Loading...
HomeMy WebLinkAboutPN_Project Narrative_Renton Airport Fencing_251001_v1.pdfRenton Municipal Airport(RNT) 243 W Perimeter RD, Renton, WA 98057 Starting at northwest corner of the property. We will begin with gate P1, this will be a repair of the existing pedestrian gate that is currently in place. We will be adding electrical to this gate for the card reader and camera that will be installed. To achieve this, we will be trenching 165’ along the fence line to the area of gate V1 to accommodate for the new electrical that will be needed. Conduits will be installed for new electrical. While the trenching is being completed, we are also added fence skirt to the fence underground. After completing we will replace existing asphalt that was previously trenched. In the area of gate V1/P2 we will be excavating 2,500 SF of asphalt to accommodate installation of new electrical and new automated gate. Gate P2 will be replaced with a new pedestrian using the same footprint as the previous gate. Electrical will be added to gate P2 for card reader and camera. Conduits will be installed for new electrical. Existing manual V1 gate will be replaced with a new automated gate using the same footprint. New electrical panel will be added to accommodate for gate V1. V1 will have the new card readers, cameras and access control system added to the new gate. From this area we will continue trenching west towards w. perimeter road to an existing electrical hand hole. After completing we will replace existing asphalt that was previously trenched/excavated. Gate V2/P3 located near 850 W Perimeter Rd include 65’ of trenching to accommodate installation of new electrical for the new card readers, cameras and access control system. Gate V2 will have the new card readers, cameras and access control system added to the existing automated gate. Conduits will be installed for new electrical. Gate P3 will have a repair done to the existing pedestrian gate. After completing we will replace existing asphalt that was previously trenched. Gate P4 located on the north side of the building at 840 W Perimeter Rd will have 50’ of trenching to an existing electrical hand hole to accommodate the electrical that will be needed for the installation of the new card readers, and cameras. Conduits will be installed for new electrical. Gate P4 will also be replaced with a new pedestrian gate that matches the existing. After completing we will replace existing asphalt that was previously trenched. In the area of gate V3/P5/ located at the east side of the building at 790 W Perimeter Rd we will be trenching/excavating 50’ of trenching for V3 and 110 SF for P5 to be able to install new electrical for the new card readers, cameras and access control systems. Conduits will be installed for new electrical. Gate P5 will have a repair done to the existing pedestrian gate. Gate V3 will have the new card readers, cameras and access control system added to the existing automated gate. After completing we will replace existing asphalt that was previously trenched. Gate V4 located on the north side of building 750 W Perimeter Rd will have 110’ of trenching to an existing electrical hand hole to accommodate the electrical that will be needed for the installation of the new card readers, and cameras. Conduits will be installed for new electrical. Gate V4 will have the new card readers, cameras and access control system added to the existing automated gate. After completing we will replace existing asphalt that was previously trenched. Gate V5 located on the south side of 650 W Perimeter Rd will only have new locking mechanism install to existing manual gate. No trenching Gate P7 located at 616 W Perimeter Rd will have new electrical routed to it via new surface mounted conduit. Gate P7 will have the new card readers, cameras and access control system added to the existing pedestrian gate. Gate V6/P8/P9 located on the south side of the building at 600 W Perimeter Rd will have 70’ of trenching to an existing electrical hand hole to accommodate the electrical that will be needed for the installation of the new card readers, and cameras. Conduits will be installed for new electrical. Gate P8 will have new card readers, cameras and access control system added to the existing pedestrian gate. Gate P9 will have new card readers, cameras and access control system added to the new pedestrian gate that shares the same footprint as the existing pedestrian gate it is replacing. Gate V6 will have the new card readers, cameras and access control system added to the existing automated gate. After completing we will replace existing asphalt that was previously trenched. Gate V7 located on the east side of the building at 243 W Perimeter Rd will have two 13 SF pads excavated for new electrical next to existing electrical junction boxes. Conduits will be installed for new electrical. Gate V7 will have the new card readers, cameras and access control system added to the existing automated gate. After completing we will replace existing asphalt that was previously trenched. Gate P10 located on the east side of the building at 243 W Perimeter Rd will have 13SF excavated to accommodate new electrical. Conduits will be installed for new electrical. We will be adding new card readers, cameras and access control system to the existing pedestrian gate that is being repaired. After completing we will replace existing asphalt that was previously trenched. Gate P11 located near the south entrance to the airport will surface mounted conduit to an existing electrical hand hole to accommodate the electrical that will be needed for the installation of the new card readers, and cameras. Conduits will be installed for new electrical. P11 will also have repairs completed to the existing pedestrian gate In the area of gate V8 located near the south entrance to the airport we will be excavating 1,900SF of asphalt to accommodate installation of new electrical and new automated gate. Existing automated V8 gate will be replaced with a new automated gate. New electrical panel will be added to accommodate for gate. V8 will have the new card readers, cameras and access control system added to the new gate. After completing we will replace existing asphalt that was previously trenched/excavated. In the area of gate V10 located 1,200ft north building at 300E Perimeter Rd we will be excavating/trenching 1,300SF of asphalt to accommodate installation of new electrical and new automated gate. Trenching will follow west side of E Perimeter rd. for 240’ to existing electrical hand hole. Existing automated V10 gate will be replaced with a new automated gate. New electrical panel will be added to accommodate for gate. V10 will have the new card readers, cameras and access control system added to the new gate. After completing we will replace existing asphalt and backfill dirt that was previously trenched/excavated.