Loading...
HomeMy WebLinkAboutWTR2700108 (2) 6" O. D. STEEL PIPE - S 173RD ST. & W-108 S 17 4 TH FROM SPRINGBROOK RD -- 9 4TH AV S r � N ENDING FILE TITLE OF FILE i i Z .114-,.' r j t I t 4 v O 44 t ti 4 Mora r Aew• C�u e...ar.�s , h'a.+cr..�n►. I CITY P= REN'ON UTUM.S DEPART MHIT- OF W-!OB "N4 PRO,J'ECT NO.—w-Ion UTILMES DEeARTWZNT WORK ORDER 1l0. •/_. 7 CITY OF REN70F WASININGTON DATE SUBMITTED 8/31/61 DATE COMPLETED DEPARTMENT Water DESCRIPTION OF WORK Install 6" O. D. Steel Pipe in South 173rd Street and South 174th Street from Springbr, -)k Road to 94th Avenue South as per attached sketch. NECESSITY WORK TO BE DONE BYz City Forces (� Replace inadequate mains. dontract � Others � 'TEM UANTITY U':IT COST AMOUNT 6" O. D. Steel Fire 1100 L.F. 1.47 1617.00 20" x 6" Tapping Sleeve - Transite.Ies4&J 2 ea. 016.00 2032.00 6" Tapping Valve - M. J. 2 ea. 65.00 130.00 Tap{ Lng machine rental 2 taps 35.00 70.00 Valve Box 2 ea. 9.00 18.00 Ditch, install & backfill 1100 L.F. 0.60 660.00 Sub To al 4527.00 Sales ax 181.10 Overhe d 226.35 TOF:AL COST $4,934.45 APPRMED BY SUPT. OF - ,I 17MS DATE APPROVED ' - �•/ I i . PRC.SECI ':O. W-108 UTILIT::ES DErARTIZNT CIIY OF REI+TCN WORK ORDER N0. �� WASHINGTON DA;E SUBMITTED 8/31/61 DATE COMPLETED DEPARTMENT water DESCR:'TIOII OF WORK Install 6" O. D. Steel :ipe in mouth 173rd Street and South 174th street from Springbrook Road to 94th ..venue South as per attached sketch. NECESSITY WORK TO BE DONE BYi City Forces Replace inadequate :rains. ;Ontract C� 0t:ars *_TEN UANfITY 'Ii;IT I COST AMOUNT 6" O. D. Steel Pipe 1100 L.F. 1.47 1617.00 20" x 6" Tapping Sleeve - Transite-A& 2 ea. 016.GO 2032.00 . 6" Tapping Valve - M. J. 2 ea. 65.00 i30.00 Tapiiing machine rental 2 taps 35.00 70.00 Valve box 7 ea. 9.00 18.00 Ditch, install & backfill 1103 L.P. 0.60 660.00 Sub To al 4527.00 Sales ax 181.10 Overh d 226.35 _ TO:AL COST $4,9:4.45 APPROVED BY %UPI. OF r,ILITIES _ DATE Ar,?R(40 s� ph. T•' i-+ e PROJECT No. w=108 UTILITIES DEPARTMENT �. 4, CITY OF RENTON WORK ORDER NO. -' WASNINGION DATE SUBMITTED 8/32/61 DATE COMPLETED DEPARTMENT water DESCRIFTION OF WCRK Inatall 6" O. D. steal Pi a in south 173rd Street and South 174th street from SFringbrook Road to 94th wenue South as per attached sketch. NECESSITY WORK TO BE DONE BYt City Forces L Replace inadequate gains. ;ontract adders 0 T_TEM UAWTITY I U!;IT COST AMOUNT 6" O. D. Steel Pipe 1130 L.F. 1.47 1617.00 20" x 6" Sapping sleeve - Transite-L%& 2 al. 016.00 2032.00 6" Tapping Valve - M. J. 2 ea. 65.00 130.00 T 'ing machine rental 2 taps 35.00 70.00 VL Vtl Box 2 ea. 9.00 16.00 Ditch, install 6 backfill 11'�0 L.F. J.60 660.00 Sub To al 4527.00 Sales ax 101.10 Worh d 226.35 TOTAL CMT ;4,934.45 APPROVED dY OF UTILITIES DATE APPROVED BEGINNING OF FILE