A
Oa'Lirv't-%n/l.ve: � n. .,.+n.:..e vsan .. �s'a.wn�'.»t:f)trO 1)tNllte�i trne.5rtn1':+s'l.tit:■OtJ9ll rs)-t'/as,/..r�.i�ry�l.rtl]A)'ll)».aty►- •
,rti.
The required "PRESSURE TEST' has been taken by
At a pressure of PSI , for _ minutes, on
The test Failed Passed Comments
11 . The required "PURITY TEST' has been taken by
On Date of Rrrly Failed
Passed Commer!,
12. is the.e an Easement required? If so, give dates for:
Preliminary Submitted Recorded
And Recorded Number
13. This Project included LF of Watermain
And Gate Valves Gate Valves
Gate Valves and Gate Valves,
And all miscellaneous accessories for a total value of $
Also, Sire Make type _Fire Hydrants for a
total value of $
14. The transfer or 'Bill of Sale" is in; Preliminary
Submitted �ecorded rorm.The recorded number
15. This project information was t to the Utility Dept, for recording on
and taken into "plant" cn
16, What drawings does the Mat: Shop have on File.
Preliminary As-Built
A;
WATER MAIN PROJECTS
PRESENTLY UNDER CONSTRUCTION
IN
THE CITY OF RENTON
WATER PROJECT M W-251 DATE 1977
WATER PROJECT TITLE Rolling Hills lie Line
PROJECT LOCATION Puget Ur 3E between Benson Rd. SE and Rolling Hills
Av. . SE
DEVELOPER City Of Renton
ADDRESS 200 Mill Ave. S.
PHONE 235-2631
EMERGENCY
PHONE 782-3688, Ron Olsen
CONTRACTOR Paul Snyders Conrt. Co.
ADDRESS PO Box 475, Kirkland, WA 98033
PHONE Office: 827-1569, - 587-1796
EMERGENCY 827-5753
PHONE
FOREMAN Paul .Inyders
PHONE All above 24 hrs, daily
EMERGENCY
PHONE
A+ .Ii..-
IIRF 142 —
(To be sent to duplicate; .mo copy returned to Bui'.ding Dept. , 2nd copy for your file.)
TO: Planning Department DACE MAY 13, 1975
Engiucaring Dep,irtwen[
Fire Deparrownt FINAL INSPPCTION_
Traffic Depnrtnrnt '—
Utilities Division
FROM: BU1Idin1 Department
SUBJECT: WASHINGTON NATURAL CAS COMPANY Permit No. B-5957 -
(Owner)
1 WILLIAMS AVENUE SO. b SO. 19'itl STREET Typo Business STORAGE TANKS
(Address)
The subject pruject is Paring completion. Please investigate your area
of responsibility and indicata below either your acceptance or corrections
necessary in order that a Certificate of Occupancy my be issued.
TO: Building Department DATE A4Ai 12
FROM:
Tits project is a(prved -th depa \ nt subject to the following
(Orr,ctions:
T4A7 INEY N16ET TN6 tt/Arr"t. Man F,aE la-ionAw-r
R+<t,iN,n(=,✓rE.o iS AS SPE.Y,P,E[l oM 97! AFFO--+17 Pcaa.S
Author sed Signature
f
WASHINGTON NATURAL GAB COMPANY
P. G. Box l869, feall/r, Wa,htngf n, 98111 1.
January ), 19;5 f
R
Mr. Bob Bergstrom
Utilities Engineering Department
200 Mill Ave we South
Renton Washington 98055
Dear Mr. Bergstrom:
We are sending to you one (1) prlit an.. one (L; repro-
ductible of our Swarr Station drawing 3DP-10. This sheet shows
the stction on-site utilities for your recnrds.
Sincerely,
Tony Tessitore, P.E.
Dlvialon Engineer
enclosure
lilt- 2-'S1\�'�) C p *r'0A1 oil Pu6Er 041 v6 µ/CST OF
(RN SON ROAD
£$Sr,v"ATCr> CIL6T Of' fS" "A," PPzr�o-)
Z80 LF eF 8 C.I. WATCQ P110O Cj� 3. 2Y'/FT 918 .40
I/JS7ALL .2SO LF .{ a.. C.I. WATER &"A,N Q 4..0oAr I I,zo, 00
1 - 2 " 6Lo.J - OFF A SCC-.6sy e 110-0
S46 'TOTAL s', 14T . 40
Sy � o 7, tZ.
(`A ) -r,Tyl. 2
t;_57i-y,Kco c'c_�tir of it, r'9 AAA(_ /N 1�)LL/� ,o,v L llr O;IZLO Pa'Jrlav,
.two a o{ 1(I'* 0.1. CL2. WAr6L P, (P 1.4o/Ff 2 3'S",Z. CIO
r
IAISCrALL. 280 LF f 06" 0.1. ,,Areft/ ,M Cl? S•kx3/Fr 1 4oc. eo
I - 2" 64ar OFF Asfc-60,y /y )IO!t M- i 1 I O . no
yMS rorAL I3, 4G2 . 00
SALE,, Tar 19" '8 1O
Cg� yJTA4 4 O 5 7 .IC
(A ) -ruTAL /6 2LSS'. SL
CiTVS poar,oH 1 711 `l 28
`eptember 21 , 1972
W-251(B-1) (portion of) Puget Drive West of Benson Road
Estimated Cost of 8" Main Insta'lation (Mobil Oil Co. portion)
280 LF of 8" C.I. Water Pipe @ $3.28/Ft. $ 918.40
Install 280 LF of 8" C.I. water main @ $4.00/Ft. 1,120.00
1 - 2" Blow-off Assembly @ $110.00 ea. 110.00
SUP TOTAL $ 2,148.40
5% Sales Tax 107.42
(A) TOTAL $ 2,255.82
Estimated Cost of 16" Main Installation (OVERSIZED PORTION)
280 LF of 16" D I. CL2, Water Pipe @ $8.40/FT. 2,352.00
Install 280 LF of 16" D.I. Water Main @ $5.0 7T. 1 ,400.00
1-2" Blow-off Assembly @ $110.00 ea. 110.00
SUB TOTAL $ 3,862.00
5% Sales Tax 193 10
(B) TOTAL $ 4,055.10
(8) TOTAL $4,055.10
A TOTAL 2,255.82
CITY'S PORTION $1 .799.28
f
i*
• � M
a
WASHINGTON NATURAL OA• COMPANY
$15 Mann 1'rr`er fP. O. &is 18691 Seat/4, weah+ngt"", 98111 Telephone MA&2.6767
S A.'
September 5, 1967
City Engineers Office
City Hall
Cedar River Park
Renton, Washington 98055
RE: Water Project Plan
W-251
Attention: Hr. Ronald Glsen
Water Engineer
Gentlemen:
Your set of drawings for the above referenced project have been
marked with our existing gas facilities and are being returned as
requested. You will note that on 106th Avenue Southeast we Dave an
8" supply main. This main is the primary source of gas supply to the
industrial plants in Renton ar,d the distributicm mains in the Highland
area. Therefore, we request that particular caution be exercised in
designing this proposed job and that the location of the 8" main be
included in your drawings.
Please call MAfn 2-6767, Ext. 250 if additional information is
needed.
Sincerely,
Bernie W. Trout
Publlc Improvement Supervisor
BWT:jw
r
PUGET SOUND POWER 6 LIGMT COMPANY
P. U. Box 325
Renton, Washinst,n 98055
September 5, 196/
City Engineer's office
City Hall
Renton, Wsshingtnn
Attention: Mr. Ronald L. Olsen
Gentlemen:
We ate enclosing the Water Project Plan, W-251. We have checked
the location of our utilities and noted the c.rrections in red,
as you requested in your latter of August 30, 1967.
:�w
Form Completed on
City of Renton
Utility Department P,oject Fort.:
1 , Water Project N W- w51 B Date Project No. given JAt`+NAR'O 194i7
2. Project Description and location P'4<9E7 ORW6 F2orss TµE IR6+y50A1 RUA()
TA THE TAL60T f4iLL at'r.wwpir - SITc
3. Developer's Name (If City check )
Address
Phone M
Engineer's Name (If City check )
Address
Phone N
Contractor's Name (If City check )
Address
Phone M
4, Is there an ACTIVE Late-Comers Agreement in the project area?
IF so, give File Name
Recording Date And Number
5, The Utility Department Work Order Numbers on this project are as fo lows:
6. What plans have been submitted? Preliminary As-Built
7. Has an Estimate been Prepared for Project _ If so, give Date Prepared
And Total Amount of Estimate _ p+
8. Is there to be a Late-Comers Agreement on this project f so, gi,
dates for; Preliminary __Submitted Recorded
and P;corded Number
9. Cate of ''Start of Construction" Date of "Completion"
+
Y:. a
Y
, r
BEGINNING
OF
FILE TITLEW10 W r
i
� � I
I
_.�.�--��r..�afT l)Y l'. • I'.t + f )) ] 6 ) llfl �• i")..I U:).0' tl�).')IlttF slY'e. >i)� Il/lf - .