Loading...
HomeMy WebLinkAboutNOA_Project Acceptance_20251015DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 www.rentonwa.gov NOTICE OF APPLICATION AND PROPOSED DETERMINATION OF NON-SIGNIFICANCE (DNS) A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: October 15, 2025 PROJECT NAME/NUMBER: Valvoline NE 4th St, LUA25-000338, ECF, CU-A, SA-A / PR25-000061 PROJECT LOCATION: 4225 NE 4th St (APN 9374000400) APPLICANT/PROJECT CONTACT PERSON: LeAmber Yisrael / 1230 Peachtree St, Suite 2900 Atlanta, GA 30309 / LYisrael@greenbergfarrow.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://tiny4t.com/TK1Gta PROJECT DESCRIPTION: The applicant is requesting an Environmental (SEPA) Review, Administrative Conditional Use Permit Review and Administrative Site Plan Review for the change of use of a vacant space into a small vehicle service and repair. The project site is located at the southwest corner of the intersection of NE 4th St and Whitman Ct NE at 4225 NE 4th St (APN 9374000400). The project proposal includes constructing a 2,673 sq. ft. Valvoline Instant Oil Change building for vehicle service and repair with a total of nine (9) parking stalls, which includes one (1) ADA parking stall. The project site totals 0.73 acres (31,865 square feet) in area and is located within the Commercial Arterial (CA) zoning classification and Urban Design District D. Access is proposed via the existing driveway access of Whitman Ct NE and NE 4th St. The City of Renton’s (COR) mapping system indicates that a wetland and a stream (Maplewood Creek - Type Ns) are mapped offsite to the west of the project site. DATE OF APPLICATION: October 6, 2025 NOTICE OF COMPLETE APPLICATION: October 15, 2025 OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non- Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS. PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Administrative Conditional Use Permit Review and Administrative Site Plan Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Pemrit, Construction Permit, Sign Permit Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://forms.rentonwa.gov/Forms/LandUsePublicComment or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: Valvoline NE 4th St, LUA25-000338, ECF, CU-A, SA-A / PR25-000061 Name: ____________________________________ Email: _________________________ Phone#:_____________________ Mailing Address: _______________________________________________City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  REQUESTED STUDIES: Arborist's Report, Drainage Report, Geotechnical Report, Landscape Analysis, Parking Analysis, Traffic Imapct Study CONSISTENCY OVERVIEW: Zoning/Land Use: The subject site is designated Commercial Mixed Use (CMU) on the City of Renton Comprehensive Land Use Map and Commercial Arterial (CA) on the City’s Zoning Map. Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-2-120, 4-3-050, 4-4, 4-9-070, 4-9-030, 4-9-200, 4-3-100 and other applicable codes and regulations as appropriate. Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting. Comments on the above application must be submitted in writing by 5:00 PM on October 29, 2025. Please submit comments online at https://forms.rentonwa.gov/Forms/LandUsePublicComment. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. For more information about this proposal, contact the Project Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Mariah Kerrihard, Associate Planner, 425-430-7238, mkerrihard@rentonwa.gov NE 4th St Un i o n A v e N E Wh i t m a n C t N E