Loading...
HomeMy WebLinkAboutC_Confirmation_of_Compliane_Letter_ESM_Consulting_Engineers_251009_v1 August 6, 2025 Job No. 441-004-023 City of Renton Dept. of Community & Economic Development 1055 South Grady Way Renton, WA 98057 RE: LUA24-000081, SHPL-A – Sophie Jo Short Plat Administrative Report & Decision – Response Letter Dear City of Renton Staff: ESM Consulting Engineers is providing this letter in response to the Administrative Report & Decision that we received from you dated April 4, 2024. In an effort to provide concise and direct responses, we have copied the review comments below in italics and our responses are in bold. 1. All lots shall have a common undivided interest in proposed Tract A and a maintenance agreement shall be established. A draft maintenance agreement for all common improvements shall be submitted at the time of Construction Permit Review for the review and approval of the Development Engineering Plan Reviewer and Current Planning Project Manager. The language regarding the maintenance for all common improvements has been satisfied by plat notes # 5 and 6 sheet 1 of the Sophie Jo Short Plat. Note there is no HOA or CC & R’s associated with the Short Plat. 2. A detailed landscape plan shall be submitted at the time of Construction Permit review. The detailed landscape plan shall include, but not be limited to a ten-foot (10’) wide onsite landscape strip along the Smithers Ave S and S 21st St frontages. The onsite landscape strip shall be comprised of a mix of trees, shrubs, and ground cover. The plant species proposed shall be in the following order of preference: native coniferous trees; native deciduous trees; other native vegetation. The detailed landscape plan shall be submitted to the Current Planning Project Manager for review and approval prior to the issuance of a Construction Permit. Detailed Landscape Plan has been fully incorporated into the final civil construction plan set. You can find the complete plan on sheets 20 and 21 of the document. We have ensured that all requirements set forth by the City of Renton have been thoroughly addressed and satisfied within these plans. City of Renton August 6, 2025 Page 2 3. The detailed landscape plan shall include and detailed planting plan for the stormwater facility. The landscape buffer along the south side of the facility shall be vegetated with native evergreen trees and the landscape buffer along the north side of the facility shall be vegetated with plantings that are consistent with the plantings approved for the ten-foot (10’) onsite landscape strip, unless otherwise approved by the Current Planning Project Manager. Detailed landscape, tree, and retention replacement plan, as presented on sheets 20 and 21 of the civil construction plan set, successfully satisfies the condition of approval. Additionally, the landscape buffer along both the south and north sides of the facility is uniform and fully compliant with the requirements outlined in the City of Renton's condition of approval. 4. A final tree retention and replacement plan be submitted at the time of Civil Construction Permit review. The final tree retention and replacement plan shall include the planting of an additional 31 tree credits to satisfy the 48 required tree credits on the project site. The short plat layout shall be revised to include a tree protection easement. The preferred location of the tree protection easement would be along the south property line unless otherwise approved by the Current Planning Project Manager. All trees proposed to satisfy the tree credits requirements shall be planted within the tree protection easement. The final tree retention and replacement plan shall be reviewed and approved by the Current Planning Project Manager. Alternatively, if it is determined by the Current Planning Project Manager that it is infeasible to replace or supplement trees on the site, payment into the City’s Urban Forestry Program fund may be approved in accordance with RMC 4-4-130H.1.f. Landscape, tree, and retention replacement plan. The final versions of these plans are officially included on Sheets 20 and 21 of the civil construction plat set. We have successfully satisfied the requirement for 48 tree credits. Additionally, please note that the tree protection easement is clearly delineated on the south property line, with trees already planted within this dedicated easement. 5. A fencing and signage detail shall be provided at the time of Construction Permit review for review and approval by the Current Planning Project Manager. Fencing and signage shall be installed prior to the recording of the short plat. Signage Detail is included on sheet 19 and Fencing Detail is included on sheet 20 of the Sophie Jo Plan set. 6. A note shall be recorded on the face of the short plat stating that the primary entrances for the homes to be constructed on Lots 2 and 3 shall be required to be oriented to the north towards S 21st St. The requested plat note by the City of Renton has been satisfied by plat note # 4 on sheet 1 of the Sophie Jo Short Plat. City of Renton August 6, 2025 Page 3 7. The facades of the new homes on Lots 2 and 3 facing S 21st St and the shared driveway tract (Tract A) shall include an offset of at least one story that is at least ten feet (10’) wide and two feet (2’) in depth on the façade, or at least a two feet (2’) offset of second story from first story. Building elevations showing the façade treatment shall be submitted at the time of Building Permit review and review and approval by the Current Planning Project Manager. This will be completed by the client at time of Building Permit review. 8. A note shall be recorded on the face of the short plat that states that access to Lots 2 and 3 shall be provided via the shared driveway tract (Tract A). The requested plat note by the City of Renton has been satisfied by plat note # 5 on sheet 1 of the Sophie Jo Short Plat. If there are any questions or a need for further clarification, please feel free to contact me at (253) 838-6113 and we would be happy to discuss them with you. Sincerely, ESM CONSULTING ENGINEERS, LLC ROBBY OVERFIELD Project Manager \\esm8\engr\esm-jobs\441\004\023\document\letter-005.docx