HomeMy WebLinkAboutWTR2700157(2) CONST. 400 L.F. 6 STEEL PIPE IN CAMAS W-157
AV NE FROM NE 20TH ST
F
b
r�
t 'n
1
t O
OF FILE
FILE TITLE UJ
ENDING
w - L
PROTECT NO. W-157 A UTILITIES DEPARTMENT
CITY OF RERTCN
CRDER NO. WASHINGION
DATE SUBMITTED 11/6/62
DATE COMPLETED DEPARTMENT water
DESCRIPTIL+I OF WORK
i Install Fire Hydrant on East side of 114th Ave. , S.E.
Bwtn Lot 3-4 as per project W-157
NECESSITY WORK TO BE DONE Sys
City Forces ($�
Fire Protection to Area Contract
Others
ITEU QUANTITY I UNIT COST I AMOUKr
Fire Hydrant 1 ea 155.0 155.00
6"x6"x6" Steel Tee PExP • 1 ea 22.0 22.00
6" Dresser Couplings 2 ea 6.5 13.1P
6" Steel Fiange Spool 10 L.F. 35.0 35.00
6" Gate Valve F x F 1 ea 67.5i 67.50
Valve Box . 1 ea 10.0 10.00
Installation Lump Sun 75.0 75.00
Sub-Total $ : 77.60
Sales Tax 12.10
overhead I 37. 76
c,
Mr. John Fintow ski '
Al 5-6029
TOTAL COST $ 427.46
APPROVED BY
SUPT. OF UTILITIES_ ��"`'��'�� DATE APPROVED
—0-2,MT
b
d
�y
S•E. /G41h .ST. - ,��
` V
P
G`kGxi•G -tt x
6 w
ti
v
1
FRWECT NO. W-157 UTILITIES DEPARTNEhT
n CITY OF P.ENTON
WORK. CRDER NO.� WASHINGCON
DATE SUBMITTED 11/6/62
DATE COMPLETED DEPARTM it Water
DESCRIPTION OF WCRK
Lay 400 L.F. 6" O.D. Steel pipe in 114Lh Ave. , S.E.
from existing 6" on S.E. 104th St as per attached :ketch.
Woodland Terrace
■
NECESSITY WORK TO BE DONE BY3
C:ry Forces Lam]
Property owners request Contract
Others
ITEM UANTITY L::?T COST AMOUNT ``
6" 0 D. Steel Pipe D & W 10 ga. 400 L.F. 1.50 60G.UOI
6" x 6" x 6" Steel Tee PEXF 1 ea 22.00 22.00
6" Plug Tay, 2" + 1 ea 5.55 5.551
6" Gate Valve F xF 1 ea 67.50 67.50
6" Flange Spool - 1 I L.F 15.80 15.80
6" Dresser Couplings 2 1 ea 6.55 13.10
2" Blo-Ncff Assembly 1 ea 45.00 45.00
Valve Box 1 ea 10.00 10.00
Restore Paving 4 q,yd 3.00 12.00
Ditch, Install & Backfill 400 L.F 1.00 400.OJ
J aS.ua r3 •• r jf" A2.v• /3C~--r
Sub-Total $1, 190.95
Sales Tax 31. '4
Overhead I 119.10
r)
2�
Mr. John Fintowski
r
TOTAL COST $ 1, 341.691
APPROVED ' Y
SUPT. OF UTILITIES L��-- �..�1.�/ DATE APPROVED
�Vy
AAl eel�Y
PROJECT N0. "-1=7 UTILITIES DEPARTMENT
CITY OF REN'TOtJ
WORK. ORDER NO. WASHIN'TON
DATE SUBMITTED 1J/6/62
DATE CCWLETED DEPARTMENT er
DESCRIFTION OF WORK
Lay 400 L.F. 6" O.D. Steel pipe in 114th Ave., S.E.
from existing 6" on S.E. 1041n St 4s per att4ched sketch.
wuuuland Terrace
■
NECESSITY WORK TO BE DONE BYs
City Forces �^
Property owners request Contract
Others
ITEM QJANTITY UNIT CCS7 AMOUNT
6" r, .u. c-eel Pipe D 6 ft 10 ya. 400 L.P. 1.50 600.00
6" 6" x 6" Steel Tee PLXF 1 e" 21.00 22.00
6" Pluy Tap 2" 1 ea 5.i5 5.55
6" Oato Valve F XF 1 eA 0.50 67.SU
6" Flant,e Spool 1 L.P 15.80 15.80
6" Dresser CouplinyA 2 ea 6.55 13.10
2" 51(woff Asseably i ■a 45.00 45.UO
Value BOX 1 e, 10.00 10.00
Restore Paving 4 q,yd 3.00 12.00
Ditch, Install 4 Bdckfill 40U L.F 1.00. 400.00
i
Sub-Total 51, 190.95
Sales Tx 31.64
Ovs4rhead 119.10
i
1
Mr. John Fintuwehi
TOTAL COST $ 1, 341. 1".
APr 71E) PY
OUPT. OF UTILITIES DATE APPROVED— —
BEGINNING
OF FILE
FILE ITLEUI "(� - i w -lS7