HomeMy WebLinkAboutWTR2700029(1) FIRE HYDRANT INSTALLATION W-29A
1
ENDING
CIF FILE
FILE TITLE
a
x
DEPARTMENT OF UTILITIES
Work Order N CITY OF RENTON
WASHINGTON
Project#
Date Submitted Ma, 21, 1959 DEPARTMENT ,.j.,.
Date
Approved Comnletion Date
�I Description of Work:
Install Fire Hydrant on North side of S.E. 104th :itreet j
approximately 600 ft. east of 129th Ave, S.E. as per
Project W-29 1
_ _ I
Necessity ---- WORK TD BE DONE BY:
City Forces
Contract
Fire protection to new subdivision �--1
Others
UNIT
ITEM Ql'A:rf ITY UNIT COST AMOUNT
1 1
Fire Hydrant 1 (each 113.00 153,00
6" Oate Valve - Fx? 1 each 65.00 65.00
6" x 6" O.D. Tee 1 each 13.00 n.o0
6" O.D. Steel Pie 5 'L.F. 1.90 9.50
6" Dresser Coupling 4 teach 7.00 28.O0
6" Flange Adaptor 1 (each 9.75 9.75
Valve Box 1 Fmp
cl 10.00 10.00
Installation S m 75.00
iSub To al 363.25
(Sales ax 14.55
Overh ad 36.30
i
TOTAL COST $414.10
APPROVED BY:
Superintendent of Dept.
DEPARTMENT OF UTIL":IES
Work Order M_ CITY OF RENTON
WASHINGTON
ProjectY W-29-8
Data Sutmttted ::; ; 21, 1959 DEFARTMENT Nater
Date Approved_ Comoletion Data
Description of Work:
Install Fire Hydrant at Northwest corner of
130th Ave. S.E. B S.E. 101st Street as per Yrojtzt W-29
Nacaeaity WORK TO BE DONE BY:
City Forces _
L- J
Fire protection to new subdivision Contract
Others
UNIT
ITL74 QUANTITY UdIT COST AMOUNT
Fire Hydrant 1 each 153.00 153.00
6" Gate Valve - FxF 1 each 65,0CI 65.00
6" x 6" O.D. Tee 1 each 13.00i 13.00
6" O.U. Steel Pipe 5 L.F. 1.90 9.5C
6" Dresser Coupling 4i each 7.00 28.00
6" flange Adaptor 1 each 9.75 9.75
Valve Box 1 each 10.00 10.00
Installation I Lum,) S m 75.00
iSub total 363.25
jsales tax. 14.55
1Ov"rho d 36.30
1
4
TOTAL COST i414.10
APPROVED BY:
Suporintendent of Dept._ _
DEPARTMENT OF UTILITIES
cork Order N CITY OF RENTON
WASHINGTON
Project/ 6-29-A
Date SuW.tted May 21, 1959 DEPARTMENT
Date Approved Comnletion Date
Description of Work:
Install Fire Hydrant at Southeast corner of 129th Ave.S.E.
4 S.E. 100th Street as per Project W-29
Naosssity WORK TO BE DCNE BI,
City Forces
r1re protection to new subdivision Contract
Others
UNIT
nu WARM UNIT COST AMOUNT
Fire Hydrant 1 each 153. 153.00
6" Grate Valve - FxF 1 each. 65. 65.00
6" x 6" O.D. 1'ee 1 each 13.rX 13.00
6" O.D. Steel Pipe L.F. 1.9 9.50
6" Dresser Coupling 4 each 7.00 28.00
6" flange Adaptor 1 each 9.7 9.75
Valve Box 1 each 10.0c 10.00
Installation Lump Eum 75.00
Sub tctal S 363.25
Sales Iax 14.55
Overh d 36.30
II
f
TOTAL COST ..
As PROVED BY:
Superintendent of Dept. -
i
t! Tt
R h
BEGINNING
OF FILE
FILE TITLE
r
1