HomeMy WebLinkAboutWTR2700159(1) FIRE HYDRANT INSTALLATION W-159A & B
i
,
PROJECT NO. W-159 t UTILITIES DEPARTMENT
CITY OF RENTO7
WORK ORDER NO. WASHINGTON
DATE SLEMITTED 8/14/63
DATE COMPIE7ED DEPART!.IENT Water
CESCRIPTIW OF WORK Lay 200 LF. 6" cast Iron Pipe ii. Maplewood Plac •,
between 6th Ave. East & Primary State Riyhway No. 5.
As per attached drawing.
14ECESSITY WORK TC BE DONE BYs
Increase water supply in Maplewood City Forces
sub-division Contract
Others
ITEM QUAIr,7TY I Uf.= COST AMOUNT
6" Cast Iron Tipe Tyton Joint 200 L.F. 2.14 428.00
4x4x6 Cast Iron Tee S"BxF 1 ea. 40.00 40.00
12x12x6 Cast Iron Tee MJxMJr.F 1 ea. 1.02.90 102.90
6" Gate Valve MJxF 2 ea. 70.74 I 141.48
Valve Box - ea 10.00 20.00
Restore Paving 22 Sq.y 3.00 66.00
Ditch, Install & Backfi.Sl 200 IL.F. :..00 200.00
Sub Total I 998. 38
Sales Tax 31.94
Overhead I 149.76
i
I
TOTAL COST $ 1180.08
APPROVED BY
. J: OF UTILITIES DATE APPROVED
W-159a
PROJECT NO. 17ILITIES DEPARTYSN7
CITY OF RE14TCN
WOFiK ORDER NO. WASHINGTON
DATE SUBMITTED 7/11/63
DATE COMPLETED CEPARTMEN7 Water
DESCRIPTION OF WORK
Lay 910 L.F 6" Transite Pipe in 6th Ave. , E. ,
Maplewood Division No. 1., as per attacheu sketch.
NECESSITY WCRK TO BE DONE By,
Replace inadequate 4" wood line City Forces (�]
Contract O
Others
ITEM UANTITY UNIT COST AMOUNT �
6" Transite Pipe I 910 1,.F 1.60 $1, 456.0
6" Gate Valve i ea 65.00 65.0
6 x 6 x 6 CI Tee 1 ea 39.00 39.0
6" 22�o CI Bend 2 ea 26.00 52.0
Valve Box 1 ea 10.00 10.G
Restore Paving 104 q.}' 3.00 312.0
Ditch, Install & Backfili 910 L.F 1.On 910.0
Sub Total ( 2, 844.0
Sales T4x 77. 3
Overhead 426.6
TOTAL COST $ 3, 347.9