DEPARTMENT OF C7TILITIES
Work Order V CITY (jF RENTON
WASHINGTON
Project# _c
Date Submitted ,_ DEPARTMENT
Date Approved 4 'sue Comnletion Date
Description of Work:
I
?ns`_all 'ire hydrant on south. ��.;t corncr of "E4" Strut € 1_th Ave. 1:.
as per :'roject W-46
Neoessity _ WORK TO BE DONE PY:
Fire protection to area City Forces
Contract 1
0
Others
UNIT
ITLl1 QCAXITY 'UNIT DST AMOUNT
Fire 1ydrant 1 ach 13i.O" 187.00
6" Gate Valve 1 ach 65.55 65.55
10" x 6" O.J. Steel Tee 1 ach 30.0 30.C^
6" O.D. Steel Fipe 5 .r. 1.75 8.75
Valve Dox 1 each 10.09 10.(•`
10" Lre�ser Codplino each 1<,':5 25,7C
Installat'on (i sum 7,
� I
i
I
TOTAL COST
P.PPROVED BY:
Superintendent of Dept /-
l
DEPARTMENT OF TILITIFS
Work Order N /�� CITY OF RENTON
WASHINGTON
Project#
Date Submitted -i, -- GEPARTMEtT
Date Approved f If Comnletion Date
Deaoription of Works
Instal: Fire hydrant or. east side of "? " Street approximately
3CIP Fe:-.t G^sth rf 10ti� Avn. rr p. jnrt -46
Necessity -+---' WORK TO 13E DONE BY:
Fire protection to area City Forces
Contrsct
0
Others r--�
UNIT ,
ITEM '4ANiITY UNIT COST AMOUNT
Fire Hydrant I eact IC7.OC 187.CC
6" .:rte V..lve 1 each 65.55 6L.56
10" x 6" O.D. Steel Tee I eac , 30.00 30.G)
6" G.D. Ste•l iI1;>e L.F. 1.75 P.75
Valve lox 1 earn 10.010IO.Or
10" Dresser Coupling Isach: 12.P.5
Installation Lump 6Ln % •
1
4
TOTAL COST
APPROVED FY:
Superintendent. of Dept
4JL,.
DEPARTMENT OF UTILITIESS
Work Order tY � � CITY '�F RENTON
WASHINGTON
Project# - _-A
Date Suhmittsd 7-".So DEPARTMENT
Date Approved Comoletion Date
Description of Works
Ins`all F're hydrant on lout?*east corner of "�"' Strp: t '
and 9th Ave. llo. as per Project 'W-4
Yaoseaity — WORK TO BE MNE BY: --
City Forces
Lire protection to area Contract
Q
Others
um
3T� WANTITY UNIT COST AM=
Fire hydrant I c 187.0^
6" Gate Valve ' --•c,: 65.,5 65.`r
10" x 6" O.D. Steel lee 1 each 30.00 3C.'
6" O.D. Steel Pipe L.F. 1.75 C.T
Valve ox I each 10.00 10.0'
!0" Presser Coupling sac`. 12.85 15.7C
Installation 7
d ao.2c
I
i
i
I
TOTAL COST
APPROVED BY:
Soperintendant of Dapta� —lz
LEPGRTMENT OF JTILITMi
Work Order N CITY 'IF RENTON
WASi12tlGTGN
Project#
Date Submitted -__.A DEPARME!:I
Date Approved Comnletion Date
Description of Work:
Install fire hydrant on 90uth..e6t Corner of wM" Street 12th Ave. C.
as ,)Or Pr,,Joct W-46
--------- ---- ------- —
Necessity WJRK TO BE DONE BY:
Fire protection to area City Forces
Contract �
Others
UNIT
ITEM Q'"ANTITY UNIT COST kmOUM
,Fire Kydrant 1 ash 1E7.00 187.00
I6" Gate Valve 1 Ch 65,55 65.55
10" x 6" O.D. Steel YP^ 1 ach I 30.00 30.00
6" O.D. Steel i1pe 5 .F. 1.75 8.75
Valve Box 1 aanh 10.M 10.0!:
10" Dresser Coupling 2 each I 12.85 25.70
Installation Luse cum 1 75.0C
SD TalAL 402,00
Sa es tax 16.10
Ov rhend AO.'C
I
P
TOTAL COST ' ----- 4 5.;.30
APPROVED BY:
Superintendent of Dept.
r
DEPARTMENT OF UTILITIES
Work Order d CITY OF RFIVON
WASHINGTON
Project# 111-46-0
Date Subsitted 7-24.59 DEPARTMEEET slate:
Date Approved Comnletion Date
i
Descriptiov of Works !
Install Fire hydrant on east side of *P" Striet approximately I i
300 Fo=t :'orth of 10th Ava. i:. as per project W-46
a
Necessity WORK TO BE DONE, BY:
If i
I. Ft" protection to area City Forces j
Contract
0
Others
i
UNIT
TTF?I 2CANTITY JNIT COST AMOUNT
i
Fire hydrant 1 each 137.001 187.00
6' - to Valve 1 each 65.551 65.55
10" x 60 06D. Steel Toe i each 30.00, 30.M
60 o.D. Steel Pipe L.F. le75 8.75
Valve Box i each 10.00 10.00
10• Dresser Coupling ,. '.each 12.85 25.70
Installation Lump cum 75.00
SUB 1 402.00
Sale tax 16.10
1 Over ead 40.20
I
t
L
--------TOTAL COST -.------ 45C.3n
APPROVED BY:
Superintendent of Dept.
I
i
DEPARTMENT OF UTILITIES
Work Order / CITY OF RENTON
WASHINGTON
Project# IF46-A
Date Sutedtted 7-24-go DEPARTMENT pater
Date Approved Comoletion Date
Doscription of Work:
Install Fire hydrant on southeast eorrer of "td" Street
and 9th Ave, No. as per Project W-46
Necncity WMX TO BE DONE BY:
City Forces �-�-�
Fire protection to Area X
Contract
Others
L.J �
UNIT
1TSM CCANfITY UNIT COST AMOUNT
Fire hydrant 1 oath 187.00 187,00
6" +ate Valve 1 each 65.55 65.55
10" x 6" O.D. Steel Tee 1 each 30.00 30.00
6" O.D. Steel pipe 5 L.F. 1,75 8.75
Valve Box I each 10.00 10.00
10" Dresser Coupling 2 each 12.85 25.70
Installation Luap um 75.00
SLCL TOTAL 402.00
Salts tax 16.10
Or. head 40.20
I
r
- ---- TOTAL COST .4 0
APPROVED BY:
Superintendent of Dept.