Loading...
HomeMy WebLinkAboutWTR2700136 STATE RELOCATION 16" ON TALBOT RD S W-136 I f 1~} j� t A r y 1 PROJECT NO. Yit UTILIT.ES DEiARTt-1!.7 CITY OF REITON WOR,C ORDER NO. WAS:iI.; TO14 DATE SUBMITTED y 4y DATE COMrLRTED DEPARTMEN7 k-T a ESCRIrTICN OF WORK (Continued) Relaeato 16" Cest Iron on Tal!wt 'toad and 11stall Caring also relocate 2" D 7C,ely. on Talbot to Penson Hxy. ;Er CESSITY WORK TO BE DOVE BYt City Fo-ces [p Witte :'teloea'tlon .>ontraet O Othars O ITEM UANTITY U::IT COST AAKM- eu.hoe (ktopto) 190 X. 6.40 1,14r,.cr- vrare (unit) 210 :ir. 6.Do Truck, ;Sckup 380 iir. ,75 2E5, Truck. Dump g H:, 2.5 12r.cr oapreasor 41 lr. 1,5 61,5c Bulldozer (Rental) 1 31 Ftr. 6, 186✓.t Pipe Cattor - tiydraulie 14 , lO.SO 53,063.00 .'.�dFiF:twt Engineering •�9 :;r, 3._, 1 1i9.4C1 Supervision 46 Hr. 3.57 164.27 *Fri" - Soc±z1 Sacuri.ty, Ind. Ins. Vacation. Sick, 12,17; 493. Oflii,e Lxpenae .1 4,:•5,50 • (As Per 1961 State Hwy. Audit) 5 1,22:t.6 5ALVACE done - - Nona Sh7IcRAENT Nona - - None TOTAL EPl .CEt::i+T T 5" III I ENT. SERVICE LIFE (Roplacerent Cost x -46U" - S_LC-g� F:x,.ected ife 22,713.35 x = $1,817.r.7 1,817. L COST APPROVED BY �U T, OF U71LITIES DATE APPROVED L PROJECT NO. w-136 UTILIT--ES DEPARTI&N'r CITY OF RENTCN WORK ORDER NO. WASHINGrON DATE SUBMITTED —23-62 DATE CO.:iPLE ED DEPARTMENT WATER 7ir. iPTION OF WORK (Continued) Relocate 16" Cast Iron en Talbot Road and instcll Casing also relocate 2 on Talbot to Benson Hwy. i:ECESSITY WORK TO BE D(AE BYs City Forces State Hwy. Relocation Son Oract F-1 Oithars ITEM UANTITY U.::T CCST AMOUNT EQVIPME Ts Backhoe (Fopto) 190 hr. 6.00 1,140.CO Crane (Unit) 210 hr. 6.00 1,260.00 Truck, Pickup 380 Hr. .75 285.0O Truck, Dump 48 F(r. 2.50 120.0O Compressor 41 Hr. 1.50 61.50 Bulldozer (Rental) 31 Hr. 6.00 186.00 Pipe Cutter - Hydraulic 14 H-. .75 10.50 ( $3,063.00 OVERHEADS Eugimering 49 Hr. 3.2 $ 159.40 Supervision 46 Hr. 3.5711 164.27 *Fringe - Social Security, Ind. Ins. Vacation, Sick. 12.1 493.50 Office Expense .1C! 405.50 * (As Per 1961 State Hwy. Audit) $ 1,222.67 SALVAGE None - - None BET,aMENT None - - None TOTAL REPLACEIt.ENT COST $'<2,713.3.5 ENT. SERVICE LIES: %Replacement Cost x EYS.Lff ------ 22,713.35 x _ $1,817.07 Expected Life 1,817.07 EXT.E DLD-CEWICE L.. L COST $20 896,2d APPROVED BY :;I;FT. OF :r:ILITIES DATE APROVED (5A) F"OJECT NO. -; UT!LIT-ES DE,ARTU1,7 CITY OF RE!TON WORK ORDER NO. YlASHI:J'?GtJ DATE SUEKITTED DATE COMPLETED DEFAR:!:EiT DESCRIPTION OF MCRK xelocate 16" C t Iron on TalWt Road 2n.4 install Casing,siso rrlocate L" Cely, on T:lbot to '.tenon Hwy, NMUSITY WORK TO BE DONE BY: 01ty Forces l� State Hwy, relocation ::ontract Others �] UANTITY Ui:IT COST A!-MVT MA7r.RMs 16" Cost Iror. 11pe • Tyton Joint 73C .. , 7.93 S6,1;5.40 30" ;Icinforc®d Concrete Casing Pipe (Stern Specls) 750 L.1 . 7.00 5a25^'.'x 16" - [2'0 Cast Iron Pendo M.J. 2 Ea. ie9.89 1✓5.70 16" • 456 Cast Iron fiend LJ.J. 2 Ea. 167.90 33G._-o 16" Gate Valve M.J. 2 7"2.56 1,405.12 16" Cast Ixvn Cap-Bllimi M J, 1 31.s,5 Valve bax 20,00 vterililatdon e, Testing Lump Sur- 12-,.O Cons-rota - Thrust Blocks 4 I i5,CX 60.04 Move 8 ROoc tz Cxisting 900 Bend 8 I Changing aver ystm b Shut Don Lump Sur I rU 114;372,67 I Lt90Rt Forem:.n 111C hr. .311 C�2£.09 -Wipsert Operator 160 Fir. _,9O 465,12 Equipment Operator 210 Hr. 3,CA 641,14 plpexn (2) 36 ) Rx. 2*619 942.84 Fiperen 2) 360 Hr. 2.59 93440 Utility Han 190 Er, 2.33i 44e..22 Sr4� TO-AL COT APeaMED B': OF L�ILITIES DATE AF;!iWED (5) nrr r PiiOJECT :x. W-136 LT iLiT_ES DEi'ART,Z!T CITY OF RELTOti WORK =ER AtO. WASHINC10ti rATE SUBMITTED 5-23-62 DATE CohPiETED DEPARTMENT WATER DESCRIPTNO OF WORK Relocate 16" Cast Iron on Talbot Road end in,tal! Casing,aiso relocate 2" raly. or. Talbot to Benson Hwy. AECESSITY WORK TO BE DONE BYt City Forces u State Hwy. relocation .,;nLract _ Othars C� IIEM UAIfCITY i:::1T COST AMWPIT MFTERIALr 16" Cast Iron Pipe - Tyton Joint 780 L.F. 7.93 I 16,185.4C 30" Reinforced Concrete Casing k'ipe (State Spec's) 750 L.F. 7.00 5,250.00 16" - 2W Cast Iron Bend, M.J. 2 Eo. 129.e5 259.70 16" - 450 Cast Iron Bend M.J. 2 Ea. 167.90 335.BC 16" Gate Valve M.J. 2 Ea. 702.56 1,405.12 16" Cast Iron Cap-Blind M.J. 1 Ea. 81.65 81.65 I Valve Box 2 Ea. 1C.00 20.00 Sterilization 8 resting Lump Su 125.00 Concrete - Thrust Blocks 4 Yd, 11,00 60.00 Move 8 Relocate Existing 900 Bend 8 Changing over System 8 Shut Dorm Lump Suc 650.00 $14,372.67 LABCR3 Foreman I 190 hr. 3.311 629.09 Equipment Operator 160 Hr. 2.9M 465.12 Equipment Operator _iu Hr. 3.054 641.34 Pipeman (2) 360 Hr. -61. 942.84 Pipenan (2) 360 Hr. 2.59 932.40 :itility Man 190 Hr. 2.33 444.22 S 4,055.01 TO:AL COST AP:)ROVED BY SU;'T. OF UJ71LI7IES DATE APPROVED 5) mom". TA L 8 T Fi�7A 6YerrK'�-r.f, � � 3oYCas N�-F�l"C.r v.v6 i , 'IA IN w ✓ �� µG , `.�' �i:.Ll'tu1. Lra..'rttl• CITY 0 RENfON UTILITIES 0EPAPTMENT RELOCATE IG "TWATER MAIN ANC INSTAL I N CA INis __ _ HlGHWA,Y PELOt AT:0N at.agvp u 1 APIW*A ATES-.Y+1Z`FILE w-1361 tF i y J r' OF