HomeMy WebLinkAboutRHS - Land use submittal list.pdf Page 1 of 4
TO: City Of Renton DATE: September 16, 2025
FROM: Lisa Klein
Tacoma - (253) 383-2422
PROJECT NO.: 2230388.31
PROJECT NAME: RHS Replacement & Site Expansion
SUBJECT: List of Land Use Submittal Requirements
Renton High School Replacement and Site Expansion
PUD Submittal Items
# TITLE NOTES
PUD
#17
Affidavit and photo of Installation of Public Information Sign (This needs to be installed
prior to application submittal. Needs to be notarized. Needs a site plan.)
PUD
#18
Affidavit and photo of Public Outreach Sign. Needs color renderings. Worksheet needs
to be notarized.
PUD
#30 Arborist Report
PUD
#45 Colored Architectural Renderings
PUD
#12 Compliance with Development Standards Included in #12 PUD Criterion
PUD
#10 Construction Mitigation Description
PUD
#12.c Construction Phasing Plan Attached to #12 PUD Narrative
Utility Phasing is in civil plans
Density Worksheet Not applicable
PUD
#47 Drainage Control Plan See #47-Civil Plans
PUD
#34 Drainage Report (Technical Information Report)
PUD
#26 Elevations, Architectural
Project Memo Page 2 of 4
RHS Replacement & Site Expansion
2230388.31
September 16, 2025
# TITLE NOTES
PUD #6 Environmental Checklist plus NOC
Existing Covenants (recorded copy) None required for submittal
PUD
#13 Existing Easements See links in Title Report
Flood Hazard Data (if applicable) Not required
PUD
#22 Floor Plans
PUD #5
and
#47
Fill Source Statement (if fill is brought in) See #5 Project Narrative and #47-Civil Site Plan (Sheet C.4)
PUD
#37
Geotechnical Report Done
PUD
#47 Grading Plan, Conceptual See Civil Plans
Habitat Data Report n/a
PUD
#48 Hazardous Materials Management Statement
PUD
#23 Landscape Plan, Conceptual Includes Tree Retention Plan
PUD #3 Legal Description Attached to #3 Master Application Form
Draft Legal Documents (Street dedications, covenants, etc.) Not required
PUD
#38 Letter understanding geologic risk Done
PUD
#51 Site Lighting Plan, Photometrics Prepared by BCE
PUD
#52 Street Lighting Plan prepared by TENW
PUD #3 Master Application Form (w/notarized signature) Includes signatures, legal descriptions
Monument Cards n/a
Project Memo Page 3 of 4
RHS Replacement & Site Expansion
2230388.31
September 16, 2025
# TITLE NOTES
PUD
#16 Neighborhood Detail Map
PUD
#19
Neighborhood Meeting Materials (Mtg date is 8/6; notice to be mailed between 10 and
40 calendar days prior.
Plat Plan n/a
PUD
#47 Parking Analysis, Lot Coverage and Landscaping Analysis See #47-Civil cover sheet
PUD#7 Phasing/Sequencing Plan See #12 PUD Criteria
PUD #1 Pre-Application Meeting Summary
PUD #5 Project Narrative
Public Works Approval Letter n/a
PUD
#43 Screening Detail- Mechanical and Refuse/Recycling
PUD
#25 Site Plan, Colored See also #47 Civil Plans, sheet C1.01
PUD
#12 Statement Addressing PUD’s Relationship to the City Comp Plan Part of narrative for #12 PUD Criteria
PUD
#12
Statement addressing the PUD’s compliance with the following decision criteria: RMC
4-9-150 Part of narrative for #12 PUD Criteria
PUD
#47 Street Profiles (Profiles, grades, cross sections) See Civil Plan Set, Sheets C.8
PUD
#27 Survey and Topography Map (5’ Contours) May not have all parcels completed by submittal Defer to
construction permit phase.
Survey calculations n/a
PUD
#13 Title Report
PUD
#44 Traffic Study
PUD
#23 Tree Retention/ Land Clearing Plan See #23-Landscape Plan set (Sheet L0.01)
PUD
#29 Tree Retention worksheet
Project Memo Page 4 of 4
RHS Replacement & Site Expansion
2230388.31
September 16, 2025
LK/
Q:\2023\2230388\30_PLN\Working_Files\Renton Land Use\RHS Land use submittal list.docx
# TITLE NOTES
PUD
#11 Urban Design District Review Packet A
PUD
#11 Urban Design District Review Packet D
PUD
#47 Utilities Plan See #47-Civil Plans
PUD
#31 Wetlands Assessment
PUD #8 Waiver from S 2nd St Frontage Improvements
PUD #2 Waiver Form (or email)
CUP (Hearing Examiner)
Same materials required as PUD
CUP #7 Justification for CUP Request (For use) and compliance with criterion
Airport Overlay Zone Requirements
PUD
#53 FAA OE Approvals Referenced in #12 PUD Criteria
PUD
#54 MUSCO Lighting Study Referenced in #12 PUD Criteria and #7 CUP Justification