Install Fire Hydrant! East side of "Q" Street
between Lots 13 & 14, Block 4. As per Pcoject W-166
NECESSITY WORK TO BE DONE BYs !�
City Forces
Fire P: otecticn to Area Contract
O:hers
ITEM QUANTITY UNIT COST AMOUNT
Hydrant 1 ea. $155.00 $155.00
6" Gate Valve M.J. 1 ea. 71.20 71.20
6" x 6" x 6" C.I. Tee M J. 1 ea. 39.00 39.00
6" C.I. Pipe Tyton Joint 10 L.F. 2.10 21.00
Valve Box 1 ea. 10.001 10.00
Installation Lump Sum 75.00
Sub otal $371.20
Sal s Tax 11.85
Ove ead 37.12
i
TOTAL COSI 2
APPROVED EY
SUPT. OF UTILITIES_._. DATE APPROVED
PRWECT u0. Sr16------ 6-B�_
UTILITIES DEF•AR!jrEGT
91CRt; ORDER No. �; /�j CITY OF RENTM
-�-- WASHI.Nc'TCYJ
DATE SUBMITTED 1/_ 4/63
DATE CL941LETEL
I DEPARTt1EtJT W_,,�_
IDES.RIF;IOU OF WORK
Install Fire Hydrant; E&st Side of "Q" Street between Lots 8 & 9, Block 3. As per Project W-166
IJECESS ITY
WCRK TO BE DONE BYt
Fire Protection for Area City Forces
Contract
Others [J
ITEM LY MIT CC157 UAtJT
- � AMOUNT
Hydrant
6" Gate Valve M.J. I ea. $155.00 $155.00
1 ea. 71.20 71.20
6' x 6" x 6" C.I. Tee M.J. 1
6" C.I. Pipe Tyton Joint ea. 39.0O 39.00
Valve Box 10 L.F 2. 1 21.00
Installation I ea. 10.0 .10.00
Lt- F Su
75.00
Sub Total $371.20
Sale Tax 11.85
Over ead I _; 7 12
I I
I
APPROVED P•Y .— TOTAL CCbT $420.17
SUPT. OF UTILITIES_ "`' > �_ DATE APPROVED
FROUECT NO. .W-166 A UTILITIES DEPARTMENT
�� _ CITY OF RENTON
WORK ORDER NO. l ,L WASHINQrON
DALE S'7Bh1;TTEO 1/4/63
DATE COMPLETED_ DEPARTMENT water
DESCRITION OF WORK
Install Fire Hydrant, Southeast Corner of 12th Ave. N
& "O" Street. As per Project W-166
IIECESSITY WCRK TO BE DONE BYc
Fire Protection for Area City Forces "---I
.ontract
Others
ITEM AJANTITY U';IT COST AMOUNT
Hydrant 1 ea. $155.0 $155.00
6" Gate Valve M.J. 1 ea. 71.2 71.20
6" x 6" x 6" C.Z. Tee M.J. 1 ea. 39.0 39.00
6" C.I. Pipe Tyr_on Joint LO L.P. 2.1 21.00
Valve Box 1 ea. 10.0 10.00
Installation Lump Sum 75.00
Sub Total371.20
Sal s tax 11.85
i
Ove head 37. 12
TOTAL COST 0.17 i