HomeMy WebLinkAboutReinforcing Steel Field Report_2025-10-13-Lindbergh High School Field Improvements-25B121-01_000002Inspection Information: Inspection Date:10/13/2025 Time Onsite:09:20 Weather Conditions:50, Sunny Inspection Performed: Reinforcing Steel Subcontractor:J. Scott Continuous or Periodic: Sheet(s):Location / Area: Sidewalk on East side of lower baseball field Details:3 / F210 Level / Elevation:Foundation Approved Plans Dated: Report Profile: Any Deficiencies Noted:Yes No Deficiencies Cleared:Yes No RFI:Yes No Show Up:Yes No Retest / Re­inspection:Yes No Standby:Yes No Remarks: MTC on site as requested to visually inspect reinforcing steel for the sidewalk on the East side of the lower baseball field. MTC observed that the sidewalk was reinforced per the following plan details: 3 / F210. MTC visually inspected the welded wire mesh at the locations noted and observed that the reinforcing steel complied with the approved project plans and specifications. MTC observed the reinforcing steel size, type, and placement. MTC will verify the final clearances prior to and during concrete placement. To the best of MTC inspector's knowledge, the above­described work was performed in general accordance with project specifications and approved plans. Work in progress. Additional inspection needed. ✔ ✔✔ ✔✔ ✔ Reinforcing Steel Field Report RS­000002­00Report #: Burlington 777 Chrysler Drive Burlington, WA 98233 Phone: (360) 755­1990 Client: Renton School District No. 403 300 SW 7th St Renton, WA 98057 Project: 25B121­01 (Bldg Permit: B25002218) Lindbergh High School Field Improvements 16426 128th Avenue Southeast Renton, WA 98059 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Page 1 of 4Page 1 of 3 Inspection Information:Inspection Date:10/13/2025 Time Onsite:09:20 Weather Conditions:50, SunnyInspection Performed: Reinforcing SteelSubcontractor:J. Scott Continuous or Periodic:Sheet(s):Location / Area:Sidewalk on East side of lower baseball fieldDetails:3 / F210 Level / Elevation:FoundationApproved Plans Dated:Report Profile:Any Deficiencies Noted:Yes No Deficiencies Cleared:Yes NoRFI:Yes No Show Up:Yes NoRetest / Re­inspection:Yes No Standby:Yes NoRemarks:MTC on site as requested to visually inspect reinforcing steel for the sidewalk on the East side of the lower baseball field.MTC observed that the sidewalk was reinforced per the following plan details: 3 / F210. MTC visually inspected the welded wire mesh at the locations noted and observed that the reinforcing steel complied with the approved project plans and specifications. MTC observed the reinforcing steel size, type, and placement. MTC will verify the final clearances prior to and during concrete placement. To the best of MTC inspector's knowledge, the above­described work was performed in general accordance with project specifications and approved plans. Work in progress. Additional inspection needed. Images: ✔✔✔✔✔ ✔ Reinforcing Steel Field Report RS­000002­00Report #: Burlington 777 Chrysler Drive Burlington, WA 98233 Phone: (360) 755­1990 Client: Renton School District No. 403 300 SW 7th St Renton, WA 98057 Project: 25B121­01 (Bldg Permit: B25002218) Lindbergh High School Field Improvements 16426 128th Avenue Southeast Renton, WA 98059 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Page 2 of 4Page 2 of 3 Inspection Information:Inspection Date:10/13/2025 Time Onsite:09:20 Weather Conditions:50, SunnyInspection Performed: Reinforcing SteelSubcontractor:J. Scott Continuous or Periodic:Sheet(s):Location / Area:Sidewalk on East side of lower baseball fieldDetails:3 / F210 Level / Elevation:FoundationApproved Plans Dated:Report Profile:Any Deficiencies Noted:Yes No Deficiencies Cleared:Yes NoRFI:Yes No Show Up:Yes NoRetest / Re­inspection:Yes No Standby:Yes NoRemarks:MTC on site as requested to visually inspect reinforcing steel for the sidewalk on the East side of the lower baseball field.MTC observed that the sidewalk was reinforced per the following plan details:3 / F210.MTC visually inspected the welded wire mesh at the locations noted and observed that the reinforcing steel complied with theapproved project plans and specifications. MTC observed the reinforcing steel size, type, and placement. MTC will verify the finalclearances prior to and during concrete placement.To the best of MTC inspector's knowledge, the above­described work was performed in general accordance with projectspecifications and approved plans.Work in progress. Additional inspection needed.Images: Reported By:Randy Stevenson Reviewed By:Kevin Walters ✔✔✔✔✔✔ Reinforcing Steel Field Report RS­000002­00Report #: Burlington 777 Chrysler Drive Burlington, WA 98233 Phone: (360) 755­1990 Client: Renton School District No. 403 300 SW 7th St Renton, WA 98057 Project: 25B121­01 (Bldg Permit: B25002218) Lindbergh High School Field Improvements 16426 128th Avenue Southeast Renton, WA 98059 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Page 3 of 4Page 3 of 3