Loading...
HomeMy WebLinkAboutWTR2700172(1) FIRE HYDRANT INSTALLED W-172 . F r OF FILE FILE TITLE WT ENDING 1 FRC.ECT INO. W-172 a UTILITIES DEr'ARTMR.r CITY OF RENTON WORK CRDEP. NO. WASHL'43TCN DATE SUBMITTED #Water DATE COMPLETED DEPART1.¢NT DESCR'.?TION OF WCkK Install Fire Hydrant at Northwest corner of 7th Ave., No 6 132nd Ave., S. E. 14ECESSITY WXK TC BE DONE BYt L Fire Protection for Area Fences ;on�..ract O`.hers ITEM UALrIITY UNIT COST AMOUNT Hydrant 1 ea $155.00 $ 155.00 6x6x6 steel 'fee PExF 1 ea 17.45 17.45 6" Gate Valee FxF 1 ea 63.60 63,60 6" Steel Flange Spool 10 LF l ea+ I 35.00 35.00 6" Dresser Coupling 2 ea 6.20 12.40 Installation LUMP .;UM 75.00 Sub Total I 358.45 Sales Tax 11.34 Overhead 53.76� TOTAL COST $ 4_3• -51 APPROVED PY JUPT. OF UTILITIES DATE A.i-RoliM