HomeMy WebLinkAbout7945.05 S 2025 1002Geotechnical Engineering
Environmental Services
Earthwork Observation & Testing
CESCL & Stormwater Services
REDMOND 425-449-4704 PASCO 509-905-0275 SILVERDALE 360-722-5081 esnw.com
FIELD REPORT
Project No. 7945.05 Page 1 of 3 Report ID 7945.05 S 2025 1002
Date Thu 10/2/2025 Weather Sunny, 65°F
Arrival/Departure Time(s) 4:30pm/4:45pm Travel Time (hr)1.0
Project Name Canopy Property
Location 4130 Lincoln Ave NE, Renton
ESNW Rep., CESCL No.,
Phone No. & Report Statement
Jessie McNiesh, ECO-3-6232513, (206) 468-0991
“This report is true, accurate, and complete to the best of my knowledge and belief.”
Client Info/Contact Century Communities | Brian Monahan
Permit No(s). WAR311273
Reviewed By JB
Initials/Date
N/A
Field Supervisor Project Manager Initials/Date
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s
observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for
obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible
for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations,
is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Type of visit: Daily Weekly Monthly Other
Precipitation since last inspection (approximate): 0.55 inches
Precipitation in last 24 hours (approximate): 0.44 inches
Phase of active construction (check all that apply):
Pre-construction Clearing, demolition, or grading Infrastructure or roads
Concrete handling Vertical construction Utilities
Off-site improvements Site temporarily stabilized Final stabilization
Was water quality sampling part of this inspection? Yes No
If “Yes”:
•Record results in the table below.
•Hanna Turbidity Meter No. 30
Monitoring
Point Monitoring Location Turbidity
(NTU) pH Description of
Discharge Notes
MP-1 Beehive on Lincoln Ave NE 7.95 7 Clear
Discharge piped from un-
plugged vault to beehive
along Lincoln Ave. Not flowing at time of visit.
5('021' 3$6&2 6L/9(5 '$/( HVQ Z.FRP
eotechnic al ngineering
nvironment al er vices
art hwork bservation esting
tormwater ervices
Report ID 7945.05 S 2025 1002 Page 2 of 3
Erosion Control BMPs
(13 Elements)
Overall
Condition
(Good; Fair; Poor)
Needs
Repair?
(Yes; No)
Comments
1. Preserve Vegetation; Mark Clearing Limits
• Buffer zones around sensitive areas • Fence G N -Wall in at NE perimeter of site.
2. Establish Construction Access
• Fabric; quarry spalls
• Wheel wash
• Sweeper truck
G N -Paved construction entrance off of Lincoln Ave NE.
-Little to no track-out leaving site.
3. Control Flow Rates • Stormwater vault; facility
• Straw wattles
• Check dams
G N
-Stormwater vaults at NW corner of site are un-
plugged.
-Sandbags at key locations on site to control water
flow on site roadways. -Straw wattles along roadways throughout site.
4. Install Sediment Controls • Silt fence
• Vegetation
• Sediment ponds; traps
• Treatment
G N
-Silt fencing along roadway near active construction
area.
-Curbs throughout site; on-site roads paved with
base lift.
5. Stabilize Soils
• Nets and blankets
• Mulch; bark; rock • Vegetation
• Plastic covering
• Water truck
G N -Piles on-site appear actively worked or covered.
6. Protect Slopes
• Benching; track-walking
• Pipe slope drains
• Plastic covering
G N -Slopes are hydroseeded, actively worked, or
covered in plastic.
7. Protect Drain Inlets • Catch basin inserts G N -Catch basins inserts in site roads near active
construction area.
8. Stabilize Channels and Outlets • Channel lining
• Check dams
• Outlet protection
- - N/A
9. Control Pollutants • Chemical storage area covered
• Concrete handling G N -Concrete washout lined with plastic and Eco-Pans
on lot 41.
10. Control Dewatering - - N/A
11. Maintain BMPs G N -See details below.
12. Maintain SWPPP & Site Logbook G N -Available upon request.
13. Protect Low-Impact Development (LID BMPs)
• Bioretention rain garden facilities
• Permeable pavement
- - N/A
Do existing BMPs need to be modified or removed, or do other BMPs need to be installed? Yes No
List the action items in the table below:
Element
# Description and Location Action Required Completion
Date
2 Debris built up on on-site roads. Sweep on-site roads. 10/02/2025
7 CB inserts built up with debris along Alley 1. Refresh inserts. 10/02/2025
Report ID 7945.05 S 2025 1002 Page 3 of 3
BMP LEGEND
MONITORING POINT
HYDROSEED
STRAW
VERTICAL CONSTRUCTION
FINAL STABILIZED
JOB SHACK
STORMWATER VAULT
STABILIZED CONSTRUCTION ACCESS
SANDBAG
SILT FENCE
STOCKPILE
PLASTIC COVERING
WATTLE
CONCRETE WASHOUT
MP-1