Loading...
HomeMy WebLinkAboutWTR2700268 JONES AVE NE & NE 27TH ST. W-268 r1j J �7 T ri 4 f rl 1�i In In c JOHN E. URCE: : 9623 - 108th ATZ SE. RJit-cJ, 98055 Difference between 6" and 12" Pipe `,ins i on 108th Avenue SE-W-268 12" Pipe vs 6" Pipe (460 LF) 2.77/ft. 1,274,20 12" r,.v, vs 6" ^.v. (2) 3.65.00 336.00 12" Tee vs 6" Tee (1) 63.65 63.65 12" x 4" Tee vs 61,x 4" Tee (1) 52.35 52.35 12" Plug vs 6" Plug (1) 9.25 9.25 12" x 6" vs 6" Tee (1) 52.45 52.),5 T2"x6" Reducers 2 rd 0.45 87.10 Sub-Total 1,875.00 Sales Tax 78.75 Total 1,953.75 $5231.77 W-269 Total 1953.75 Les: itv's Portion $3278.02 Total Lwvelopsr Coat C..ty' s portion of proieat 1,553.75 approved by G rvi 67 �ru PRCUECT NO. w-26HA UTILITIES DEPARTN&NT CITY OF RELTON WCRK ORDER N0, WASHIN(706 DATE SUBMITTED Arril 20. 1967 DATE COMPLETED DEPARTMENT WAdkrL DESCRIrT10C OF WCRK Fire i-!ydrant for Urchts Subdivision NECESSITY WORK TO BE DONE BYt City Forces r--1 ?rnmrcy Owners Request Contract Others [ ] ITEM UANTITY U::?T C06T AMOUNT 5" MVO Fire Hydrant (FL) 1 Fa, 155. 155.00 12" x 6" ^,.I. Tee (MJ x MJ x FL) 1 ra. 97.L 97.40 6" Gate Valve (FL x FL) 1 isa. 78. 78.00 6" x 4" L.F. C.I. Spool (FL x FZ) 1 Ea. 41. L1.00 8" x 24" C.I. Gate Valve Box 1 La, 12. 12.00 Installation 1 i;a. E0. 60.00 :pub-Total L43.40 Sales Tax 4.2% 18.61 I ` TOTAL COST $W.O1 APPROVED BY SOPT. OF UTILITIES _ DAIE APPROVED i FkO.iECT N0. W-268 UTILITIES DEYARTMIN7 CITY OF P.EN70N WORK ORDER %0. WASHIlIC70N DATE SUBMITTED April 20, 1967 DATE COMPLETED DEPARTMENT oA' TLh DESCRIPTIOU OF WORK Water Wain for Urch's Subdivision i NECESSITY WORK TO BE DONE BYs iroperty rAmers iiecuest City Fo_^ces I--I Contract U C:hers [� ITEM UANTITYUI!IT COST AMOUNT 12" C.I. (T.J) Pine 460 L.F. 4.75 2185.00 Installation of 12" Pipe 46c, L.F. 1.25 575.00 4" C.I. (T.J) Pipe e: > L.F. 1.35 388.80 Installation of 4" Pipe 288 L.F. 1.00 286.00 12" Gate Valve (MJ x MJ) 2 Ea. 249.00 498.00 14" Gate Valve (MJ x MJ) 1 Fa. 63.00 63.00 8" x 24" C.I. Gate Valve Box 3 Fa, 12.00 36.00 12" C.I. Tee (All MJ) 1 Ea. 102.65 102.65 12" x 4" C.I. Tee (All MJ) 1 Ea. 89.30 89.30 i2" x 6" C.I. Reducers (SEB,MJ) 2 Ea. 43.45 87.10 6" Adapter Couplings (STi, c C.I.) 2 Ea. 22.05 Lilo 12" '.1. Plug with 2" rap 1 Fa. 1i.35 I 15.3$ 2" Blow off Assembly 1 Ea. 60.00 60.Do Asphalt Restoration 120 q.Ft. .5[ 66.00 Oravel Bedding 10 u.Yds 5.GG 50.00 Select Backfill 10 u.Yds 3.00 30.00 Sub.-Total i 77. 0 Sales Tax 4.2% 192.26 rTOIAL COST APPROVED BY Tote with Hydrant :e5231.77 EUNT, OF UTILITIES DATE APrROVED v `. --- - --7-7- Mir NING UN OF FILE FILE T r 40 a r