Loading...
HomeMy WebLinkAbout2- RHS Wavier items.pdfFrom: Alex Morganroth <AMorganroth@Rentonwa.gov> Sent: Tuesday, September 9, 2025 12:40 PM To: Lisa Klein; Clark Close Cc: Allison Conley; Brianne Tomlin Subject: [EXTERNAL] RE: RHS - PUD Waiver Items Hi Lisa – Thanks for sending this over. Yes, per our previous discussion, the struck items in the attached document can be considered waived for the RHS project. Thank you, ALEX MORGANROTH, AICP, Principal Planner City of Renton // Planning Division office (425) 430-7219 // email amorganroth@rentonwa.gov Virtual Permit Center // Online Applications and Inspections NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public Records Act – RCW 42.56 From: Lisa Klein <LKlein@AHBL.com> Sent: Tuesday, September 9, 2025 11:16 AM To: Alex Morganroth <AMorganroth@Rentonwa.gov>; Clark Close <CClose@Rentonwa.gov> Cc: Allison Conley <aconley@AHBL.com>; Brianne Tomlin <brianne.tomlin@rentonschools.us> Subject: RHS - PUD Waiver Items Alex and Clark, Attached is a list of the submittal items for the Renton High School PUD and CUP. The PUD Submittal Checklist requires we submit a waiver of items that are not required. On the attached list those are shown in strike-out text. They are items we have discussed with you previously. Could you please respond to this email that you approve of the waivered items? Thank you, Lisa Lisa Klein, AICP | Associate Principal AHBL, Inc. | TACOMA • SEATTLE • SPOKANE • TRI-CITIES 253.383.2422 TEL | 253.284.0256 DIRECT | 253.651.7907 MOBILE | lklein@ahbl.com EMAIL Civil Engineers • Structural Engineers • Landscape Architects • Community Planners • Land Surveyors Visit us at www.ahbl.com. | Follow us on LinkedIn and Facebook. | Send us a file. Career Opportunities available | Learn more today! CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Page 1 of 4 TO: RHS Reconstruction Project Team DATE: September 9, 2025 FROM: Lisa Klein Tacoma - (253) 383-2422 PROJECT NO.: 2230388.31 PROJECT NAME: RHS Replacement & Site Expansion SUBJECT: List of Land Use Submittal Requirements RHS - PUD Submittal Items # TITLE NOTES/QUESTIONS STATUS PUD #17 Affidavit and photo of Installation of Public Information Sign (This needs to be installed prior to application submittal. Needs to be notarized. Needs a site plan.) 3 signs as approved by City PUD #18 Affidavit and photo of Public Outreach Sign. Needs color renderings. Worksheet needs to be notarized. One sign required. Need new renderings from BRIC PUD #30 Arborist Report PUD #45 Colored Rendering 3 – 4 oblique views plus colored site plan PUD #12 Compliance with Development Standards To be included in #12 PUD Criterion PUD #10 Construction Mitigation Description Joint effort Skanska and civil PUD #12. c Construction Phasing Plan PDF attached to PUD Justification #12 Utility Phasing is in civil plans Density Worksheet Not applicable n/a PUD #33 Drainage Control Plan See Civil Plans PUD #34 Drainage Report Report PUD #26 Elevations, Architectural Project Memo Page 2 of 4 RHS Replacement & Site Expansion 2230388.31 September 9, 2025 # TITLE NOTES/QUESTIONS STATUS PUD #6 Environmental Checklist plus NOC Existing Covenants (recorded copy) None required for submittal PUD #46 Existing Easements (recorded copy) Get from Title Report Flood Hazard Data (if applicable) Confirmed with COR not required PUD #22 Floor Plans PUD #5 and #47 Fill Source Statement (if fill is brought in) See Project Narrative and Civil Site Plan PUD #37 Geotechnical Report (Needs to include soil analysis, detail construction measures to assure site stability) PUD #47 Grading Plan, Conceptual See Civil Plans Habitat Data Report n/a PUD #48 Hazardous Materials Management Statement PUD #23 Landscape Plan, Conceptual PUD #3 Legal Description Attach to Master Application Form Draft Legal Documents (Street dedications, covenants, etc.) Per Amanda, nothing specific is required with the PUD. PUD #38 Letter understanding geologic risk PUD #26 Site Lighting Plan, Photometrics, Field Light details from Musco BRIC to coordinate PUD #3 Master Application Form (w/notarized signature) Will need to add legal description Monument Cards n/a Project Memo Page 3 of 4 RHS Replacement & Site Expansion 2230388.31 September 9, 2025 # TITLE NOTES/QUESTIONS STATUS PUD #16 Neighborhood Detail Map PUD #16 Neighborhood Meeting Materials (Mtg date is 8/6; notice to be mailed between 10 and 40 calendar days prior. Plat Plan n/a PUD #24 Parking Analysis, Lot Coverage and Landscaping Analysis See civil site plan PUD #7 Phasing/Sequencing Plan PUD #1 Pre-App Meeting Summary PUD #5 Project Narrative Public Works Approval Letter n/a PUD #43 Screening Detail- Mechanical and Refuse/Recycling PUD #25 Site Plan (see details in Urban Design District packet) Being updated PUD #12 Statement Addressing PUD’s Relationship to the City Comp Plan PUD #12 Statement addressing the PUD’s compliance with the following decision criteria: RMC 4 -9- 150 PUD #42 Street Profiles (Profiles, grades, cross sections) Need cross sections, grades can come later. Road profiles not needed for planning, but Yong said more is better. PUD #27 Survey and Topography Map (5’ Contours) May not have all parcels completed by submittal Defer to construction permit phase. Survey calculations n/a PUD #13 Title Report (no more than 45 days old) PUD #44 Traffic Study PUD #28 Tree Retention/ Land Clearing Plan See Landscape Plan set Project Memo Page 4 of 4 RHS Replacement & Site Expansion 2230388.31 September 9, 2025 LK/ C:\Users\lklein\Desktop\Project Memo (landscape orientation).docx # TITLE NOTES/QUESTIONS STATUS PUD #29 Tree Retention worksheet PUD #11 Urban Design District Review Packet A Document needs cleanup PUD #11 Urban Design District Review Packet D Document needs cleanup PUD #39 Utilities Plan See Civil Site Plan PUD #31 Wetlands Assessment PUD #8 Waiver from Frontage Improvements PUD #2 Waiver Form (or email) Email from City confirming this list CUP (Hearing Examiner) Same materials required as PUD CUP #7 Justification for CUP Request (For use) and compliance with criterion Required Airport Overlay Zone Requirements AOZ #1 a. A certificate from an engineer or land surveyor, that clearly states that the proposed use will not penetrate the Federal Aviation Administration Regulation Part 77 Objects Affecting Navigable Airspace (subsection G of this Section); or b. The maximum elevation of proposed buildings or structures based on the established airport elevation reference datum will not penetrate the Federal Aviation Administration Regulation Part 77 Objects Affecting Navigable Airspace (subsection G of this Section). Elevations shall be determined by an engineer or land surveyor. Precision Engineering to provide Required AOZ #2 FAA OE Approvals As needed for height variance Required