Loading...
HomeMy WebLinkAboutWTR2700018(2) W-18 HIGHLAND 3/4 MG RESERVOIR WTR-11 1+ #3A 3/4 MG Tank I--- M- BEGINNINGi l i+i ts OF FILE FILE TITLE womov, JW qi7kovoj stetuniR # 3a Vq A OP7"K October 1st, 1959 Nanarable Mayor Ju B. Baxter and Samlxsn of the City Council OentleaenW The Utilities Departaent rey,esta authoriratl n to advertise for bids for the construction of an Elevatad Steel Taws Tank located in the Highlands, as outlinod in the 1999 Bevemm Band I; us. Plens anti speoifiutions are ready for this project With bids to be opened on October rnh, 1999. Your approval In this roquc5t will us appreciatrd. t 4. Yotas very truly, W H. Schroeder 9upt. of Utilities MSS/'ea RICHARD E. WOLFF MM S1nn1 tuwrR . UATIL1 4 WA-H, AtAu1 109N October 9, 1939 Mr. Marvin Schroeder Superintendent of Ltilities City Hall Renton, Washington Dear Marv: Herewith are four copies of Call for Bids for the elevated tank for transmittal to the Renton paper and Daily Journal of Commerce. I will send you copies of the plans and specifications as soon as they are ready, but not later than Wednesday. Sincerely yours, Y " a. t. Wulff, ILEW:t, File. ry„ J 2 Y � 4 -t4 'h -�' �;. -400, 1 j . � . | �qq � | f | , � ■ IJ V � � �| ' \ IL _ ` |� � }� � / , a % � a / . • ��a47 � � i �� | � � � | � t fill | CALL FOR SIDS LLEVATED WATER TANK R5rrON, WASHINO7'ON Sealed bids for the construction of an elevated steel water tank will be received by the City Clerk until 5:0 P.M. and by the City Council until 8r00 P.N., October 27, 1c59, at the City ball, Renton, Washington. At this time the bids will be puolicly opened and read. The tank is to be of 750,000 gallon capacity on a tower 100 ft. to bottom capacity level. The work includes painting, but foundation and site preparation will be by separate contract. Plans and specifications my be obtained from the office of the Superintendent of Utilities, City Mall, Renton, Washington, or from A. E. Wolff, 1506 S*ith Tower, Seattle, Washington, on deposit of $10.00 per set. Plan deposits will be refueled to bidders if plans and specifications are returned prior to November 6, 1059. A certified check, or bid bond, payable to the City Treasurer in the amount of 5% of the total bid mist accompany each bid. The bid deposit will be forfeited to the City of Renton if the successful bidder fails to enter into a contract and provide a 101r% performance bond within 10 days after notice of award. The City reserves the right to reject any or all bids. Vern Morris Clerk, City of Renton Date of Ist publication- October 14, 1959 2nd " October 21, 1959 city of nent.m Tank Wundat tiles, hops, puapbcuac, pi{elin, �;.'u P,.k L110o Sealed bids for the tanstructioa of seek tuamatatione. pipe (w,nee,lane, pups and puap,p,se will be »solved by the City Clerk at the city halt, .,eaten, kaahi,gtoa until Sim Y.W„ OeesmMr 22, Jiu or the sane MY be ,Kaseated to the city Cavacu until "100 0.14. on tea same date. .t tbis tine the bids Will be opened and read. The principal items of work arc as follows, 19u c.y. , eomcrer.. ,a tame fou"atieas, laying MO it. of la" seat item pipe, cunstructieg a concrete bloek pamp►nwse, 1011mishleg and installing two ec0 g/m and one 1,$W Spa Vertical turbine sons, and other anaecisted site work. The city Will furaisb the Cast iron pipe. fleas end speeifieatiaas my be obtaleN few* the aupesialMdent of Utilities, city Neu, koatono %&&"tun .r iraa the Cunw,ltinS LaglMer, k.c. Wolffs l906 swath TMOC. Seottic s, Washington upon deposit of $20,W per sat, plen depaeit will be teMCesd to bidders if plans and specifications are retwrne,! An usable eoaditioa prior to WeenMr SQ, 1959. Nam-bidden will be refymda:' one half of the Deposit if sets are returned by the sees data. We"'Won state sales tea 4he11 be ststaC as a separate item in the bid. A certified Check at bid burn An the anon, of $1, of th, total bid anet accompany each bid. The City of Kestan reserVos the r.Sht to reject a,I• w ".1 bi.s. Yoam N. "trio city, Clerk Publish, 1*eaombea V, 0eecober is, 11039 SITE MAP i 750,000 GALLON ELEVATED TANK RENTON , WASH. ea SCALE 1'•60' l � LtK NA Crpt-1• ,-OR- iL O � Ad A -00 oN ` V [ TANK a TFJ 8F 13U1LT FAY lip CEISt Eifr: I EXi'T- 1.5, MG RESERVOIR =f DAq t ir N � VICINITY MA AMLa '3� —'� m�o.�aao�z- - / sCALE 10-2000'p 12 TH AVE. N. INFORMATION FCR Rlptk7t5 1. Sealed bids for the construction of an elevated steel water tank will be received by tie City Council, Renton, Washington, at the City Fill until 8:00 P.M., October 27, 1959. The envelope containing the bid shall be plainly marked en the outside as "Ad on Elevated Tank" sal with the come and address of the bidder. 2. Each bid shall be accompanied by a certified check, or bid bond by a reliable surety co:spuy, made Payable to the City Treasurer, Renton, Washington, :n en amount not lass than 5% of the amuunt of the bid. Checks will be returned to the unsuccessful bidders immediately after decision as to award of the contract. The check of the S, ce ldul bidder will be returned provided he enters Into a contract and provides a satisfactory performance bond for the full &nuunt of the contract within ten days &fist ratification of award. 3. Bids shall be submitted on the forms enclosed herewith. The work to be dome is shown on the plans and described in the specifications. It will be noted that selection of the type of tank is left open, with certain limitatio,s, in order that the individual manufacturers ally select their most economical design. Appearance, however, will be a consideration in deciding on the award. A sketch of the proposed structure is required with the bid. 4. Bid proposals shall state the time of beginning work and the time of completion. Completion Is desired by June 15, 1960, This will be a consideration in the award of the contract. 5. The State Sales Tax of 4.% of the amounts bid shall be stated separately. 0. Payment for the work will be In cash and will be based on monthly estimates Of the work completed. 7. The right is reserved to reject VV or all bids am to waive informalities If It is deemed advantageous to City to do so. 5312 y Y 75n,Q00 311IJr�a l 1�T91.t1►1� �Cr174 The XWOWeble hyat ore taint" City at Aamtw mobioptan ("aleaenr Thr Iasipned hefty catiflas Ust he has esWacd tAr alto of ita pcapaead ■ark MW that he ban tars mri thata,pkiy eaeeretarar tea pisaa, +petitiaattaer, aM oar"Vet govat Arp ube Work. It is twum Odatstaad thtt the tqt M fW is itetah the S1*4 ai% UbW a d �w 1ho au Ifu Of a gglde seaat �r er» ' in aikipOWOSCOLV stekaO in the pl m tad ssrellkaki", and that ills owas of Ma Me tiw iagAW to tM pttlese gusted hssati W. Ae*Wetaply, thn vt1sN{ysted P 0 11 mad so is siswtakr and Omelets tke rock es Sot tooth, in the time astd at the peloso quekrf as tallspr As RMWAM 1 Csetttl ft 751,M Callan ttiVeet twa an U)Ot taawr, ar:IWsive of teukdattotr, r Pot o%teub" stutah shrimp style of ts,eh Cud prlaai*1 diaeaaiaU la. Intarier W ry.*aiar ralatirG booted an atro duet— .�• � siu: mud* (pat. 4.3) titarlar L.. h4 lankier ekd f atlar pklmttop asuri an viryl takeiar eastlop (Par. 4A) �t TOW aide! It" 1, tam, plus Itan 1 a, buie paint L.it flay M. *Ate sties Tim. 10 raw. ltmt I, tusk plus Ito 2 b, altertots pair& state Sales 'lax, 4ti 'metal It srrrded the eoabeat I spree to stet! ectrh Within �► �otiaa+ar diq�s bm to earylsta the With Withinrt r• IM ire '7'�t�Ngr,YMIMW'.�'+!r),It+.NA»..wr.rtes ,'rWa. AiarRr s{Ir rytn ill' eo6 raytria to tM r� SF a1 to a o r bi,: ►bay.. btt+aea a siader, sl , sw,c�.cya.,r r e Af iR�� ter.r uy G1rr+t..na• rKna..wr ,,,r,�ru � o •� ate �r��.�� SPECIFICATIOIS ELEVATED STEEL WAT%R TAM+ 1.0 Scope of Stork The work to be performed under this contract cofalstr of the furnishing of all the labor,equlpment and materials for the constriction of a 150,000 gallon elevates steel water storage tank, including accessories as specified herein, and painting. The location and details of the site are shown on the drawing accompanying these specifications. 1.1 Furnished by the City The City will furnish the site, water for testing and the foundations. Sufficient area is available at the site for storage of material and equipment. The site is adjacent to an existing reservoir and wood stave elevated tank. It is mildl, Sloping* Sixty cycle current at 110, 220, 440 volts is available. 1.2 Foundations mnuisshh The Tank Contractor shall/fo= Ion plans required for tt,e tank. The soil at the site is a fairly clean sand overlying a cemented sand and gravel at about 4 ft. depth. Permissible bearing pressure shall not exceed 5,000 pounds per square foot. the Tank Contractor shall furnish the anchor bolt- for the columns and riser. Construction of the foundations will be by others. 1.) Information to bs furnished by the Bidder The bidder shall submit with his bid a drawing showing the structure he proposes to furnish. :his drawing stall show all major dimensions and the site of all male structural sections and the thickness if all plates. Shortly af, twrd of the contract, the Clty will furnish plans showing the desired orientation of the specified accessories. Within four weeks thereafter, the Contractor shall submit to the Engineer three sets of prints showing the details of the proposed construction. 2.0 Design and Materials 2.1 Basic Requirements The tank shall have a capacity of 750,000 gallons between the overflow and tye bottom usable level. The type of tank stall be optional with the bidder provided the rage of head between bottom capacity level and overflow shall not exceed Lon-0". The tower height from top of the footings to the bottom capacity level shall be 100 f, .L. The materials, design, welding, shop fabrication, erection, inspection ail testing of this tank shall conform to all applicable portions of the American Water Work Association specification D 100-59 for Elevated Steel Water Tanks, Standpipes and Reservoirs. The thickness of plates need not be increased for corrosion allowance. The design stresses used for the tank, tower, and foundations shall Include earthquake loads in accordance with the requirements of the Pacific Coast Building Officials Conference Uniform Building Code for 5312 so Spec if ieat io s Zone 3 intensity, 2.2 Design The tank shall be of butt welded construction for all water bearing plates, and either lap or butt welded joints for non-water bearing plates. Comex or concave surfaces shall be formed with double curved plates to secure a smooth, true curved surface. The columns shall be vertical and tubular in shape. After erection but before painting the colians shall be tested for air tightness by applying at least five pounds per square inch air pressure. Any leaks shall be located arel repaired before paint is applied. Column bases and riser base shall be granted after erection. 3.0 Accessories to be Provided 3,l Riser Pile The riser pipe siull be 48" In diameter, and equipped with a removable safety grating over the top, a 16" minimum diameter manhole near the bottom, and a 16" Inlet-Outlet connection. The bottom eormection shall be a flanged by plain end Schedule 40 steel pipe welded to the riser bottom sheet and coated with Situsastic 5o after weldin-., The top of the inlet-outlet connection shall be protected from objects fa, ne from above by a steel plate not less than 24 inches in diameter, supported by adequate bracluts or other suitable means at a distance of 18 inches above the top of the outlet pipe. The inlet-outlet connection shall be provided with a Class 15o cast Iron 900 flanged foot elbow, Piping Beyond the foot elbow will be provided kv others. 3.2 Roof Hatch A 24" square rocf hatch with padlock hasp shall be provided. ladders At.. outside ladder with safety cage shall be provided on one column Irom 8 feet above the ground to connect with a ladder on the outside of the tank let Ing to the rcof hatch. A short balcorp• or lending with railing shall be provided where necessary at changes of direction. Vertical, or rear vertical, ptauinns Of the outside tank ladder shall be equipped with a safety cage. An inside ladder extending from the roof hatch to the tank bottom, and if the bottom is Inclined, to the riser pipe, Shall be provided. Ili Overflow A weir type Overflow capable of passing 2,000 We shall in provided. It shall be connected to an 8" overflow pipe outside of the tank extending to 14 inches above the top of the footing. The Overflow pipe shall end with a standard flange fitting. The pipe shall be securely supported on the tank column by suitable brackets and clasps. Piping beyond the end flange will be by others. 5312 e• 3,5 Roof Vent A roof vent shall be provided capable of passing not less than 650 cubic feet of air per minute, The vent shall be so constructed and screened as to prevent the ingress �_ oirds or animals, 4.0 Painting 4,1 In general, the preparation of surface for painting and the application a pa nt shall conform to the requirement€ of AWWA Specification D 102-55T, except as modified in the specifications which follow, 2 A" steel surfaces (except the Interior of tubular columns) shall be roughly cleaned and all mill scale removed before fabrication by pickling, or by shop sand or grit blaiting. All surfaces cleaned shall be given a shop prima coat that same day. 4_3 Toe shop prime coat and two subsequent field coats on the interior of the tank, and including the riser, shall :e done with a zinc dust-tine oxide phenolic paint, DuPont 373-8015, or acceptable rqual. The formulation of the paint stall be: Pigment 74% (by weight) Zinc dust 90% Zinc oxide. 20% Vehicle 26% Phenolic rashi 15% Chinawood oil 29% Thinner 51% Drier 5% jLfter the tank has been completely erected and tested, all welds, unpainted rs areas, and abided areas stall be field-sand blasted to "Witte" metal and painted shortly after with the same primer as used in the shop cost. After completion of the spot coat, two more full coats of the Same paint shall be applied; the first of which shall be tinted sufficiently to make it apparent that full coverage has beer secured. 4-;I As an alternate to that specified in paragraph 4.3 above, a vlrryl systems Amercoat 86/33, as manufactured by the. Amercoat Corp„ South date, California, of accepted equal, may be used on interior surface. In this case, the steel suriaces shall be prepared by shop or field sandblasting to "white" meta: folloued by the proper prime coat and subsequent coats of viIWl top coat, .4ariclent to give a total protective costing of at least 5 mils thicimess. All work stall be performed in strict accordance with the manufacturer's Instructions and in a safe workmanlike manner. All phases of the work shall be available to inspection by a representative of the coating manufacturer as well as the Resident &vineer, Exterior surfaces shall be spot-Sandblasted and primed in the same manner as specified for interior surfaces in paragraph 4.3. They ahall then be Painted with two coats of first grade exterior enamel, DuPont Corp„ or approved equal. The first exterior coat stall be tinted t, rake full coverage readily apparent. The color to be used shall be as Selected by the Owner, 5312 Following collation of the eyterior painting, the words "Renton Water Departasnt" are to be painted on the tank. The Contractor shall submit plans showing dimensions, style, and arrangement. of the sign for approval. 4.6 After completion of the interior paintinp and sfter it has tLoroughly dried, thv tank and riser interior shall be sterilised by washing down an: spray:np with a solution containing at least 50 ppm of available chlorine. .0 Guaranitec !t.e Contractor shall guarantee this structure, including the painting, against iefective materials and workmanship for a period of one year after completion. Arley defects appearing within this period shall be ^epaired or replaced without cost to the Owner. 5312 Olt1l�NZ1i. OI�[L+Ai�1Y 3101 ELLIOTT AVE. ^SEATTLE 1, WASHPJGTON A.TWATER 4"8440 O(WPI 1R W �NDUi'[IUAL(f(JPPUh rai PNOTECHON by •• y /lOof:-�rJ 0 0 HIGHLANDS BIBVATBD TONER TANS BID OPENING OCT. 27,1959 BIDDEN AMOUNT .6 - r i GL/f LDuvr� wj-&of"SrwrrB,ac f 6w Ec dti rJLt / i/ � ✓ r... r4 //�'� a.rrJQ�@[.y _>•s He:.,gs .Sr<`c �, r' �r4/cC;`',,g' r'c .'mil of U/u .ir 20 7- C.n,.i x reo -46- P.3G.00 r2/3 �r nc GR 'ER r VK $ .y(pG. C NION TIN. Cep all "I, COHFeNv LA ....I M. N. Schroeder October 29. 1959 Cityupe r ndaot of Hall Uti lilies Renton. Ww"9Con Subject; Geht GrOver pCoPoag1 No. 4 81et•ated69ater Tank ieaen: ring our not n. It off gk C�cP opoaed pto tturn�ah ketch, w You scale Voluted Out IN, -`Oct hsr uded the of the res I all idential sdea a adty ighbo hood. �Porta Ot to spo 27,hin 1959 Wi Also,th our bid to sh the We do hot have is to erected need 201.three There oiseke[chase f our dp�orf.anHowevet nds ,er tank that is g I ched raw. YOU ij In the is theYcolu W L�e hOU I o rep�s� tf ndYaaut proposed stask ra I" equal tank Arity bar,. Once slight batter q are vortical on thelon.Ren The on1Y not ea, elevated f`e1 on the Plysbuth tank. on tank instead o differ. tanWe that of lug s Other 'I this designs being e cad nPpu ble ee; are ncerteYI ta® shovW how Well a mould r graph of other wra obl ec tin. that tank e considered, the People in the vhank of this the Regarding deliv ° Our duringdthe for 80 d�I required �exbel s�dve v�'1d day Oclobar 28, that if Wednesda makI y strike . for inju, tank ny iJuhn, 15 b11960, ut toas CowulrIt e,ee ectiO° °f�hei i18 ful ir.ieffecte We thank evat ed water to supplying [YOU for hi. elevatediVQt�r tOuur proposal tak. add at, lookin k forward VarY truly yours, GNAVBR TANS 6 NFC ;0 DIVISION _ UNION TANX.CAA CMVApy g88:v1 - End 1. R. S• [inball District Soles Mshaget A r .}- 9 A.n+Niw'+.. o,IG'G,r: ram. ,� Hrt"i �b�pa�• /� �.+relctftt� eEi.µa�cuo-.!.d y�-�it Cs�+�.a� d.ta8 V Bi 9 i �rteuRt ���eHwl�i. t�ierrsfv rts# aE'�aw-e�y4 . it�. fd•.AArM��tC!?�.. ��.u-++(.[..tr/�/ti�l 2 l,'Utc I'.a-C,c�� ,uCiF;+ ,�wrfLv QIA. ,ail..A�6fd.1 .�d CITL�fR- ZA/,+, ��r.QY ������11// �/(�[Q•N.,.24�.O.6Mc'!'Ic.• '�1.U"�'k ..,Q� d'N CN/ �21+L.1"_ .CQM•n-'..tA. .tSLC�to �,r , .CCI�G�G �^T"�.E�C� .G� u�� 4d4 o- 4 IiAi A �"G�dU�u- �°'� .Grp c ;. t& to( 'e-"d �7 bat .Iq/..6.'CG ' //I,I_;OO/V-_.//�•( y �lr..aw.-+�sa� fy�c��.{.du.Y�/�c�� `�+/4.�� Nile, X .,rrt osL`��d�/MCG.liu-.,cv e�ew;f Q , ,s. �e_df��.etel iX,p. No3*6 2.0 SITni PPgPARATION 2.1 Grading Geeee, -e�be+ r ieR-shsLi-Le-e..reve43�M-6i®Bese4-e4-4eexa--ihe we-.j;site . The s!tes shall be graded as shown in the plena to a smooth nest surface. The finished grade shall slope away from the call pump pit. The fill shall be node with materials from the excavation, free it= debris and decayeble mai . ; place] in 6-inch layers individually compacted with machine travel teepes-0s-Salle+ 2.2 Driveway An access driveway, located as shown In the plans, shall be provided at each well site and shall be constructed of a a-inch course of pit run gravel. 2.3 Measurement and Payment The price bid fur site gr%AiwL atoll include the Cost of all labor, materials and equipment for excavation, compacted fill, and grading necessary for the well site improvement. The basis for payer it will be the imp am price for site gre,'ling The bid price for gravel surfacing shall include the cost of all laL It. materials and equipment for grading end forming the access driveway. The basis for payment will be the measured square yards of surfacing actually in place. 3.0 RRINPURCEV Cl-W.:RSrf, PUMP PIT 3.1 darthwork :oil The excavation for me pump pit shall be carried to umdiaturbed beeeiwg at the depth shown in the drawings. gackfill with suitsule material from the excavations shall be placed in 6-inch layers and well compacted. 3.2 Reinforced concrete Portland cement concrete shall be proportioned with not less than 5•IRQ sacks of cement per cubic yard. Aggregate stall be clean, hard and free of -1- weak or deleterious particles. Coarse and fine aggregate shall be proportianed to Secure a plastic workable six with 4-inch slump msnimum. The concrete shall have a compressive Strength of not lees than 3,000 psi at 2e days. The reinforcing steel shall be intermediate or hard grade bars deformed in accordance with ASTM-A 305. Minimum Imp for reinforcing bars shall ��e 24 diameters but not less than 12 inches. Bars Shall be Securely fastened in place and at the designated spacing. placing of the reinforcing steel shall be in accordance with the A.C.I. Code. Forms shell be of strong material firmly braced and supported, true to Sine and grade as shown in the drawings and tight to prevent lose of grout. Surfaces that will be permanently exposed shall be formed with 3/4-inch plywood. Any excess excavation underneath the concrete pit Shell be filled with lean concrete. Before placing the button aleb, fill with well tamped concrete any annular space around the 12-inch well steel casing tc beai if atimins4 possible- lnirusion, Of Surface- or ground wafer along t6o caning Pipe. All water shall be removed from the excavations before pla ing concrete. Forms shell be c)ran and reinforcing eceel shell be free from rust, scale and No concrete shall be placed without prior approval of the forms and of the reinforcing by the Engineer. Concrete shall be placed withatat segregation and vibrated with mechanical vibrators. Newly placed concrete shall be protected against damage and properly ke rurj Remove forma after concrete has set. // Remove below grade forms before backfilling. r dut flea i-loch back at the finished surfaces and f131, patch and finish Surface pits, gravel pockete, form narks and any other defect as directed by the �Enginear. r Bottom os slab to be monolithic fiuish,ateel troweled to a hard, dense, smooth surface. Slope bottom slab 1/p-inch per foot to the Sump. h1 Cover slab an' wells below finished grade, after curing, shall :!e treated with a waterproofing compound, Kim Seal CS 272U as supplied by Charles R. watts hC mpsny, or approved equal. 3.3 Sump A 2-foot deep SUMP VAll be provided at the bottom of the pit as shown in the drawings. The SUMP Shall be made of on lb-inch concrete tile with e 6-inch w{n{w—-poured con,rote bottom. 3.4 Electrical 4n tha contmcIr Shml mns,st of a rigid cnndult Electrical service to the Well site will be by others. The WorkAfraw the rtetercnd e f.,r Mc ,conne.hon to ncc pump,and connection box mounted on the Power company pole to theAPanelroshaik be in this building electrical +tlt a . The electrical Sine shall be underground card enter the pump pit `lrcthts• through the 3-inch sleeve installed in the concrete wall as shown in the drawings' LA fusible disconnect switch shall be installed ou the power lead to the PUMP starter in cunformmce with The 31ertrical Codes. Electrical requirements for pumps and check valves are specified in Sactioc 4.d. Tl.s lighting systen $hall consist of one 2tN) watt loop wall .counted and oc, tvu M amp 120 volt duplex receptacles, YsyamaJle.-�2ii..aFygye�, With wall switch, Bryant No. 4rU1 or equal. Rigid conduit galvanized; outlet boxes galvauiaed, 4 inches or larger; wire Type BW for distribution and Type Ah-ko for service and pane: feeder; conductors popper. The location of the light switch and outlets shall be verified Oil the job. The City reserves the tight to make chances in locations before rough-in At no additional expense. 0, All work shall—be done in accordance with National and State of Washington Electrical Codes and local ordinances. -3_ The electrical rock shall be tested in the presence of 0c in inner before final Acceptance. 3.5 ,latch Covers and Miscellaneous The 21 x 2• hetchwaya in the cover slab Mall be provided with 24" x 24* sid-welt ..anhole ewers, 4-inch frsue, solid lid and equipped wit:. hinges, latch and padlock heap. Access rungs shall �)e J/4-!rich roomd bar not in tht concrete w11S As shown in the drawuiga. The vents send be provided with 4" x 12" cast iron Scott, 5/8-inch &quote holes, with bronze scram se fabricated by 01yapic Foundry Cmpeny, Seattle, or approved eque:. dll ^petal Stems shall be painted with one coat of primer and two finiah ;:oats of oil paint. J.6 Measurement and Payvunt The bid price for reinfotced concrete pmp nit shall include the cost of All labor, materials and equipment necessary for the construction of the pump pit and related facilities as shown in the drawings and described in Section 3 of these specifications. It &hall include Such other were incidental to the completion of the pump pit not specifically included in other bid items. The basis for paymAnt will be the loop our bid for this item. 4.0 PIMPS, FITTINGS, VALVES, MhrrM AND M1SCWAA iji0US 4.1 Pmrp for Well No. 6 The pump for *ell No. t shall be a deep well turbine with submersible electric motor capable of producing 3M) gpm At A total dynamic head of 390 are feet. Pertinent design data is AS, follows. ♦♦ Well Dstm: Floor of pump pit, elevation 4SE - 1t 10-inch inner CA", elevation 441 to III ` 6-inch perforated 11ner, elevation F7 to 134 Static Water Level, elevation 2,86 Specific Yield, 2.5 Spm/foot draw down eatimoted pumping level, at 300 gpm, elevation Ito water was sand free at 210 gpm -5- The pump bowls shall be Class 70 cast iron, enamel, or glass lined. Impellers shall be the enclosed type constructed of bronze metal. The p,Mtp shaft shall be of stainless steel. The rotational Speed shall be 1,750 rpm unless the fit of the head-discharge curve to the perticular Job conditions, or other considerations, make 3,500 rpm preferable. The bidder ■hall submit curves showing the basic performance data (head dischs age, efficiency, and horsepower curves) for the unit proposed. The pump Shall be manufactured by Layne s Howler Company, Los Angs:es, California, or approved equal. The submersible motor shall operate on 210 volt, 60 cycle,`3 phase current. It shall be designed for continuum duty underwater operation. The motor shall be encased In an oil-filled or water-filled Stainless steel housing. If shalt b, nanu/ao.lu,cd by the U.5 Mo#or Co.r Byron Jackson Co.ror cyc.al _ Motors enclosed in an oil-filled housing shall be sealed with a mercury sea: or a mechanical seal which shall effectively prevent loss of oil to the well water. Means shall be proviCecl for circulating the oil. The housing shall contain a reserve supply of oil sufficient for a 10 year period of operation. The reservoir shall provide for expansion and coutraction due to temperature change and for equalizing pressures inside and outside the motor dousing. Motors in water-filled housing shall be equipped with wets, lubricated bearings. Interchange of water between the interior and exterior of the motor housing shall be prevented by Seals and a neoprene diaghragm unless Special prots.tion is provided against corrosion. The power cable to the motor shall be impervious to moisture and shall be ,)Qlvvinyl chloride insulated cable designed for underwater serv+.ce. The cable shall be protected for its full length against abrasion and mechanical damage by a tough, non-eorrealve covering. The Cable shall have adequate tensile Strength to withstand the weight involved. Conductor size shall conform to the applicsble Llectvic Codes. The point of entrance of the motor leads shall be ptzmmneatif sealed and watertight. -O- A15668 ry equipment: The motor starting equipment shall be a magnetic, non-reversing, reduced voltage, two peint Acceleration starter in a NW 1 enclosure. overload protections shall be provided on all three legs. The starter shall be equipped with an N111 switch and Shall be suitable for remote cmrtt I operation, The electric check valve shall be ConseCted in the motor star:il, circuit. The top of the 12-inch outer casing of the well shall be sealed against entrance of foreign utter by a suitable sanitary well seal. A 1/4-inch air line shall be installed to about the to p of the pump bowls. It shall be of gAlvAnised steel pipe or copper tubing. The pump shall be equipped with A strainer on the pump suction, and either a foot valve or a vertical check vtlye to prevent back flow. 'he top fitting on the discharge pipe shall be a stacdard 6-inch companion flange. 4.2 Pnaap for 4i No. 7 The pump for dell No. 7 shall be a deep well turbine with submersible electric motor capable of producing 175 gpm at a total dynamic head of 360 feet. Pertinent design date to as follows: 12-inch outer casing 10-inch inner casing, elevatl on 438 to 136 6-inch perforated liner, elevation ov to 155 Plour of pimp pit, elevation 433.25 Static water level, elevation 284 estimated pumping level At 175 gpm, elevation 187 Specific Yield, l.t gpm per foot draw dam. The specifications for the pump, motor, Starter, and Accessories shall be the same as stated in these Specifications for :'ell .40. 6. 1 -7- 4.5 Sump Pare: 'Ihe sump pumps shall be of 45 gpm nomina: capacity at 12 foot total held, aiae D-2, Model B. as fabricated by Yeomans brothers Company. WGU ose Park, 1111nois, or approved equal. The pumps shall be of vertical type with no clogging (,Pell,,, heavy screen, self-lubricating ball thrust bearing and sleeve pump cesrlryls, stainless rtcreen, abaft end flexible coupling. eel The motors shall be 1,750 rpm, 115 volt, alugle phase, grease lubricated, drip Proof with built-in overload Protection, The controls shall be of enclosed type with ■dJwtable float switch. The discharge lines shall be of 1-1/2-inch galvanised steel pipe pith screwed fittings. The cover for the sure shall be aluminum with one row of 1-inch. holes approximately s inches center to center, for draining the pump pit flour, ?•< Well Wead Pi tt _ ing ya l,.vea Flanged fittings and spools shall be Class 150 cast iron short bndv. The ✓slew-m4f flanged globe f is blow off line 8 8 o valveeshall comfurm to the latest AWWA ape,:- ificAt(onA for 175 psi cold water service, iron body, brnnse mounted, renewable bronax disc, hand wheat operated. The ahutoff gate valve located Just Outside the pap pit on the discharge line ad shall be iron body, btonre mount'"s , mechanicai Joint end$, as aptcified in Paragraph 5.4 and call be equipped with a two piece, cast iron, adjustable valve box. The air and vacua, release valve shall be of the Crispin flost type, :"a ,m screwed connections. The air VACUUM valve shall have been tested at axl pal and 911411 be suitable for 15o psi working pressure. Yht• $seel' A 5jatt$leff valve shall be Provided below +he dwr Waive -8- The flanged b-Inch spool at the poop discharge shall be equipped With 1/4-inch bras ca:k suitable for pressure gauge reading* and with h-inch bronze bihb n�sampling cock. The well breather li*e shall be of 1-1/2-inch g*lv&nized standard steel pipe with *craved malleable im, fittings. It amo11 be cooeecte to the existing a"tvrn ben11-icuh and Wall aaeei cuing and provided witnro copperdut•en at its Md. 4.5 glectric Chock Volvos The electric check valve shall be crat iron globe bury With all bronze dnd tria,^fla*ged ends. The liver shall be oronze with V post opeaiN e. The piston shall be bronze. The pilot *lull be of &il brmse construction of the J.way .ype. The design of the valve anall be Such as to provide air avd water cu*hiooing to preveot hammer alto Shock. Speed of closing and ensuing *hall >e Adjustable by a hand operated regulating valve. The electrical characteristics Shall be 3 phase, W cycle, 220 volt aC. The valve shall be equipped with solenoid pilot, cmtaet relays, pressure Sue limit *wit,he$ and Shall be suitable for parallel operstion with the pump motor. The valve &lull ,provide emergency cloaink on electrical outage, in addition ad closins� fusutim to the noneol opening/ It shall be manufactured by the Golds; aderoo* c:ompany, Pittsburgh, Pem*eyivonia, Pigure 173-D. or Spirov#J equal. 4.6 Motors The water flow meter shell be a propeller type mounted in a fleagre cast iron tube with straightenissg vanes. It $hall be equipped with a eagnatic delve head and Shall be & Sperling Nasterelo Meter as mauufactused by the Sparlicy, Meter Company, 81 Monte, Calltarnis, or approved equal. alaetrical connections from the meter head to the recording instruments will be by others. _6_ 4.7 HIM-off Line The hlow-off 13ue shall be made of 2-1/2.-inch raltanissd standard steel ,ipe with screwed 300 pound malleable iron fittings, at shorn in the drawings. The pit provided at the end of the line shall be constructed of a lumber testing with removable cover and surrounding fill of 3-inch minimum cobbles. Lumber shall be No. 2 common grade crewote treated or better. drain The blow-off pit shall eimeluas.'a through a 6-inch open joint connate tilt to the existing !treat ditch of to the open ground. 4.6 Measurement and payment The bid price for the submersible turbine pump sbail Include the costs Of tabor, materials and equipment necessary :o. furbishing, installing and testing the puny. It !hall also include the discharge line frmi the pump to the flange above the concrete pit floor, the Starting equipmelt, the power line from the starter to the pump, the wall sanitary •sal, and the air line. !i s64r1 also include fhe cost of cvtfina off Mee well cas;ngs It iha paled in.l;c-ded on fhe pfanv. payment will be based an the puce bid for nth pump. Tic bid peace for wall head piping, valvea and miscellaneous shill include the coats of labor. Materials and equipment Iit furbishing, installing and testing pfpe, flttinrs, *pools, globe valve, electric rhsck verve, meter shut-off gab valve, blow-oft line, blow-o:f pit end the sump p&p so described in paragraphs 4.3 through 4.7 an! Shown in the drawings. It shall Also include the discharge line of the sump pu-b. the discharge line of gol"niaed steel ,.lye from the check valve pilot to the ales, env well breather 'anr, the elec rical wiring for the check valve, thrust blocking end tupperts as i�quirad. Payment will be bared on the loop am bid for each wr,u. 3.0 pipil LIM15 5.1 Line and Grade The Bnginaer will pco�rde centerline mini offset stake* giving the line and grade for the underground pipe lines. 1J- 3.2 Tionchins and backfill prior • trenching, the are, of the ,pipe location shell be cleared e,d leveled. Clearing snall include the cutting and rearoval of bruat, trees, staapS and large boulders. Leveling $hall consist of the preparation of Suit- able corking area for the trenching equipment, includitgl fills or mats an soft ground, if such is [squired. The Contractor shall be responsible for the replace .ent ;ti any property stakes disturbed and i u [eventing damage to or blocking of any drsinsµe culverts. The trench shall be excoveted to a uniform grade to provide Support along the barrel of the pipe.J. �8011 bole$ shell be provided (The width of the excavation shall be not less than the pip, diameter !,inf. N onr foot. when-the--txssehypth 'a cam,. t..e�_.,�. ....,mot.+ullaah►u...:., ahcrmul-to-Pcavawt . Trench &hall be free of water until b&ckfilled. Selected soil, free of large rocks, #boll be prnvr-tamped under the pipe up to the springlioe an.: the pipe covered to a depth of 12 inches With Selected backfill bofore the remainder of the backfill is placed. If moisture conditions make good compaction for support impossible to obtain, the contractor shall provide pit run ono backfill to the middle of the pipe. backfill Shall include the replacement and reshaping of bock slopes, fill slop$, ditches, shoulders, etc. It shall also include the repair of road surfacing, gravel surfacing, driveways, rep Lc went of guard rail poatt, mail boxes and cleaning of culverts. to gateral, backfill shell include all work se,essary to restore tho comstrictiou area to its condition before the work started. -11- 5.J Cast Iron "ipe sn6 ripe Pittings "st um pipe sluff be centrifugally cast in Metal molds and shall conform to specifications of V, American Standards AsSociatist A 21.6-1952. thickueu clap 22 for 150 psi working pressure. The pipe stall be furnished in 18 foot nominal laying lengths with Tyton Jo.nt, or approved squal. The wtaide of the pipe shall be coated with coal tat varnish and the inside shall be lined With ■ light cement mortar centrifugally applied. Pip* fittings shall be short body, cast iron, for 150 psi working pressure. They shall conform to Specification ASA A21.11 for %*chemical joint connections, and to the latest revision of A.W.W.A. C100-03 for flanged fittings. Holta, nuts, and gaskets shall is furnished with the fittings. Handling, laying and Joining of cut iron pipe shall conform to the beat recawended practice with first class workmano- hefore placing each lenttl of pipe shall be tested for crack&,and any it which do not have a clear metallic ring shall be rejected. Damages to the coating 01 lining shall be repairer. The inside of the pipe and the joint surfaces shall be cleaned of dirt, mud coating Dilaters, etc. before assembling. Concrete blocking of 1:3.5 mix, or better, shall be installed at every change of direction of the pipe lines at the dead 00" of unused branches of Tea$ and at the Connecticut of the new lines to the Water aria. Concrete blocking shall be poured in place against the body of the pipe or fitting and extend to undisturbed earth in the trench side. The thickness shall be equal to the pipe diameter. 5.e irate Valves The gate valves &hull emfom to the latest A.W.W.A. $pecificatims for cold water, double disc, 175 psi working pressure. They shall be iron body with brouse Mounting&, non-rising star, counter-c lockwisa opening, out operated mechanical joint ends, unless shown otherwise on the plane. -1�- Bate valves Snell be Aanasr.laer List 13A, or approved equai. All gate valveS Shall be installed ill a vertical position and equipped witt+ A two-piece, cast iron, adjustable valve box with the word "wAT6W' east ill t!lief on the lid. Date-1-10 ieetlet sfon6 id2ne Susses--S.r, ehell " pr"Icladlwith aerluit-paata..inalallau at n fast free, tbo calve ou the property inns-Mae yt-'b.A'levNM�17'eM URteetr• The posts *hail be of pr--ast rulwi*N*MavaoMasr-+>•-�.w-4.1weR-eeese meiwn amd *i inehet long. They shall.-bs-aK-.veails*:ly-rWypvawlwaNly i1 191Nroe-pee}ec?ing above the o.i Sterilisation AS sections of pipe are constructed, and before pipe lines are placed in service, they shall be sterilized in r011fotmance with the requirements of the Statr Health Department. Sterilization a, 11 be done by injecting in the pipe a solution containiag �.: ppm of available chlorine. The injection of the c"lorint-water Solution sum.l be done from gas chlorinating apparatus at the beginning of the section t; be sterilized, with water exhausting at the end of the section. The rate Of flow and the rste of chlorine feed shall be measured and adjusted to Sacura the desired chlorine concentration. After introduction of the chlorite and filling of the line, the sterilizing ¢.root shall be left for at least three hours but preferably 24 lours. However, SUN* chlorine solution shall not remain in the line for mote thee five days. .; ue line appears reasonably tight after filling, the Lille pressure test ijay performed concurrently with aterilisstion. Following completion of the sterilising period,the line Shall be flushed at a rate of flow sufficient to remove foreign materials, dirt, and Stonea teat might havt gotten into the pipe during construction, slid to remove the aaoriu*ted water. -li_ After the line is Sufficiently flushed, the engineer will take bacteriological Samples to determine the effectiveness of tna sterilisation, The wort: shall not be acceptable, nor shall any flow be pagmitt, from the new lines to service connections no: to other parts of the water syster•••, ui:tii a satisfactory bact..riologlcal test has beer obt•inr.;. Where the above method of sterilising is impracticat for small portion of the wotl, as At tees cut into existing operating; lines, the followium method shall be us:J: 1. The s:ea of the work shall be sufficient fog ample working space, shall be safe from cave-ins, end shall have no ftee water in the worL area. 2. The work shall be precut and fitted as much as possible before aab,bly. 3. The interior of pipe, fittings, valves, etc., to be installed slw .. be washed clean and then sterilised as much as possible by swabbing, flooding, or other, with strong chlorine solution. a. Thereafter, the work shall be conducted under as clean cunditiucs as obtainable. Support parts on planks, change to clean gloves, etc. 5.6 Pressure Test The watertightness of the pipe floe installed shall be demunstatod before the work may be considered for acceptance. The Contractor shall furnish the labor slid equipment necessary to petfar.n the test, including pressure pump, an accurate pressure gauac, aso the va i•r.a, fittings, pipes or hoses as may be required. If necessary, us sbe11 olio provide corporation cock connections to the mains. After filling the pipe line and releasing trapped air, the lice shell .� checked for leaks at normal pressure and valves checked for proper uperation and opened or closed to isolate the section to be tan rd. Thereafter, tba -10_ pressure shell be increased r . pumping cicaa water into the line until 150 psi to obtained. This pressure shall be maintained for a period of Me hour and the quantity of water "ad during the test shall oe deter,cihed, the allowable amount shall not exceed 1/2 gallon per hour par inch diameter per 1,000 feet of pipe under test. The 4aginaer or his rapraaentativs shall be notified u day aheec of the test and &hall be present when the pressure test is n,sde. 5.7 Cleanup At the completion of the work before final acceptance by the City, the ui vMyi< Contractor &hall remove all a q procnt and excess materials from the cork sites and dispose of all traeh and debris. The pipe line areas shall be restored to their original condition. Restoration of streets must be satisfactory to the responsible City Department. All equipment, valves, slid accessories installed under Shia contract shalt be checked for proper operation and adjustment. Cleanup shall also be defined to include the furnianing of Satisfactory evidence th.. bills for materials slid labor, &no clainb of the Tar Division and the Department of Labor and Industry have been satisfied. 5.8 Measurement and payment The bid prices for the cast iron pipe shall include the cost of labor, materials and equipment iur trench excav&tton and backfill, turaisniny, and installing pipe and fittings, making conuectiona to existing water „sin, concrete blocking, testing, sterilir.ing, flushing, dew&tering, and shoring Of trenches, cleanup mid any other work incidental to installing the water Pipe lines not specifically included in other t '.d items. 1'he price for Schedule A item h, 8-inch cut iron pipe, shall also include the fittings, spools and sleeves necessary for the connection to the existing I.-inch water main. -15- The bssia for payment rill be the Measured length of pipe of each class Uiostion " place. Measurement will include the length of fitting& and valves. where pipe sire changes, the measurement rill be to the center of the fitting. The bid prices for get& valves shell include only the ertr■ costa above those included in the cast Iron pipe prices for furnishing and installer4. the gate valves, valve boar& and marker posts. The shutoff gate valve Just outside the pump pit &tall be included in the bid price for the well head rIping. The bavis for payment will be the rflatber of each size and type "'stalled and ready to operate. -le_ October 31, 1959 The Ronorable Meyer and Council City of Renton, Washington SubJacti 750,000 Gallon Slswat.. Meter Tank Grover Proposal No. 41669 cleat temea t Reeled bids Were opened October 27, 1959. for the 750,000 gallon elevsted "ter tank required by the City of Renton and n company, Graver Took 6 Mfg. Co„ wea the lov bidder. It is my feeling the intarasts of the teapayers of the City of Renton could bent be scrved If the contract were ewerded to Graver Tank c Mfg. Co. for the follow. lag reasons; 1. Graver is for bidder on a tank that complies in all respects with the specifications. 2. The Graver teak has ti,e lowest initial coat to the taxpayers of the City of Renton. 3. The Graver took will cost less over a period of years through interest savings, na bonded indebtedness will be lover. 4. Mafutenance cost - paintiog - is leas due to simplified design and leas surface area than the designs submitted by other tank suppliers. This eevings Should moot to approx- imately "'Goo per painting. (Rased on original bids from pointers in this area) 5. Supporting colusm■ are thicker on the Greyer design •n on the other designs being considered. This gi.as added cot_c- tion against corrosion and should add to the life of the tank, 6. The supporting tvver on the nrever design is stronger than on the other designs being considered. 0 NEI The HuMM t.e Mayor a,.: ^... Ii Page 2 City of Y atoo, Washington October 50, +oao 7- supporting colts era tied togotbar just above the footings. Tbra abould result in low, foundation eta as .he fo, datior will act As one plet i-stsed of eight separate piers as oa 'that deeigem. Yowdatiw prices are to be :oiled for under . aeparat- contract. S. Fran an oppytraocn stattdpoir� w feel the Craver design has great eeslh6t1.c value. We admit that the toser oe o,r design loess the sass as otbars being cewidered - eight colts and three bays of structural - but the tank itself has a very cleat appearsoee that it pleasing to thu aye. Attacbad is en unretouchsd polo- photogrmpfi of .. tank or similar design and marks twr blight obich we erected for uu City of Plyslbuth, Indiana, Mete the pLossing appearance of this design. 9. Delivery and ersetioo can be completed by Jtsa 15, 1960, as called for in the specifications. 10. Craver Tank 6 Mfg. Co. can be relied upon to handle the u+w. tier of this tank in s Prcmpt and reputable eannor. Craver has had 102 yeare of eapariocs in fabricating and erecting tanks WA is thought to be the oldest cargsny in thia line of i tsfrk in the United States, Quality anrkmonship is Our greatest asset. fansidoriag all empecte, the meet important of Which is the savings tz the tarpayoup of the City of jo tW in initial cost, interest Costs, motnteeence costs, possibly foundation costs, and loner teal life, I feel certpin the members of the City Council rill PS.se thr contract ohusld be swrded to Craver Tank A Mfp. Company Your favorable consideration of our proposal is npprect&t0d. Very truly yeas, GRAVER TAME S, I&G. Cl, DIVISION - 141ION TANS CAR C4WANY R. S. Kimball RatVI District Sales Manager Laolosatro cot M. R. Sehrndor, Supt. of Utilities k. R. Wolff, Legr. November 3rd, 1959 ReCOYREFDATIOIs BY FIRE AND WATER CCMITTEE AW SUPFRINIEN)ENr OF UTILITIES IN AWARDING THE Bill (N THE 75o,00n GALLON ELEVATED STEEL TOM TANK, TO BE ERECTED IN THE HIGHLANDS, UNDLR T11E 1959 REVENUE PcM ISSUE. The raaoittee recommend's that the Sid of b150,n5o.80 for con- struction of the "Elevated Tower Tank' be awarded to "Chicago Bridge and Iron Company." Because this is not the low bid, the following reasons are given in recommending this award, (1) Based or steel being available and in stock to start this tank immediately. (2) Completion date) if not met would delay the department In its program, and would cost considerable money, in revenue and construction Costs- (3) Appearance of tank in a residental area. This bid is $5,774.72 higher including tax then the law bid, but in as opinion, Justified due to the above statements. TEA-OFFICo • • From: Ce rd N Date No uembeR l lad De Nary Schroeder p tental Account No, To: Navor and Cit Council E - xpenditure Account No, MESSAGE: Lear Nan: ahicagod you ea,, tIronnCo. an anal three copies of nrapoeed contract With Chicago Bridge al I YOU oeretfw]ci�ck and parti wlalmw it it mate withaupgeyourot that l,u I eek law Over Our o inion t you do not hated.Mnvidch should be included. It is still p that by June 1.:, 1950, e:rperated the bidder coe'sitesnt that the work be cOmpleted which letter Se ineorperated In e b bid in his letter Of 59, caused by governaentsl aetien and strikes, . excludes This rnae °Andes delays y 3, i959, rvation is rct cured D Please also no ix the third psravreph in letter of October 27th wherein certain s'audard apicifioations are included as long as them is no co with the apecificatioas as prepared by the to e revember tlyt you Baked s will Form MI _ lxyorr�e dEeemnt. include said •t+ecificatiot n the will no to prime eb FEDERAL INSURANCE COMPANY Mw WLKI,Ms.an.I 'd t1M.,„JJI UNITED STATES vUARANTeE COMPANY �w CHUBS i SON, Menapnn ♦a 90 John Stroh,Now York X N.Y. Y 0 PERFORMANCE BOND Bond No. _9618718 Asmanna$150.01111,.p .._... 11nom all Wen by thee, Presents, That w<, CHICAGO BRIDGE S IRON COMPANY, en Ulinois Cmperaiey of Sedlle, wahlnpen, (hereinafter called the"Principal"), as Principal, m the FEDERAL INSURANCE COMPANY, of the City of New Yak, New York, a corporation duly organized under the laws of the Stale of New Jersey. (here;nafter called the"Surety"),as Surety,are held and firmly bound unto CITY OF RENTON, WASMNGTON, (hereinafter called the"Obligee"), ;u the Sum of OrA— (f I12fa5DAW, for the Pvment of which sum well and truly to be made,we,the said Principal and the .said Surety,bind ourselves,our heirs,executors,administrator,,auaessora and assigns,jointly and severally, firmly by these present.. Setled with our seals and date this_._._ __._......._._...-_.day A. D.nineteen hundred and....... IW.......... L._.._,_.. WHEREAS, said Principal ha, Mtered into a contract with said OW,ger, dated ' '�,-I.—M9R, for awshumom of 73D M-When elaAdaf Wrier Tide in accordance with the terms and oinditims of said contract, which is ''ereby referred it. aid made a part hereof as if fully set forth herein; NOW,THERRYORE,THE CONDITION OF THIS OBLJJATIOX IS SUCH,that if the ahove bounden Princi*J' wi I and truly keep,do and perform each and every.,all aid singular,the natters and things in said centnct set forth and specified to be by said Principal kept done and performed,at the times and in the manner in Said contract specified,or Shag pay over,rake good and reimburse to the above paused Obligee. all los; and damage which said Obligee tnav sustain by reason o! failure or default on the part of said Principal so to do,then this obliption shall be null and void; otherwise shall remain in full force and effect. cy"OD Noel � 0"co "M- y �f Ph LA / LIC' 1 i. w OMnr► FEDERAL INSURANCE COMPANY C♦aJIMrNpudJ "I - MwA i Akken to (,pp4p.-,, M.L MOONS, AManwy-in-Feel Gas. W. FamwJallJ, $with,, Wtslaieaal Lala 11 )�J THIS AGR€EMI.T, node and entered into this -day of Issarr 19JL—, by and between ME CITY QE R�rrcv, Washington, a municipal corporation Of the State of Washington, hereina fter referred to as "City" and a� ARM OS s 'heYreinafter referred to as "Contractor," H I 'f N E 5 S E T Ht 1. That the Contractor shall perform within the tine stipulated, to-wit: to coa¢lete emstruction or brtme ar 11. 29"t j"RW as required by contract, of which �+this +�4rer�,.ent is a ca"let -:art ar_' aver"tl ing reouirea to be performed, and Contractor shall provide and furnish any and all of the labor, materials, tools, egaipasnt, utility an=1 transportatt.on services necessary `.o pe:rfor=n Lhe contract, and complete sane in a warkvinli''ce Anner and all the construction work covered by the contra-- in connection wits the construction and JaVruvenent of d 4100" at• M W Pun a be and vek to le Us"" I* us 21001ta. }S>/111060 assimea QW ft"ya fto~ma, and all the foregoing in strict conformity wit!, the plane and�,wcif:caticma, including any and all addenda issued by the City, with th" other doeu.-ents hereinafter enumerated. It is agreed and sttpulated ttat said labor, �mter- ials, tools, equipment and services shall be furnished and the contract per- formed and completed subject, to the approval of the City and/or its author. Seed re?resentative. 2. The contract entered into by the acceptance of the Contractor's bid and the signing of this agree:ent consists o: the follaring documents, all of which are componet ;arts of said contrget a^.d as fully a part thereof as if herein set out in full, and 1f not attached, as if tersta attachedi (a) This agree+e-t (b Instruction to ,,dders (c)) Sid nropoaal (d) General condxtiaUa � � � (a) Srecuicationa "sa•O�S� Noel `a4 (f) 1^aas a ens (g)) 'id � now Minn ans"'Aed of NNr so%-/ (h) Advertisement for bi's (aietiaa sf 3 panne (i) Special contract provisions, i^ ar)G, 3. It the Contractor refuses or fails to prosecute thr work or ay part theree^, Witt, Such diligence as will irsure its completion within the time specified in thisr contract, or any extension in writing thereof, or fails to complete said work within such time, or if t`,r '.ontractor shall :.e adjudged A bankrupt, or if he sha,ld -ake a general assi.gruxnt for the tenefit o^ his cireditors, or if a receiver shall be am,ointed on account of the Co�tractorls L-solvercys or if he of his scbecontractorts 971114clate any of tie provisions of this contract, the City may then serve Written notice upon. MA and his surety of its intention to terminate this contract, such notice to contain the reasora for such intention tr terminate the contract, and unless within. ten (10) days after the serving of suet notice, such violation or nom- cxgliarea of any provision of the contract shall cease and satisfactory arrangement fm the correction thereof be made; this contract, shall, upon, tine er¢iration of said ten (10) day period, cease and deter.4dr:e in every respect. In the event of any such termination, the City shall ifmmeciately serve written notice thereof '4> n the suety ani the Contractor ani the surety shall have the right to take over and perform the contract., orovided however, that if the surety withir, fittean (15) days after the serving upon it if such notice of termination does not perform the contract or does not comenoe performance thereof within thirty 00) days from the date of serving such notice, the City iterlf may take over the work under the contract and prosecute the same to completion by con- tract or by any other method it sway deem advisable, for the account and at the sole expense of the Contractor, and his surety shall be liable to the City for any czoess cost or other damages occasioned the City thereby, and in such event the City may, without liability for so doinF,, take possession of and utilise in completing said contract such materials, applicanoes, plants and other p- xrties belonging to the Contractor as may be on site of the project and necessary therefore 4. The foregoing provw.sixs are in audition to and not in limitation of any other rights or remedies available to the City. C. The Co tractor shall hold and save the City and its officers, agent, servants and employees harmless ffrom sany and Allliability of any nature or pat- kind, including all coo a legal ezp'Aeea foro� accca om a�I ented or unpatonted invention, prtnss, artiole or applianco manufactured for use in the performance of the contract, including its use by the City, unless otherwise specifically stipulated in this Contract. 6. Any notice from one party to the nther party under the contract shall be in writing and shall be dated and signed by the party giving such notice or by its duly authorized representative of ouch party, Any such notice as here- tofnrc sn rified shall be by personal delivery thereof or by depositing sa-e in the United States 'tail, postage prepaid and rrCistcred. 1. The Contractor shall cmnc.nce porfrrmanee of the CmArnet on the �� of isesair —, 19fL_, and shall corplete the full performanoc of the contract newt later than_,NM 15. 1}bp WMEM For each -end <:vrry day of delay after the date of e Q • canplcticn it is h• •by ^Led and ngrc ed that the d,&s to the City C¢onsiened by said delay V11 be the sum of dos AI f l3m MnA) pw as l qui 1-tad damages for each such day, tc be paid by the Contractor unto the City. Be Neitlwr the final certificate of yaymcnt nor any provision in the contract nor martial er entire use of any installation provided for by this contract by the City shall constitute an acerptnlnce of work not done in accord- ance wit:' tfa. contract or relieve the Contractor of liability in respect to any wnpress warranties or responsibility for faulty rmterials or worknanahip. The Contractor shall be under the duty to rcnedy an, defects an thr work and ray for ary da;niCc to other -ark resulting therefrom whicf: shall appear within the period of one (1) year from the date of final acceptance of thr work, unites a lon,.er period is specified. The City will Eivc notice of obscrvttt dcferta as heretofore sneclfiod with r,asonable promptness after discovery thereof. 9. The Contractor ant each sub-cortrnetor, 1% a y$ shall submit to the City such schedules of quantities and costs, progress schedules, payrolls, reports, estimates, rrc.rds and miscellaneous data pertaining to the contract as ray be requested by the City from tix to time 10. The Contractor shall fxwnish a surety bond or bands as security for the faithful performance of the contract, including the payment of all persons performing labor on the construction project under t 'As contract and furnishing of materials in cotnectien with Vila contract. The surety or sureties on such bond or bonds must be a duly licensed surety comnan+. 4814 swety bow stall be to Us fJL &msam of the esaaaaat pT'no 11, The total w*unt of this contract is the sum of Moss Mmdevwt ► f* Tbomm",hfMY ;fellers sad -t;;t v forts ("101VO.M) . -M;ich includes !%shintton state sales tax, laymrnts will he made unto Contractor as W-ci- fied in the "general eciditlons"of this contract. Ill 1,7T7 S: *4ET7r, the City has oeus•d there preserts to br si-nod by its "ayor and attested by its City Cler'.- and the Contractor has hereunto act his hand and seal the day and year first above writter. Tfi:. CITY % ^"MM �tee.ct r A City t7s'rTc salons dt;Ty� a MV ODR%er G.Ow�•M��y �,•�.wa r: CHICAGO $RIDGE & IRON COMPANY late-41,ATZXVX SEATTLE 1, WA8ffiNGTON November 1.0, 1959 'rho City of Renton City Ball Renton, Washington Attn: Br. Y.B. Schroeder Sub: 750,000 gallon elevated tank CB&I contract 8-0351 Gentlemen: We are pleased to attach the original and one (1) copy of bond #9618718 in the amount of $150,050.80 of the Federal In- surance Company to cover the work we are to perform for you in the tabrication and construction of the 750,000 gallon elevated steel water tank which you awarded to us. We are pleased to advise that the work has been assigned to our Salt Lake City, Utah fabricating plant for preparing the necessary engineering drawings and fabrication of the material for your elevated tank and the construction at the site will be handled by our Torrance, California erection office, Our Operat- ing Department has assigned our contract number 8-0381 to this work and, if cohvenient to you, we would appreciate your referring to this number in any correspondence concerning your tank for ease of identtficatioh. It would be appreciated if you would direct any correspondence to our Seattle office so that your Questions can be promptly an- moored and distribution of your instructions to our operating people can be handled expeditiously. We are pleased to have this opportunity of building your new -levatod steel tank. We sincerely hope that our handling of your work seats with your complat. approval. Yours very truly MCAGO RRIDG9 a IRON C0NpAN7 By LBB:• Lewis B. Bollmayer trip-Mr. R.X. Wolff cc-■G,SLp,TR i B-0381 file CHICAGO BRIDGE & IRON COMPANY 1305 WaaT 105"vreaaT CHICAGO 431LLIN018 November 24, 19b9 City of Renton Renton Washington RE1 Insurance in connection with Contract covering 7500000 al.sphe^eidal elevcted trnk City of Renton Q.r en raft, _= Gentlemen: Chicago Bridge & Iron Company has self-insured Public Lia- bility risks for bodily injury, property damage, etc. for many years in tt" state where your job is located, except where the public liability risk arises out of She operation of a motor vehicle, and we respectfully tender the following certificate: WOA='S CQNPSNSATION: We are subscribers to the State Fund an., ieport our operations to the Department of Labor end IAustriee at Olympia, Washineton under Firm No. 9699. ll 1 s e w a s t ea protec , save ha ass CITY OF RENTON, WASNINGTON hereinafter called the customer, from and against loss from the liability imposed by law upon the customer for damages on account of bodily injuries or death, or destruction or other damage of or to property, suffered or alleged to have beer, suffered as a result of any act or omission on the part of Chicago Bridge & Iron Company or any of its subcontractors in the course of the performance of the work mentioned above, and we will defend in the name and behalf of the customer every suit, even If groundless, seeking to enforce any such alleged liability. This paragraph, however, shall not cover injury or death of any person to whom the customer is liable under any workments compensation law or plan unless negligence or other breach of legal duty on the part of Chicago Bp4dge t Iron Company or one of its subcontractors is the cause of such injury or death. Its. 17 • 0ICAGO BRIDGE g IRON COMPANY • • City of Renton. Wsshingren 92 ll 4/" The limits of our liability for bodily injuries, including death resulting therefrom, shall be i100 000 for each person for any one accident, and, subject to that JUN •300,000 for each accident. rho limit of our liability for property damage shall be 125,WO four each accident. Z` sago Bridge-1-Tr—on Company self-insures the risk of bodily injury and property damage arising out of the operations of motor vehicles, except that insurance is carried with Fidelity ! Casualty C of Now York with stated limits of liability for bodily injury of�,000 for each person and #300,000 for any one accident and for pro arty damage of $100,000 for any one accident. Coverage uo.•r the automobiles. SincecY Is sweeSelf-insureealllothererisks Wenbbeelievefit un- necossary to furnish certificates of automobile insurance, but such aartificates will be mailed to you upon request. This letter is submitted in lieu of the purchase of insurance In connection with the contract above mentioned, but nothing in this letter shall limit or restrict any liability Assumed by us under that contract. Ten (10) days' advance written notice of any change in or canerllation of this certificate will be sent by mall to City of hens. ., aashington. Very truly yours, CHICAGO BRIDGE ! IRON COMPANY Amy Bergstrom,Ass tent Secretary ABA cc Mr. R.E.Wolff Consulting Engineer 150E Smith Tower Seattle, Washington cc Seattle Sales cc 8-0381 Ins. 18 Dome ber 1, 19" Hone"ble Mayor too R. Buts wid Members of the City Coumoil tlentleWent plans aM BPecificetlom ere MA res0y for author• faetlon to advertise for bids to corstrut the foot!n•_j for the llevated Tom Tuts, wWaMouM piping, ground prspsra. "an and toNUr SUtiai In the highl nip Alch 10 a p ction Of the 1959 Rwwm,e Braid Progr:e, The Utilities r4porteent request the City to approve this autl,orima•lon with bids to be opened pacerober 22nd, 1959. taws very truly, sy R. Schroeder Supt. of Utilities imAs UNITED VINYL PRODUCTS, i; 0 an . . WESt 5.6181 ..., .,., ....�. ..... ... .,. ,.. ...�,�..o TR. 8-3620 '\ December 9, 1959 M \ C City 'hate r uperintendent City oP Her, n r Renton, Wash 1 gton Dear Si:: — W: speclellse in a manufacture and contracts Z contracting, of MAIAC, a pol7vinA chloride plartie coatitip,. Vinalae LI Is deli red to rive urerlor corrosion protection for N natal$, and will seal racked or leaking concrete tanks. We have a ennit nt�t for the Interior of fresh water tanks. Tt gives th'k interior of t!.e tank a very bright, white finish which'�a akee a very clean finish, and makes inspection end mal�ptenance easier. The In Amerlonn r-,ter 'Aorke wcaccie on rantl�ns polyvinyl chloride as an Interior ilnish�for fresh water tanks. I In June of 1959 we coated the interior of a new wester tank for the Citv of Bremerton. Wore starting It was � naeossnry to have the Virvilac test by the d. Si. Hunt 1n Company Testing laboratory. on a se :rate page is an ez=lanatlon of the te, tint! epee if scot one and the results. In all instances our matarlal equr,led exceeded the specifications. If P..irther inforestion Is needed, or you 3ttu�sIre help X ng In writi specifications, please content Thank _ you . or Tour t1^0 end consideration. \\ r Tours truly, Z � Ln e� umin V. Amends i TvD VINYL £RODCCTS CORD . 1 � D Z x Ui �. E. WORK, INC� co,�wkm�� am ►acne: bau.nus.I kx GL 4-4041 Re0000"W"MMM07 . MV l lTVe_ WAeNMOTON fe7pa - w. E. R th Superintendent of utilities City watt Renton, WvAlh. Oentlemn" Please find our check COT t20.00 es deposit for the encloeed plans. Thanks. V*ry ttnly voIrM �. E. WOK, INC. E. Work V RICHARD E. WOLFF f....:A.r .r..- Ii8 SMITH TOWER • SEATt1E•.WASH WaUM'O/N December 11. 1939 Mr, w, h. Wilkins Chicago bridge and Iron Company Salt Lake City, Utah Dear Sirt I an returning herewith one set of drawings consisting of plan sheets 1, d, D3 and be and sill sheets N1 and N2, for the Renton tank marked with W app+eval for fabrication. The 21 inch round roof m"'Iole in approved in Ilea of the 2e inch square Which was Specified. I Question accessibility through the 11 x IS riser manhole, but assume es practical matter that principal access to the riser for lnapec Hon will be from the top and that the bottom opening will be principally umed for ventilation and remove' of silt. It t Krefore Is also approved, 1 am sending also usr site plan showing orientation pi the tank and exterior featu-eS. Also the construction plan for the pier and footing As now out for bids. This closely follow the plan you fur_ "imbed we but you may wish to check it. Mote that certain details have not yet been received which are noted on the plan sheets. Yours truly, RNNSt R. L. Wolff cc' Mr. M. F. Schroeder City Mall Renton, washingt.m i i�naBat AexarluR x112��1 asartla a1vm meta WMIC Doa 1e - Doairg Pie1d Beettls 8, Washington Boeeasbar 12, 1959 Mr. M. g. Brhroader Utilitita BuperinterAent City of Raton Renton, Washington Bnb,jectl Rotioe of OOstreotlon or Altetttlon b7 Vt City of Benton VW-Utiss Departrsw',, Renton, Washington Dear Mr. Bchrooders 'lhie Will aelmwledp readO of ►eats 4c1-117, Motive of Con- etru0tion. Hoverer, us also require four copies of a sketch or erp shoving the location of the etructure with respect to the airport. Sincerely, Charles W. Drew District Airport MMInser drrnocEn DEI B I'ktdU OF RLp06'I It"A""AA. �Ap���A NAME OF II COMPANY STRUCTMN OR ALTCRAT1011 IMStRIaED ffiAwON, tTC.INWnIN6 Iry IYM NOTICE OF CONSTRUCTION OR ALTERATION (INSTRUCTIONS CONTAINED IN REGULATION PRINTED ON REVERSE OF THIS FORM) 1,cNELR AFItK'Aytt ITEM A. TYPE OF RTgIkTURE NJ�AEW YDIIA �— RtaYalwar ❑tRaYAaar, a.YAYVIIE ARARD DDMFIiTE DEZRIFrIDrt ---_._,_ EL 41l�e r..o 4G • tet+e Win' �.roa.r::a .:i+u-. `,.F.....e.ne..� __-_.__..__ _ B. LQCATiON OF STRUCTURE(S.bnit t.LATNOE a.tD1gttU0[ a.RtAREST cm M --m-st w Keteh) lOWlt,AI10 STATE T pIl.�'M_t_t__ _ 4P2 Z +<% ,J) l<�•.n,J �.Ith' 14 REAItp]FOAM ROCTgN pRpY . � . AIM DIRE4'TbR FIIDM RtAR{t'T pDRtMRY OF IANP !TASTED ! DAY[WO D WILL EC !.OVERALL NCIRMY tlry ��- CO.MPRIuIt.Rn MwuW LLl4 Ft8T1 OF CDMPLEIED STRIN-lUR[AMM -�e•--�• Ft6 .. - l9C(.O ' Jt,M eRn fVYW M14 UNL(MPwTMit01 •Y4R iA Yw1 /FO ID.CwgyR IFOOIyR,�O4lRKlltryt WILLK +WWnRw TM W1eTC,OOF AM MY1YTgI -__A.FAwRON MMwENMIFiIRIItpM WR—_- Mj.MYW� e.WNR04 M[CMnP MDynIyLTRIR MY1RYw MtAyAt CRRTIFICATION.—I wpeRY cERNry that all Of the Abu"1pGmlev4 nudn by me aM dq4 omtpletn, and Fn beet Of my hnoWleI,Ind belief, met W the by- -r o .. .. y.H. 11:A9 ISwler.r,Y YM.N WII•NYawaMvy MnW My AntGaAWFI _ as�� . y. 1'ENALTT.-ParAone hilinE w .111ply AI tho provWalM of th UaWa w a Ana of Bbep=dM by HOn YU8(al O e f the CiYil Aer aukt"I Of of IN,vgA roinl aR Imemled. detnwr, PAr! 886, an Mi[ntttluEo RiWYw[NDED FDR NOTAY (LEI NOT FILL IN) M11UAi A pi CHICAGO eRIOGE a IRON COMPANY SALT LAM[CITY 10,UTAH December 14, 1959 AIR MAIL Filel l-09t1 IN DUPLICATE R. E. Wolff Consulting Engineer 15% Smith Iower Seattle, Washington Rai 750MG Spheroidal Elevated Tk. 100' to Bottom Renton, Washington CBSI Contract B-0381 Gentlemen: In accordance with your request in your conversation with Mr. L. H. Hollmoyer of our Seattle Sales Office, we are en- closing three prints each of the following detail drawings: Plan Shoetsr 1 and 7 Bill Sheets: F1 Piease review these drawings at your earliest convenience and return ono print each with your approval or comments noted thereon. Drewb% 41 has been checked final, showing the roqui: inaide tank 16der and the grating over the top of the rim• ;. Drawing 07 is the detail of the strut showing the end con- nection to the column. Bill shoat Fl is tha detail of the tower rods with its end connection detail to the column. With these details you have suffietont information to expedite approval or the tank. If possible. we would appreciate approval by wire since this contract is scheduled to be released to the shop this weak for fabrication. If there are any further questions, please feel free to call upon us. Very truly yours, CHICA;O BRIDGE 6 IWN COMPANY MHidvo W. E. Wilkins, Division Engineer Enclosure eci TorrErec, SeaSsl es M. H. Schroeder ncl) CC13tBy Hall - Renton, Wash. 8-0 SALT LAKE CITY CHICAGO BRIDGE & IRON COMPANY Sni T L&U an, vrAH. a.. 14. 1959 INVOICE OF MATERIAL SHIPPED THIS DAY _... SPNG INY / 32 Cmw[md7o:._..Cj.�' --0f_4EN'Tft WAMIN=11 ATTNt le. MARVIN SQL 00,R vc� O�,IDA� >�I�SWAY6 8>�Tl1N, +`AMINGTON _.... ............... ........... MARK � r'luv 9P142 1ILmi VMGMr 9 I Anchor Bolts 1 3AIP x 710■ 9P170Y 1 1 Bdl. 1200 Anchor Bolts do x 400" 2A2 4 I ltoda 1}+tA x 10' 11 l Pc 43 1 Bdl. 264 8-0381 Anchor Bolts 15071 cct Ch$o (2) File S (2) File � R.ne 7414e IIN IY ' CHICAGO BRIDGE & IRON COMpA.Nj. "0 WXRT ea r' % Ml TH e)ITH yra Wr SALT LAKE('M. ITAH .eCember 169 1959 Mr. Marvin Schroder C/o City of Renton Renton, Washington Dear Slrt CB41 Contract 8-0381 1-750,000 Gel. Elevated Tang �Y- �' Ran � W__ • Attached is a copy of the bill of the shipment of the foundation lading covering elevated tank we are to a anchor bolts for the Renton. These anchor bolts cwererNhip et the City of Frelghtways December 15. packing 1latedw Co soli via Consolidated to you in the next day or so, arded Very truly yours, CHICAGO 3—RInGB/4 14ON COMPANY tz H. D. BURBACK HDBtvh Traffic Manager CCt Mr. Wolff, Consulting Engineer City of Renton 3 InIMr brrrk wnMl\:t W.4f M<o^wl M� 'J '�Mrt a w«wrn fr.rrillsrwn i«r:w.4.. .' r )' .nwrM .upwr 1. If]0\lr.f If lr.l THIS MEMORANDUM '.0'i r n rw 4 ne Shipper'.No. OPVMIVf�� pry4.1 WI t IaYY r gMo4«n14i tM nrw.0 n.«M wtl..W b udrd/Mf da1a, Ia.aK - -----CO)iIOLINAM P�IIl1YRa____ `COMPANY Agmtra No. ncm,p.r.ebo n M a+WkuAI W br1f4 In N141 w IY Mw M M r«.M\,rM r.nlfr M M Nf.frlr Mr«W, Ow M MfM From CHICAGO BRIDGE 6 IRON COMPANY at Salt lake City, Utah, TOe r< M1r d.rrrW 1Np.. M alplrtnl Mal Nae, f pp r I I Ifn4.M ro dllwn nl eantenY ul p A un..I II <nNYNd M MinN .XIII b rtb rN a rN. M rumpnr MuoY Mar«.odl uI u.baat I m n...I..II I P ft Nrp,. on m p4rNM a1 tM pN un.br 0.mn6xtl a�r.w p In u 1 Vlnn 1 Nlir pal H.r N4un. dine tlb u r wl 14 . br Ilne IN fHi4ar to nolM.stria an W of Yd dartrNUnn Ill�lr utuall, aumd•u 4 0•�•.m1rr nl NI a.nY utn 'd .11 ;ro11I n 1 Y ro u to Ma4Nrun,and L1pa.1• ,tln.a mb tl In all nr p pn I•. l re p AveN Mnundn aab II ! -to 1 II 11. wnL11aN rna pMA1tM LI b .Mtlr«prinW er.rlt4n. Mwlr:Iwn41N<. Innudin,n tMfn�rMnM•s run IM\ Mrml..LMr w MMr... L 4u.bptur ...—ioad 41.lull aN\4 YaV N. 0.4• Con,igneds�- //�t}}��tr ��l.,1w,.�q• f W4«flmr AIM[wlNw—Iw M1raa.a fl bnllir.r4n a tiaaTiara/� Deatinailr., MAW W� State of County of 4m'.. Delivazing Carrier 00091R IQAIM Car Initial Car No. a&ala�ia _ - t+l.�i:°1r� e i lu &I nµw.L .u.._"N. aawardea m+,titre,anal ruar aao nrvrwla n Mww r..iwi.ys w raWI Sam 1 AM ilaaa fir .a. rtpet� iWV ww°r°nrwa.a.. is , IMrl.oara WrNnl IMfa.1 ty..tortl 19 Nu.'• "MAD aaw1.M 1 .... ._. .. .. r win u Iw ene.rral N w a...r n w pro.arV dr.a,l\d \«rrn ♦ --�iw�l r AiG'—_- _ I ._�_—Sri.��•°.o�r.i o+wid'4ma -- — araOUND RICORD . L1.r.w tl.aneN Slay�Iwnl...b \�w b\w4+1t b wr.. Ib. 4. rwvl«. Ib.t w wl f1 1.uy.wl w4 �, it It "Iiwl+.1.• Y thUrr\Y.1°WIrM r1.4 .fa•ll«II In . % u,Wa y1� WYN «.r.!-w a.a..tr.tb n YWWMIMMMrMMM a,i�ff w MY•l, w Nrab W«Ine.11, .4td .NpOfr°M r .l . w ''���yyy GLirago Aridge&Iron ConlPI Shi ra ri0Ri0LT1'•l7'a� },1(q� . ........Agent per ■off .. .. Parmao,at pw w 4.h t-ot!w,addrlpW r 6a Wat 17th South Street,IP.O.Hml 6871,Salt Luke City.Utah. a11 CHICAGO BFIDGB!IRON COMPANY P.LT LAY(CItY 10,Oi.M AIR 'RAIL IN DUPLICATE Deceeber 17, 1959 yr' R E. Wolff FSles ionsulteny En9lneer 8-0381 Seattle. Washingrton Res 750pG Spherpida• 'Boll City of Bottom Elevated Tank Beene CB& Con Renton Washington tank,We appreciate your We are onclPrompt approval of the detail drawings for this the details of them: for Your + throe Prints of draw drawn approval. 8 overflow and dProval Ohre. prints If Drawing ins #] C�r1re_ as you haviahl has been n OR the repvrls the the flanq Overflow- a haveaill°�ltdrarinyxa'p=entation Of the accaaaorie, radialoI., as thetv�eerticaltreaAof�thetfe bottom elbow 10 is a detail of able a ed this You have o. oundatlonj howeend have attached oriented in sAosee on drawl. attached to the col Me are not the field drawlny p10,drawl., Bl• Therefore. lu'vdn the to sat afy �ha bottom flange plate offset turn On* a" review Mads• will M Print t these drawings at U•efe9R W+ ttoWoul this office r1tA Your earllest Ppreciate not, Your approval orCOnvenlence and ro_ We have reviewed +PProval°mments noted 'Ound everything In your fourM;;tion drawl Y wire, order, drawing 5312 If we a sheet 2, and have us, may be of further assistance, please feel free Yer to call upon Y trulY yours, CHICAGC BRIDGE B IRJN t,"WpANY 0f+dvo Enclosure cce Al. tS, Oodei WEWilklna,C (Encl) Dvicen En9l near Sassremon' Wash. 8-0381 • TorrE SALT LAKE CITY SAN JOSE STEEL COMPANY, /NC. J ,a, N.,w.,v10, , .. . FENCE DIVISION Aomefs INKY TO Ui WEST MASSACHUSETTS ST. SEA%.I 2 SIwASNIN6TON December 21, 156.9 City of Renton City Hall Fen�on, waohington Rqz ft Hoes for fencing the Rlghlands iilavutad Tana Gentlemen: We are pleased to quote you a price for furnishing and instAlling fencing at the above referenced locatdoni Item No. 2, l4902.00 Item No. ?, $1,900.00 thank you for the opport-mity of qunting you on your fencing requirements, and we will be pleased to work with you on the name. 7ery truly yours, SAN yJOSE STEM CO., INC. q, k'. Waldron Sales Rapresentative. pw/cr.. OAKIAM IUMA SAN IQSE .pa\LANO wwNE 11CYAMIN\O 1EAi\l1 � SNIIANf RICHARD E. WOLFF 16; . y f„y.... IN SMITH TOWER • SEATTLE 1.WASH. MAIN-aw Decaaber 21, 193U Y,r, k.G. Wilt ins Chlcago Bridge and It.. C Salt Lake City, Utah ompany Dear Sir: Re: 731) ERG ULIVA711) TAja I am retuming one set of the fol C'ry Up RM"' WASH. taring drawings approval tot fabrication: Plan ghee ta; Bill mbeeta; 1' 7 iD Standard a P 1 3 -3 beet: C18-3 The orientation of the S" overflow could hav Bite plan Drawing 5312, sheet 1. NCoul r, boon +atked in r e been fired rY:-atl from cw�ed is these drawings. the raquirad location has Very truly your$, RhW,I Enc. c/c R.L• eolff Nr. M.N. Schroeder City Nall Renton. Waabington � t1 pZt 2 I f31D TJE)JLATIO� �e �y MNK W071N6'�- P,o'-LINC-5 — PUMPPJJS� g�Y P;'O 4 EFGT W-!a 1 MD r:Nb - .>E'G. �z, l9Sy 3z erc eo.+c _ s etc eWvo -1 x tJo 19&W _-1 X uo BOIrorowz .' TEM 7T TOTAL U-V7 707,0 LN7T�7OT0L UNIT 704. / - ztwyr 2HNF CONCPFrP 7ANK F007/Nbs /157 Cl` .SZ.X 0714..7J T4..b V:-M V d0.•tl ; /iZ VJ-7C &Z401, "W ALJ L -EYMJYE ( (STPUC7 [.'NC/N LrNI'%- e- ..318 C.F. L..b 6-A&7.= Z;O: "';-V ,i.AO 7D7.Z0 L 61 e-9 ZLr 3- CONST. NEW CNQJN L/i)'C FFJYCE i 400 Lf. d'm /714J x 3.M, Z_::G`.x 447 .'113.07 4.V /9GQLY/ 4 -3/T<- C+.f'UElDJNu ` G240/Nb 1<Lw,%m I /4.ra x I y00--e iSTd.aT /L1G.7:� J - SNST4LL :'G' C.l. =r:-i- 6.T0 :.0 7W. d�SO b 4 S?i '.l.. V Z4 497f W 9.R7, d'.lrO..XI b - LA074LL <9 C.! PJO.� Z7 Z.F 4 Yi wJ %D ',-4 /s0.x 14-V -f 70.,'.F7 - fUQNrJN of /N374LG Fr4E N✓0P4.V7 / Efl f..J.m 200 X) .:/.7 V ZG94" Z..S.1.aol Z3J 00 ZA/.X ,d/.00 a _ GUQN/JN 0 JN3T4C- ..-44TF r1✓F Z FA I-".X 17JO.aO 11119.CI L .XJ.v 9,21.30' /J/ 7.-V 6MIV /680,A 9- COI✓.STnPUCY PWAG/✓OU.SE amJ .54W 3dS:J A7 I 7�10.a J.91P..Q7 1691"x CON37RoCT A.C. 4ArMPN4✓ 60 J✓ /./C i �14 .V /O.7i 1 G-M.fV 4.49_ Z-9 40 S s7 -W I"// - GBc✓PL S✓,PF4CE :7.P/✓FIYw": ZZ31/ RI ;ti7..27 4'r "A7.X Z.N; I9Z.7S F+•/CN/S/ f/N374LG 4.W &~ 0LW0 Z EE. L,Vo.V ;)O.X 'lg n 51� 4:X Z&LL(..?7' rJJZZV :Bf V JL 70.XJ Al � c4WN/.SN if/N37AU /SQO O� -�/Mv / fiC -W.W 3540.:70 Li1.•X' .14W..x /4.X' .3914.X +7+a71 4179.00 N - FU2hG3N O/NJ7.VL4 At*%P'V kd= P'P"V& I"Alp .':ff 9410.-,v d(]L°7 J7 7&tf.00 I d+bL..t7 .SUS TOTAL 44L/B.m .fF S91A7 4949/.51 4o J.394D 1341E3 Me /7GB-7S /1943.'r0 /833.44 /B73,S0 TO 7'04 419B71T 474/dd0 477Z7-ZJ - 4d 7/1.9B JTA.PT/NG TiME /O 00✓S J LYE✓S /O ZW✓J /O A/7✓J SEW TTCE G IiY37N. 4 CC 74 t v .v b � (�•• In . � p y � Oo30 9"aYF JO G A S�` .�4i.A�^ �,fg.'hO C4 N;O��p Oy •jEio rrCEa Wsv dv�.6 V, �OvpV4 � iii $ �8 E888888$858808 ^ ° ieco`cote-`y ca trap 8 �"888&88888888888 (l C, GL'-LX.[.GYL�.'.'.V7lt l LYYub.uJ jC `o p(�, . 4 to T7d CfXrAr v q0ti4Cv1U4 _%,WMFeivOS/r. ti �b a�24�6opt, o� `A 88hp 4a de t. g 4 A � @ ��tErcawrfEA�ecv O Jvlt .sw G b yob t n o� �88a���B83��ti'" � � .sEarrrF • rrovi ,� ao 88888888�88888 4 444 bva:c 4hp 2 �^ t� /KOYhf'• tt?NJT PO.Mr 4f7 AC eAW. C JM 4 v vbip 4��°44convhl°Rq o sew;rcF., ru.:,.w. P � . Sv�o�vpppgoouyo$pv� D bVO@�@008@8&8l4'@08 h 4 a 0 �N;x-0orr w tn., ZI/3 h9f�OCEKr.r4 7 JT � v AW O��U���8R�0,ti0G V � RJ�riGNO ii �A7'F'Oh' � "8 $8R88$88888888 � wow� ,pow �& ®y,� � �& aewklak:a»kt■R a@ ka(■ e 2kQ2aakakaetaeata mw4 _ ttA r � CHICAGO SAIDOR a IRON COMPANY sox to, ..IV LAIR[e111 w.VUY November 24, .959 AIR MAIL File: 6-081 IN CVPUr-11TE R. F. Wolff, Gonsulting Engineer 1506 Smith Tower Seattle, -aa!angton ;,ot 750,000 cal. spheroidal Elevated Tank IWI to Dotton i lion, Mesh] ton �j� act 81 Gentlemen: �i enclosed for your arprovel ait three each of the following detail drowl"s for this tank: PIM OsPoton 1. 4, 115, B6 fill assets: Pl. 'lease review these drawings at your edrliest convenience :.mar aod #061M one print each with your approval or comments noted i The "nk nas bean designed in accordance with eased. UBC for 10% seismic factor and lob specifications. Referring to drawing B6, we ask your approval of this 12 x 18 riser manhole. This manhole is designed fox the existing high head and has a self-sealing ever. A circular manhole is not designed for high heads and is we are to design It for such It would require a vary heavy cover, alsc I.a ask your approval of a 2400 roof manhole as detailed on drawing B5. He bel eve there is a certain amount of stress in the roof plates and, therefore, suggest a circular roof manhole. If there are any Questions regarding design or details, please feel free to call upon us. Very truly your. CHICAGO Pjim;E d IR IN i;uW VN MNtdvo W. E. Wilkins, Division Engineer Enclosure ccn Torr sec, SeaSales. Mr. M. !i. Schroeder (Fnc1T City Hail Heaton, wa.Slr 8-0781 LI LAKE CITY CHICAGO BRIUGF & IRON COMPANY 1:1Iw 4•• Mewrw BP.ATTLN I,WAS IIIN GTON December 31, 1959 Mr. R.E. Wolff, Consulting Engineer 00' Smith Tower Seattle A Washington Sub: Our contract 8-0381 750,000 gallon elevated tank for City of Benton, Washington Dear Br, Wolff : This will confirm our verbal request concerning the changing of the exterior shop primer from zinc dust - zinc oxide paints to I red lead paint conforming to Federal Specification TT-P-86a, Type I1 . This request is made since we believe that the red lead primer for exterior expexure will provide ■ better protection for this tank than the zinc dust - zinc oxide Phenolic material, The use of red lead prlmeru on the exterior of water tanks has been a proven ma- terial for a long period of time. We would propose to use a red lead primer manufactured by the DuPont Company, their code number 1067-8007,wbtch meet@ the Federal Specification. We would appreciate your approval for changing the exterior shop primer and field patch coat to the DuPont Red Lead Paint. Your consideration of our request will be very such appreciated, Yours very truly C81CAGO SRIDGI \ IRON COMPANY My ,Xil Lewis B. Hollmeyer Contracting Engineer LBH:e dup-Mr. M.H. Schroeder Public Utilities Director City of Renton, Washington cc-MO SLP, TE \ B-0381 file a+L� TA.,Is. Afl,.��� .. . C!TY OF RLNT:3ht r„y SANK hO!;NUATIONNS s PO;OP rNAME, (}F a JaEA AC)DRES$ _ I_ �a_ t'a 1�arRwcYc+_ -� .fa 9'�Arr Ison+_... Sy i 3 Yy.rrr�.•au s'7w... Cwwsu' rn. i yals..to'"` , ' s — , `4 //�Cwarwr sl.�o ti9Ma Rau.nsM qr '� .yh �^ o waa',4iir•NrwFPy a �:.y Nlr'+ �, y_.SISs[74f1 ,.-_.f+.fR :�'.. . YFv-SYwrE Ca sr !a +� 4/c!' 111 il✓6wMiX ✓. —.rs twc ZsAe rfA.etearaH A r` ( '. /+.�(i<J.��P fit•Ace-v LYYn,Ci 79f.2MXF*7e�ie+w lraPC. <' rrl.L' r . z + P eA-,r eowsY .ra l • ff.•r�r/ C'.P<•vr c.�s+ ,.9I/� /d" 4,1-- .5<e �I � brie«• .✓- .tGu,v� C'P /`a�t..'JYMi},Y-LJd .SrwrY<e.'SS� G-f ts9 < _ 7 /K i ) v i 1 i- - I f CHICAGO!RIDGE a IM ON COMP4NV • O EV.'111 ,a11a11(CI�. 10 i .•M la"nary 4. 1960 File: 8-0381 AIR MAIL IN CUPLICATE R. E. Wolff Consulting Eng.neer 1506 Smith Tower Seattle, vashington he. 75W Spheroidal Elevated Tank 100, to Bottom Renton. Washington C_Bei Contract 9-0361 Gentlemen: We are enclosing for your files three prints each of the following detail drawings: Plan Sheets: 1, 4, 7. 10, B5. 06 Rill Sheets: P1. P?. C18. F3 These are final drawings and have incorporated in '.hem any changes requested on approval drawings or changes pre- viously agreed upon. If we may be of further assistance, please feel free to call upon us. Very truly yours. CHIC:AGU BRID,�E It IR ti QM,-AM W. Wilkins. Division Cngineer MH:dvo Enclosure cc: Tor-rErec SeaSal.,s Mr. M. H. Schroeder (Enc}i City Nall - Renton, •+ash. M381 SALT LAKE CITY January 9th, 1960 John Nwoan t Company 1e11 • 4th Avenue Bldg. Seattle, :tashln.gton Dent Sir, Attasw hereto ft out file$, is speclflcati"M and Slgt Contract for Project W-18 oontinued. Me to part of the 19D9 Water t Sever Revenue Bad Program. Yours very truly, M. M. Schroeder Supt. of Utilities MNS/de RICHARD E. WOLFF IERE SMITH TOWER • SEA"LE A WASH MAIN eN. January 7, 1960 Mr. L. H. Hollseyer -hicago Hrldge b Iron Joep v 1318 Fourth Avenue Seattle 1, Washington ^ear Mr. Hellaeyern Your letter of December )1, 1959 regarding exterior prime cost on the 75C.000 gallon Renton tank is acknowledged. The change in the paint specification for the exterior prime and patch coat from zinc dust-sloe oxide to red lead conferafng 'o Federal Spectflcation TT-P-La, Type Il, is approved. The paint proposed In your letter will be satisfactory. Sincerely yours, Richard E. Wolff REWnb bnsulting Engineer c/c M. H. .Sehroederr city Hall Renton, Washington Amory 8, 176^ Mr. Dan Kate^ra 1212 Wvie Street Suuth Renton, eashlngton Ref, Removal of trees at Highlends Rosevolr. Dear W. fataere Phis latter is your autheriaation to rma,, all the tirt'or as instrasteA on Tuesday ]anuary Ss 1960. Pro;wrty at lath AV*. North and approuimetoly MP Streets If the^o is any gaestion on trees which borc+sr other property please contact me hofory taking them out as, we may have to contact other property owners for approval. Yours Very Truly, Marvin S. Schroadar Supt. of Utilities N M FEDERAL AVIATION AGENCY REGION 4 P.O.Box 45007,Anp T STATION Las Angeles 45,Ca:ifoenia January 11, 1goo Mr. M. H. Schroeder Utilitieu Mpt., City of Rent,,n Utilities Dept, Slater Cedar River .lark Heaton, Washington Dear Mr. Schroeder: This will acknowledge receipt of your Forms A';A-117 and drawit.gs describing the proposed uuastruction of an elevated steel water atom teak at Ralston, Washington. The location is given as uei4g wituin the City of Renton, Waahington, and two miles cast Of Renton Municipal Airport at N. Latitude 47' 29 , W. Longitude i21d 12e. The over-all height is 140 feet above ground level am 510 feet above mean sea le%ml. 44is office will iatcrpose no '.je:etion to the proposed corstructicn; however, it is r :ameada_ that the .,. Ar tank be obstruction painted and obstruction lighted is accordance with the specdfl�ations eontnlued in the FA:; Ubstruction Marking and L3ghLing MSFAL .. Sincerely, L. Ponton de Arce Actirg Chief Air Traffic Management Division ncL,uure January 15th, 190 I/we the vndi signed herei:y give permission tr the City of Renton ( Utilities Dcpaxbtrent ) a right to rerwve brush, trees and trash and to ispr�ve the sixteen (It') foot easement a part of the ®oosrc S+NbdivisLon rhieh pere11es1 the City 'f 3entw Ytat^r propert, SIGNED r.. Yia.c(C DY RICHARD E. WOLFF 161m 5MITH TOWER • SEATTLE 4.wASH January 22, 19C, G.R. Lcisctmer Construction Comp..ny 1201 West 92nd street Seattle 7, Washington Dear Mr. Leischner: The list of subcontractors and suppliers proposed for the Renton tank job in your letter of January 21. 1960 is approved except as noted below. I have no knowledge of the L1 Dorado Fence Company (Item M. 3). 1 woulf:. like catalog information from t1Lem, and if convenient the names an9 locat- ions of some recent installations in this vicinity. The F i P pumps, item No. 10, are not approved. The data received from them this morning shows that the NPSH required on the No. 1 and 2 pumps is 10.5 - 12 feet RnJ on the No. 3 pump is 14.5 - 16 feet at probable aper- ating fates. This meats that with the pump setting cottemplated, the pumps Would not operate without cavitation, and possibly vibration, if thw reservoir was dram dorm below elevation 433 for No. 3 pump or 429 for Nos. 1 and 2. When the reservoir is cleaned the water level necessarily is 425 - 426. The alternative of lowering the pump barrel and bowls sufficiently to se- cure the required NPSH Would be expensive and would not be considered satis- factory. sincerely yours, RUW;i R. ,, hulft cci M.N. Schroeder City Hall Renton, Washington CHICAGO BRIDGE & IRON COMP,�..Ny late-ere.vaxt.7s SEATTLE 1. NASMNGT()N January 29, 1990 R.S. Wolff, Consulting Rngioeer 1508 Smith Tower Seattle e Washington Sub: CBhI contract 8-0381 750,000 gallon elevated tank for City of Renton Renton, Washington Dear ■r. Wolff: This will confirm our telephone agreement concerning the shipment of the foot elbow required for connecting the elevated tank to the water distribution syetea for the City of Renton, Washington elevated tank. We have requested our fabricating plant to ship the neces- sary 16" foot elbow from Salt lake City, Utah mad they believe that this shipment ■hnuld reach Seattle by Monday, February 1, 1990. They are shipping this foot elbow to Chicago Bridge k Iron Company, c/o O.R. Laischner Construction Company, High- lands Reservoir Site, Renton, Washington. The papers covering this shipmwnt will be forwarded to the G.R. lsischaer Coce- truction Company, 9701 - 19th R.W., Seattle, Washington with copies to your office. It 14 imp>rtsut that this foot elbow be Installed accurately in accordance with the information shown on the foundation draw- ing we supplied for this tank, our drawing FB, since an error in the setting of this foot elbow would create difficulties in making the connection of the vertical run of piping from the foot elbow to the bottom of the riser of the tank we are supplying. Our Construction Division has wired as follow, cwcs.rning the in- stallation of the foot elbow and attachment of the connecting piping: 'Okay for contractor to .ate* foot elbow and connect his Piping if he will guarantee accuracy and pour the thrust block in rccordanoe with rOundatine drawing nuaber ►B. • CHICAGO BRIDGE a IRON COMrXNV -y- 1/28/60 We are pleased to be able to cooperate with tM other contractors lovolved on this project. We hope that the ship- seat of this foot elbow assists the foundation contractor to complete his work prior to the arrival of our construction crew at the project site. Yours very truly CMICAGO "111Gt h IRON COMPANY By ✓ Luis R. Rollasyer Cwtractiae iahgiaeer L®:s '*+ dup-City of Boston, Mr. Schroeder trip- G.R. La Ischne: construction Co. Seattle, Nn. cc-Mo SLP T[(YTR) B-0361 file CHICAGO BRIDGE A IR0jiW COMPANY SALT LAXg C"y' UTAW INVOICE OF MATERIAL SHIPPED THIS DAY CONTRACT 8-4a381 1.-...........11.. .........--.. SPNG ;NY C*m{Xned To: CliICAGO MIDGE & niM COWAU..%-.P..-.,R. LEISCHNai Vi- INTERSTATE MOTORC0NSTTWCTT0N Co. r�Nm 1UMLAND5 j=EFjVQIR SIM.. PREPAID...................................................... . .. .. ..... RMMOU, 4ASHINGTObj-............ KIMON muw Standard i6wO CI Foot DOW PC. 8-0381 Fbundation material ces Laischner constructio Co. R. E. 401ff, consulti ChEo ngEni;lnter Pac Enact Seattle Sales Pile 1nol . 4—.16 Yr.41Y e I No..e b> ...rvw.m ro'T i, $WM.m a wwwn(ie'.JIKMiw>pw.M....116 Y Ini w M1Mn4d Aepv4 .. Ub a I... U. Ir<I THIS MEMORANDUM "' yy.���.y�' •1° °I 11.o I w.. w d ,t .W Shipper's No. �OjBI nmIwN N W.Y.p b�•r nw«eN.Vi...4 n.4.w m.. w u Mo C yy��ya�yyt�yYpplw��.��yey�� medi • t1t.Y�Y3y...YLL;`_�___-_ __COMPANY Agwit's No. I`1TERSTt Miors.H bid^~'.moi ow•. w4..d rn.IN.M.Nm.n W MI.N r4 4..IN M M.wrw.N M.r.Hm 4nrAN a.raM From CHICAGO BRIDGE & IRON COMPANY at Salt Lake City, Utah, Tn.p.uy.ar drl," J.1r.. Io .Vp..ent rm! N... wRvt 11pW t 4nt. a ..Jluun a mme of W<rww whnn.o] 4ViA..Y o »YhdK.[.1 . N.i1. rd WYfuW w.d.Ym nY Mtn` F.,ww thr 14hm I Ui,r.. 1q 1 n me.nlnY. Y.. .mrp+.ulYn In ry Y.M tM .<Il y Y\Y 14 wall p1Y4 of Allnn wIJ 4M.Wb . :f 14•aI.no. JIOM<Wrrl. n IM t le er w.q »'l,Wol. 11 l ro.l.11, woved. Is w. h .nmpbn..nq '1.{wnY.1. Y uw Iw4_Wd Iw.11 .v of wId Vrowr\v. lh4 .s Y 4rv:. to M wrlurmW M'rvn4r µNI N�iuMrn . U p. nddivI Vlq to,l I, 'd hu w.4.. pr:a»or v 11...Mmin lo.,red.4<IWIw M.mMluum on Mh h.,-(.garb.n hmb,y...d w br W..Mnp. .x 'nMY� Consigned to CK'CA00 11RID,R AND IRo7 COWL ANT 0. R. LEImCRNERONBSRDCTVV C�M'AR! Nstination ETMOVS REBRRY'IR BITE state of County of WTOW, VASHI'IOTON Route Delivering Carrier Car Initial Car No. e�a aIl/'ativM aawanoa M 471<lf. K11 uu uq n I �•N.Na.lap � C tt Oel d.1.v.Mw 1u4 - of Mdl nun =tMAN .ol f : � 1=1 .. nM t'Ur low., 16. »oc.ner, th. -� »nNpne.µ.tl.4.0.lolle.{nY .44ment 1 }M Cost Inns Caetus w N'NK A,Vw Y< ,A Yl II I�w>.1—1pw••4h, ud.11 otor, 1.4 µ 4.1:.4WI W.M Io. »Iv.q If <.rywy. W. .n, tor. "III flbl Jri Ww'n un. Jun.it.1N1. Y .sh4w.:el...t.- IA.mi1 Nl.nuvN aln.Me�awleep'.i_ 14 p•wi N•a••iwo n.ew n 6 rµ.� au.. PYWAID 4 pb In pnwrm.m M IM --Lill .h...»Yn n.pnw.4 draws Mr.nn 'ZaMt w O'ilTx ry 'li4 Nan...l ^.n hw.M1.a WW t vra.4la. IN90UND 26CORD by ..4c N.W.".i—N., N.w1i It JWlnd wNl wt. N.W.It L" Wr'.w 41pwi . I.ht" N.4.Ity.pnM.1 Iw,.Plp or.n ool", 4 q4.w<1n11I1 4 .Nln.1h. r..q Y. qw ..I wN.d Yx peew<I>.1M..r.M oY Mc1.M..Iw of W nnW rll 4 MN. .p.elffeNll .4tw1 4 h. .�laM. to M nel a»N.w we OdcagtY Bridge&Iron Company.Shippan ' ,. .'.�.. ...Agent Par.` ........................... P.r Mwt prat-office.ddre.a Yf.hlppei-660 Wag 17th South Street.IP.0.Soo 4871.S.It L.he City,Utah. CHICAGO BRIDGE & IRON COMPANY seo wEAT ecv:wrlxM sovre srascr SALT LAKE CrM UTAH January 29. 1960 City of Renton City Hall Renton, Washington Re: 750 MG Spheroidal Elevated Tank 100, to bottom Renton, .Washington CB&I Contract is-0391 Gentlemen: Enclosed are packing lists in triplicate and memorandum bill of lading covering the Fbot Elbow to be installed in the foundation of the above tank. The foot elbow shipped from our Salt Lake Plant January 28th to Renton via Interstate Motor Lines, charges prepaid. Yours very truly, CHICAGO BRIDGE &,IRON COMPANY Y R. D. BURBACK Plant Traffic Manager bit RICHARD E. WOLFF I504 SMITH tOWEA a UA171E 1,WASH. 5 AWN 2A%4 February 1, 196C PAOGRtLSS B.STINATE W) 1 Tank Footing, etc. Centrar tor: G. N, Leischner 9201 . 12th Ave. N.a', Seattle, Washington I_?n ntit Ueacrl9Hon f Unit cowl, Price Amount 1 155 cy, Concrete footinse 5 170 ft. Install 16" C.I.P. 90f s32.00 $ 7,234.00 6 25 ft. Purnlsh and 7.0' 1,071.0O Is instal 1 8" C.I.P. 901E P—P NCuse Pi 8'�h' 180.00 Pe work. Water tale on job Value Of work co �•0!1.73 Plus State Sales nTe, 41, i11,516,73 +61.e7 Less 13% retained $12,008.62 Payment due contractor 1,801.29 S1t35 aE:Eklchard �. ojff C„na.ttin8 linalnter 7700 SIXTH AVENUE N.W. SEATIIE 7, WASH. NORTH AMERICAN INSPECTION & TESTING/ Su. 24350 ---�7— SU. 24U CERTIFICATE: 0dW8 REPORT NUMBER. 001 DATE: i 7ebnmry 1960 WE HEREWITH CERTIFY THAT WE /,AVt CONDUCTED COMPRESSION TESTS ON STANDARD 6- X 12" CONCRETE TEST CYLINDERS ( AREA 28.3 SG. IN� AND HAVE TO REPORT AS FOLLOWS. JOB, Hltillino Anter TWA, Yty of Hontun ADDRESS: Ramon. wuohlmrtwl ARCHITECT: ENGINEER. Richnrd tolff CONTRACTOR: G. p, ucimar Const. Cu. sPECNA�N AGE IN ULT. NTRENGTH STRENGTH DATE DATE Numm(R DAYs WEIGHT IN 6pj LEtIEp. IN. CAST mRC-f,.N - 1 7 30p"58. 2653 1-13-60 1-25-60 Notsl Cyl. M2 ws accidaet Glly destroyed vt jobsito. MIX: 6 sk earnnt/au.yd. eoner•tal 3000p/sn.in. � 26 aeys. BtCndanl Gftmmt - 3" plump. Waightes 56ti` eenoRt. 1..38% send. 20050 t1nud egm"l - Not orar 6 gels. wltor nddod per suck c,mse6. PLANT INSPECTOR: MIXING PLANT: itoNWy FIELD SUPERVISOR: YARDAGE: SPECIMENS TAKEN FROM: Yooting Ne. 1. GUIN"g.i AND RyQIULITiQH JUB1{ TMi eel 3-RnGir:aar 1-Fils .0RTH A NICAN 14P 1" 0 "ly IH , yyOE SUITN AVlNUE N.W. 14 SEATTt[7, WA3K NORTH AMERICAN INSPECTION G TESTING w. s.aM - SU. 2JSsi CERTIFICATE: OBOa REPORT NUMBER W7 DATE 3 FeDrn_ n 19f,0 WE HEREWITH CERTIFY THAT WE HAVE CONDUCTED COMPRESSION ESTS ON STANDARD e^ E 12' CONCRETE TEST CYLINDERS ' AREA 29.3 SO. IN) AND HAVE TO REPORT AS FOLLOWS. JOB: HiPllino Tator TEak. "_ty of Runtou ADDRESS: Penton, W1Ehington ARCHITECT: ENGINEER: Richard K. Wolff CONTRACTOR: �'• sicclu:.,^ "'not. p,. SPECIMEN AGE IN ULT STRENGTH STRENGTH NUMBER DAVR WE DATE DATE ItI Los LO.Iep. IN. CA T r, 7 31N 4vr• 91.000 3719 1-21-C+ 1-7ii-bp b Ek caOEllt/Qa�1I•Yd,at 110 Eat8el I r�/M •rinuo inY!� 3tendntd Csnent 2 V2R n1uar MIX: •6 sk Cut jy , 9' +Wdod l.er 'rock �,DBnt. ':rr:w1 - Mot Dw! 6 gel E. wrtS! PLANT INSPECTOR MIXING PLANT: 8tommy FIF_LD SUPERVISOR. YARDAGE SPECIMENS TAKEN -ROM: Pior MIW,Rr 4. CYLIND3x,, IND I4i'UI",ATI Dh,}�M TjTID4 oor 3-:�1I94 r.uor 1-File NnRTN AM{RKAN qN o TpT. r 7: •v 7'FOE SIXTH AVOM H.W. ,.x. SEA1TLE 7. WASK NORTH AMERICAN INSPECTION b TESTING7 SU' 24"0 —" SU. 24331 CERTIFICATE: 0308 REPORT NUMBER: 003 DATE: 3 debruory 1960 WE HEREWITH CERTIFY THAT WE HAVE CONDUCTED COMPRESSION TESTS ON STANDARD e" X 12' CONCRETE TEST CYLINDERS AREA 28.3 SO. IN I AND HAVE TO REPORT AS FOLLOW0 JOB: !li,*lino 1^•,.ter Teals, City of REnton ADDRESS: Renton, liashingtom ARCHITECT: ENGINEER: Rishsrd e. ',volt! CONTRACTOR: D. R. 1,0tWmar Conat. Co. SPECIMEN AGEIN ULT. STRENGTH STRENGTH DAI'E DATE NUMBER GAYS_ WEIONT IN jL% LSSISG. IN. CAST ■ROKEN 1-" i 30'8D.�. 80,000 2830 1-22-6U 1-29-60 — 6 Ek earptl"".yd. oono»te, 3000#/B9.in. O 28 days. Standorl C,Ceo% - 2 1/2" elwp. �, • ++el l-htax 564# Salient, 1,38W ET0 20Dy? 1 1/2" minus grrrval - 50+ over LI.la. H ne'"A per arCk eemwA. B 2D PLANT INSPECTL- MIXING PLANT: FIELD SUPERVISOR: YARDAGE: SPECIMENS TAKEN FROM: Footing 7o. CYLINUSRS R11) IN_ma_,'p:T ON i'nETTTIyTjt Cal 3-Mmginear 1-File TH 1M[uuN 1 y K1N G TE5T1 ff /, o• y 2..•hL.et-..� a 771N SIXTH AVENUE N.W. .� SEAT LE T ,yam NORTH NIVIIERICAN 1N ECTION G TESTING SU. �350 --w.2J331 b CERTIFICATE. QWV REPORT NUMBER: D04 DATE: 3 Pnbmary 1960 WE HEREWITH CERTIFY THAT WE HAVE CONDUCTED COMPRESSION TESTS ON STANDARDS' X 12' CONCRETE TEST CYLINDERS AREA Ie.3 SO. IN I AND HAVS TO ne;''YRT AS FOLLOWS: JOB: Hig;tline ater Tank. City of Nentom ADDRESS: Ra»ton, ' u G)Jington ARCHITECT. ENGINEER: Richard R. Aolff CONTRACTOR: C. R. Loiaehner �onmt. Co. ePE,:IMIL- AGE IN .I GTREN1.TH STRENGTH DATE DATE "WEER DAYS WEIGHT IN Lei. LswisQ. IN, CAST BROKEN 6-t 7 30080s. 102.000 3608 1-27-60 2-340 6 sk oemnt/cu.yd. concrotes 30D0#%sy.ia. a 28 days. 3tMdnrd 3oDent - 3" slump. Mix, Roightat 564,# cewent, 1.3890 -n d, 2(105f 1 1/2" minus .T'•+el - Not oror 6 gr19. H2O Lddod -.r 0"" ,:grant. PLANT INSPECTOR: MIXING PANT: Stonewcy FIELD SUPERVISOR: YOROAG6- SPECIMENS TAKEN FROM: Plor No. 7. iMbI L ANJ INfOMATION SUMUTTh'Ds ocs 3-1ilngir,aer 1-File NORTH AM[R�V,I.I��NSIE(TIW 4 TESTING Lo RICHARD E. WOLFF 1.,✓A.y err-«. I5%SMITH TOWTa a SSATTIA a,WASH. 0941 February S, 1960 G.A. lxc schner Construction Company 9201 121th avenue N.W. Seattle 7, Washington UNT\A TANK F OTINCS, CHANGG i,RURR N,,. 1 The Renton btility Department requests that the cast-west fence he moved to the north line of the reservoir property instead of the location slroun on your plans. This will increase the amount of new fence Item t to be constructed by approximately 5>o feet, "Ve will stale^ the new location in a few days. You are alsu notified that the 3parli.ng worse at the Pump House is to be furnished with the magnetic drive head as specified, Lot without the indicator-totaliter recorder inatrument. Please advise me of the amount of reduction in your bill price for Item 14 result- ing frog this deletion. A.L. Wolff "WIi Consulting laplineer Concurred inl WE RICHARD E. WOLFF Fw.Mniy t,yw•,. ISYI SW.H MWEr a SEAM[L.WASH. LIMN OW Pebruary S, 1901) G.N. Ltischner construction cc. 9701 kith Avenue N.a, Seattle 7, Washington Dear Sir: The additional infor,:mtion requested in my letter of January 22, 1960 Ims been received. ..n the basis of this inforeuition the L1 Dorado Fence Company and the Picse and Plrstenberger Pump company are approved as subcontractors on the Renton Job. Sincerely yours, R.E. Wolff PUtIi Consulting Rnginoer February 9, 196C rionorable Mcyor Joe R. oaxter and members of the Ctty Council 6 ntlemem "taehnu her^te 1■ Eat'a.mta ::o. 1 Vz 1 ork c i. leted .m the ialdl Footi,;gs, irojsct -18, ;>y G. d. I.Aschner, contractor, up to February 1, I IC. lue o: •,rork eortau oo Gil,:r',G.7h i ashinyton state S,e19e i.x 44 -, 461., Loss 154 re*einetl loaf rayuent doe contractor 4047 The Utilltles .:epartwnt :ocom ljg peyl,:,t of zstjm:te 140. 1. yellrn Vhry truly, . i:. Schroer or Stye-<-.nnen• !Clime CHICAGO BRIDGE & IRON COMPANY sALr I A U ar.% UTAH. &bruary...l INVOICE OF MATERIAL SHIPPED TKIS DAY 1w CONTRACT 8-0381. _ ._ .. SPNG INY / 280 CbeYae,aro: ICAGO BRIDGB & IAON Ca14'aNY ..... OT DISTRIBUTORS vr.__VeCRANs..TRA(� C"Na DRG 21001 dF t,%. =M(ZTCWN STATION SEATTLE$ 4ASHIMTC (NOT"T !R. RAWICK t;&MUT LIST. lyda6t .PREPAID PHONE. PARRdAy 5-2�;)-), n ) au•.ert SL14 nRn 21MI ICS/2 15 Intrm wlumns 48"A x 26, 7-7/8e 27500 SL15 j ffi 8 Balcony Sacts. i3 16 SLl6 Shell Pls. Sk x 23.40 32 #2 24 Shell Plates Sk x 12.75# 42668 33360 8-0381 2nd Shipment 114,384 PREVIOUS SHIPMDT 111740 THIS SHIPMENT 114,48 TOTAL TO DATE 22 2 586450 07 0 AD 285�&0 96105 cc: C1190 (2) 2 2 0 Pee E Fbreman D. 1 . Macoo % General Delivery ) Cement Distributoral (2) 1Ii e I Ns0.q• W-18 HIGHLAND 3/4 MG RESERVOIRWTR-11 2 UA 3/4 MG Tank -r CHICAGO BRIDGE & IRON COMPANY POltt OFFICE BOX Saab TORRANCti. CALIFORNIA February 11, 1960 The Honorable Mayor sad City Council City of Renton Renton,e.ashington Subj: CB&I Contract A-0381 73CMG Spheroidal Elev Tart City of Renton, ttashington Gentlemen: tle are pleased to inform you that we have today issued erection instructiocs for your new water tank mentioned above, to our Por%man D. L. Macom. The material for this tank has been shipped from our Salt Lake City Fabricating Plant and our Fare- Meow plans to start erection at the jot, site Febres ry 23. It is our understanding that the foundation work is now entirely completed, includi.ug the back filling and is ready i0r this erection. Our P-reman uacoi: has handled the erection of many tanks such as yours, along with all other types of steel structures which our Company erects. As a matter of fact, Foreman Macon; erected one of the largest elevated tanks in the City of Seattle,oamely a two million gallon spheroidal elevated tank for the City located in the Beverly Park area. we sincerely hope that you and your representatives will find both the wor Uganship and cooperation of Foreman kacom and his entire crew, to t� to vocr complete satisfaction. Tours very truly, CHICAOD FRIDGE 6 IRON ODWANY LTE:r -- 8-0381 Torrance erection Oistriet CHICAGO BRIDGE & IRON COMPANY SALT LAKE cin� i r+H, Fek...12....lSbV_ .. INVOICE OF MATERIAL SHIPPED THIS DAY OONTRACT 8-0381 SPNG INV / 282 CHICACO BRIDGE & IAON COMANX OoWpwdTo. � CBMM DISTRIBUTORS Y4......___ ',. UNION PACIFIC OVBUM0 CRC TRACKS GBOR(WTOWN STATION (NOTIFY M. HAMICA s0jMjjWE WASH. a.sm SP. .5431I _5�..@3. ......... PHONE; PMAWAX 5-23P0 DTBT: 1'w1xAc SAIDD.._.. . . _. _.........._..... .......... ................ WEGHT TRS i 1 SL Top Riser Sect. (6'A x 15o9o) i BRS 1 Bottom Riser Sect. (61A x 15�9n) 6531 ICSE1 4 S1.14 14038 Int. Columns 48" x 37' 2 It 1/16r B101-H 16 SL2 36000 BL0 -B 1 Tower-Rod Bars (6x2M x 34#9-3A11 Tower Rod Bars 6 x 211 x 3516-5/164) 21ZO f.ffi 87tla9 14400 IRS-2/ 1 Int IRS-1 3 2 Intrrn Riser Sect. (6'A a 15'7-3/4x) 6252 TEA 8 SLlti 6252 BSA 8 Strut Assemblies (Chs. As 18�11- gn) do do 13360 8-0381 4th Ships PREVIOUS SHIPMENT'30 67824 i 150 THIS SHIPMENT00 TOTAL TO DATE 9 1 O 1 -07 °%60 —Z 00 cc: Chao (2) 33000 Pee E ---3. L Fbreman D. L. Hato¢ 3270' % General Delivery Cement Distributors (2 FYle CHICAGO BRIDGE & IRON COMPANY SALT I-AKE CITY, UI AH. 1.96a......... INVOICE OF MATERIAL SHIPPED THIS DAY Fa.... ................ SPAG..INV ­ ... 00GOPW To.....QIU.QW..Z1jDG3 & MON COMPANY % CEM14T vk--....UP..................................... PACIFIC .01WHEAD CRANE..MACr.. ..... C`wNw....M4..23059......IRIS 115 MMAWN TO STATION SKATTLE WASH (XMZJX MR.-HAMICK C&bQWT EtsT. F-iSk.......PREPAID PHOUR PARKWAY 5-2500 .......... Ono (I ) RIPMNspGllT SLi, G IC41 4 Tntrm Columns (48".0 x 3712-1/1611) 1 Bottom Column 36000 15000 SL2 B103-B 16 Tower-hod Bars 6 x 2 x 3718-5/6't 24600 8-0381 1st Shipment 11i.7400 0 9-U270— f,1400. —"3 --- 800 — 3-0r— cc: ChgO (2) 29660 Pac E Fbreman D. L. liaco4l % General Delivery Cement Distributors (2) File SL15 IWTE 11,;-u, TaA 5 TOP-Column/Shell Assemblies 28500 1-11 18A -- I C4 E?C+• ysCe RRA 9 a -S; EON iD'.,tV.PM'JY SALT LAK3 C1-r. UTAH_..-Y-^b�"__A2' 1'!th_!,96P INVOICE OF MATEROM- SHIPPED T%1-3 DA't ^hna COtv£lc aqp }•� ChicaRO 9ridRe and Tron CorpanY % COMOnt Distributors �REIe',HS_Prepaid . _ �, 11n7�n PAQ11'ttl nvo bp.B.d _rrnnny. rack 'v1a. U•P—.--- CAn No, DROP+ 55002 DRO4! 21091 Seattle, WashlnRton _ ant. I "A"" OCOf•CvI1T10R MAC 0 750 MG SPRDL Tank DROW 5 02 SL1 61, SPF Dr 1 Plate 4" x a" 014++ ldo 42 SPO Dr 1 P1. 4" x 5/16" 0+4" 56 4n WE Dr 1 Pl. 4" x �' Oe40 48 I 4- SPJ Dr 2 Pl. 4" x 3/16" 0'4" 32 42 SPB Dr 2 Pi. 4" x 1/8" C'4'+ 24 1301 2q3 Dr 2 Bar 2n+ x 51'16n 015" 1R� I til,2 6 3102-B Bar 6" x 2" 351 6 5/16" IIII 864-0 SL3 Pickle ry 8 P1106 Dr 8 Pl. S[ x 3/8" y0 1 P1105Bbe ° Can 6 P1. SH x 13/16 3/8" Thk Flat Rubber raas:tst I 2 i 4 11156 P1. 411" x 1". 0' 41.. i1 8 31.5 Pickle II 1 D2-5 Ladder Section 5 I D1 Ladder Section 665 1D2e Dr 8 Bar 5" x 3/8" 1' S 5/16" 170 1 DBC I. 5" r. 3f" x 3/8++ 1+ 33 II 22 616 Pickle 5 0514-B.-5 Bar 2" x k' S' 21" a0 ZO OOSSi4 ar-B-20 BB 2" x 5/16" 6+ 11 V8" h 25 2 :c % 20' 2P P 750 8 OS14- ! Bar 2" x 5/16" 6' 11 31811 I 11 8 OS14-B do 4'10" w so 5 0515- -20 Bar 2" :c ¢" 23'3" 200 0Si4- I, 3 i 0514-B ao 2 ' :: 5/16" 6' 11 '+ p 3/8 PP 28 1 I 4 10■ 15 G2S 1 120A t4usbroca gent „ 127 1 I 6 Oasts 1/1h" Cloth £nserted Rubuar jCpn 20.^CD x 1/16" x lbnfl S78 316 I B5 Had 1 Ip �/ PP. 112A1i Red 1 ./+� 3q, 16+ g0c,788" hl �41;0 118-1 Rod 1'+V a6. 8 7/8., ;3r, SI.4 P2 9148-8 3 bbd Section of vatting 52 P7. 4Mf+8-5 Ctr. rect. of mating .0 COID BACT 8- el row 9610 M ?AU IAKF UTY, WAH,_Februar ....M 19�Q dam..............__ Y�-- �SY�.���SG�S:4l'.AffiS1LiWYY3T^L NP 1E1 i CE+CEEP11?V M1Mali i5 i»s 3 Teep. Cover For 1-;I" x 180 M.H. 10 in 36012 Weld Rod 250 oI.i 1 16 IN5-3*pr 8 Pin 21�111) of 3tff 80 50 I LBS Dr 3 5/32" E7018 Weald Rod 50 i56 ! 812 ;60 5/8"A Y&ch. .Bolts N;:Tuts Of 1 3/4" 52 5/8"A Carr. Bolts w 'nats OE lF 55 i0 5/8itA Carr. Bolts N!nuts Of 1 3/4"36 .:.7 64 4"A Mach. Bolts w/nuts OfZ�3/4" � 40 2 + De �! Banc 7 i"0 Mech. Bolts w/nuts Of I 1 �10 Hach. Bolts N/n.tL3 0f4" 130 16 1"k Mach. Bolts w/nuts Of 4d"' i52Q 32 + 1:;+�A Mach. Bolts v./nuts Of.3" d 51 13 K6 P317 8 Pl. 5 4" x }.. Of Oil 64 I SL15 Pickle r A2 I 01301 ) 6,. chrxnnc: 8.2� 2: tot, I 750 l C13302 Ik-! 1 BtYd2! 6" Channel C 8.2,;#y 2' 10 ' f 183 3 ;Q Ol 4�' z 3^ x 01 5/16" 27' 8 2-5/32" r 161C 8 M102 , G 3" x 21, x $1 271 6 7/tb" Ron 716 Pickle gJ ! J4 Pl. SK x 10.2# 275eO 05 P1. SK x 10.2}' 7816 #6 Pl. Sr; x 10.24' 1402 1. #6A Pl. SK x 10.2# 1428 1 I+ 07 ?1. BY, x 10.2# 166E 1 lf1R Pl. S x 10.20 2§0 2 M502 i 5" x 3 x 5/16, 25, 4 i/lbf� i30 } i 36 4 630 S717 Pickle P.1 i PP1001 Dr 8 Pc. 811.0 F•ch. 40 '43 P i_ae it 9 7/16" 51 I PP10021 Dr 8 Pc. Silt Sch. WS P.tpe 1, lO*w 42 1 PP1003: Pc. 8"P Seh. 40 s Steel pipE �p f -V 3" 573 MM 1 K-8 Mitered Pipe Sect:ton 133 I 811 125 119. Pl. 25 j '3;.D01 ! Dr ? 3ars 2ft x 3/4-1 P1001 ' Dr 8 Pl. 13 3/4"OD x 3/80 x 4 3/9"IC' lG ^ 31003 Or 8 Bar 2" x 3/8" 004" 1 PP1004 Pc. 8110 Seh. WS Pipe 2' 11 U/16" 67 PP1007, Run 8"A Sch. 20 WS P ie 106, 4E" 221 3100r Dr 8 Bar 4" x 3/4" 0' yvi 3S SAA Pr 8 Support Assm. P2 SAC Support :ssm. 50 nl P1201 i Or 8 P1. SK x 3/:"' I I CONTRACT 8-0381 SALT LAKE CITY, L1T.+H,__7ebrusri,._7,2th,..1Q6Q._.. CONTRACT ....8zf23a1.___._.SHEET._.............. asa s� No C wue nFiC!^TKN Mal01i R. 1 Dr 4 2110 Brass Plug - -- 2 P21 1801 i,$ 3" x 2" x i" 1860 P7 M802 '.s 5" x 34^ x 5/16" 16' 0 23/3211 1000 le P803 Dr 8 PIS. SK x t" Y 40 i SL19 lower Tank Ladder �14 P2 B603 Dr 8 Bar 2t" x 3/8" 1' 2#" P1 UTI Upper Tank Ladder L32 i Pi 15 Ladder section 592 t, Pi S-1 Sweep Sk x 1" 10 P1 S-2 Sweea Sk x 1" 10 P24 P401B Dr 8 P1- SK x 3/8" 120 SI,20 P.'. N5 "XN Rod It" Sq. 25 10 3/ 318 ERECTION MATERIAL 275 01-4 Dr I Keyhole Shims 42 50 4n-5 Dr 1 do 10 20 0-6 Dr 1 do 5 33 0 BN-314 Dr 2 It" Blank Nuts 3/4" nt. 16K 600 Dr 2 1*" Synthetic Nutt 1S6 500' 6&1-FA U-Bars 5/8" Sq. 300 280I WEI-D ➢r 2 Finger We 250 8BS Dr 1 Erect. Bracket Straps 1021 Dr 4-5 Mach. Bolt 1"0 w/nuts 0T 61" rz� 1 22 I�` 26 Dr 4 Mach. Bolts 3/4^A w/nuts 016" +8 224 I Vt72 Dr 1 5/le StBolts4" x �" 1f3" 36 DRGW 21091 2 BCS Rottom Columns 48" 0 x 4214" 3 ICE 2/3 Intermediateiser Sect�sX*8"ft 6p x X617- 16 oo 8-o381 3rd Shipment DRG 21C4)1 PRG 55002 Previous Shipments 22 Groan 107300 139700 This shipment Tars RM 5091X� Total to date Net _��f ____ Dun 55330o0 300 T' 50 1 96 Eracta Hetl 8b?si�+ i a City of Renton City Hall Renton, dashCHICAGO BRIDGE & IRON COMPANY Attn: Mr. M. H. Schroeder SALT LAKE crrr, UTAH...FaL. i.5,...:.9n0. INVOICE OF MATERIAL SHIPPED THIS DAY For CONTRACT. 8-Oj81 FIIAL SPNG # 3 '.hY 32 - C-90edTo:...�I(�Q.. Vi►....._...UP----------_._. ___ _....._.____�. -- .- %..IHIION PACIYIC OVEHH&AD QWt& TRACK hr 72 ,57244 ...MP 6817_.. ........ (',&MG9104i STATION F'+W"- P]t&RAID. EATTLE dASH1NGT0N w r n u uPAY 1-2 aac"r T,nk SL13 UP W7 44 BCS 5 Bottom Columns (4'R% x 42'4") 7500 SLl6 #1 8 Tank Plates Sk x 7/16" 8136 SL3 CPA 2 Transition Cone Assemblies 7J2µ DPA 2 Diaphragm P1. Assemblies 4 D8-36 1 Ladder Sect, 317" 42 SL7 C18-16 1 164A Inlet-Outlet Flg. Cnnn.A 554 C18b-16 1 16" Inlet-Outlet Fig. Conn. SL15 TCA 3 Top-Column Assembiir+s (Post Pis) 17630 8117 B1002 1 Bars 5 x 3/8" x 216e 10 SL18 SDA 1 Siphon Drain Assemblies 55 PP1203 1 Pcs of 2"A WS Pipe 27' 31" 99 SAC 2 Support Assemblies C 50 NP 1 2"A 3000# FS Half Couplings 2 P803 Plates Sk x }" 6 2A9 Pltes 4 x #" Or6" 8 SL19 1 P30 2B 2 Pltes Sk x S" 8 P301B 2 Plates Sk x 3/8" 10 8-0381 5th & Final Shipment 113,4000 PREVIOUS SHIPMENT 498124 111400 . TOTAL TODRATE 61 WP bRt7 It 2 2260 g31tl�$7�6p0 WWQ_ 3 74760 cc: Chgo (2) Pac E foreman D. L. Macom % General Delivery Cement "Distributors (2) File WM+rwIM tO*W DA MgYa n. aNNy.Y W%Ym Mvx•xn\we.N.n bnrerwn:en b.,xw+.r.n..m v •nx.u.nrMN�.DeV 1. IY. •bue u. nn THIS MEMORANDUM " " «- t ;.,11 ,.f x m e :.. :.d; 8-03al A....d ..LWia mW.w H.ph.nr."..nv tm . w ...i Shipper'•No. �II4ILEAGMG AAV RQ&,___._--- -- —COWAMlr 1p r�a�� 1� AgaD1'e No. �'YN IY MMN YI N wN Nr11N Y Nmr:w M Mr N t1w N•Mt\.W nr.:rr M 14 "..••_^"�•w..,-..am Z� nYen.wnMe. MN N From CHICA60 BRIDGE Ef IRON COMPANY at Salt lake City, Utah N thx..n MI prwW arrpy Ller. In epweu•"1 r.M ma.r. «p u uotW .„^,�"n.,l e Mbled T,rAleh M en.r.rd x YI.1 np m�nv ana.nw.M li..�r«n�,n °•wahgx.n\wn vr\rd mnnlpnW era 4her xr IAe N of rMeaNU n'��t 1 mutual of JeL.eq .0 h,n v"•eun n l<wxn .,ely,d.i IY r•°"w gap'µYlbe In InrruA dxh 4RImY pn,nM eb Iv x ) n. nlrr tl•II of ) ueewJ.•Y'a .r \n w ei ref uA wwn>onr yl M.. tMan N dHmr m •rM••pyyrmn• prohlllt t W:)Ib1i h.M. •e v WMw�e•p,:ntN rot ex, minN r:eel�l�na«IM Nnlitlnu n xu�i ..... h w.Mee Y..i�yl et f NO'q'e 1'tM fer mreell d '• oNr*t i ya1���h rem etd h tM Nlfuuh� C,onsigned to M =ZD� ZRW C�A� "%"my{{ZYpp"'N•ti"Mn N N.rinuwen D,Ip. D1Id �ACIIIC OWD �A�' VWX (RMFY !Q. W HANU CY t CEDDestination 1�1�/D SATM State of DIM >RDate BRAIN"a UP 5—a5oo Delivering Carrier Q Car Initial DP 57244 (.err \u I a•Ifl Y{QI•uoN a ut srfu• w.ep{ AND eaa'lnpat •rMONe 1 (llft (nR{ aub.et t a u f e.nai. n Y�.rape�.�. tMi ie C.wMNn W VA GDIaaN Mllr"o N•h nw t a _. .. `. � 1RnYr.e xNlpMe r�:hnul nnYnor•eAe11M •p Inoc he d Pi Pit. AS"abliaa 0 tr nlr.N A.mll.an. 1 00 n.wf of thi.•eM'hllpn^n�'!gym Aw I&RI7 CCC� � n .f fnlpnt d ai,mrr CN•i.nenx 19� Plata As _n „"•"; °N *�aatlpllas 3r78� W uh4 t to thery n•d xJ 'td .oWalane f tha Vn Y t� 1urnNe 16.11i811' 1'•dlnl. vffxlive D! PI" Aaaeg{flles g311 tsMpp./•Rmnavni UP IE7 1Men1'.Xln�io.a 11 ja= 1 , 0 I�iuiun�l3nYA., If aW.gl6 7 �4 7 '6 0}S.+ rHm s.•ynp Mn. "M1 L Pn: IIW.` I Wrpee oe Ih:mawnu\-.Jf t\. mw.n. pxp..tr a.N.lme —_.__.. M'1l01NdD hOaertrh. i1mill W/a 1 o _r) 11 ��dal\ j i[15aYa 47 198 1• nn/1 •.f uu eh�p4nt n x bl.F I— oA p m.YnM,suri wn:c�be':. o..na.wre el.•. V 11M. me No:DNe rwu;trri u NN i N• M 'eYl vn�• ( Mnr vw,..d a,N.nd uNw M W slew I. h.rJ) ��� CTicago(lodge&Iron Company,Shipper r l -yWYi.egPn! Poemanent pwo-offiee uid.. TriureDr -d ,-sCR7FT+ Soath Bttaet.(P,O.Bo:1117) Salt t+ka City.Utah, __Mlf i x CHICAGO BRIDGE & IRON COMPANY 160 WSFIT NEVF.NTZUWM MMVM yrp=T SALT LAKIC CM.UTAH February 16, 1960 City of Renton City Hall Renton, Washington Attentions 1r. M. H. Schroeder Res One (1) 750 MG Spheroidal Hlevated Tnnk 1 to Bottom Renton, Washington CBRI Contract 8-0381 Gentlemen: Enclosed are packing lists in triplicate aril memorandum bills of lading covering the shipment of material for the above contract. This material shipped from our Salt Lake Plant Flibruary 12th via Union Pacific Railroad, charges prepaid. Shipping notices on all subsequent shipments will be air mailed to you. Yours very truly, CHICAGO BRIDGE } IRON COMPAfi. R. D. BtRBACK Plata Traffic Manager bh RICHARD E. WOLFF i5te SWTH TOWER • SEA7LE 4 WASti MAIN 01N February 18. 19oo Mr. G. H. 1.eischner 9201 - 12th Avenue N.W. Seattle 7, Washington Dear Mr. ialschnert Subjectt REN M TAN[ hUTINGS, EX. My previous letter which gave approval of the al Dorado Pence Company as fencing subcontractor and of the P k p Noway pumps with U.S. Motors for the booster pump installation apparently was lost somehow. Such approvals are hereby confirmed. It has been decided that a 121, two leaf entrance gate will be re- quired at the southeast corner of the existing reservoir fence. Construction should be equal and conform to the present fence. A Concrete center atop,and gate holders for each leaf should be provided. Will you please secure a price fros the Fence company and direct them to install it as soon as possible. Yours truly, HLWti H. E. Wolff Consulting Engineer CAMr. N.H. Sc ht oe dec ' City Nall Renton, Washington 77M SIXTH AVENUE N.W. ,rr. SEAiTIE 1.7. WASH. NORTH _AMERIC. , INS FICTION b TESTING SU. 2JS,70 / SU. 2433I CERTIFICATE, OBOE REPORT NUMBER, 006 DATE: 23 Fetrunry 196'l WE HEREWITH CERTIFY THAT WE HAVE CONDUCTED COMPRESSION TESTS ON STANDARD 8" X 12" CONCRETE TEST CYLINDERS AREA 28.3 90. IN AND HAVE TO REPORT AS FOLLOWS. J0B: Iflghlino Voter Tnnt. City of Renton ADDRESS. RentoDT 9nshinrton ARCHITECT. ENGINEER: Richcrd 6. wolf! CONTRACTOR: C. i'.. Iuinehnsr od.. Co. SP[CIM[N AGC IN ULT. STRENGTH STRENGTH DATE DATE e[R DAYS WCIGNT IN L!8 Lef IRL IN CAST HRGK[N 5 28 30d80E. 119r000 4209 1-21-W 2-18-60 6 28 30#803. 137e000 4646 1-21-6U 2-18-60 MIX: 6 s1 oement/cu.yd. eonoretel 3000i/sq.in. a 28 dnyr. .Alnlsri Ce::Ant 2 1/2" [lugs. PLANT INSPECTOR. MIXING PLANT. Stonelwy 9r.rd A Orava FIELD SUPERVISOR YARDAGE: SPECIMENS TAKEN FROM: Cyl. 05 froze msr :5. Cyl. E'6 from I'ior ,I,. CYLIRPM A1,J II;y'ORAPTION mul"rat act 1�1i'r N AvkrICIW I�T� ♦J�4iaJZJ44 Q."Ly 'rM 710S SIM AVENUE N_W__f1j MAMA 7.WAbt N_ORT_H AMERICAN INSPECTION G TESTING w. 2-4m SU. 24331 CERTIFICATE. 08G8 REPORT NUMSFR: D05 DATE: 23 February 1960 WE HEREWITH CERTIFY THAT WE HAVE CONDUCTED COMPRESSION TESTS ON STANDARD 6' X 12" CONCRETE TEST CYLINDERS AREA 19.3 $0. IN I AND HAVE TO REPORT AS FOLLOWS: JOB. Nl ghl.ine ',nN%r Tmk, City of Rant" ADDRESS. Rmtm, n: shingtan ARCHITECT. ENGINEER Richeld g. Wolff CONTRACTOR G. R. Coact. CO. SPECIMEN AGE IN ULT STRENGTH STRENGTH DATE DATE .UMBER DAIS WEIGHT IN LBl. LBBIBG. IN CART BROKEN 3 28 30#80E, 151,000 5142 1-18-60 2-15-60 MIX: 6 81 esmOM/ca.yd, conar.•tsI ;OOCfl;s,.in. n 28 lays. atnndard Gsmant 3" slump. PLANT INSPECTOR. MIXING PLANT'. Stonaeay Sand It Gravol FIELD SUPERVISOR YARDAGE: SPECIMENS TAKEN FROM lootlnF 113. CYLINDER ANDSNFQR:ATIDN SUB.:I1T!191 cal 3-�.ginaar 1-n1B ��4..._--M{ni H INYICTRX+ 4 T{1TIN� 770E SIXTH AVENUE N.W._jr SEArnE 7, WASH. NORTH AMERICAN INSPECTION_G_ TESTI SUN� su. 24M 2-051 — CERTIFICATE J808 REPORT NUMBER. 007 DATE: 25 February 1960 WE HEREWITH CERTIFY THAT WE HAVE CONDUCTED COMPRESSION TESTS ON STANDARD 6" X 12'- CONCRETE TEST CYLINDERS AREA 28.3 SO. IN AND HAVE TO REPORT AS FOLLOWS. JOB: Righline xatsr Tank, City Of Renton ADDRESS: Renton, Aushir Eton ARCHITECT: ENGINEER: Richard B. Itolff CONTRACTOR: 1. R. Lai Rchnor gnat. Co. SPECIMEN AGE IN OLT STRENGTH STRENGTH DATT DATE NUMBER DAYS WEIGHT IN Las Le2.1EO IN. CAST BROKEN _ "'1-A 7 3 0 a. 80,000 2830 1-22-W 1-29-60 7-b 28 3 oa. 144,000 5094 1-22-60 2-19-60 7-C 26 3 802. 152,DDO 5342 1-[i-60 2-19-60 "Previously reported Mix. u as coment/eu.ye. eonoretsa 3 /s9.in. B 28 days, bturdam Coolant. 2 1/2" slump. PLANT INSPECTOR, MIXING PLANT: Stonewl:y Sand S Gravel FIELD SUPERVISOR. YARDAGE: SPECIMENS TAKEN FROM. Footing B7. CYLINDERS AND INFORIi:.TION SUBIUM. &1 eel ,y-611gineer I-File swat 77M SIXTH AVENUE N,W. UATIU T WASH NORTH AMERICAN INSPECTION G TESTING SU. 24330 SM 24351 CERTIFICATE. 08D8 REPORT NUMBER: 008 DATE: 25 Fob"rry 1960 WE HEREWITH CERTIFY THAT WE HAVE CONDUCTED COMPRESSION TESTS ON STANDARD S- X 72" CONCRETE TEST CYLINDERS I AREA 28.3 SD. IN AND HAVE TO REPORT AS FOLLOWS, JOB: Hi6hlins :,'.ter PnnK, City of ADUHESS: Renf.on, q:,uldnrton ARCHITECT: ENGINEER: RiClmrd S. CONTRACTOR: G. R. Lo_eolc:or Conet. Co. SPECIMEN AGE IN ULT. STRENGTH J'91MaER DATE [ !IT BTRENUTH CqT[ DATE Y7 IN Lee. LSB.ISO IN CAST BROKEN_ .g A 28 i 8u,, 102,000 VAA 1- 8-e 21-60 2-3 Go 8-0 28 153.000 434 1-27-60 2-24-60 3 Ao[, 152,000 5378 1-27-60 2-24-60 *Previously reported MIX: 6 sk comentjcu.yd. Condrote7 3000.4/sq.iA, E 28 days. Stanistd Caant 3" sluff. PLANT INSPECTOR. MIXi: 1 PLANT: Stunu%,ny Bund ! Crnyel FIELD SUPERVISOR'. YARDAGE, 8^ECIMENS TAKEN FROM: Pier W9. CYLINDERS AND INFORWITION SUBIIILM! eel j-?rlineer 1-711• NOPTH AM(e1C Tlpa . K fl61 axtN AV"A N.W. NORTH AMERICAN INSPECTION G TESTING�� Bl. 9 4w Su. 2J3li CERTIFICATE: 0808 REPORT NUMBER: Ou9 DATE:29 Febrw ry 1960 WE HEREWITH CERTIFY THAT WE HAVE CONDUCTED COMPRESSION TESTS ON STAN7ARD 6- X 12- "ONCRETE TEST CYLINDERS I AREA 28.3 So, IN) AND HAVE TO REPORT AS FOLLOWS: DOB: lllghllne dieter Tank, City of pentoa ADDRESS. Renton, Waahi.gtoa ARCHITECT: ENGINEER: Richcrd E. A,Iff COMTR,kCTOH: G. R. Liiachner CPnet. Co, SPECIMEN AGE IN ULT. STRENGTH eta EKGTH NUMBER DAYS WlIGNT GATE LATE . IIN—�- �.L6A160 IN CAST OKEN E9-B 28 30/114Gr. 91,000 3219 2-1-80 2-8-60 30#8o■. 151,000 5342 2-1-6u 2-29-60 ePreviouely reported MIN: 6 ok cement/cu.yd, 0Oneretel 30000/e0.1n. 0 28 days. 9tandnld 0eolent - 3" slump. PLANT INSPECTOR: MIXING PLANT Stoneway Sd0 FIELD SUPERVISOR. YARDAGE: SPECIMENS 'TAKEN FPJM: Fier No. B. CYLIN"4F15 AND INIOIZ�rTON BUBYIYTImr cot 3-ingineer 1-Pile NORTH AFU N NsgCT oN o MT No? y d:l 770E S" AVIRM N.W. .;e. SFATR! 7, WASH. NORTH AMERICAN INSPECTION & TESTING SU. 24M SU. x-uSl CERTIFICATE: OBOE REPORT NUMBER: 0111 DATE: 29 February 1960 WE HEREWITH CERTIFY THAT WE HAVE CONDUCTED COMPRESSION TESTS ON STANDARD 6" X 12" CONCRETE TEST CYLINDERS AREA 28.3 80, IN) AND HAVE TO REPORT AS FOLLOWS. JOB: Highline Water Tank, City of Roston ADDRESS: Ranton, i\nshington ARCF.ITECT: ENGINEER: Richard E. Wolff CONTRACTOR: G. R. Leischner Const. Co. SPECIMEN AGE IN ULT STREN4TF STRENGTH DATE DATE NUMBER DATE WEIGHT IN Lab LSE 18G IN CAST BROk e10-A 7 30 14az. 55,000 1946 2-1-60 2-8-60 10-B 28 3 ox. 109,000 3856 2-1-60 2-29-60 '"Pravioualy roportod Mix: o sk zanort/CU.yd, concrete, 3000#/aq.in. B 26 drys. Stn:\dard Cement - 3` Slump. PLANT INSPECTOR: MIXING PLANT: Stanomy am FIELD SUPERVISOR: YARDAGE: SPECIMENS TAKEN FROM: Pi-r #9. CYLINDERS AND INFORUATION SLHNITTED: cc, 3-Engineer 1-File `N9R`•. .MFRICAN�TEST. \Y I RICHARD E. WOLFF ISO4 SMITH TOWER SEATTLE 4 WA!.H MAIN&M4 Arch 1, 1960 Mr. M. N. Schroeder Superintendent of utilities City Hall Renton, Washington PROGKLSS ESTIMATE NO. 2 Tank Pootings, etc. Contractor: G. R. Leisc hner v201 - 12th Avenue N.N. Seattle, Washington i Unit Itm tit De"riotion Coapl. Price Amount 1 197 c.y. Concrete footings IOU S 52.Cl i 9,724,00 2 328 f,. Remeve and reconstruct fence 98 2.10 674.82 3 780 ft. Construct new feUCL 98 4.4o 4.363.36 4 1 job Site grubbing and grading 100 t,430.(YJ 11450.0C 5 360 ft. Install 161, C.I.P. 100 7.00 2,520.0( 6 25 ft. Furnish an.'. install 8'' C.I.P. 90 .00 185.0( 7 I ea. Purnish any install 4^ hydrant 90 300.00 270.0, 14 Pump house pipe work, ,aterials on job 3,D41.75 Value of work coupletrsd $21,223.93 Plus Stato isles Tam 4% 848,96 $22.072.89 Less 15% retained 3,31U.93 $18.761.96 Less previous payments 10,207.33 Palnuent due Contractor $ 8,554.63 Richard E. Wolff Consulting Engineer RICHARD E. WOLFF ito.SMITH TOWED SEATTLE 4,MASH March 2, 1960 Mr. C. R. Lets,hrer 9201 - 12th Avenue N.W. Seattle ', Washington Dear Mr, Lelachner: Subject: Renton Tank Footings, etc. The ourpose of this letter is to call to your attention that backfill is required along Host of the recently installed fence up to the first link and for a width of approximately 3 feet. A copy of the progress eatinatc as of March 1 is eacloseJ herewith. Your& very truly, R. E. Wolff REW:t Consulting Engineer Enc 1. cc: Mr. M. H. Schroeder City Hail Renton, Washington CHICAGO BRIDGE a IRON COMPANY esa weer nrw eve rw etReer ear Age 01 Ne tis •, 1%0 AIR MAIL FSle: "381 IN DUPLICATE k. E. Wolff Consulting Engineer 1506 Smith Tower Seattle, Washington Rai 750,000 Gal. Spheroid,, Elevated Tank 1004 to Bottcw Renton, aashington Gontlanen: =I Contra,• 8-03e We are enclosing for your files three prints of bill shoat kP2. This shoot has been rovised to show the outside finish coat for this tank to be Dupont Alusinuel and the sign to be painted with Dupont Black. Both paints are to Eonform to AWWA apr._fication D102_5ST, paragraphs 5.6.3 and 5.6.4. If we aay L of further assistance, please feel free to call upon us. Very truly yours, CHICAGO BRIDGE R lR,7N CCMYANY Mitdve W• E. Wilkins, Division Engineer Enclosure cc: TorrEroc SeaSalea % Mr, M. H. Schroodef (F.ncl) City Hall 01-0 Renton, Washington 381 SALT LAKE CITY CAN# X-RAY, INC. 11V. VL .1 yT Fil BOX BO BOBINO ARID, 7500 AIR►OPWAT SRAnLF B, WASNINGTON ►ArYway 5.6960 I PaIT No ,. 1685 4Tf. 3�14/BG Vfo MIRTH AMERICAN TESTING -- -_- _ PAtt NO. IW WK111110MI RATER TANK PLATE NELOMENTS WAN. EO. q w.0 NO. MATT WIPMI MO. IKIIVNq MQ —_— A,4y NO. -- TWV 4l. c.4r M0, TNtV �EPIC II{MI TO I!INp Ir A•4r, INC, RAGAi ORA"HIC CX4411ATLN �F (PRELIMINARY REFORT) yATER TANK PLATE NEI.DMENTS 5 RADIOGRAPHS, //1, A'2, d3, r44, d5 (26363) EAAMINAII N RESJLTj, THE WELDMENTS AS OF"CRIBED APOYE NERE FV,ND TO BE PREP OF ANY WNCEUNAh LE INCLUSIONS. Fife �_---' I" 251 W FSOME MWOKR 64 MIN. B7 SUM"" NO. PAINS S PRY Im AMID YUANTRY ATPMU NO. IIIICTro AJ IIfR Am � NAVY o.n It.0 IF1 1 X i 5 FWD By ODNq.N'7® By CQ77PIm BT ---- ACIf f,.l ,N': t.NJhN, Yl,YrW s bNM,.A:n 4r NMM M b INN CW b W itl wMN'.p,N W pNrb,1 He nlNri,',rMi1N1 !1+NY AN .MNNr..m�rir M MN tltRll tM 1 NMrtl UNIFORM INVOICE GIRCAGO BRIDGE & IRON COMPANY 1305 Wmt 105th street CHICAGO 43. ILLINOIS IW INVOICE Mp.._,..__.�.,.w.a.y�...... INVOICE OAM City of Aenton City 'Tell FOR K Sicf . Renton, Washington TERMS CCOW Seattle, VRshtncton a111v PEO TO ♦pvRb, .. Salt Lake City, Utah TRAN'tIt,u r,nuF sNIPPRO 1 ROM Dtstination accsrvn.. Monthly Fatimate -.xNMa AwuyTAtcNT Freight Prepaid AuoITBo :NlPrrr VIA. _ 1 She". "ITRVIW"fit=0=S4 apv 0neRlP.1pX _ .. 1 750 NO Torus Hatton Vnherold:.1 ilevatad Tank 10:, to Bottom Controot Price $144,270,0C 4X Vashington Ft,les TF-M TOTAL.........TL.., 0.e Estimated voles of msteriLl deliverad Estimated value of completed vork 16•;hi a. 0 50 AS Vasnrton Ss1er Ttx 4�],911.78 10 .set 15% retained , I, the undersigned, do hereby certify alder paRalty of perjury, that the material furnished, service rendered, etr,ense ineurre4 or other item of irdobtasnee- as eharge^ in the forarninr bill is a true ind correct chergo Afainst CITY ^r APFT�:I that the claim is just t•nr' Awe that ne part of same has Men paid and tnet I�Iaa■ huhtorIEV tr sign for the Da yat, LIOY d`_ wont.all r � Vin LP• Or V, F.ubscribed thl GIL der t + h,a ' ols e11T 3-31-60 i'LF 1fa. U b1ECF. I.OF? FULL AMWUNT I' INCOIC-C PROMPTLY UPON RKCfSIrF OF WLL%, (111C GO BRIDGE L'i IRON COMPANY 131A a rsT loins STek6T I:na:a:e 43. 1.:.rvew April 1, 1960 Mr. R. E. Wolff 1506 Smith Tower Seattle 4. Washington Re: 1 - 750NO Spheroidal Elevated Tank 1001 to ➢ottc- Renton, WashinRto : Our Contract 8-03t ` _ Gentlemen: In accordance with instructions received from our eeattle Office we are attaching hereto our Invoice 01545 in the amount of t87,334.34 representing our 1st estimate 01' work performed on the above project. You vlll note that the contract price as indicated on the attached invoice agrees 4ith the amount indicated n the agreement i covering this work. We have noted however that the 44 Wastilmrton Sales Tax should amount to 65,770.80 instead of 65,780.80. This discrepancy does not affect the amount due us for this lst estim,tc but should be corrected before our final invoice Is issued. you may wish to have a change order written or a letter indicating the correct amount of sales tax. In view of the a-bove comments we believe you will find the enclosed estime;te to be in order -nd if so we would appreciate you having it processed for pbvment. Very truly yours, C:fl::r U!1 hF1U4E h IRON COMPANY encl. e cc: Seattle Audit 8-0381 t=orraeeWe layee Joe k. d.xter aM Msrl+ers of t:rr City Corsratl Outtlerwo an thrtel toohw Ito is btirG ft. 1 for aw# ��yet� on Cospeny, nk, Froleat ,.In, !y CPSa. ge nrid�p snd Estirted Value of esteriel aeliwrwd-u2eT29..MO fstlMeted Vslue M CeVletod 4ort 'tbarwta tr>e ?tan B. les Tex T MM loss 15% retrined ite AMUSE Totrl due this estsgste S u7.1a0 3q The t'tilittes DOPart wn+ eQ'tiftlt end resorsrnde mmusnt of 4stieste ao. 1. Yours VCay trai,r iir M. tanreedee aWniebrdent of utilities "'Sin t•, 2 RICHARD E. WOLFF 106 SMITH IOWFa . S"TTIE .. WASH. MAIN I&NH April b, lvm Chicago Bridge and lron l.,mpu,y 1310 - sth A"ImUr Seattle 1, Nashingtcn Gentlemen: The purpose of this letter is to request that you add to your cont/act for the ?50,000 gallon Benton tank, the furnishing and installation of an airways warning beacon and wiring con- duit to the ground level. I imagine this is A standard ttom, lot which y,u are familiar with the specifications. if n.,t, w• w111 secure the requireuents. 1 believe the conduit would best Le installed ad}scent to the overflow pipe. Very truly yours, RIiN:f c/c N. H. Schroeder i ity Nall Renton, Nashington 4AI.L P.e 91W SIIBMLRSIbLI. PUMPS - CITY .,F xlil'Whi Sealed bids for the furnishing and installation of subaersibte water pia,,. ai 11 be roealved by the City Clerk at tot :.Sty hall, Renton, ahskington until 3200 P.M. April 24, 196U, or the ssac may be proaeoted to the pity e.00lKil until SAO P.M. un the Saar data. t this it" the bids will be ,pened and read. The work involve■ the furnishing WIO inat&lletinn of subecratolc pups t 173 Spa and l0U Spa, site grading, c.tcretc imap pit, dischatq pipiag, and accessory equipheat, fur two previously constructee "ter wells. Plans and apeeifications may be cbtsined lt�a the Superintendent of Utilrtica, City hall, Rentch, or kilo the Coo►ulting tagp neer, O.L. aolff, liu6 Shith To"r, Scottie upon deposit of $W.,w put set. The plan deposit will be returned to bidders if sets are returned in usable eonditi� prior to May 4, 1966. Mon-bidders will be refunded ane-ball the deposit if sets •r: retarnea prior to the gang date. A certified check or satisfactory big bond in an amount not less th", 3% it total an4unt shall accuapany each hid, State Sales tax &hall be statod as a *operate iten in the bid. The lily rt�serves the right to rodect any or all bids. very h Morris City Clerk Publisb April 14.21 t.111CAGO BRIDGE & IRON COMPANY 1318 Fourfl AVSNta ttF1111.9 1. WASHINCTON Tat.-mue S•741i April 13, 1960 IN TRIPLICATE Mr. R.E. Wolff, Consulting Engineer 1506 Smith Tower Seattle 4 Washington Sub: Obstroction light for 750,000 gallon spheroidal elevated tank - loot bottom City of Renton, Washington Our contract 6-0381 Gentlemen: We are pleased to submit the following quotation covering the furnishing and installing of a doubles obstruction light on the 750,000 gallon elevated tank we are constructing for the City of Renton, Washington We would propose to furnish, deliver and install a double obstruction light for the top of the 750,000 gallon elevated tank including the necessary wiring brought to a fuse box at the base of the tower for the sum of SEVEN HUNDRED & FIFTY DOL- LARS ($750.00). The system we propose t furnish would include a photo elec- tric cell to turn on the obstruction light in the evening and turn it off in the morning without any personnel having to go to the site. The following items are included in our quotation: 1. Double obstruction light - Crouse Hinds VAW 43961 with red globes. 2. Photo electric cell - Crouse Hinds #44870. 1. A secondary rack. 1, motel, socket y, Weather,,roofed safety switch. 6. 1 2 '. galvanized rigid conduit with coupling. The conduit will be attached to the ladder brackets on one column leg and attached to the ladder brackets on the fixed ladder on the tank and the obstruction light will be mounted on a vertical angle. • CH'CeoO I1AIDGE s IRON COMPANr • -Z- 4/13,60 This work ca the n be Accomplished while our crew is at conwtruction site if we have prompt notice fro Witt the ordering o m you to proceed f materials. We hope that we may be of service to lou in supplying this work. Yours very truly CHICAGO BRIDGE 0 IRON CONIPANy Lew1a H. Hollmeyer Contracting Engineer LHH:e cc-NO SLIP TE 8-0381 file trip-City of Renton Mr- N.H. Schroeder City Hall, Rentor Va. RICHARD E. WOLFF rSySEA I{a1 Sia? SFA N TOWEa • RLE 1, WASN. MAIN rap• April 15, 1vaV Me. Nollmeyer Chicago Bridge and Iron Company 1118 Pourth Avenue Seattle 1, Washington Dear Mr. Nollmcyero The proposal regarding the obstruction light installation at the Renton tank aB stated in your letter of Aprii 13, Iva() is approved. Will you proceeJ at once W secure the aatetials and make the installation. Very truly yours, RIM:I R. L. Wulff c/c M.N. Schroeder CHICAGO SMI009 A IRON COMPANY Nd W991 11TH S"TN T1A{.T ♦IILT L..% CRT I0 NT.N April 410 1%0 File, 0-0381 I'. lRIPLIi:ATE Mr. R. E. Wolff Consulting Engineer 1D06 Smith Tower Seattle 4, Washington Re: Obstruction Lights for TSOMG Spheroidal Elevated lank City of Renton, Washington ClMI t:ontract R-03Y1 centlomanT Enclosed for your files find three prints of drawing •Ae, details for obstruction lighting as approved by your letter of April 15th. If there Are any questions regarding this installation, please feel free to call upon no. Very truly yours, CHICAGO BRIPGE s IRIAJ CUMPANY W. C. Wilkins, Division Engineer 7EH ndvo Enclosure cos TerrErac 3esSalos City of Renton - Mr. M. H. Schroeder City Hall - Menton, Wash. B-0391 SALT LAKE CITY c �� d 7.c,( •esidngt Y•` UNIFORM 1NVOICi CHICAGO BR1DGE & IRON CO MPANI 1104 Wa,t toseh Str[[t CMCAGO. ILL out& INV(JIC[ No 22" INVOICE DATE sow ir30�6P -- TO City of Aentan I.... City Hall I FOR CUSTOMLR'S USE Penton, Washington new_ r O. a_. ACCOUNT- 9HVrroTo Peettle, Washington APPROVAL •HIPPED FROM TRANDPORTATION Galt Lab City, Utah P. O a I RECEIVAL. Destination CALCULATION& TERM* Monthly Votlmate N ADJUSTMENT SHIPPED'v . Freight P j AUDITED. gh repaid II AgF_eV1.. pt"d eUANTrYv e[EeRMeee ._.. i_. Seattle 03772 1 - 750MG Torus Hottom spheroidal Flevsted Tani loot to Pottom Contract Price 11AA,270.00 Add 1, charge per cur ltr. A-13-60 4% Washington Sales Talc -"-" Estls..ted value of matartal delivered O, 0, 0 Estimated value Of coapleted wort 8 ,t.1A.00 t AS Washington Sales Tax Less 15% retained Len Previous Invoices i e7s0, I, the undersigned, do hereby certify under penalty of perjury, that th, material furnished, service rendered, expense incurred, or Other item of indebtedness as charged in the foregoing bill is n true and P correct charge against CITY OF F.}IT011 that the clap is just anC due, that no part of came has been pale and that I am authorised to sign for the payee, SIGH FrAfi , fiC, for CHICj.a 1 bF Title Sutecribed this igtM dap of MAX, 1960, at Chlenso, Illinois a ISON COMPANY Bent tot 15 P, 1 Yo • 1506 gaits T er � ___� �����ffffjjj````��''' Seattle t, W i on P 1J elt 5-10-60 �12) PLEASE[END CHECK FOR FULL AMOUNT OF iNVO1C■ ANY CHARGES YOU NAVE &ILL BE I`a:, PROMPTLY UPON RECEIPT OF a1LLT RICHARD E. WOLFF Irra SMITH TOWSS a SLARLl 4, WASH. MAIN t-0TN May 2. 1V6� The Honorable Mayor and Council City of wanton Nashington PR,GBLSS IIST1MATL No. 3 Tank Footings, Pipe Lines, Pumphouse - job N 18 Contractors G.N. Loisc htar Lunat. Co. 9201 - 121th Avmuc N.A. Seattle 7, mat,hington sign t l amen t Unit Item QuentitY Unit Description C'unpl. Prlcc Amount 1. 187 C.Y. Construct reinforced concrete footings for 610Vs30d tank 1MhR 52.00 49,734.tw 2. d28 I.f. Remove and reconstruct chain link fence 100e 2.1c 6ee.GU' 3. 780 l.f. Construct maw chain link fence was 4.40 3,363,36 4. 1 Job I.e. Site grubbing and grading. 90% 1.430.00 1,303.00 3. 380 l.f. install 16" Tyson Cast lion Pipe 100e 7.00 4.102.1A1 o. 25 l.t. install till Coat Iron Pip: Ims 9,00 .00.00 7. 1 each Furnish and install a" n,V.ci. 2 norsle hydrant, flanged connection It# J00.W 300.00 B. 1 cacti Punish and install 16" G.V.s 3U01 873.00 873.u0 V. 1 Job I.s. Construct puwphouge, complete 80% 043.cs0 3,160.00 10. 2 each Furnish and install 600 gpm suetiva-cased vertical turbine pumps with red,,ced Voltage starters 901 ::,000.tv 3,o00.0U 11. 1 each Furnish and install 13U0 Spin auction-cased Vertical turbine pump with reddced Vita� starter 90% 3,300.00 J.130.00 12. 1 Job ..a. Punish and install P"Ptiouse piping. gate val Ves, c eek valves, motor, etc, 45% 5,$20.00 8,379.U0 Al 1 Jon Install 24 it, two-lesf chain link gale 340.oP Value of work completed M7 rrr-M State Sales Tax, 4% 1 647.49 Total amount 14 less 15% retained 64�22S ,1,99� Amount due contractor i36.409.46 Less Previous payments ..1g��761...90�4 Payment due contractor S�N7.5 R,L. aolff Consulting Lngineer r w.y 9. 1960 hoMreble lhyor ,loe R. Beater end Lawbors of tte City Gotmil Gentlowaws Attached hereto is Estimte NO. 3 for work completed an " unk footing+9 ply► lines and 89oater station• project w•1s• by G. R. Leischner Comat Wtion Company. value of wpm completed 541$W7.16 state ToUl A lm Tax t 'A � Lane lads "W"d AwWnt due sowtnetar 6• Less previous payments 761-96 psymant dua contract-& $17.647.50 The Utilities ')epartment has checked the attoched ratinrts and rocmwlds paywent of Estimate Re. 3. Yours very truly M. M. 'chrosdes Superintendent of Utilities stls oms Atti 1 OLYMPIC MASONRY, INC. Paoet: oo 6 •t9a t•ata L... L•.[ ■au.avue. W•%H, WAY 26, 1960 lwisohnor Construotim Co. 9,01 - 12th N.W. Seattle. Wn. Highland hater 'Tank fobs Extra - Remove bond, heave & build 3 oourses an wing tells l-310.3E OLMIC MAi,RECL. ._........... lOg Nn....::............ 5-4 RICE O.K.......... ..... CODE No. ..�.'... ...- EK I.O.K.........--_.... RICHARD E. WOLFF Fes.. 160e SMITH TOWER . SEATTLE e, WASH. MAIN 2-0 Junt 1, 1960 she uawr.ble Hayur and Conrail City of Renton Washiagton PROGRESS ESTIMATE NU. 4 TAKE POOTIN05, PIPE LINES, PUEEPNOUSE - Jub w-18 Contractor: G. R. Leischner Construction Company 9201 Twelfth Avenue N.M. Seattle 7, Washington Unit Item 2wntity Unit Description % Complete Price Amount 1 187 C.Y. Construct reinforced concrete footings for elevated tank 100 S 52.00 $9,724.00 2 329 L.Y. Remove and reconstruct ch.iu link fence 100 2.10 669.80 3 780 L.P. Construct new chain link fence 98 4.40 3,363.36 4 1 job L.S. Site grubbing and grading 95 1,450.00 1.377.50 5 655 L.P. Install 10" Tyton Cast Iron Pipe 100 7.00 4,585.00 6 25 L.P. Install 8" Cast Iron Pipe 130 8.041 200.00 7 1 each Purnish and install 4" 144.0. 2 norrle hydrant, flanged connection 100 300.W 300.00 8 2 Each Purnish ano install 16" U.Y.s 100 875.W 1,750.00 9 1 job L.B. Construct punphouse, complete 95 0,450.00 6.127.50 10 60 a.y. Construct asphaltic concrete driveway 20 4.10 49.20 11 225 O.Y. Gravel surfacing on driveway 25 0.80 43.00 12 2 Ear', turnish sod install 60U gpm suction-cased vertical turbine pumps with reduced voltage startcra 100 2,W0.00 4,000.00 13 1 Each Furnish and install 150U gpm suction-used vertical turbine pump with reduced voltage starter 100 3,500.00 3,500.00 14 1 job L.S. Furnish and install Vmphouse piping, gate valves, check valves, meter, etc. 95 9,420.00 8,949.00 the Mon9rsble Mayor and Council PkOGAESg ESTIMATE NO. a June 1. 1960 Item stit unit Unit Description t Complet: Price A%C mt C1 1 ioD Install av, 2 leaf chin llni gate 1.A) 3e0.v0 Value of work completed -- Stets sales Tax I% SN,999.30 1.7vv.97 Total Auo"t Less 1$ retai,4 S46.790,33 7,1110.90 Amomt due Contractor 130,704.e;i Less previous prymenta 36, 19.ao Payment due Contractor y 3,369,97 Cmsu.lt,., dnginer� . . NF 37y VA:L OF NAS:NOTON - DWARMN? OF !Mkrli swtt Towr - Seattle a, wuhlnacoa PBPONT ON EAC'.L CIWICAL LLANINAT10N OF WTU 3MMLS Oolleet:ad by iL d- Pohi Eli Dare eolleettd 6-i-60 _ Sawpa of Water Boll Dollar of supply City of Aerton L�bl: oi,, 1larerintendent fBeatonDate of report 41 , 196C 11aYlington Lanraturr .dint serf ..noer of to hi. General wooer tool* .tl mm,Qna al0elr.p COM,1.]alpli rf rot tartan rdlifore drpn.ens Satie (3"molls uwmM atiarsawa. ishctery� 2730 Nev tank 0 j' 7731 New Tank 0 2732 Top of new tank 0 I I� 1211at13111CIR Y. In"StIll"t MU014 jam, SUP"IT ADDITIONAL SAI7PLM DA6S.IoraDih: Repeated renllu Of trig Me smuld to conslderea wsatlsrutory, inrgstldau tM1,14 and eutalt additional smVI.s. It m portions Sticv Dresee" of coltrote orawlleas the mmt le SAtl Afutory. to*"% Stara DautnMt of 14wtn o►teriolol,cal nen0aros a pupl.c older pewly nwl wnfgnh to tAe folloaini, Of all tM stan"m tan milliliter (to N.) portions ea04aw per recnth, n.t oore thw tan (01 Par mt owl M. the protlnte of crawlwa Of iM mlias pray. 0"o,onellr t,f. (1) or an,a of the fl.e (3) eyal ton anllliter (10 el.) portyns wnstilutnnd a single atnWO aAlele NiV ape the pleNnte of ofpanlwS of the mlitonn prtwp, prd.lOw that trot !nail hot pa allpgpla If rt oCWrs .n wASS,.11.a s"1#3 or in ore ton (a) 1,., (5) per cant " the stJWard UeSl.a .ryn tint, (a) or acre seples 11.1 Seen sawrap par SOAK. (S) pM (1) standard WWI* Man less %no t' tr in) awl"ewe Saes sawinao pee north. the aoove aaaeinatidus ors mob op me state OVArtaanl of health taooralories in ucoroarco aith try latest edition of 3twOSM IVtnoos of eater ndysia, copies to: Ring County Health Dapartn&nt Puplle Health Millneer • • Contrast Starts UNITED PACIPIC pyrsvranre (owspon r�' nnaam aso suet' ossaarass. •aaf+at •saner. Good No. 653T1 Date 71alis 6, IW c1ty of Rasta Attatinn. c1t17 r . !fetes, MrLia�iop Contractor (t. R. {4lePheR. Contract for. 1Stint"iees. 91.)e..p{»e.,��,.�a. �._._............. .._....... ...........»......................_............._................................_...,............................... ...................................................... ... Contract No. _....................._......................................._.................In the amount of$...........Aiivq 'm Our Company is Surety on the bond covering the above contract. In order to render proper service and complete out cae- orde in connection with this contract it u necessary that we have the information hmeinalter requested.W<will apprsciate Your completing this form and returning it immediately in the attached addressed envelope, .... .......................................................................... t7a.tay sad S mV hteurssnt I Percentage of work completed .97x_.. 2. If fully completed. date of completion _... .. .. .. ..... ._._ _. Date aacapted......... .......... 1. If not complain, her is ptnbeble date of complv."i.?_................. ._ t. Q„ 4. Amount of money paid contractor to data ...............__...... s. sn�............,........,..., S Amount of retained percentage withheld to date 6. Amount of incrrere or extras allowed to date 7. What it or will be total contract price including extras) ... ......................................... B. Have any liens or claims for unpaid labor or material bills been filed).. ._.....,..._._KR..... 9, le the work ptogrering satisfactorily).. __.... 10. REMARKS: __......._...... _.._.. ....»_......._.__...... ......... ...................................__..............................................._................................ ............... ...................................... ....»....................._.................................................................._._................................................................ .d........ r:... t t..........._....... . ... Date_._ .....a n*..z..1%0...................._....... TUC- ...........s..�r Addrer...._. re.�9 use.csarnet.etsws R.I.tas• June 7, PfN;I 13onorible Mayor Frail), Allwnt and iior- rc of tia Cty Council Gontlosenr *1ttachod harato is EstloatL.. i:o, 4 for vorl oowplotea mr the Tank Footingss:l;re 11nea by •. R. I.Qicc!n,r •on ,. ctton rCoauac :'react ; 1:�1C Valrxm oP ;:ork capleted state "Ijes Taz Tetal /.:.cunt 7` •" Lose 15:: Retalned '' 'n. Amount due C.Wltractor 7 1.129 ;*r^vious p,,, yenta r i :ontrar.tor 1.46 Tim Utilitieo Uc;J:.rtt ant !:., checker' eettrLty and reeorrnnds ;*Yrxnt of tatlrzi., Yoare very tail 1'.. %. chro.xier 51APar5ntem:.nt of Utllltles i /ms CumAGO BRlDGF & IRON COMPANY 130S a-uT 106Tn SnRri L.m..a I N Te..-erwaT ease Cuu-CalBafaGF. c"wA o 4.1.rLUNnp M-0c Ia June 17, 1960 Mr. P. E. Wolff 1506 Smith Tower Seattle 4, Washington. Re: Elevated Tank for City of Renton, Washington our File N8-0381 Gentlemen In reviewing Our records at the present time, we have no record of having received payment of the second estimate issued on this contract, represented by our in- voice #2202 dated April 30 for 132,686.34, and mailed to X your office on May 10. We are wondering if you can N-rnish us any information as to when we may expect to rteeive the Cltyts remittance on this estimate. We thank you for your consideration in this matter. Very truly yours, CHICAGO BRIDGE N COMPAA'Y BY FRN/d F. R Ne son cc - Seattle Sales 8-0381 (.n►c,.u,�� 13►1►u�.►�; & hmN; Comvvvy 130.i IS r+T IUST11 Sraaa7 r ,-0nanv eases .n.. IIIaRMIJ t.n Nlacn U1. ILUNntr TWX-CG RU June 24, 1960 AIR MAIL t:ity of Kenton pity Hall Renton, Washington Attentions wr. Marvin Schroeder Her R. U. #3772 Agreement dated 9/9/59 1 - 750a1U Elevated Water Tank Uur rile 8-0381 _ uentlemeni In accordance wit}, information received from our Seattle Sales office we are attaching hereto copies of our invoice #2202, dared April 30#1960, for E3..,680.34, repre- senting the second partial payment estimate to be issued in connection with the above subject order. We understand that the original copies of this estimate have been lost, and we hope you will find the att- ached to be in proper order for authorization and approval of paymrnt. We thank you for your consideration in this matter. Very truly yours, CH1CAuU URRIDD,GE I�ONN?Cumt'ANY By ERN1jw ccamr.N.L.holfe 1506 Smith Tower Seattle a,Wash. a ccsinvoice ccaSeattle Sales ccs8-0381 UNIFOKitt INVOICE CHICAGO BRIDGE & IRON COMPANY 1303 wet IOSth stun CHICAGO• ILL _ Iii C '.L TE ..S� SOLD �'!ty •+f Renton TO City R 11 FOR CUSTOMER'S USE Rantont v ahln� On TERMS__.. F. 0. E. ACCOUNT r_ SHIw.DTO sotttles Vbahir'+ttSa APPROVAL SNIPPED FROM Rfilt L ke tYtys Ut•h TRANSPORTATION RECEIVED P.O.s. Peattn&tlMn CALCULATIONS.. TERMS Xonthky fstLwte ADJUSTMENT SNIPPED VIA PtAghL =reprtd AUOITED�_ aV slOMu•s o.ou YUpo Ctis+pl(ra Fe411 mob ylMx. wu.rll•s ca410.f+ NVMM. fMn amn ARroo. ter :1.4_59 11-n.;■1 °• ttle RU ANm+ Doenv nPN ' ANouH+ r1'►t 1 Tao 't0 Tnr•r !btP ym 00%&r*tdPl F.1ry tcd Tana P .t t RottTa Contract rriee d144s '1F.?fi Milt". ebdrEe Per •rur ltrb A-7 s-d4 ..tG 49 YtNsiagtlala Axles TaTMOM �` y P lstiasted obiuo at s tert. l if literud f e t�1S.00 rattrAwd e711m, rf eamlctrd .erk 4* ►ARhinftnR F+lse T,tt +Rf LPs 15% rot? -A Lest 'rsetiue Inr'+lrat Is the. IWAorsitaRA to hereby earthy brier rov%—A? of otejuryt thhit the `e ttrl l rurntshMe tt aeree r•e r d• ds •TtPeaN t,trto'reds ar •thor Itoa .f tn'tpte'nesR is ch;rlr;S in the bill 1s tra End oorrtet nh.-ys Apinet tna ClTy Jt ei'RTA thnt the *lain 13 just so, Iu•s that nn P. rt of .,•e has been +.10 Pad test I Its authArisod to $lea for the ._yeee 2 _AW1 s 81 /,1t��,Z%�?11, r A- 1sum saDseribod this loth dr ,r\'/\�'�J�/,`•) • if Rent tit Kr. A. ".sVet lei`) j f 1SOd Wth 'In PLEASE SEND CHECK FOR FULL AMOom• .,.:.,.F ANY CHARGES YOU HAVE RILL •E PAID PROMPTL+ UPO\ nECE1PT OF OILIS. UNIFORM INVOICE CHICAGO BRIDGE & IRON COMPANY 130S Wert losth Street CHICAGO, ILL lNVOIOE: N0. INVOICE DATE DAt[ A,—___ wla or of Menton To "itt lal: Yl+ntca! Crei,i-waft FOR CUSTOMER'S USE TERM$_ F O.B.__ � VI ♦e F■ lCtaSl ACCOUNT SNIPPED TO APPROVAL— _ felt t•ko City! FtAh SNIPPED FROM TRANSPORTATION_.__�� �a�Ytioa RECEIVED_ Itaathly latlntte CALCULATIONS___ TERMS ADJUSTMENT rt'fl�At hoplLd SHIPPED VIA A,1 pl♦ED _ I. R CU5Tp1I9'b R1y191110M •ARfA MI.I IA'�—A'� Y�\!. Soa tl(� --_ —1 OIIIfI _... ANT" Is br)41,1 TION .'-- _ � .MOUNT ! Oontreat P-1N �lh:k,, lldd I, I.ncros pe^ err ltr, It Vashiaetm RPlea tau ' T"l7ALeP.. 1E11neted relw at sA terl .l ..'.o3tteMd E 1EHaated ►aloe of eonPletod vork 41 W"OhIR Eaw PA90 Tex " :.eu Tr�I Tw 3naRldef jy"�[ A" — It 'Z�iZ'T�T Is the datsl><. *A. do saN/F Sertlfy eRiPr wlntltl of N':TAryp th't ?As aaterlal lErnlska-le sariso rotE3orNe o:ponao lnevre3t sr athor Itor of indobtolsr,T ;t eharrod In the fvrolatns U111 is . Ire :nd onrrart,adRrRo EStlnat the I.IYY )Jr' K"T'ju ttaat tpo alAla is 3vat r&j Brat that no pert of [..4r hot boas p-1A, tW thot I sa aEatharlteJ to r1 for the PAY**, "Um "As AA f eulksoplIW4 this ''loth dy Df Zme, 1"00 at:!Tip �n! f11 atter7 lE de>.• t.et Mr. n, r. tplt• 190d to elk loatC*!IO 1 Fytto •5F Si' ..1 ♦MOUNT OF "0" ANY `4: i iJV NAVE .IIC BE PA1O v PpR a!;,Y UPON RUE;`or Eli Jun. 27, IWO !ienerable IAayer Frank aliment ..nv -'Oubers of the :ity Lolwc11 cwntlown# Attaobad hereto is the lee ad a=t!n,,te of wart aau. 114tod by MICage tlrtdgr ate tron Cetus any an the ptghlradia lewAed Tanars Pre}aet tutu-la. Ssltaeted Value of saterlal ualivsremj l2ssis.00 Ettlomtod Value of yak Completed ►ea'inyton 6alaa Tax ll Lose 15% »glMd 12Q Las PrsMlow P+tynwnt Tot_I due tontractmn• this date 5 TM Utilities dopsrtsmant eertlfles thet t+4 ebaae ea. tlmmate is oerraet charge amid recof"nds ,eywnt of estiests Na. Youn very truiys R. ". s0ranfer 4tmerinterdant ,! UltlillN 481ue RICHARD E. WOLFF 11a1 SMITH TOWSe 4 SSATILS t WASH. MAIN t a lulu 1, w,' Nonotable Neyor and Council city of Renton Washington MOMISS MIMATI NO. 3 750,000 gal, elevated tank, Projeet No. H-16 Contractor, Chicago Bridge and Iron Company 1305 West lll5th Street Chicago 43, Illinois 7w`,MTO gal. Torus bottom Spheroidal Tank, 1W to bottom Contract Price, $144,271.00, 98% corlplete $141,384.60 Double obstruction light, installed 750.00 Value of work completed 332,134.00 State Sales Tac, 4% 1,685.38 nrQ Less 13% retained 22,1773 .10 Amount Due Contractor 125,640.98 Less Previous Payments 120,020.69 Payment Due Contractor ; 5,636.50 kFW:f c/c CBI - Chicago CNI - 1318 Fourth Avenue, Seattle 1, Washington y�J Co Censutti gineer CHICAGO BRIDGE & IRON COMPANY 1316-4"Avawua SBATTLE LWAMHINOTON July 5, 1960 IN DUPLICATE Mr. R.E. Wolff, Consulting Engineer 1506 Smith Tower Seattle 4 Washington Sub: 750,000 gallon elevated tank City of Renton Renton, Washington Dear Mr. Wolff: As discussed with you, we do not believe that any change in the tower rods on the elevated tank we have constructed for the City of Renton, Washington is required since the condition of the tank is quite acceptable from an engineering standpoint. The amount of bow to the tower rods represents a change in length of only 1/8" over the theoretical length to produce a 51, gap between the rods. For earthquake design the required size of the diagonals prevents the use of turnbuckles thereby eliminating the control for removal of small amounts of length which would be required to completely eliminate the gap between rods. Although some movement of the tank will occur prior to the rods acting, the amount of movement required to bring the rods into action is not sufficient to cause difficulty from an engineering standpoint. Should an attempt be wade to eliminate the small amount of length from these rods, it would be possible to produce sufficient tensioning of the rods so that the column load would be too great. To summarize, we believe that we should not shrink the rods on this elevated tank to remove the gap between rods. If there is some objection from an appearance or noise due to slapping of the rods to- Mother, we could clamp the rods together at their intersections with U-bolts. Yours very truly CHICAGO BRIDGE & IRON COMPANY t. By Lewis H. Hoilmeyer LHH:e Contracting Engineer cc-MO,GenER(W.Davis) SLP,TE & 8-0381 file RICHARD E. WOLFF --lf �SO4 SMITH TOWFa a SEATTLF 4. WASH. MAIN tA4M July 5, 1960 The Honorable Wyor ankl Council City of Aenton Washington PKOGABSS ESTINATB N0. S TANK PVJTINOS, PIPE. LINES, PUMPNOUSB - JoD w 16 Contractor: G. A. Lwischner Construction Co. 9201 - 12th Avenue N.N. Seattle 7, Washington Item Zumtity Unit Description 1 conpl. Unit Price Amount 1. 167 c.y. Construct reinforced concrete footings for elevated tank 100 S2.00 $9,724.00 2. J2n L.P. Aealove ano reconstruct chain link fenct 100 2.10 688.60 t. 760 L.F. Construct new chain link fence 98 4.40 3.363.36 •. 1 job L.S. Site grubbing ano grading 48 1,430.00 1,421.00 3. 633 L.P. Install 10" Tyton Cast Iron Pipe 1W 7.00 4.385.00 6. 23 L.I. Install 8" Cast Iron Pipe 100 9.00 aw.00 7. 1 A"h Purnish and Install 4" M.Y.O. 2 noasle hydrant, flanged connection 100 301).00 3W.00 6. 2 Bach Purnish and install 16" G.Y.S. 100 873,00 1,750.00 9. 1 Job L.S. Construct pumphouse, complete +5 6,430.00 6,127.50 10, 60 S.Y. Construct asphaltic cope rete driveway I0U 4.10 246.00 11. 215 a.y. Gravel surfacing on driveway 30 0.80 00.00 Progress Estimate No. S Page 7ko July 5, 1960 Item (Nalitity unit Description 1, C�mpl. 0wit Price Amount 12. 2 bath Puroish and install 600 gpm suction-:.Ased ver- tical turbine pins with reduced voltage starters luo 2,000.00 $4,000.UU 11. 1 Each Furnish and install ltOp RPm auction-cased vertical turbine Pump with reduced voltage starter 100 3,300.00 ?.500.00 14. 1 job L.S. Purnish and install pump_ house piping, gate val vea, check valves, meter, etr. 100 e,820 00 8,920.00 X1 t job Install 24 ft. 2 leaf Rate IOU 340.00 340 00 Value of work completed 445,613.66 State Sales Tax, 4% 1,d24,63 Total $47,440.29 Less 15% retained 7,116.U3 Amount due Contractor $40.324.26 Less Previous Payments 39,77% 43 Plyewnt due ':'Jntt,,tor 344.63 R� RBw:i R. B. Molt Consults sneer RICHARD E. WOLFF mtr iwm eawh+TOWN wea a %stnmtit.. wasmt aiA1N t-0IN Jo lv P, 1460 Nr. 4arvin Schroeder Superintendent of Utilities City Hall genton, Washington Dear 4arvi 1 made up the July 1 progress estimate for the CO a 1 tank on the assumption that the tank people Were going to attempt to tighten the diagonal bracing which as you know became slack VOWS the tank Was loaded. On inquiring as to how end when this Was to be done, Louis Hollmeyer inform.'d at he had just received a report from their Chicago engineering departnamt on the biect. It is auwmariae., in his letter to me which is enclosed, While I rather unwillingly give up my idea that the rods should be tightened, 1 must admit it is boxed more on appearsace than on technical considerations. For one thing, there is the but,: problem of a rigid structure "soma a flexible structurx, It has heen found in design of bridge piers and tall buildings for instance that design for rigidity was impossible whereas is NOW,- flexibility "S perwitted, damage from wevement was negligible. Considering the earthquake problem of this tank, 4 rigid supporting structure WOukt impart greater movement in the tank itself And, therefore, a greater womeutun of the mama whl,a, would in turn ha" to be restated. As nollmew r paints out, the movement that could Occur in the colwmes before tlw diagonals started acting is quite small and of 4 magnitude that could not put any hertooe eccentttclty, for vertical loads, in the hfoot diameter caltmris. From the practical stsndpoknt, it Would seta extremely difficult to control the amount of beat Applies, 404 the subsequent shrinkage, with such "iforwity that tha SAM tension Wald be pat into tack rod. Lack of tmiformity to the rod tension Would co.rtgimly put mote serious eccentric Stregsea in t!r colmmma. 1 du not think that anything would he gained from the structural Standpoint by 41 Milts at the latersectiwa, It Would be better to leavethe rods tree to mare with exposure to our and varying "ter levels in the tank. A consideration also is the wide experience and responsibility of the CH a I Comport, the letter states clearly that the matter has been given specific consideration and their recommendation is that shrinking the rode not be attempted. I called Me, Wollawyerms attention to the tWe diagonals Which were Welded together at their intersection and questio",1 whether it Wea intentional or accidental. Ite IS checking on this. Nr. Wcrin Schroeder Pass 2 July 77, 1960 If you concur in the recoea,.,utiona, 7 belie" the tank aAaulA h a,.ceptrd as enclosed. d and the 7J-day lien period started, The CHI iMoi Cea are ehc load. I will prepare the contract co Vp etlou notices for the State. Yaws trot,, e/C CH i I, Seattle H. is. WI/ a July 11. 1%0 oosrable sbYor Frank Ai isent aue 4ebera of the city C*Wmil clentlemeen by Attaeh.d Fete IS *snort's Ns. 7 for WCC* "WI-ted town T+nk.ueF�c t� 16� eem ony on the highlands Llevatod S:atis*ted Value of "t"141 doll" SUi.;19.0D atlnoted Value of Coq:ioted aork TOTAL <% xashington Sales Tex 4%QxX Leas IU retsilwd TOTAL 3 90. Lase TOTAL Prevloue !"Voices (va,,sants) sly! AMMMT DUE '���• The Utilities 1 U.1T7.fXj mote !a eerrwt eMrgel �ro nr�oMe �sYsentu{ cell yet! I yaws very truly* 16 h. Schroeder Sul»rintand"t of Utilities wager Attr 1 honorable Wyor Frank Aliment .Mc !Av bers of the City Council Gentleman, Attached hereto '.s [stilvte 10. 3 f:s task %oWletod on the Tank pcwtings, Pipe )tees pu ph Ism prcjeet u.18 by G. K. L-oisehner Construct'm Cory:+ny. tialus of work. cospletau yu5,L15.-8 State (ales Tax 4% .La State CA Total S4T,�4o.r4 Less 15;; retained T.lt6.�3 Amount duc Contractor ',124.4 Sacs prs+rioue psy!xnts !.T19.43 Payment (.us Contract r The Utilities Lep;rtarnt has rhackcd the urtac;isd meat anki recommends Ay-vnt )f Est ate 40, S. it '!ours very truly, A• :i. Schxrw-.cr Su..erlrtterntMt '� Utilities F.itl 2 July 11, 1960 Honorable asyor Frank Aliment and llwbers of the City Council Gentlemen, The Utilities Department has completed the testing of the 750,000 gallon elev..tod tank in the highlands, which covered a thirty (30) day period, and has been in service for 9'me five Weeks. We therff.r recommend that t1'e City aees't the card as construed according to specifications and the thirty (30) day lien period atrrted. At the eospletior, of tl:o lion erlod the follo.ing final "atimto and payment should ire made. Final 4avmant Estimted value of material delivered S 92.,815.00 Lstiawted value of '..ark completed 4 Washington Sales Tax t145, Z,150,820.�:.0C lag rwiouf invoices 120,197.68 Final Psymomt Due S 22,623.12. Tlu Utilities LWpartmant certifies that th,+ amap,mt stated for final ;aymnnt is correct and reconsxenis f4yment of amount ohowm. Yours very truly, M. H. Schroeder Su.erintoodont of Utilities wiser Atti 1 ..... ..aoaau.ei.ee.a.oa • �,p,4NF4 • ....a. ........ STATE OF WASHINGTON TAX COMMISSION OLYMIIA aacoa Tu wvu.oe July 21, 1%0 City of Renton Ren Wn, Washington Re: Chieago Bridga & Iron Cc. F:.le Numhar C'409-1689 :%entleaen: The Chicago Bridge !: Iron Company ha' noi;ifien us that they have OeMpleted a contract with the ..itv of R1111n for the erection Of a 1,750,0(k gallon elevated tank. l ^lea's execute the enclosed force (FL 321) so that tax cearence may PrOceed in regard to the retainec percentage. Very truly your1j, TAX 0.'7I:IOti AUDIT SEC-10N Yemen 'r, Bu7. itt, Auditor VFB:eh Fncl. ciortock luwtus UNITED PACIFIC 'fs'NV--1 atitift,Milani..., Bond No. 65Yri Data &%Y 26, *6) City of FaUtm Attx: liuverintandsrst of Utilitift my Hall FmAm, Vaiahington I`Ont'ftct.r a. ii. -u"chwar Owstranim QV- Contract for pipe *00MU=5, PM4 and SOW I...I.........................I....................I............. ...... . ................ . ................. Contract No. 1......................... to the amount of t........hdliem.&W.....— . — Out Company is Surety on the bond covering the above contract. In order to tender proper strivice and complete Our rec- ord,in connection with this contract it is necessary that we have the information Leemsifter requested.We will appriassele your completing this form and returning it immetbitely in the attached addressed envelope. 5.,."Dets nee, I Percentage of work completed ITpi 4.of ........ ......... io.4i U230114 2. If fully completed, date of completion - -.... --............ Date accepted._............................................. . 3 If not comp;rtc,what is probahlaclate of completion), ...... Asinjoss". J. Amount of money Paid contractor to dart 324 5 Amount of retained pereentagi withheld to date 6, Amount of im.reass,or extra,allowed to data 7. What is or will be total contract price including extras, . .... .......,....,..................Ilan..._...............,... 8, Have any Itimi or claims for unp#.Cl labor or material bill.been 51*d' ......... .--.....34................-, 9. ls the w.rkp,.ffr..,igtitf.etorgy).... ...... ................I.. V4W-. ............. 10, REMARKS:. ......... ....... ........ ........ ...-...................................-................ ................... ............ ....... ........I. ..................................—....................................... ...................... ....—........................ Date. .............. ..... Title..... ....... Addresses c..".0.at.W. • STATE OF WASMINOTON • DEPARTMENT OF LABOR AND INDUSTRIES OV4M/IA AUG S Hr. it. E. %our 150E -%tm rover 5.attle u, isshington :cnt l'm,,Z; Th1s is to certify that Chicago bridge and Ireo Co pay, 1305 Rest 105th 'Jtrsst, Cdisage, 11110016, Fire No. 5,E59, ha^ made lwyro12 report and paid premiums due the Acccdeut and Yedicu, .lid funds of the De;wrtment of Labor and industries ccvering erection Of a T50,000 ,ullon stool eater taut for the City at haatou, Aaahington, rro.%,t Ro. 5-18, Contract No. 3772. Very truly yours, R. R. }h1111Es Assistant Sup, rvisor of REr,dnb Audit al,d Col.loctiona o.c. Chicago Bridge and Iron Coopany -rZ , 7 ►« 2474—maucwn 9_..._ a.vb" 9-13-55. Reg. _. DISBURSING O"ICr.R Tax Commission of the State of Washington Contractor: c:QGLt "ZI34 AND Aix Yjr jjia 1305 .-. 105"h at. PWC N° 30036 Zhioayvs I]11zraL Certificate of Payment of State Excise Taxes by Public Works Contractor We hereby certify that taxes, increases and penal,ies due or to become due from the above named contractor under Chapter 180, laws of IM, as amemGed, with reapeet to the foRowing public works contract: ..-..._.;o?atz1ti.til,�p oT..jip.�0pp. j,4R..h1ALM�dtt1..+A�C:�lit►. ._�X...9lA.Wn� together with all other taxes, increases and penalties due from such contractor,have been paid in full or are readily collectible from other sources. This certificate is issued pursuant to the provisions of Chap.60.28 RCW (Chap.236,UwG of 1955), for the sole purpose of informing the stale, count., or municipal officer charged with the duty of dis- bursing or.authorizing the payment of public funds to said contractor that the Tax Commission hereby releases the state's lien on the retained percentag r. provided by Chapter 60.28 RClS' for Excise Taxes due from said contractor. This certificate does not release said contrac.or from liability for additional tax which may be later determined to be due with respect to the above mentioned contract or other activities. Dated at Olympia,Washington-- _ _...._....._ .. IkU&Mt.1.a_1,460e --. TAX CONTINIMION OF THE STATE OF WASHINGTON 7a-Don .. Audtt. r.acator .NON[ • _ I�e � I�+O • JOMN J tAAM PI •l.va[. . Y V OO O.A. KI�CNN[a G. R. IFISCHNFR CONSTRUCTION CO. • GENERAL CONTRACTORS 9201 TW[LVTN AVENUE N.W. SEATTLE T. WA■HINGTON Septem'.,er 6, 1060 Richard E. Wolff Consulting Engineer 1506 Smith Tower Seattle, Washington Ref: Tank,Footings, Pipe Lines, Pump !louse lob W-1B Punch List Gentlemen: Item No. 1. Backfill slonE• fence has been taken care of. 2. Repair 1500 GFM Pump and 600 GPV Pump. This has been taker up with the Pump Mfvrs. Please rest assured that we will correct or repair any defective motors or pumps within the one year warranty as supplied by the Manufnetor. 3. Pump Rouse Fit grat.inr at driveway. Drain has been taken care of. Cleaning end painting piping and Electrical Transformer. We fail to find anywhere in the specifications where pumps, motors, piping or electrical equipment requires paint. We feel we have on our own, painted the pipe and pumps. V.'e did this to give the City what we felt was a decent looking job. However, we do not feel we should continually do things without charge. Follow:nq is our billings for Extra Fork involved on this Protect. Extra work for Electrical Under rround and control work done by Lindberg Electric Co. . . . . . . . . . . .#500.65 Plus Congtractors Overiend k Proftt °5. A[1 Q« l�t.U.d.�Lw� 5 5. Q K Extra Concrete Block to raise Retaining Nall Plus Contractors Overhead k profit y Extra Depth Excavation 66c L1.Ft. 16" CI 53250 Pipe Line 4 ."t per ft. . . . . . . . . . . .310 139 contrast Italue Aft UNLTKO PACIFIC comps, la^v.ls Bond No. 653TI Data SWtalabsU9, 196D city or nouton Attu; allgerintandout of Utilities City L.0 ,Antawi, wag4jactu, Contractor. Ge C.ntractfo, _ 11.....................................--................................................................................ .................................... Contract No......_............_.. . I —............... _.............................._In the amount of$..... h'.411U.55 Our Company is Surety on the bond covering the above contract. In order to tender proper"Mice and complete our rec- Ord&in connection with this contract it is nectuasty that we have the i.fo•mtai.n hereinafter requested.We will appreciate Your completing this form and returning it immediately in the attached add,staxed an'sh.ps, ............ I. Percentage.f wok completed .. ........ A..( .ktj.'.k.4/op 2 If fully completed, date of completion ... .... ...... Date see'Ptaid -ftvsyabjr-cytj�10/60 3. If not complete.wha :0 probable date of completion;......___.. .. ................................ 4, Amount Of money Arid contractor to date S. Amount Of retained percentage withheld to date 6. Amount of i—r-ftso or extra-allowed to data ..........._............ .... 340000 ........... ........ ....... 7. What is or will be totel contract price including extra. ....................... —4twot B. Have any here or claims for unpaid labor or mAte.rial bills been filed)..........................�0 ........................................... 9 Is the work progressing satisfactorily 10. REMARKS:....._._ ........................... r(n t so,ttIqd..y.qj .. ..P...1........ q.............................................................. ............ ............ ............. ...........-......... .....—1.......................................--............I.................—. Illiko"..................I...................I...................................— Data........ . ....... .-........... . . . . .... Title,............3'U."T of UtIlItt" .... IYT aim-C.U.11 *tat. Address...... ^Ye • • •ll.Y•[i ••000 1(:itiN i BP.Y�i a P ,rn eiv-..tP G. R. LFISCHNFR CONSTRUCTION CO. • GENERAL CONTRACTORS •EOI TWELFTH AVENUE N.W. SEATTLE T, WA5HINOTON See�emher 2�, 7�6i� Richard E. wo1fF Consulting Engineer 1506 Smith Tower Seattle 4, Washington Ref: Underground Service Renton Ht¢hlane pump Station Gentlemen: Enclosed herewith Is a itemized st0oment Ll from the ndbera Electric Company, which you requested. We hope this meets with your apnroval. Very truly Yours, G. R• LEISCHt1XR CONSTRUCTION CO. ...may✓[ r �.�4 c�.1/l-st4( G. R. Leischner CFL/1■ . .,, �. Lindberg Electric Company Suowr 2.830D ElECTRICA/ 4600 VARY WAY CONTRACTORS SEATTLE 7, WASHINGTON SOLD,o G. R. Laiahhner Cmatructim Co. DATE 5t,55/60 ADDRESS 9201 12th W. W. ORDER No. omd!8sattle, Nash, rground Serrioe Renton Highland pNp Station ---------------- Nat""11 Llet Miner 30 - 2+j• conduit 54.90 1 - 21�7j threaded P 18.1.1 1 - 23 IJ3 aoudulat, gaske%Yo/ 14.To 2 - 2 Ula 12.30 120 - 3/0 RWM 84.00 2 - 2Z 2 hole straps �20 10" - 2} all thread 3.9D 1 - i} Loo�mut .4T 1 - 2 gr, loa$mat 1.33 1 - bushing .94 1 - Fedsral 4M amp 600v j/p disconnect switch 269.17 Lau 40% (to cost) Wig Total material at cost pr}, I 1^' — Labor 14 bra. 65.10 355.61 Carried forward to page 21 355.61 INVOICE Da..T.�..w+. Lindberg Electric Company ELECTRICAL Su...,7 0300 4600 :FART WAY CONTRACTORS SEATTLE 7, WASNINGTON SOLO TO Q. A. Lelseimr Construction Co. DATE 5/257%0 ADDRESS ORDER Nu Work of Caatrols Aeaten Highlands PmW Balaooe Drought forward from Page 1,1 .�u.� 355.61`! Work on Controls: MaterialT List Price: 30 -�e conduit 9.00 1 - S box .63 1 - 4/8 extension ring .52 1 - VB dlaak cover .15 20 - LoGimuts .80 10 - bushings .60 150- 14 TW 4.50 6 - 84akon corn. .)6 56 'Less 40%1 16.6. 26 Material at Conti 9.94 6} bows laborL 30.22 40.16 Total extra wiring at cost, 395.17 15% Orerhea,' 59.37 Prot�tl 445.51i 10% 5•S1 Total due for Underground Service Control Wiring: $500.65 •�N•cT -••oo �n..N � a•n..o� ti • .L•O.NCR G. R. LFISCHNER CONSTRUCTION CO. • GENERAL CONTRACTORS Oa01 TWRLFTN AVa NWR N.W, eRATTIR T. WAe NINOTON Extra Labor Installinf 16" MJ Cl Pipe in lieu Of "Tytone Joint pipe as specified. . . . • •. 152.45 Additional Excavation Ear Cont.rnl Butldine snd Pumps 23vey. a . . . . . . . . . 57.50 One extra 6e Dresser Coupltnr on the Elevated Tank Drain Labor . . . . . . . . 4-42" Extra 1-16a set of Bolts R Caskets for Base Ell to pipe at Elevated Tank Materiels . Plumber Labor . . . . • ' ' ' ' ' . • • R•SO Labor 36.00 . . . . . . . . . . . . . . . . a_. 71 13.25 We feel the above listed Cos'.s are justified, and we hope t9ts prOJect can be finaled out ao that we may receive our final Very truly Yours, G. R. LEISCHNER CONSTRUCTION CO. ;l -�e4 G. R. Letschner GRL/lm li RICHARD E. WOLFF r—'ar •%r— Ilel$MIT" TOWER . S TT LE., WASH. MAIN lO.M September 21, 1963 Mr. M. H. Scroeder City Hall Renton, Washington Dear Marv: Herewith Is final progress estimate for Project W-16, together with Leisehner-a bills for extras. I'he detailed breakdown of Lindberg's bill indicates St covers the 2}" power conduits to the building and the }" conduit for Teeson's control system. The necessity for the extra depth excavation "a discovered when the lob was staked for construction. Apparently a one-foot error was made in the contour map furnished us by the City. She tower footings were raised one foot from the elevations on the original plans, bu: the pipe lines, pump barrels and pump house had to remain At the elevation governed by the ea+.sting reservoir. The extra height of the driveway wall was also due to the error in ground level. Although the unit cost claimed seemed high, the 9xtra excavation was in tough hardpan. I questioned the extra coat for connecting mechanical joint pipe, but on checking a job I had three jeers ago when we had taken alternate bids on 16" cast Iron, I found that there was a difference of 39 to 45 cents per foot bid, This msl:es Leischner's price of 24 cents sew reasonable. I believe the responsibility of connecting the tank foot elbow to the pipe line was rightfully CBhlls. The charge of $53.25 should be repaid by than. Although we are not certain whether the two pumps are without fault, the pump supplier has committed himself to repair any defect. I believe the City should accent this job as completed. I an also sending a progress estimate on the reservoir showing 100% aaepLtlan. Ib thinking at the present in that the cost of repairing any provable defective workmanship will not exceed $1,000. The retained percentage should amply cover thin. I will discuss the repair problem with you when I have cost figures on alternate methods within a few days. Sincerely y,,ure, B. Wolff RBW:a RICHARD E. WOLFF 16W SMITH TOWER • SEATTLE 4, WASH. MAIN 2-0 September 21, 1960 The Honorable Mayor and Council City of Renton Renton, Washington FROORESS ESTIMATE NO. 6 T'lNX ROOTINOS, FIPE LINES, PUMPHOUSE - JOR W 1, Contraotur; 0. R. Lelschner Construction Co. 9201 - 12th Avenue N.W. Belittle 7, Washington % Unit Item Quantity Description Compl. Price Amount 1 187 c.y. Construct reinforced oonerete footings for elevated tank 100 52.00 $ 9,724.00 2 328 L.R. Remove and reconstruct chain link fence 100 2.10 688,80 3 727 L.R. Construet new choln link fence 100 4.40 3,196,80 4 1 Job L.S. Sit, grubbing and grading 100 1,450.00 1,45U,00 5. 655 L.F. Instill 16' 3Wten cast Iron pipe 100 7.00 4,585.00 6 25 L.F. Install 8' cast Iron pipe 100 8.00 200.,00 7 1 ea. Furnish and Install 4 M.V.O. 2 nozzle hydrant, riRnged O' nnectioll 100 300.00 300.00 8 ? oil. Furnish and install 16' O.V.a 100 875.00 1,750.00 9 1 ,lob LS Construct pumphouss, aomplste 100 6,450.00 6,450.00 10 61 s.y. Canstmet asphaltfo oo,lcrote driveway 100 4.10 250,10 11 318 s.y. Oraysl surfacing on driveway 100 .80 254.40 12 2 Furnish and inetull 600 gm suction- cased vertical turbine pumps with reduced volt:'ge starters 100 2,000.00 4,000.00 13 1 ea. Furnish and install 1500 got suction-cased vertical turbine pump with reduced voltage starter 100 3,500,00 3,500.00 14 1 Sob Furnish scat Install pumphouse piping, gate valves, cheek valves, sister, etc. 100 6,620.00 8,820,o0 NenNu, Wasl:l ngton Programs Estimate 4c. 6 Job W 16 - Page 2 - '</21;'bo Item _quantity unit °lot bsmcri tion compl. Price ntp-')Unt %1 I pot Install 24 ft. 2-1eas Bate 199 392.�,i 3y2.99 X2 rurnlah and Snatc l underground clrtng for bailding rntraree and automatic control eYet". Invoice attached 5T5.75 Miscellaneous extra Work - see attached billing �ss.ls Yalu* ^f work completed State Sulam Tex 4% gu?.921.38 1.839.8g Total Use 15% no%Qlned a4$,902.85 j3 .43 Mount due Contractor rose previous payments S41.54i•43 uo z4.26 Payment due Contractor R. E. Wolff 26 Leo ar tx Attu tP r ¢o"4CL , t't M PPtt, ~ and W a°"Y,e rr �P h.'ut�bu �t of toa SOD w} t+tj drof r°Je°t W.ieor r the p or n's+,t�ota '1r,eaf �• r tJ aF �`0P"�au,' , M bt^asnrWac- rP th t In t t P ter Pr. ewe @ es rt��'"° i�araa Pr (to day Jt r to ' t t M of of 4'bvat a Oro of ram. oftoa Fora tat 'try trulw� 8a h �sa:ara�ay� �Pl PlPtq sw,t•ae,.r ,6, La6o ' onorable Mayan Fronk Ali•.•t lom'"n of tM Ctt, C7,"ll C.mtl*w, cettachtl hereto to astte•ts r,o. 6 for work cmplcted i In G, fl. Lal• hnar C'm•truoticn Caepany an the Tar* Foot- gso PtPellese and PUBWO4066 Project 0e16. ',.We o! wnk eorc,low $ales Tax +qla TMeI Loew lblt a et••d en Asct dueCantaector Laaa P+ev1•as Contractor pey Po9c='nt dueContratae 1 . TV* Utllitt•s bopertment cortifies that the above ostimto fa uerraat and rarawordt payrrnt of •affect• Poe 6. YOWM very truly$ M. h. fthr odes luwrintend nt of Utllitise tss•a Atts i RICHARD E. W01F1 irw SMnH TOWea . MATtt1 4. WASH MAIM S IMa City of Renton Washington PROFESSIONAL EMANFAING SERVICES - PROIE(.'T W-18 Protect construction cost for fee basis: Final progress eatiaate, G,R. Leisehner $471021.98 • tax lass underground electrical Work 575.75 $46,446.23 Plus items furnished ^y City - 665 ft. of 16" C.I.P. • V.72 e $ 3,136.60 >5 ft. of 8" C.1.P. 0 2.87 • 71.75 5,228.35 final estimate, C.B. E 1, tank 145,020.00 Ttal project cost $106,694.58 Bmgincxring fee, 9% of construction cost as per agreement Rf of $196,694.58 • $15,735.37 Plus concrete testa (previously billed) 117.00 15.852,57 Less previous pavments: March, 1939 $ 1,430.00 December 26, 1459 5.474.46 January 27, 1960 2,122.40 March 10, 1960 679.00 May 19, 1960 4,090.68 $ 13.797.10 Balance of fee due S 2 003v�.4` o WTkmil S�.At90, FaeiL ia3 ENDIN(a l„ QF FIL FILE TITLE IT N19A4uo03 wn'rt *3a 14 )% G: roAvK