HomeMy WebLinkAboutChange Order - 3Docusign Envelope ID: DC4209FA-A233-46B5-A340-7D510311BF52 10/16/2025 | 2:18 PM PDT Change Order No. 3 Contract Title: Windsock & 243 Bldg. GA Apron & Parking Lot Rehabilitation Project Contract No. CAG-25-013 Page 2 of 2 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: Adding Change Order Proposal 3. Reason for Change: (COP 3) The airport recognized three line items in the bid that differed from site conditions. (increase concrete removal volume, reduced excavation, increased Jbox quantity) The airport also opted the replace the ADA parking stalls from Asphalt to Concrete. This greatly improved the levelness of the ADA parking area. The airport also requested two existing asphalt side walks that adjoined the new parking lot that needed to be replaced. The airport also encountered soft soils at the Windsock apron and requested to add geofabric to stabilize the soil. This will strengthen the soil to extend its useful life. COP 3 = $31,971+ Sales Tax (10.3%) = $31,971+ $3,293.01= $35,264.01 Materials: See the attached price breakdown for the lump sum labor, equipment and materials. Plans: N/A Equitable Adjustment: N/A Extension of Time: The Time for Completion is extended 0 Working Days. Sections 1-04.4 and 1-04.5 of the 2018 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor as a result of this change. Attachments: Forms to be attached to Change Order ☐ Plans ☐ Field Directive ☒ Change Order Quotation ☒ Estimated Change Order Cost ☒ Project Labor List ☐ Force Account Equipment Rate Request (DOT Form 422-010 EF) ☐ Equitable Adjustment Determination Docusign Envelope ID: DC4209FA-A233-46B5-A340-7D510311BF52 Client:Renton Municipal Airport Project:Gate & Perimeter Security Upgrades Project Date:08/12/2025 By:BHB Quantity Rectification Cost 5,234.50$ Additional Sidewalk Cost 11,776.50$ Geofabric Costs 6,000.00$ Concrete Removal WDSK $8,960.00 Total Cost 31,971.00$ WSST 10.3% 3,293.01$ Sum Total 35,264.01$ C.O. #3 Cost Summary C.O. #3 Cost Summary Docusign Envelope ID: DC4209FA-A233-46B5-A340-7D510311BF52 Client:Renton Municipal Airport Project:Gate & Perimeter Security Upgrades Project Date:08/11/2025 By:BHB BID ITEM DESCRIPTION BID QUANTITY UNIT UNIT PRICE TOTAL AT BID ACTUAL ADD/DEDUCT TOTAL NOTE/REASON B7 REMOVE CONCRETE 1375.00 SY 20.00$ 27,500.00$ 1684.55 $309.55 $6,191.00 CONCRETE UNDER ASPHALT B11 EXCAVATION 2332.00 CY 50.00$ 116,600.00$ 2262.87 ($69.13) ($3,456.50)NET EXCAVATION UNDER BID QTY B29 TYPE 2 JBOX 2.00 EA 2,500.00$ 5,000.00$ 3.00 $1.00 $2,500.00 SHORT COUNT AT BID PER DESIGN SUBTOTAL 5,234.50$ TAX 539.15$ TOTAL 5,773.65$ PAY APP 2 BID ITEMS OVER 100% C.O. #3 Quantity Rectifications Docusign Envelope ID: DC4209FA-A233-46B5-A340-7D510311BF52 Client:Renton Municipal Airport Project:Gate & Perimeter Security Upgrades Project Date:08/11/2025 By:BHB BID ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL B7 REM ASPHALT 62.00 SY $13.00 $806.00 B6 REM CONCRETE 47.06 SY $20.00 $941.20 B11 EXCAVATE-6 INCH ONLY 23.07 CY $50.00 $1,153.50 B13 BASE COURSE 33.19 TN $60.00 $1,991.40 B14 HMA 27.26 TN $190.00 $5,179.40 SUBTOTAL 10,071.50$ TAX 10.30%1,037.36$ TOTAL 11,108.86$ BID ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL B14 HMA 32.00 TN ($190.00) ($6,080.00) B15 TACK COAT 2.00 GAL ($20.00) ($40.00) B16 CURB AND GUTTER 15.00 LS ($60.00) ($900.00) B19 FINAL STRIPE 150.00 SF $11.00 $1,650.00 B27 MULCH 25.00 SY ($25.00) ($625.00) CO3-1 CONCRETE PAVING 140 SY $55.00 $7,700.00 SUBTOTAL $1,705.00 TAX 10.30%$175.62 TOTAL $1,880.62 ADDED SIDEWALK COST BREAKDOWN ADA PARKING CHANGE FROM ASPHALT TO CONCRETE C.O. #3 Sidewalk Costs Docusign Envelope ID: DC4209FA-A233-46B5-A340-7D510311BF52 Client:Renton Municipal Airport Project:Gate & Perimeter Security Upgrades Project Date:08/12/2025 By:BHB BID ITEM DESCRIPTION UNIT UNIT PRICE QUANTITY TOTAL CO3-2 GEOFABRIC SY 3.00$ 2,000 6,000.00$ SUBTOTAL 6,000.00$ TAX 10.30%618.00$ TOTAL 6,618.00$ C.O. #3 Geofabric Docusign Envelope ID: DC4209FA-A233-46B5-A340-7D510311BF52 Client:Renton Municipal Airport Project:Gate & Perimeter Security Upgrades Project Date:08/11/2025 By:BHB BID ITEM DESCRIPTION BID QUANTITY UNIT UNIT PRICE TOTAL AT BID ACTUAL ADD/DEDUCT TOTAL NOTE/REASON B7 REMOVE CONCRETE 0.00 SY 20.00$ -$ 618.00 618.00 12,360.00 CONCRETE UNDER ASPHALT A9 EXCAVATION 3213.00 CY 50.00$ 160,650.00$ 3145.00 (68.00) (3,400.00)NET EXCAVATION UNDER BID QTY SUBTOTAL $8,960.00 TAX 10.30%$922.88 TOTAL $9,882.88 C.O. #3 Concrete Removal at Windsock Apron PAY APP 2 BID ITEMS OVER 100% Docusign Envelope ID: DC4209FA-A233-46B5-A340-7D510311BF52