HomeMy WebLinkAboutWTR2700159(1) FIRE HYDRANT INSTALLATION W-159A & B i , PROJECT NO. W-159 t UTILITIES DEPARTMENT CITY OF RENTO7 WORK ORDER NO. WASHINGTON DATE SLEMITTED 8/14/63 DATE COMPIE7ED DEPART!.IENT Water CESCRIPTIW OF WORK Lay 200 LF. 6" cast Iron Pipe ii. Maplewood Plac •, between 6th Ave. East & Primary State Riyhway No. 5. As per attached drawing. 14ECESSITY WORK TC BE DONE BYs Increase water supply in Maplewood City Forces sub-division Contract Others ITEM QUAIr,7TY I Uf.= COST AMOUNT 6" Cast Iron Tipe Tyton Joint 200 L.F. 2.14 428.00 4x4x6 Cast Iron Tee S"BxF 1 ea. 40.00 40.00 12x12x6 Cast Iron Tee MJxMJr.F 1 ea. 1.02.90 102.90 6" Gate Valve MJxF 2 ea. 70.74 I 141.48 Valve Box - ea 10.00 20.00 Restore Paving 22 Sq.y 3.00 66.00 Ditch, Install & Backfi.Sl 200 IL.F. :..00 200.00 Sub Total I 998. 38 Sales Tax 31.94 Overhead I 149.76 i I TOTAL COST $ 1180.08 APPROVED BY . J: OF UTILITIES DATE APPROVED W-159a PROJECT NO. 17ILITIES DEPARTYSN7 CITY OF RE14TCN WOFiK ORDER NO. WASHINGTON DATE SUBMITTED 7/11/63 DATE COMPLETED CEPARTMEN7 Water DESCRIPTION OF WORK Lay 910 L.F 6" Transite Pipe in 6th Ave. , E. , Maplewood Division No. 1., as per attacheu sketch. NECESSITY WCRK TO BE DONE By, Replace inadequate 4" wood line City Forces (�] Contract O Others ITEM UANTITY UNIT COST AMOUNT � 6" Transite Pipe I 910 1,.F 1.60 $1, 456.0 6" Gate Valve i ea 65.00 65.0 6 x 6 x 6 CI Tee 1 ea 39.00 39.0 6" 22�o CI Bend 2 ea 26.00 52.0 Valve Box 1 ea 10.00 10.G Restore Paving 104 q.}' 3.00 312.0 Ditch, Install & Backfili 910 L.F 1.On 910.0 Sub Total ( 2, 844.0 Sales T4x 77. 3 Overhead 426.6 TOTAL COST $ 3, 347.9 APPROVED BY TUFT. OF UTILITIES.. _ DATE lPPROVED .• r � t 1 0 0 OF FILE FILE TITLE 'Soy BEGINNING 0