Loading...
HomeMy WebLinkAboutMFP25005067.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP25005067 IVR Number: 25005067 Permit Information Permit Name: Puget Sound Energy - Electric 101174060Address/Location:10/06/2025Application Date:1823059089Parcel Number: 200 SW LANGSTON RD Permit Type:10/21/2025Issue Date:Franchise Permit Work Class:10/21/2026Expiration Date:Minor Utility Job Number: 101174060Franchise Type:Electric Description: Puget Sound Energy Electric REPLACING PRIMARY CABLES PULLING THROUGH EXISTING CONDUIT FROM J01 GRID 317817 165764 TO P01 GRID 317816 165761 REPLACE CUT OUT& TERM & RISER @P01 GRID 317816 165761 J BUSSES AND ELBOWS @ J01 GRID 317817 165764. NO GROUND DISTURBANCE ANTICIPATED. ASPLUNDH TO COMPLETE REQUIRED BUSH TRIMMING. Contacts Name Address PhoneTypeBilling Katie Zimmerman Puget Sound Energy 1660 Park Lane Burlington, WA 98233 B: (425) 620-6742 C: (425) 620-6742 ApplicantX Permits Central 355 110th Ave NE Bellevue, WA 98004 B: (425) 620-6742 H: (425) 620-6742 C: (425) 620-6742 Contact Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Katie Zimmerman Puget Sound Energy 1660 Park Lane Burlington, WA 98233 B: (425) 620-6742 C: (425) 620-6742 Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. PUBLIC WORKS DEPARTMENT Page 1 of 6 | Published: 2/25/2025 Transportation Systems Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 2/25/2025 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK AND FOR TRAFFIC SIGNAL WORK WITHIN 150 FEET OF THE INTERSECTION AT LEAST FIFTEEN (15) WORKING DAYS BEFORE THE DATE OF WORK. FOR PURPOSES OF THIS APPLICATION, WORKING DAYS ARE DEFINED AS MONDAY THRU FRIDAY, AND EXCLUDING CITY HOLIDAYS. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a Traffic Control Plan (TCP) and obtain City's approval of that plan when construction, repair, or maintenance work is to be conducted within the City's right-of-way. 1.Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2.All TCPs must conform to all attached requirements. Failure to do so may be subject to resubmittal. 3.Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” 4.Resubmittal may be required for TCPs that are incomplete and do not display proper requirements as described in the guidelines. Additional review time may be needed. By signing, I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge and have read all the requirements and guidelines on this application. Applicant’s Signature Date Applicant’s Name (Print) Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: ___________ Description of Work: 24 Hour Emergency Contact Name & Phone: Approval By: ______________________________________________ Date:____________________ PW/Transportation or CED/Development Engineering Division Potelco, Inc 6905 S 228th St Kent, WA 98466 Please See Attached Katie Zimmerman 10/6/25 101174060-604194 EAR17 CREW2 200SW LANGS 200 SW LANGSTON RD RICHARD MILLER 253-355-6930 Monday Friday 8:00am 3:00pm MFP25005067 Scott Warlick CED 10/21/2025 Page 2 of 6 | Published: 2/25/2025 This Page Intentionally Left Blank Page 3 of 6 | Published: 2/25/2025 APPLICANT AGREES TO ALL THE FOLLOWING REQUIREMENTS: GENERAL •Applicant is responsible for compliance with all traffic regulations of the City of Renton (City) and the State of Washington, including codes and regulations not described in this application. •Work Zone Traffic Control shall be in accordance with Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to Washington State Department of Transportation (WSDOT) traffic control plans. •Any lane or street closures not in conformance with the approved Traffic Control Plan (TCP) and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved TCPs including claims arising from towing of private vehicles and the acts of Applicant’s agents and employees. •Applicant must comply with all conditions of the application. •The City shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this application, Applicant is responsible to pay for legal counsel chosen by the City to defend against same. •No more than one TCP shall be in use at any given time for a single project. If multiple TCPs are submitted for review and approval at the same time, the TCPs shall be clearly labeled as separate plans and include construction phasing and sequencing. •Previously approved TCPs cannot be combined into a new TCP without review and approval by the City. •Expired TCP is not valid and shall not be used. Applicant shall resubmit the expired TCP for approval with the updated date and time and/or any changes to TCP. •Applicant must have the approved TCP prior to commencing the work. •Approved TCP must be at the work site during work hours. •Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. •At signalized intersections, vehicle detection shall always remain operational, unless approved in this TCP and notified Transportation Signal Maintenance prior to commencing work. If damage occurs to existing vehicle detection that is to remain, it is Applicant’s responsibility to replace with video vehicle detection equipment that meets current City’s standards at Applicant’s expense. •When not in use, temporary traffic control devices shall be removed or covered immediately. It is the Applicant’s responsible to cover any temporary traffic control devices when not applicable for the construction activities. Similarly, when work is suspended for short periods of time, traffic control devices that are no longer necessary shall be removed or covered. If deemed abandoned, City crews will remove and may store them at the City’s maintenance shop (3555 NE 2nd Street) for up to sixty (60) days. The City is not responsible for any private property from City assets and identifying the property owner. •Applicant is responsible to maintain existing pedestrian accessible routes during work and non-work hours. At intersections, the work on pedestrian facilities shall be limited to one (1) corner at a time, with the least possible inconvenience or delay to pedestrians. Pedestrian pushbuttons shall remain accessible at all times, unless approved pedestrian accessible detour(s) are provided. Accessibility to existing or temporary Page 4 of 6 | Published: 2/25/2025 pedestrian pushbuttons shall not be impaired. Deficiencies caused by Applicant’s operations shall be repaired at Applicant’s expense. •Applicant shall provide complete assistance and accommodation from a dedicated pedestrian escort to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. •Driveway and alley access shall be maintained at all times, also see RMC Chapters 9 and 10 for Street Closure and Street Excavation for details. Applicant is responsible for coordinating with the property owners and/or residents prior to commencement of the work. •Pavement excavation shall be limited to a maximum of one travel lane at a time unless otherwise approved. •Accessibility for emergency vehicles shall be maintained at all times. PUBLIC OUTREACH •Applicant must notify Transportation Signal Maintenance (425-430-7423) and City inspector (425-430- 7203) at least twenty-four (24) hours before commencing work (lane shift/closure or near a signal) affecting the vehicle detection. •Applicant shall notify emergency services (253-852-2121) twenty-four (24) hours before any street closures or lane closures. •Applicant shall call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five (5) working days (excluding weekends and holidays) prior to starting any work. •Applicant shall coordinate with King County Metro Transit Construction Information Center (206-477-1140 or construction.coord@kingcounty.gov) for any construction or installation activities affecting transit operations or facilities. Notification information and guidelines can be found at: https://kingcounty.gov/en/dept/metro/about/contractor-resources/transit-system-impacts. WORKING DAYS AND TIMES •Normal working days are Monday through Friday. Work on holidays, weekends or at night shall not occur without City’s approval. For work times between 10:00 p.m. and 7:00 a.m., see Night Work section below for details. •Work time begins when any street or travel lane is fully or partially closed. This includes set up and removal within the traveled way. •If the City determines the closure hours adversely affect traffic during the work, the City may require to adjust or reduce the working hours accordingly. Reduced work hours may be required by the City to minimize traffic impacts for any work located near a school during pick-up and drop-off times or on an arterial street. (See WSDOT Functional Classification Map: https://www.wsdot.wa.gov/data/tools/geoportal/?config=FunctionalClass) •Applicant may request the City for consideration of extended or modified working hours. Such request must be approved by the City before changing hours of work. CLOSURES •All closure hours and days are subject to local permit and ordinance conditions (such as noise ordinances). More information can be found on https://www.rentonwa.gov/City-Services/Permit-Center. Total street closure lasting more than twenty-four (24) hours is subject to City Council authorization per Section 9-9 of the Renton Municipal Code (RMC). •Road closure notice – Applicant must install Portable Changeable Message Sign (PCMS) boards no less than five (5) working days in advance of effective date and time, not including holidays, at location(s) as identified in the TCP. Other methods of displaying the messages shall be approved by the City. Page 5 of 6 | Published: 2/25/2025 •Road closure notice messages must include at least the following: ROAD WILL BE CLOSED MONTH/DAY – MONTH/DAY _AM - _PM •Road and/or sidewalk closure must be evaluated by the City with respect to both the necessity as well as the impact of the closure to the public. Applicant shall submit detour plans for road closures to accommodate both motorized and non-motorized users, including accessible pedestrian route(s). Road closures shall require additional temporary traffic control including advance notification, approach and detour signage. •Applicant is responsible to temporarily remove the flags and install bags over the flag holders for any work requiring the temporary closure of a crosswalk equipped with pedestrian flags. Applicant shall ensure the bags remain intact and shall replace damaged bags as needed or determined necessary by the City of Renton inspector. For any misplaced or lost flags, Applicant is responsible to replace at Applicant’s own expense. Upon restoration of the crosswalk, Applicant shall remove the bags and return all flags to the holders. Inventory of pedestrian flags must be submitted to the City inspector and reported to City of Renton Transportation Signal Maintenance (425-430-7423) prior to removal. UNIFORMED POLICE OFFICERS (UPO) / FLAGGERS •Any construction activities within one hundred and fifty (150) feet of a signalized intersection shall require Uniformed Police Officer(s) (UPO) at the traffic signal, unless otherwise approved in this TCP and evaluated by City Transportation for the impacts of traffic signal operations and safety. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •For TCPs that require the presence of UPO to manage vehicular traffic and pedestrians at signalized intersections, Applicant shall coordinate with Transportation Signal Maintenance (425-430-7423) at least twenty-four (24) hours in advance for any signal that will be placed in red flashing mode. Applicant shall notify Transportation Signal Maintenance when the intersection is back to the normal traffic signal operations. TEMPORARY TRAFFIC SIGNALS OR TRAFFIC SIGNAL MODIFICATION •Temporary traffic signal programming or modification requires a minimum fifteen (15) working days for each traffic signal controller to be programmed and tested by City Transportation staff before starting the work. The Start Date on this TCP shall reflect the time for temporary traffic signal programming or modification. TEMPORARY NO-PARKING •Applicant must post notice of date(s) and time(s) of Temporary No Parking Zone with signs at every hundred (100) feet at least seventy-two (72) hours in advance of effective date and time. •Applicant is responsible to show on the TCP the limits of Temporary No Parking Zone, identifying barricade locations for vacate parking or curb lane usage. The cover sheet of this approved TCP form must be attached to each Temporary No Parking Sign on the project site. •Two travel lanes (one for each approach) must be open at all times on arterial streets unless approved in this TCP. NIGHT WORK •Between the hours of 10 p.m. and 7 a.m., approved Noise Variance shall be required (See Section RMC 8-7- 8)for night work. Process may take up to twelve (12) weeks. More information can be found at https://www.rentonwa.gov/City-Services/Permit-Center/Land-Use-Development/Noise-Variance. •City may require night work for TCPs that have severe traffic impacts on arterial streets. Page 6 of 6 | Published: 2/25/2025 •Night work shall always be required if two lanes of traffic (One for each approach) cannot be maintained on an arterial street. •Night work shall be required if an evaluation of existing traffic volumes and patterns finds that any TCP will functionally reduce an arterial or high-volume collector street to only one lane of traffic. •The following configurations may require night work: Work at traffic signals that requires shifting one direction of traffic into a left turn pocket where a high volume of left turns occur. Work at traffic signals that requires shifting two directions of traffic into left turn pockets. Work at traffic signals that requires shifting high-volume left-turn movement into a through lane on a single approach to the intersection. Work at signals that requires shifting left-turning traffic into a through lane on multiple approaches to the intersection. •If City’s initial TCP review finds that night work is required, a pre-construction meeting is mandatory to confirm the extents of the work required, the duration of work, anticipated noise levels, and any potential alternatives to mitigate the impact of night work to adjacent residents prior to review and approval of the TCP. TRAFFIC CONTROL PLAN (TCP) FORMAT •TCP must be site and project specific. The TCP shall clearly indicate all existing transportation facilities impacted by work including roads, bike lanes, sidewalks, transit stops, and driveways. Typical drawings, taper tables and MUTCD illustrations, by themselves, are insufficient. •Each construction phase shall be provided with appropriate work zone traffic control. The impacts of utility relocation, traffic delays, detours and capacity restrictions must be considered and addressed. A suitable sequence of construction activities must be discussed with City Staff prior to fully developing TCPs based on the complexity of a project. •TCPs shall be clearly labeled as separate plans to identify the construction sequencing during each phase when more than one TCP layout is submitted. •TCP must be submitted with an electronic copy of TCP layout(s), on 11” X 17” paper size PDF format, which consist of: Map(s) showing the location of the project and work area. All fonts shall be legible and a minimum 10-point font size. All symbols of viewing or printing shall be clear and contrasting. All streets shall be labeled, and layout must include a north arrow and scale. Must show channelizing devices, signing, flagger locations, barricades, PCMS boards, etc. Show locations where the standard traffic control plans are applied. 111311111111111111111111 11 11 19231311111111RAINIER AVE S SR 167SW SUNSET BLVD1111ONLYONLY11111114141818 SW SUNSET BLVDSW LANGSTON RDHAR D I E A V E S W1111111111111111111111111111121211SW SUNSET BLVDHARDIE AVE SW BUSSTOPBUSSTOP21212121RENTON CENTER WAY SWRAINIER AVE S SR 90011LIND AVE SW SW HARRIS PL8888SW HARRIS PLP01J0 1 STOP STO PPOLICEUPOS/WCLOSEDR9-9SIDEWALKCLOSEDAHEADR9-11C/WCLOS E D R9-3DETO U R M4-9BADA COMPLIANTCURB RAMPFLAGGER/SPOTTER SHALLASSIST PEDESTRIANSAROUND WORK AREA.W20-1 ROADWORKAHEADW20-4ONE LANEROADAHEADX'≥ X'≥ X'≥ W20-7 A W20-7AX'≥ W20-1 ROADWORKAHEADX'≥W20-4ONE LANEROADAHEADX'≥W20-1ROADWORKAHEADW20-7AX'≥ BEPREPAREDTOSTOP W3-4X'≥W20-4ONE LANEROADAHEADX'≥W20-1ROAD WORK AHEADX'≥W20-1ROADWORKAHEADW20-1 ROADWORKAHEADX'≥X'≥W20-1ROADWORKAHEADBEPREPAREDTOSTOPW3-4X'≥X'≥X'≥W20-7AW20-1ROADWORKAHEADBEPREPAREDTOSTOPW3-4 X'≥X'≥X'≥W20-7AW20-1ROADWORKAHEADBEPREPAREDTOSTOPW3-4 X'≥X'≥X'≥W20-7AW20-1ROADWORKAHEADX'≥NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVGreg Harwood(425) 424-6425gregory.harwood@pse.com1 OF 1200 SW Langston Rd, Renton, WA0 1200399805/22/2024Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated,if indicated use ADA compliant channelization.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hours asper jurisdictional requirements. (Generally between 9a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3p.m. on arterials. If night time work is approved,signaling and flagges shall conform to WAC296-155-305. Night time work to take place between_____________and ______________.)8. All Flagger and Downstream tapers shall be 50'-100'.LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYWORK AREACHEVRONARROW BOARDFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPUG/BOX/VAULTVAULTTEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:John CrofootCard No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658Puget Sound EnergyTraffic Control Supervisor:John CrofootCard No. IS 6 100071Card Exp. 10/10/28John.Crofoot@pse.com(425)424-6658MFP25005067 200 P# 1823059089 SW SUN S E T B L V D SW LA N G S T O N R D SW HARR I S P L HARDIE AVE SW60 P# 1823059100 280 P# 1823059149 150 P# 8663500005 BUSH TRIMMING REQUIRED AØ42112 BØ42113 CØ42114 EXISTING TO REMAIN AØ42100 BØ42101 CØ42102 EXISTING TO REMAIN AØ42115 BØ42116 CØ42117 TO BE REMOVED AØ42112 BØ42113 CØ42114 EXISTING TO REMAIN AØ42100 BØ42101 CØ42102 EXISTING TO REMAIN AØ-EJU025 BØ-EJU026 CØ-EJU027 220 l b s 4 6 l b s EJU025 - AØ EJU026 - BØ EJU027 - CØ EXISTING 4" CONDUIT AØ42100 BØ42101 CØ42102 EXISTING TO REMAIN AØ42112 BØ42113 CØ42114 EXISTING TO REMAIN 101174060UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R. MILLER 253-355-6930 9/15/25 L. NEELY 253-569-2523 9/15/25 N/A N/A N/A R. MILLER 253-355-6930 9/15/25 N/A RENTON 604194 EAR17 CREW2 200 SW LANGS REPLACE PRI CABLES, J-BUSSES, ELBOWS 200 SW LANGSTON RD, RENTON, WA 98057 O#604194 N/A N/A 101174060 AS NOTED 1/1 KING N/A N/A QCSOKE SW 18-05-23 N/A N/A 2305E071 2305E076 2305E071 EAR-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A Potelco, Inc.DESIGNED BY No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL Notify Customers and Service Area 48 HRS Prior To Planned Outages ORDER#NOTIF#PROJECT PHASE MAINTENENCE O & M SUPERIOR FAILED SILICONE REMOVAL EXPENSE 12003998 101174060 N/A 108156108 593258345 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG OVERHEAD CIRCUIT MAP: 2305E076 SCALE: 6" = 1 MILE P01 (317816-165761) -REPLACE C/O & TERM W/ 3Ø LI UG-OH TERM (6043.1001 UTSU3L1) F:65T (MID: 3412600) -REPLACE 4" RISER (6042.1000 RIS4CSS) J01 (317817-165764) -NOTE: VAULT IS FULL OF WATER -REPLACE (3) 4-POS J-BUS (MID: 7625900) -REPLACE (9) 1/0 PRI ELBOWS (6041.1000 ELB10J) -REPLACE (3) DUST CAPS (MID: 7630600) J01 (317817-165764) TO P01 (317816-165761) -REMOVE EXISTING CABLES AØ42115, BØ42116, & CØ42117 -PULL IN 3Ø 1/0 PRI THROUGH EXISTING CONDUIT APPROX 75' -ASSIGN CABLE TAGS EJU025/26/27 CREW NOTE -FOREMAN TO NOTIFY SYSOPS AND CLOSE O#604194 WHEN WORK IS COMPLETE SITE PLAN SCALE: 1:50 FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. JOB SITE L. NEELY 253-569-2523 9/15/25 PRE CONSTRUCTION UG MAP SCALE: 1:100 POST CONSTRUCTION UG MAP SCALE: 1:100 VAULT & EQUIPMENT TABLE SITE GRID NUMBER VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) REMARKS LB DC J01 317817 165764 EXISTING VAULT J-BOX BELOW GRADE W/ 3-4 POS. J-BUS 9 3 TOTALS :9 3 ONE-LINE DIAGRAM NOT TO SCALE PRIMARY CABLE & CONDUIT TABLE (FOREMAN TO COMPLETE) LOCATION CONDUIT PRIMARY CABLE QTY OF LUBE (gal.)REMARKS FROM TO SIZE (in)QTY DESIGN LENGTH (ft) ACTUAL LENGTH (ft) TYPE BENDS PULL (lbs) PULL REV (lbs) SIZE DESIGN LENGTH (ft) ACTUAL LENGTH (ft) CABLE NUMBERS MANUFACTURING INFORMATION For Feeder Cable Only Check applicable box DB120 HDPE SCH 80 90 45 22 11 A B C MANUFACTURER COMPOUND YEAR TAPE CN #4/0 NEU DESIGN AS BUILT J01 P01 --EXISTING 220 46 1/0 AL JKT 75 EJU025 EJU026 EJU027 0 TOTAL 4"0 TOTAL 3Ø 75'TOTAL LUBE 0 ABANDONED / REMOVE / REPLACED CABLE SCHEDULE CABLE NO. SAP EQUIP LOCATIONS CABLE (LF) EST EXISTING CABLE MFG. NAME EXISTING CABLE MFG. DATE ABANDONED CABLE LEFT IN PLACE ABANDON CIRCUITRYFROMTO 42115 10694422 J01 P01 75 NO NO 42116 10694432 J01 P01 75 NO NO 42117 10694442 J01 P01 75 NO NO TOTAL CIRCUIT FEET 75' SITE SPECIFIC NOTES VICINITY MAP NOT TO SCALE JOB SITE MFP25005067 RESTORATION PER CITY OF RENTON STANDARDS