HomeMy WebLinkAboutConcrete Field Report_2025-10-10-Lindbergh High School Field Improvements-25B121-01_000007Inspection Information: Inspection Date:10/10/2025 Time Onsite:09:30 Weather Conditions: Overcast/Showers 55*F Inspection Performed: Concrete Subcontractor:JS Scott Continuous or Periodic:Continuous Inspection Sheet(s):F270 and E9.01 Location / Area: SW corner site stairs and field lighting vault slab Details:1/F270 and 1/E9.01 Level / Elevation:Foundation Approved Plans Dated: Report Profile: Any Deficiencies Noted:Yes No Deficiencies Cleared:Yes No RFI:Yes No Show Up:Yes No Retest / Re­inspection:Yes No Standby:Yes No Remarks: MTC on­site as requested to visually inspect reinforcing steel and concrete placement at the following location(s):  1.) Cast­in­place concrete for the site stairs in the south west corner of the project site. 2.) Cast­in­place concrete for the field lighting vault slab MTC observed that the stairs and slab noted above was reinforced per the following details:   Site stairs per detail 1/F270 Field lighting vault slab per detail 1/E9.01  ­Reinforcing Steel Inspection: MTC visually inspected the reinforcing steel at the locations noted for compliance with the approved project plans and specifications. MTC observed the reinforcing steel size, grade, type, and placement. All reinforcing steel was observed to be ASTM A615 grade 60 reinforcing steel and welded wire mesh reinforcing.  ­Concrete placement observation: MTC observed the placement of 19+ cubic yards of the project­approved concrete mix #1250AFG delivered by Miles Ready Mix for the noted areas above. Concrete was placed via placing boom pump truck and properly consolidated by screeding. MTC took a composite sample and cast one set of (5) 4x8 cylinders to test for the required 4000 psi design compression. Reference MTC concrete sample #5228 project set #8 for the compression strength test results. MTC notes the site stairs required 4000 psi and the field lighting slab required 3000 psi. The contractor used a 5000 psi approved mix design. ✔✔ ✔✔ ✔✔ Concrete Field Report RCCON­000007­00Report #: Burlington 777 Chrysler Drive Burlington, WA 98233 Phone: (360) 755­1990 Client: Renton School District No. 403 300 SW 7th St Renton, WA 98057 Project: 25B121­01 (Bldg Permit: B25002218) Lindbergh High School Field Improvements 16426 128th Avenue Southeast Renton, WA 98059 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Page 1 of 4Page 1 of 3 Inspection Information:Inspection Date:10/10/2025 Time Onsite:09:30 Weather Conditions:Overcast/Showers 55*FInspection Performed: ConcreteSubcontractor:JS Scott Continuous or Periodic:Continuous InspectionSheet(s):F270 and E9.01 Location / Area:SW corner site stairs and field lighting vault slabDetails:1/F270 and 1/E9.01 Level / Elevation:FoundationApproved Plans Dated:Report Profile:Any Deficiencies Noted:Yes No Deficiencies Cleared:Yes NoRFI:Yes No Show Up:Yes NoRetest / Re­inspection:Yes No Standby:Yes NoRemarks:MTC on­site as requested to visually inspect reinforcing steel and concrete placement at the following location(s): 1.) Cast­in­place concrete for the site stairs in the south west corner of the project site.2.) Cast­in­place concrete for the field lighting vault slabMTC observed that the stairs and slab noted above was reinforced per the following details:  Site stairs per detail 1/F270 Field lighting vault slab per detail 1/E9.01  ­Reinforcing Steel Inspection: MTC visually inspected the reinforcing steel at the locations noted for compliance with the approved project plans and specifications. MTC observed the reinforcing steel size, grade, type, and placement. All reinforcing steel was observed to be ASTM A615 grade 60 reinforcing steel and welded wire mesh reinforcing.  ­Concrete placement observation: MTC observed the placement of 19+ cubic yards of the project­approved concrete mix #1250AFG delivered by Miles Ready Mix for the noted areas above. Concrete was placed via placing boom pump truck and properly consolidated by screeding. MTC took a composite sample and cast one set of (5) 4x8 cylinders to test for the required 4000 psi design compression. Reference MTC concrete sample #5228 project set #8 for the compression strength test results. MTC notes the site stairs required 4000 psi and the field lighting slab required 3000 psi. The contractor used a 5000 psi approved mix design. To the best of MTC inspector's knowledge, the above­described work was performed in general accordance with project specifications and approved plans. Work in progress. Additional inspection needed. Images: ✔✔✔✔✔✔ ✔ Concrete Field Report RCCON­000007­00Report #: Burlington 777 Chrysler Drive Burlington, WA 98233 Phone: (360) 755­1990 Client: Renton School District No. 403 300 SW 7th St Renton, WA 98057 Project: 25B121­01 (Bldg Permit: B25002218) Lindbergh High School Field Improvements 16426 128th Avenue Southeast Renton, WA 98059 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Page 2 of 4Page 2 of 3 Inspection Information:Inspection Date:10/10/2025 Time Onsite:09:30 Weather Conditions:Overcast/Showers 55*FInspection Performed: ConcreteSubcontractor:JS Scott Continuous or Periodic:Continuous InspectionSheet(s):F270 and E9.01 Location / Area:SW corner site stairs and field lighting vault slabDetails:1/F270 and 1/E9.01 Level / Elevation:FoundationApproved Plans Dated:Report Profile:Any Deficiencies Noted:Yes No Deficiencies Cleared:Yes NoRFI:Yes No Show Up:Yes NoRetest / Re­inspection:Yes No Standby:Yes NoRemarks:MTC on­site as requested to visually inspect reinforcing steel and concrete placement at the following location(s): 1.) Cast­in­place concrete for the site stairs in the south west corner of the project site.2.) Cast­in­place concrete for the field lighting vault slabMTC observed that the stairs and slab noted above was reinforced per the following details:  Site stairs per detail 1/F270Field lighting vault slab per detail 1/E9.01 ­Reinforcing Steel Inspection: MTC visually inspected the reinforcing steel at the locations noted for compliance with the approvedproject plans and specifications. MTC observed the reinforcing steel size, grade, type, and placement. All reinforcing steel wasobserved to be ASTM A615 grade 60 reinforcing steel and welded wire mesh reinforcing. ­Concrete placement observation: MTC observed the placement of 19+ cubic yards of the project­approved concrete mix#1250AFG delivered by Miles Ready Mix for the noted areas above. Concrete was placed via placing boom pump truck and properlyconsolidated by screeding. MTC took a composite sample and cast one set of (5) 4x8 cylinders to test for the required 4000 psidesign compression. Reference MTC concrete sample #5228 project set #8 for the compression strength test results. MTC notesthe site stairs required 4000 psi and the field lighting slab required 3000 psi. The contractor used a 5000 psi approved mix design.To the best of MTC inspector's knowledge, the above­described work was performed in general accordance with projectspecifications and approved plans.Work in progress. Additional inspection needed.Images: Reported By:Mike Currie Reviewed By:Kevin Walters ✔✔✔✔✔✔✔ Concrete Field Report RCCON­000007­00Report #: Burlington 777 Chrysler Drive Burlington, WA 98233 Phone: (360) 755­1990 Client: Renton School District No. 403 300 SW 7th St Renton, WA 98057 Project: 25B121­01 (Bldg Permit: B25002218) Lindbergh High School Field Improvements 16426 128th Avenue Southeast Renton, WA 98059 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Page 3 of 4Page 3 of 3