HomeMy WebLinkAboutCM_CONSTRUCTION MITIGATION_20250829_V1.pdf August 21, 2025 Project No. 25014 CITY OF RENTON CONSTRUCTION MITIGATION REPORT SALEH FOUNDATION CENTER The following is a report of expected construction dates and times, as well as proposed hauling/transportation routes, ESC measures and traffic control plan. Proposed Construction Dates: Clearing, Grading, Utilities and Roads Summer 2026-Fall 2027 Hours and Days of Operation: Normal site hours of operation will be in compliance with the allowable working hours in the City of Renton which are as follows: For new residential and non-residential construction, the permitted work hours are 7:00 am-8:00 pm Monday through Friday, 9:00 am-8:00 pm Saturday, and no work shall be permitted on Sunday. Proposed Hauling/Transportation Routes: North on Jones Ave NE, east on NE 43rd St., north on 110th Avenue SE, west on NE 44th St which connects to Interstate 405. ESC Measures: The Erosion and Sedimentation Control Design elements as listed in SECTION VII of the Technical Information Report shall be implemented to minimize dust, traffic and transportation impacts, erosion, mud, noise, and other noxious characteristics during Site construction. Special hours: No special hours proposed for construction at this time. Preliminary Traffic Control Plan: Will be provided at final engineering.