HomeMy WebLinkAbout2- RHS Wavier items.pdfFrom: Alex Morganroth <AMorganroth@Rentonwa.gov>
Sent: Tuesday, September 9, 2025 12:40 PM
To: Lisa Klein; Clark Close
Cc: Allison Conley; Brianne Tomlin
Subject: [EXTERNAL] RE: RHS - PUD Waiver Items
Hi Lisa –
Thanks for sending this over. Yes, per our previous discussion, the struck items in the
attached document can be considered waived for the RHS project.
Thank you,
ALEX MORGANROTH, AICP, Principal Planner
City of Renton // Planning Division
office (425) 430-7219 // email amorganroth@rentonwa.gov
Virtual Permit Center // Online Applications and Inspections
NOTICE OF PUBLIC DISCLOSURE: This message complies with Washington State’s Public
Records Act – RCW 42.56
From: Lisa Klein <LKlein@AHBL.com>
Sent: Tuesday, September 9, 2025 11:16 AM
To: Alex Morganroth <AMorganroth@Rentonwa.gov>; Clark Close <CClose@Rentonwa.gov>
Cc: Allison Conley <aconley@AHBL.com>; Brianne Tomlin <brianne.tomlin@rentonschools.us>
Subject: RHS - PUD Waiver Items
Alex and Clark,
Attached is a list of the submittal items for the Renton High School PUD and CUP. The PUD Submittal
Checklist requires we submit a waiver of items that are not required. On the attached list those are
shown in strike-out text. They are items we have discussed with you previously. Could you please
respond to this email that you approve of the waivered items?
Thank you,
Lisa
Lisa Klein, AICP | Associate Principal
AHBL, Inc. | TACOMA • SEATTLE • SPOKANE • TRI-CITIES
253.383.2422 TEL | 253.284.0256 DIRECT | 253.651.7907 MOBILE | lklein@ahbl.com EMAIL
Civil Engineers • Structural Engineers • Landscape Architects • Community Planners • Land Surveyors
Visit us at www.ahbl.com. | Follow us on LinkedIn and Facebook. | Send us a file.
Career Opportunities available | Learn more today!
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open
attachments unless you know the content is safe.
Page 1 of 4
TO: RHS Reconstruction Project Team
DATE: September 9, 2025
FROM: Lisa Klein
Tacoma - (253) 383-2422
PROJECT NO.: 2230388.31
PROJECT NAME: RHS Replacement & Site Expansion
SUBJECT: List of Land Use Submittal Requirements
RHS - PUD Submittal Items
# TITLE NOTES/QUESTIONS STATUS
PUD
#17
Affidavit and photo of Installation of Public Information Sign (This needs to be installed
prior to application submittal. Needs to be notarized. Needs a site plan.) 3 signs as approved by City
PUD
#18
Affidavit and photo of Public Outreach Sign. Needs color renderings. Worksheet needs to
be notarized.
One sign required. Need new renderings from
BRIC
PUD
#30 Arborist Report
PUD
#45 Colored Rendering 3 – 4 oblique views plus colored site plan
PUD
#12 Compliance with Development Standards To be included in #12 PUD Criterion
PUD
#10 Construction Mitigation Description Joint effort Skanska and civil
PUD
#12.
c
Construction Phasing Plan PDF attached to PUD Justification #12
Utility Phasing is in civil plans
Density Worksheet Not applicable n/a
PUD
#33 Drainage Control Plan See Civil Plans
PUD
#34 Drainage Report Report
PUD
#26 Elevations, Architectural
Project Memo Page 2 of 4
RHS Replacement & Site Expansion
2230388.31
September 9, 2025
# TITLE NOTES/QUESTIONS STATUS
PUD
#6 Environmental Checklist plus NOC
Existing Covenants (recorded copy) None required for submittal
PUD
#46 Existing Easements (recorded copy) Get from Title Report
Flood Hazard Data (if applicable) Confirmed with COR not required
PUD
#22 Floor Plans
PUD
#5
and
#47
Fill Source Statement (if fill is brought in) See Project Narrative and Civil Site Plan
PUD
#37
Geotechnical Report (Needs to include soil analysis, detail construction measures to
assure site stability)
PUD
#47 Grading Plan, Conceptual See Civil Plans
Habitat Data Report n/a
PUD
#48 Hazardous Materials Management Statement
PUD
#23 Landscape Plan, Conceptual
PUD
#3 Legal Description Attach to Master Application Form
Draft Legal Documents (Street dedications, covenants, etc.) Per Amanda, nothing specific is required with
the PUD.
PUD
#38 Letter understanding geologic risk
PUD
#26 Site Lighting Plan, Photometrics, Field Light details from Musco BRIC to coordinate
PUD
#3 Master Application Form (w/notarized signature) Will need to add legal description
Monument Cards n/a
Project Memo Page 3 of 4
RHS Replacement & Site Expansion
2230388.31
September 9, 2025
# TITLE NOTES/QUESTIONS STATUS
PUD
#16 Neighborhood Detail Map
PUD
#16
Neighborhood Meeting Materials (Mtg date is 8/6; notice to be mailed between 10 and 40
calendar days prior.
Plat Plan n/a
PUD
#24 Parking Analysis, Lot Coverage and Landscaping Analysis See civil site plan
PUD
#7 Phasing/Sequencing Plan
PUD
#1 Pre-App Meeting Summary
PUD
#5 Project Narrative
Public Works Approval Letter n/a
PUD
#43 Screening Detail- Mechanical and Refuse/Recycling
PUD
#25 Site Plan (see details in Urban Design District packet) Being updated
PUD
#12 Statement Addressing PUD’s Relationship to the City Comp Plan
PUD
#12
Statement addressing the PUD’s compliance with the following decision criteria: RMC 4 -9-
150
PUD
#42 Street Profiles (Profiles, grades, cross sections)
Need cross sections, grades can come later.
Road profiles not needed for planning, but
Yong said more is better.
PUD
#27 Survey and Topography Map (5’ Contours) May not have all parcels completed by
submittal Defer to construction permit phase.
Survey calculations n/a
PUD
#13 Title Report (no more than 45 days old)
PUD
#44 Traffic Study
PUD
#28 Tree Retention/ Land Clearing Plan See Landscape Plan set
Project Memo Page 4 of 4
RHS Replacement & Site Expansion
2230388.31
September 9, 2025
LK/
C:\Users\lklein\Desktop\Project Memo (landscape orientation).docx
# TITLE NOTES/QUESTIONS STATUS
PUD
#29 Tree Retention worksheet
PUD
#11 Urban Design District Review Packet A Document needs cleanup
PUD
#11 Urban Design District Review Packet D Document needs cleanup
PUD
#39 Utilities Plan See Civil Site Plan
PUD
#31 Wetlands Assessment
PUD
#8 Waiver from Frontage Improvements
PUD
#2 Waiver Form (or email) Email from City confirming this list
CUP (Hearing Examiner)
Same materials required as PUD
CUP
#7 Justification for CUP Request (For use) and compliance with criterion Required
Airport Overlay Zone Requirements
AOZ
#1
a. A certificate from an engineer or land surveyor, that clearly states that the proposed use
will not penetrate the Federal Aviation Administration Regulation Part 77 Objects Affecting
Navigable Airspace (subsection G of this Section); or
b. The maximum elevation of proposed buildings or structures based on the established
airport elevation reference datum will not penetrate the Federal Aviation Administration
Regulation Part 77 Objects Affecting Navigable Airspace (subsection G of this Section).
Elevations shall be determined by an engineer or land surveyor.
Precision Engineering to provide
Required
AOZ
#2 FAA OE Approvals As needed for height variance Required