HomeMy WebLinkAboutWTR2700015(1) F,I RE HYDRANT W-15 A
ABE RDEEN AV NE & NE 25TH ST.
N
n
PNOJECT NO.--W-1 -A VTILIT ES DE�ARTI-ViT
CITY OF P.Et7ON
WORK ORDER NO. MASHINGICN
DATE SUBMITTED 12 16-60
DATE COMPLETED -,t'.l .�- DEPARTMENT
DESCRIPTION OF WORK
Install fire hydrant on north-ast corner of ZI,.. It. & F 3trek;t
North as per Project W-15
PdEf�SSMY WORK TO BE DONE BYt
rity Forces [�
Ft re - to area
'ion tract L�
Othrzs
_ IIY UI;ITI COST I AMOUhT
Fire i.ydrant 1 "a. 1s5,ff. 155.00
6" Gate Valve - F x F 1 ea. 5,'. 65.00
6" x 6" O.D. Stool fee - F1. L:, 1 'ta. 20.5C 20.50
6" U.D. F10. S;)ool - 10 LF i Pa. 39.5C 39.50
Valve Sox 1 00. 11.0 11.00
Installation b p am 7� 540
SUL, tal ( 366.00
i
Salo Tax 14.6s
Over' ad
Ii
I
TOTAL COST
APPROVED BY
SUPT. Or UTILITIES �z / b..-F, AF'r:?.WM
4
PNOJECT NO. UTILIT ES DErARTNEIJT
CITY OF REtTON
WORK ORDER NO. �/�b- L I WASHINGTON
DATE SUBkITTED
DATE CUMPLETED DEPARTMENT 'PLC
DESCRIPTION OF WORK
Install `ire hydrant on north Pact corner of Zth Ave. N. & F Stroat
North as Por Project +4-15
NECESSITY WORK TO BE DONE SYr
city Forces C�
contract
Fire pr-otoction to urea. Others CY7
TTE.M UANIITY UNIT COST AMOUNT
Fire Hydrant 1 pa. 155.00 155,00
6" Gets :a1Va - F x F 1 ea. 0.00 0.00
6" x 6" G.D. steel T" - F14 Rr. 1 ^r. 20,50 20.50
G" O.D. Flu. Soo*l - 10 LF I fee 39,50 39.50
"alve Box l a. 11,00 11.00
Installation I L++ay '^r 7%00
Sub TDtal 366.00
sales Tax 14.65
• nr rad 36.60
APPR(WtL BY
CUPT. OF UTILITIES DATE APrROVED
Yr F
LLPARTMENT OF UTILITIES
Work Order k CITY OF RENTON
WASHINCTON
Project# W-1`,-A
Date Submitted 4.14.59 DEPARTMENT Water
Date Approved Comoleticn Date
rDescriptior, of Works
Install fire hydrant on N.t,, corner of 117th. Ave. S,E. and
S.E. 99th. St. as per ✓roject W-15.
Necessity WORK TO BE DONE DYc
Fire protection to hrea. Ci�y Forces
Contract
Others
ITEM �,CANTITY UNIT GO Am=
Fire Hydrant 1 ea. 155.00 155.00
6' Gate Valve - F d F 1 ea. 65. 65.00
6' x 40 x 6' U. D. Stool Tee 1 ea. 16.' 16.2i
60 0. D. Steel Pipe 5 L.F. 1.8 9.45
6• Flange Adapter 1 use ,. 9.75
6• Drsc::er Coupling es. 7, 21,0'
4' Dresear Coupling 1 ea. 5. 5.15
Valve Sox I sa. 9.. 9.50
Installation Lump St" TS.OU
i
Sub I otsi 3t, .10
$also Tax i 1,•.65
Overl sad 36,60
I
I �
--iTOTAL COST