Loading...
HomeMy WebLinkAboutConcrete Field Report_2025-10-14-Lindbergh High School Field Improvements-25B121-01_000009Inspection Information: Inspection Date:10/14/2025 Time Onsite:09:45 Weather Conditions:53, Sunny Inspection Performed: Concrete Subcontractor:J. Scott Continuous or Periodic:Continuous Inspection Sheet(s):Location / Area: Staircase Landings on upper West side of school. Details:3 / F210 Level / Elevation:Foundation Approved Plans Dated: Report Profile: Any Deficiencies Noted:Yes No Deficiencies Cleared:Yes No RFI:Yes No Show Up:Yes No Retest / Re­inspection:Yes No Standby:Yes No Standby Time (Hours):1.00 ✔ ✔✔ ✔✔ Concrete Field Report RCCON­000009­00Report #: Burlington 777 Chrysler Drive Burlington, WA 98233 Phone: (360) 755­1990 Client: Renton School District No. 403 300 SW 7th St Renton, WA 98057 Project: 25B121­01 (Bldg Permit: B25002218) Lindbergh High School Field Improvements 16426 128th Avenue Southeast Renton, WA 98059 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Page 1 of 5Page 1 of 4 Inspection Information:Inspection Date:10/14/2025 Time Onsite:09:45 Weather Conditions:53, SunnyInspection Performed: ConcreteSubcontractor:J. Scott Continuous or Periodic:Continuous InspectionSheet(s):Location / Area:Staircase Landings on upper West side of school.Details:3 / F210 Level / Elevation:FoundationApproved Plans Dated:Report Profile:Any Deficiencies Noted:Yes No Deficiencies Cleared:Yes No RFI:Yes No Show Up:Yes No Retest / Re­inspection:Yes No Standby:Yes No Standby Time (Hours):1.00 Remarks: REINFORCING STEEL: MTC on site as requested to visually inspect reinforcing steel for the sidewalk / staircase landings for the upper staircase West of the school. MTC observed that the sidewalk was reinforced per the following plan details: 3 / F210. MTC visually inspected the welded wire mesh at the locations noted and observed that the reinforcing steel complied with the approved project plans and specifications. MTC observed the reinforcing steel size, type, and placement. MTC will verify the final clearances prior to and during concrete placement. CONCRETE PLACEMENT: Continuous Inspection MTC was on site to observe the placement of approximately 20 CY of concrete with Mix Design ID #1250AFG supplied by Miles Plant #202 into a sidewalk/staircase landings at the locations noted above. One set of five (4” x 8”) cylinders was cast for compressive strength test specimens. Refer to Report #5249, Set 10 for field test results and for more information. Concrete was placed via concrete pump, and was consolidated and finished by hand. To the best of MTC inspector's knowledge, the above­described work was performed in general accordance with project specifications and approved plans. Work in progress. Additional inspection needed. Images: ✔ ✔✔ ✔✔ ✔ Concrete Field Report RCCON­000009­00Report #: Burlington 777 Chrysler Drive Burlington, WA 98233 Phone: (360) 755­1990 Client: Renton School District No. 403 300 SW 7th St Renton, WA 98057 Project: 25B121­01 (Bldg Permit: B25002218) Lindbergh High School Field Improvements 16426 128th Avenue Southeast Renton, WA 98059 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Page 2 of 5Page 2 of 4 Inspection Information:Inspection Date:10/14/2025 Time Onsite:09:45 Weather Conditions:53, SunnyInspection Performed: ConcreteSubcontractor:J. Scott Continuous or Periodic:Continuous InspectionSheet(s):Location / Area:Staircase Landings on upper West side of school.Details:3 / F210 Level / Elevation:FoundationApproved Plans Dated:Report Profile:Any Deficiencies Noted:Yes No Deficiencies Cleared:Yes NoRFI:Yes No Show Up:Yes NoRetest / Re­inspection:Yes No Standby:Yes NoStandby Time (Hours):1.00Remarks:REINFORCING STEEL:MTC on site as requested to visually inspect reinforcing steel for the sidewalk / staircase landings for the upper staircase West ofthe school.MTC observed that the sidewalk was reinforced per the following plan details: 3 / F210.MTC visually inspected the welded wire mesh at the locations noted and observed that the reinforcing steel complied with theapproved project plans and specifications. MTC observed the reinforcing steel size, type, and placement. MTC will verify the finalclearances prior to and during concrete placement.CONCRETE PLACEMENT: Continuous InspectionMTC was on site to observe the placement of approximately 20 CY of concrete with Mix Design ID #1250AFG supplied by Miles Plant#202 into a sidewalk/staircase landings at the locations noted above.One set of five (4” x 8”) cylinders was cast for compressive strength test specimens. Refer to Report #5249, Set 10 for field testresults and for more information. Concrete was placed via concrete pump, and was consolidated and finished by hand. To the best of MTC inspector's knowledge, the above­described work was performed in general accordance with project specifications and approved plans. Work in progress. Additional inspection needed. Images: ✔✔✔✔✔ ✔ Concrete Field Report RCCON­000009­00Report #: Burlington 777 Chrysler Drive Burlington, WA 98233 Phone: (360) 755­1990 Client: Renton School District No. 403 300 SW 7th St Renton, WA 98057 Project: 25B121­01 (Bldg Permit: B25002218) Lindbergh High School Field Improvements 16426 128th Avenue Southeast Renton, WA 98059 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Page 3 of 5Page 3 of 4 Inspection Information:Inspection Date:10/14/2025 Time Onsite:09:45 Weather Conditions:53, SunnyInspection Performed: ConcreteSubcontractor:J. Scott Continuous or Periodic:Continuous InspectionSheet(s):Location / Area:Staircase Landings on upper West side of school.Details:3 / F210 Level / Elevation:FoundationApproved Plans Dated:Report Profile:Any Deficiencies Noted:Yes No Deficiencies Cleared:Yes NoRFI:Yes No Show Up:Yes NoRetest / Re­inspection:Yes No Standby:Yes NoStandby Time (Hours):1.00Remarks:REINFORCING STEEL:MTC on site as requested to visually inspect reinforcing steel for the sidewalk / staircase landings for the upper staircase West ofthe school.MTC observed that the sidewalk was reinforced per the following plan details: 3 / F210.MTC visually inspected the welded wire mesh at the locations noted and observed that the reinforcing steel complied with theapproved project plans and specifications. MTC observed the reinforcing steel size, type, and placement. MTC will verify the finalclearances prior to and during concrete placement.CONCRETE PLACEMENT: Continuous InspectionMTC was on site to observe the placement of approximately 20 CY of concrete with Mix Design ID #1250AFG supplied by Miles Plant#202 into a sidewalk/staircase landings at the locations noted above.One set of five (4” x 8”) cylinders was cast for compressive strength test specimens. Refer to Report #5249, Set 10 for field testresults and for more information.Concrete was placed via concrete pump, and was consolidated and finished by hand.To the best of MTC inspector's knowledge, the above­described work was performed in general accordance with projectspecifications and approved plans.Work in progress. Additional inspection needed.Images: Reported By:Randy Stevenson Reviewed By:Kevin Walters ✔✔✔✔✔✔ Concrete Field Report RCCON­000009­00Report #: Burlington 777 Chrysler Drive Burlington, WA 98233 Phone: (360) 755­1990 Client: Renton School District No. 403 300 SW 7th St Renton, WA 98057 Project: 25B121­01 (Bldg Permit: B25002218) Lindbergh High School Field Improvements 16426 128th Avenue Southeast Renton, WA 98059 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Page 4 of 5Page 4 of 4