Loading...
HomeMy WebLinkAboutWTR2700195 6" WATERMAIN IN TAYLOR AV NW FROM NW 4TH ST. TO STA W-19 5 1 1 `�. • .. . A r � r .' lip m 10. The required "PRESSURE TEST' has been taken by At a pressure of PS. , for minutes, on The test: Failed Passed Cv".ents 11 . The required "PURITY TEST' has been taken by On Date of Reply Failed Passed Comments - 12. Is there an Easement required? 'r If so, give dates for: Preliminary Submitted Recorded And Recorded Number 13. This Project included tF of Watermain - 11 And Gate Valves ___ Gate Valves , ,a Gate Valves and Gate Valves, jf And all miscellaneous accessories for a total value of $ Alto, Size Make type Fire Hydrants total value of S {y )4. The transfer or "Rill of Sale' is in; Preliminary Submitted -,eccrded form.The recorded number 15. This project information was sent to the Utility Dept. for recording on ,. and taken into "plant" on 16. What drawings does the Watm- Shop have or. File. Preliminary As-Built r. ... Form Completed on Citv of Renton Utility Department Project Form 1 . Water Project k 1,V- /915 Date Project No. given 1.:141 /W�- 65' 2. Project Description and location <" Cl, ��/.r;,rra-,i Cif �n T./•� 3. Developer's Name A-,4iw - '.vim-/ (if City check ) Address Phone A 11110i/?- 'jl�01 Engineer's Name _���, - ir' La�.F�- (If City check ) Address Phone X Contractor's Name (If City check y/ ) Address Phone r 4. Is there an ACTIVE Late-Comers Agreement in the project area? If so, give File Name _ Recording Date And Number 5. The Utility Department Work Order Numbers on this project are as follows: 6. What pans have been submitted? Preliminary e� As-Built J. Has an Estimate been Prepared for Project If sc, give Date Prepared And Total Amount of Estimate 8. Is there to be a Late-Comers Agreement on this project 1K If so, give dates for; Preliminary Submitted __ '.acorded and Recorder u•iber 9. Date of "Start of Construction" Date of "Completion" ry .�1 pf A71 / t._, zxv 5, Ir _ � H h AT-- ro� 3 v kL- TJi� UTILITIES DEV—! 4RI":TENT DA. " DATES 'ir�f SCAL, : w:J' I PROJECT M.Q CM. -- DAT(.S4°='y APPM DATT ME ' 'BUILDING DEPARTMP'T .:ITV OF RENTON WASHINGI A CAMEL CONSTRUCTION COMPANY 401 - 90Tfi `.-.;i..0 - IL'TH _ - �_ 1313 1107 S NECA ST., SEATTLE, WAS1{"G'CON 6' ,7 8 6 Latimer's Like York Addition •I•ec ..1W5125,000.00 6 9 _ �_ . INSPECTION RECORD _ BUILDING PERMIT - -- -- - VOED IF WORK I$NOT COMMENCED IN 60 DAYS 240.50 PH.ffLATEPERMIT $ SEPTENJBER 20, 1968 FEE $ FEBRIJARY 28, 1969 240.50 3 DESCRIPTION OF WORK _ —�—' I:ONSTRUCT 14-0IT APARTMENT BUILDING. -- ---- ---- 1° l; r.. .. . C r•:.n .�.,.. . BLILT-UP 23' .120'-----' ' KJ YES YES 2 14 ELECTRIC CAMEL CONSTRUCTION COMPANY 1360-68 1223-01-7355 1107 SENECA STREET, SEATTLE, wASHINCTON MU 2-2782 OR MA 4-2410 THIS PER;.+O DOES NO'..UTHORUF ANY wORK IH PUBLIC eIGMi OG-wAY I _ I ON UIIUTY FA5EM1N'5,OR ANY EEECERiCAE D:MECHANIC;,i WORK q HEkFBv CERNY THAT NO WORK I$ TO BE LONE EXCEPT ,. ?ESCR16ED ABJ`+E AND IN ALPROVEIi PLANS AND `;GECIFl(A :pN$ AND IHn' All WORK IS TO CONFORM TO RENTON COPES AND ORDNANCES. 'r ' I CALF FOR IN SPECIIUIJ BFEORT WORK IS CC, POURING CI IN REIP ! nUBL C1 TO COMP6ANCF WITH 1Ht ORDINANCES OF THE CITY OF RENTON AN(J PHONE "FORMATION FILED HEREWITH, n14PERMP SIGf(AwE At 5-3464 BUILDING DIRECTOR I F%TEN"0N 37 0• 38 �'O FIC er ORIGINAL :' 2225 DEPARTMENT WORK ORDER-DISTRIBUTION RENTONCITY OF ATERIAL NO. SIZE KIND t t ISSUED RETURNED __ems - I ESTIMATED COST INSTALLED BY CITY ❑ CONTRACT � CONTRACTOR _ SUBDIVISION WORK STARTED WORK COMPLETED REMARKS yam/, �J— -- PROJECT NO._ � DATE_- " 19 e-� NAME--- ----ADDRESS SIZE OF METER—____ —NO._-. - +KE--READING ACCOUNT NO NATURE OF WORK A"" DIRECTIONS: 4e SUPT. SIGNATUC BEGINNING OF FILE FILE TMEW - 19S N w u ' � .