HomeMy WebLinkAboutWTR2700108 (2) 6" O. D. STEEL PIPE - S 173RD ST. & W-108
S 17 4 TH FROM SPRINGBROOK RD -- 9 4TH AV S
r
� N
ENDING
FILE TITLE
OF FILE
i
i
Z
.114-,.'
r
j t
I
t
4 v
O
44 t
ti 4
Mora r Aew• C�u e...ar.�s , h'a.+cr..�n►.
I CITY P= REN'ON
UTUM.S DEPART MHIT-
OF W-!OB "N4
PRO,J'ECT NO.—w-Ion UTILMES DEeARTWZNT
WORK ORDER 1l0. •/_. 7 CITY OF REN70F
WASININGTON
DATE SUBMITTED 8/31/61
DATE COMPLETED DEPARTMENT Water
DESCRIPTION OF WORK
Install 6" O. D. Steel Pipe in South 173rd Street
and South 174th Street from Springbr, -)k Road to 94th Avenue
South as per attached sketch.
NECESSITY WORK TO BE DONE BYz
City Forces (�
Replace inadequate mains. dontract �
Others �
'TEM UANTITY U':IT COST AMOUNT
6" O. D. Steel Fire 1100 L.F. 1.47 1617.00
20" x 6" Tapping Sleeve - Transite.Ies4&J 2 ea. 016.00 2032.00
6" Tapping Valve - M. J. 2 ea. 65.00 130.00
Tap{ Lng machine rental 2 taps 35.00 70.00
Valve Box 2 ea. 9.00 18.00
Ditch, install & backfill 1100 L.F. 0.60 660.00
Sub To al 4527.00
Sales ax 181.10
Overhe d 226.35
TOF:AL COST $4,934.45
APPRMED BY
SUPT. OF - ,I 17MS DATE APPROVED ' - �•/
I
i .
PRC.SECI ':O. W-108 UTILIT::ES DErARTIZNT
CIIY OF REI+TCN
WORK ORDER N0. �� WASHINGTON
DA;E SUBMITTED 8/31/61
DATE COMPLETED DEPARTMENT water
DESCR:'TIOII OF WORK
Install 6" O. D. Steel :ipe in mouth 173rd Street
and South 174th street from Springbrook Road to 94th ..venue
South as per attached sketch.
NECESSITY WORK TO BE DONE BYi
City Forces
Replace inadequate :rains. ;Ontract C�
0t:ars
*_TEN UANfITY 'Ii;IT I COST AMOUNT
6" O. D. Steel Pipe 1100 L.F. 1.47 1617.00
20" x 6" Tapping Sleeve - Transite-A& 2 ea. 016.GO 2032.00 .
6" Tapping Valve - M. J. 2 ea. 65.00 i30.00
Tapiiing machine rental 2 taps 35.00 70.00
Valve box 7 ea. 9.00 18.00
Ditch, install & backfill 1103 L.P. 0.60 660.00
Sub To al 4527.00
Sales ax 181.10
Overh d 226.35
_ TO:AL COST $4,9:4.45
APPROVED BY
%UPI. OF r,ILITIES _ DATE Ar,?R(40
s�
ph. T•' i-+ e
PROJECT No. w=108 UTILITIES DEPARTMENT
�. 4, CITY OF RENTON
WORK ORDER NO. -' WASNINGION
DATE SUBMITTED 8/32/61
DATE COMPLETED DEPARTMENT water
DESCRIFTION OF WCRK
Inatall 6" O. D. steal Pi a in south 173rd Street
and South 174th street from SFringbrook Road to 94th wenue
South as per attached sketch.
NECESSITY WORK TO BE DONE BYt
City Forces L
Replace inadequate gains. ;ontract
adders 0
T_TEM UAWTITY I U!;IT COST AMOUNT
6" O. D. Steel Pipe 1130 L.F. 1.47 1617.00
20" x 6" Sapping sleeve - Transite-L%& 2 al. 016.00 2032.00
6" Tapping Valve - M. J. 2 ea. 65.00 130.00
T 'ing machine rental 2 taps 35.00 70.00
VL Vtl Box 2 ea. 9.00 16.00
Ditch, install 6 backfill 11'�0 L.F. J.60 660.00
Sub To al 4527.00
Sales ax 101.10
Worh d 226.35
TOTAL CMT ;4,934.45
APPROVED dY
OF UTILITIES DATE APPROVED
BEGINNING
OF FILE