economic Development
Southeast Building Demolition Project
Staff Report to the Environmental Review Committee
LUA25-000296, ECF
Report of October 6, 2025 Page 4 of 4
ERC_Southeast Building Demolition Project_v1
Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal
fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted
electronically. The appeal submitted in person may be paid on the first floor in our Finance Department. Appeals
to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process
may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov.
DocusOgn Envelope ID: 8AED238B-7D7F-4B6D-85CE-622AEE29B9AE
CITY OF RENTON
DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT
STAFF REPORT TO THE ENVIRONMENTAL REVIEW COMMITTEE
EXHIBITS
Project Name:
Southeast Building Demolition Project
Land Use File Number:
LUA25-000296, ECF
Date of Meeting
October 6, 2025
Staff Contact
Ashley Wragge
Assistant Planner
Project Contact/Applicant
Michael Stanek
Kimley-Horn
1201 3rd Ave, Suite 2800,
Seattle, WA 98101
Project Location
295 E Perimeter Rd, Renton, WA
98057 (APN 0723059007)
The following exhibits are included with the ERC Report:
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: SEPA Checklist
Exhibit 3: Project Narrative
Exhibit 4: Site Plan
Exhibit 5: Duwamish Tribe letter dated September 11, 2025
Exhibit 6: Advisory Notes
Docusign Envelope ID: 8AED238B-7D7F-4B6D-85CE-622AEE29B9AE