HomeMy WebLinkAboutWTR2700031(1) ENDING
OF FILE
.7 7 DEPARTMENT OF UTILITIES
Work Order / ; �/ CITY OF RENTON
WASHINGTON
Project# W-91_r
Date Submitted F,.r-SO DEPARTM121
Date Approved /C -/ f Comnletion Date'
Description of Works
Install Fire hydrant on Southeast corner of 128th Ave, S.E.
8 S.E. 100th Street as por °roject W-31
Necessity J "ORK TO BE DONE BY:
City Forces 11��
Fire protection to new subdivision Contract ru
Others u
UNIT
Im ;CANIITY UNIT COST AMOUNT
Fire hydrant 1 each 1D3.00 153.CC
6" Gate Valve - F x F 1 ealch. 65.00 65.00
6" x 6" O.D. Steel Tee 1 each 13.00 13.00
6" O.D. Steel pipe 5 L.F. 1.65 8.25
6" Dresser Coupling 4 each 7.00 28.00
6" Flange Adapter 1 eacl� 9.75 9.75
Valve Box 1 each 10.00 10.00
Installation Loimp Sum 75.00
i
j S b Total 362.00
S as tax 14.50
erhead 36.20
I
f
TOTAL COST $412.70
APPROVED BY;
Superintendent of
s. ,
I
DEPARTMENT OF UTILITIES
Work Order N CITY OF RENTON
MASHINGTON
ProjsctN
i
Date Submitted- DEPARTMEh? water
Date Approved Comnleti.on Date
Description of Mork:
Install Fire hydrant on East side of 126th Ave. S.E. approxima tel
600 Ft. North of S.E. 1.04th As per Project w-31
Necessity i WORK TO BE DONE BY:
Fire protection to new subdivision City Forces
Contract LJ I
Others
UNIT
ITEM QUANTITY UNIT COST AMOUNT
I
Fire hydrant 1 each 1-)3.00 153.00
6" Gate Valv> - F x F 1 each 65.00 65.00
6" x 6" O.D. :,teel Ie- 1 each 13.00 13.00
6" O.D. Stesl Pipe 5 L.F. 1.65 8.25
6" Dresser Coupling 4 each 7.00 28.00
6" Flange Adapter 1 each 9.75 9.
Valve Box 1 each 10.00 10.00
Installation Luw4 sun 75.00
Su Total 362.00
Sa es tax 14.50
Ov rhead 36.PO
i
TOTAL COST
APPROVED EY:
Suporintendent of Dept.
II
DEPARTWM OF UTILITrM
Work Order CITY OF RENTON
WASHINGTON
Pro�aot/ w_�r_a
Data Submitted �1 /�_o_go DEPARTMENT__Data Approved A[ 44, / S9 (; mpletion Date Ali...✓s=.- L�.S�
Description of Works
iiutall Fire hydrant on Northeast corner cf 126th Ave. S.E. 8 104th St
.
ac per Project W-31 7,
Neoeeeit7 WORK TO BE DONE M
City Forces
Fire protection to new subdivision Contract u
Others
UNIT
ITEMQUANTITY UN'T COST AMOM
Fire Hydr;+nt 1. each 153.00 153.00
6" "ate valve - r x F 1 each 0c .0 65.00
6" x 6" Q.D. Steel Tee 1 eaci: 13,00 13.00
6" O.D. Teel Pipe i 5 L.r. 1.65 8.25
6" "resser Coupling 4 each 7.00 28.00
6" Flange Adapter 1 each 9.75 9.75
Valve Bo,. 1 eacl. 10.00 )%00
Installation Lu np Sum 75.00
Su total :362.00
6a es Ta 14.50
Ov rhead 36.20
L
TOTAL COST $412.70
APPROVED BY:
Superintendent of Depteo, -/54-4✓
I
j
a. 'Tz-
ACNOMrh
I _
I
I \�
ry
V.
I'
4� =
r i
— �Q
I
.k'
i► .t
r�. _
r
F
I r"
� F - aO
,S2
P rL
IZ
air
_ l'• ` � yr t f t '�t K.+� � �`�_ y� __-__ - _..-{�" � I
.L FwF-rL"
.:?11.6.0 xf�
�-F�'scx•Y5
Y
CI
t
I � �
�' - G a37 o tpp'
DEPARTMENT OF ,TILITIFS
Work Order k �'�I'✓j _ _ CITY CF HEHTON
WASHINGTON
Project?,
Date Submitted _ DEPARTTLAT__ �alr
Date Approved Completion Date
Description of Works
e
Install Fire hydrant on Southeast corner of 129th. Ave. S.H.
S S.E. 100th Street as per rroject W-31 I
Necessity — WORK TO BE DONE BYs --
City Forces
Fire protection to new subdivision Contract
Others
UNIT
ITEM QUANTITY UNIT COST AMOUNT
Fire hydrant 1 each 153.0CI 153.00
b• Gate Val• ss • F x F 1 I arch 65.001 65.00
60 x 6' G.D. St"I Tee 1 each L3.00 13.00
6" G.D. Steel pipe _ L.F. 1.65 8.25
6" Dresser Coupling 4 each 7.00 28.00
6' Flange Adapter 1 ; each 9.75 9.75
1 Valve Box I eseh 10.00 10.00
Installati,)n Ing Sm 75.00
TotalSu b 362.00 Sees tax 14*50
rhead 36.2D
i
I
i
I
i
— , — _ --- TOTAL COST -- f412.70J
APPROVED BY:
Superintendent of Dept.
I
DEPARTMENT OF UTILITIES
Work Order N ZL-� -.3`f CITY OF RENTON
ProlectN
WASHINGTON
w 73 d
Date Sutaitted_.j._^ DEPARTMENT rya
Date Approved Completion Date
naecription of Work:
Install Fire hydrant an East aide of 126th Ave. S.f. approxieataly
60P Ft. N3rth of S.E. 104th As prr Project W-31
i
- - - -- —�
Nec esa!ty WORK 1'0 BE DONE BY:
j
Fire prctacprotectiont^ now subdivision City Forces
� I �
Contract I
Others
' UNTT
ITEM 2l'ANTTTY UNIT COST AMOUNT
Fire hydrant 1 each 153.00 ' 153.00
6" Gate Valve - F x F 1 each 65.00 . 65.00
6" x 6" O.D. Steel Tat 1 ' ea;.h 13.00 ' 13.00
6" O.D. Steel Pipe L.F. 1.65 .3.25
'F. 6" Droeser Coupling 4 each 7.0' 28.00
6" Flange Adapter I each 9.75 9.75
Valve Dex 1 each 10.00 10.00
Installation 'Jump sum 75.00
S Total 362.00
Sa as tax 14.50
Ov rfiead 36.20
— TOTAL COST -----;41Y.
APPROVED EY:
, . Superintendent of Dept.
DEPARTMBM OF UrrILITIPS
Work Order N 2o S9 CITY OF RENPON :!
WASUNGTON
Project# M�11r _
Date Submitted &mG4 DEPARTMENT V *a,
Date Approved Comnlation Date
Description of Work:
Install Fire hydrant on horthaast corner of 126th Ave. S.E. R ID4th St.
as per Proje,.t M-31
Necessity --------- — WORK TO M DONE BY: -----
City Forces
Contract
Fire protection to new subdivision
Others
UNI^
f ITEM QUANTITY UNIT COST AMOUNT
Fire Hydrant I each 153.00 153.00
6' "ate valve r x F 1 each 65.OQ 63.00
60 x 6. O.D. Steel Tee 1 each 13.OQ 13.00
6. O.D. atenl Pipe '> L.F. 1..65 8,25
6' "resser Coupling 4 each 7.00 28.00
V Flange Adaptor 1 each 9.75 9.75
Valve Box _ I arch 10.00 10.00
Installation Ws9 Sum 75•00
Sub total 162.00
Sales Yal� 14,50
Ownccad 36,20
i
I
TOTAL COST
- APPROVED BY:
Superintendent of Dept.
fI/