HomeMy WebLinkAboutWTR2700291 NE 27TH EDMONDS-KENNEWICK PL 291 Bob Puhich, water Sups rintardent October ls, 19)G Bart N. McHenry, Assistant City Engineer 8' Ceativ n water Line - N.C. 27th Street Edannde Avenue to N.E. 28t,. Street U�wn reviewing the jobsite an N.C. 27th street, it would appear tt,at the existing 8" waterlias and services must all be lcwred to provide for adeq%ate construction of the street project. Also the services to all houses and all hydrants and valves will have to be lowered or adjusted to the new grade.elevations of the street. T:e steel oipe currently installed on the project would sustain undue dasage should we attempt to lower the existinq pipe for other than tomporaty "a. Proviud the water utility could provide new 8" castiron pip*, we will provide the placement soot by the contractor on the project under change order to the project. Please provide me with a confirming rawrandus. we are requesting Fon Aser, to provide water olans for the p10"d yatsolb a. 0CI Pan Olsen ,r / hen' till7Fd 4 G- e-Xe- � f� -,3 Bert H. McHenry, Assistant City Engineer October 12, 1970 F14nold L. Olsen, Water Engineer Street Construction - N.E. 27th Street I received an Interoffice memo from Bob Vuhich yesterday with regard to the existing U' steel water main In N.E. 27th Street. it appears that this main is quite shallow and must he lowered or relocated due to street construction. 1 have studied the plans rnd it appears the best solution to this problem would be to relocate this main and provide sufficient cover. If tiu street project will orovide Installation costs for a new &' C.I. main the '.later Utility will supply the material and relocate the services. would you please check out this possibility. Thank! RON RLO:mj e . Ron Olsen, /star Engineer October 8, 1370 Job Puhich, Water Superinterdent 5treet Construction - N.E. 27th Street The water train on the south side o/ N.E. 27th Street Is above subgrade on the now street construction. We have provided temporary lowering but many water mains leaksln the existing e' steel water main have occurred. This main should be replaced or relocated be/ore .further construction continues In this street. Please see what can be done. one 10. The required "PRESSURE TEST" ha; been taken by At a pressure of PSI , for _ minutes, on The test: Failed Passed Comments 7 11 , The required "PURITY TEST" has been taken by 0n Date of Reply Failed ✓t Passed Comments 12. Is there an Easement required? If so, give dates for: Preliminary Submitted Recorded Vx� And Recorded Number 13. This Project included LF of Wa,ermain -. f. +,r And Gate Valves Gate Valves �w Gate Valves and Gate Valves, And all n �cellaneous accessories for a total value of $ Also, Size Make type Fire Hydrants for a total value of $ 14. The transfer or "Bill of Sale" is in; Preliminary _ SuDmi-ted ?ecorded fo,m.The recorded number 15• This project information was sent to the utility Dept. for recording on and taken Into "plant" on _ 16. What drawiro; foes the Water Shop have on File. Preliminary , As-Built a'n a .a , Form Completed o� _. City of Renton .. Utility Department Project Form 1 . Water Project N JM- a9/ Date Project No. given _ 2. Project Description and location LItg rEr< MSI/N /;?e vNe6Iwclyr /VE, 27rH .sr, 3. Developer's Name (If City check ) Address Phone p Engineer's Name (If City check ) Address Phone k Contractor's Name We. rRo,57 eom Sr cn (If City check ) Address 49ev5 .3 111'J ei 7' ' kc"7, H/.4•5N 9P41 :11 Phone # 4, Is there an ACTIVE Late-Comers Agreement in the project aria? If so, give File Name Recording Date And Number 5, The Utility Department Work Order Numbers on this project are a: follows: 6. What plans have been submitted? Preliminary As-Built _ 7, Has an Estimate been Prepared for Project If so, give Oate Prepared And Total Amourt of Estimate b. Is there to be a Late-Comers Agreement on this project If $o, give dates for, Preliminary Submitted Recorded and Recorded Number 9. Date of "Start of Construction" Date of "Completion" City of Renton, Utility Dept. PURITY TEST FORM Water Project _/ "ame of Project /j/�_z ST c 0& 7'V je/�1fVCFA)`A /4' This test was taken by f/j1�yB� on Date of Reply d � 70 "Failed or "Passed __ on _ Comments: / 2 O->•L/ �lct/ ///4��__.__. f ..�r.` City of Renton, Utility Dept. PURITY TEST FORM Water Project 4 _ vl-2°Ii 'lame of Project '7704 This test was taken by I,/� on / - 7o Date of Reply "Failed on "Passed !/ on - Commen t s: _ ,��r� 4 ,1106 FN A01iF Al, ACE i Ail City of Renton, Utility Dept. PURITY TEST FORM Water Project Name of Project �• Ems. �,,, ~ /��N/�V[.s� .. This test was taken by -D, 740-40q _ on Date of Reply _ ,r "rai led on mm "Passed y� on 1 Coents: ..�. as rW40 OT LAlI�r—Jq_-91 €Ar-to .or�r, W. puv+ CITY OF RENTON Engineering Department ��,� • •� CONTRACT CHANGE ORDER AGREEMENT y CONTRACT -=1•_:------,-c---.---..-^---------------------------------------------- CINTRACTOR-.:.-.....-1.......-_--.c---------------------------------------------- SUMMARY OF PROPOSED CMAMOE------------------------------------------------------- _.'- - ---' --------- --------.-----------------------------------.--------------------- ' ; ------ -- ------------- -------------..........::-------- -----i= ' „ ------------=•--------......----------------f------------------- ............. -------�1'--�=J.......... -------------------`'-------/=----------------—-----r.�'-.. -------------- -----------------=- -- -- = = _.....__.__. ------------- _.___/__----..-...--.--........ j . _- ------------/•------------------------ -------------------------- ` -------- 1----------------------------i--- ------------ - /.... . . 11���I y/� l / JJa---------------------------- ------------ SIGNATURES: CONTRACTOR---WIf-- `-'-F--��'�•�'+�+- DATE � ENGINEER- -^`---^'� :---------_C•_—..--- -DATE- --s--- APPROVEDBY--------------------------------------19------- ---------------------- (Municipal Authority) (Date ) (Authorized Official) City of Renton, Utility Dept. PRESSU% I&bf fuh.. 'dater Project Name of Project �, 7 >M J' r• This test was take, by ' Si./pao" on 11- 2if - 90 — At a pressure of 3QQ PSI , for /A� minutes. The test "Failed" / on "Passed"_ ice" on Comments: 7 ,17- AIW W L�L'.Naw/L�3 i4ti` /f��` - V /f-4'S ' TD NE 28 �_ Sr �' ,�dc.yN�i✓�G',r P� Nt'. *e27 v v N N B INNING M FILE Y - ...W f"I'r ,, r, rX. ...Si - � ..:: i P .. 'ai, •. i "'� l"i'( - �ID1 Ilia t • ' t ENDING OF FILE TITLE i e �v iN • H L- i � t I 1 L_ :eL `� r I1t � 1 ! e=4 E.9 t f ESTIMATE SCNFUgK If ---'-'- ----- STREET 'ROVEMENT � CONTRACT C.A.G. 1733-70 PROGRESS ESTIW,'F DATE---•--------/----•------- � SHEET I of 3 N.E.27TH STREET A KENNEWICK PLACE N.C. FROM EDMDNDS AVE. N.E. TO SOUTH R/W LINE OF OLD P.C.R.R. ITEM------_.__--_- � r- - --_ __ DESCRIPTION UNIT UNIT PRICE TOTAL QUANTITY LAST ESTIMATE TOTAL QUANTITY THIS EST14� E �__ t[-1. NOL't�ILATION L.S. 4000.00 /oo � � _� ZOO / •4IOa7,oc 11-2. CLEARING S GRUBBING L.S. 5500.00 Too k �-0 o � /vo /e 5,S•oo m 1I-3. 'WCLASSIFIED EXCAvA7[ON C.Y. ' .00 _97B/ - 9 9B/.00 I I-4. BANY, RUN GRAVEL CLASS "B" TON 437. w /</ZA II-5. WATER (PER M GALS) _ M GALS 3.UO Z--j - - (n6, o _66.m I1-6-. SELECT 'FRENCH BACY,FiLL TON 1.50 9� /f z. -50 9S I-7. /y1.so- i.HUS1�t SI G TDU�� ____ .---- --- -- / S/.- . �, 1 TON _ 2`80 ��8.1. /o � - 4 -SZSB_.�__" /•�7Z3.9'/� C[I-8. ASPHALT TREATED BASE TON -3 Z g oo 2G/ cx> Zj 2 /G Z(./oo �..____. 1I-9. ASPHALT CONCRETE CLASS "B" TON :]4,50 40 / o9s/ 9/ P9.Go - - _ _ 1397 _ o Zo,aSS,oa 1I-10 CEMENT CONCRETE. SIDEWALK - S.Y. j5+yy.i? �29�77 20/®, 9.'/ 9�oAs37 11,11. CEMENT CONCRETE DRIVEWAY S.Y. 5.75 /Zg 49"8 ,29 99. 97 6, 9a993 t�ACRETETFrV Y--'-' /oy/ /,Z_ tI-12 ^_ -- REPLACEMENT S.1. 4.00 ZG/J, za II-I31 CEMENT n'GUTTER kETE -LUft�b L.F. -1 .90 - - ----- y996.ti/- r/ y9j /6 11-14 SAW CUTTING L.F. 1.00 ,Z7. Sp `�' 70. SD 70„tea 11-15. 36"C.M.P. IN FLACE-- -- - L.F. 26.00 II-16. 12" CONCRETE PIPE IN PLACE L.F. 7.U0� g�� II-17 8" CONCRETE PIPE IN PLACE L.F. 6.00 �39 � Z o�y 3 9 2 o a 72" DIA. STORM MANHOLE EA. 750.00 _ II-19. 48" DIA. STORM MANHOLE EA. 375.00 9 II-20. CATCH 6ASIN TYPE I EA. 160.00 / o / d'oO . co /O /600.00 II-21 , CURB INLET TYPE - EA. 130.00 --290 oo RELOCATE EXISTINb-'MTH----- II-22. BASIN EA. 1 15.00 / _ � / '76-0o' II-23. CONCRETE STEPS -_-- L.F. 35.00 //.S 741.Sd �</ 9d /, Z$/ SO 1I-24. ROCK RETAINING WALL TON 15.00 I 7S/7�I FILLER K*4 RIAL FOR RETAINING 11-25. WALL; 1 1 4" Cru;..ad TON 3.00 3yj� /02f/' cX� - `✓/ SO / C� 2�/_SO i 11-2-6.1 SACKED CONCRETE RIPRAP_--- - EA. 4.00 II-27. RELOCATE MAILBOXES EA. 1U.00 �_ Zee. II-28. MAILBO% POSTS i EA. 25.Cg1 r 3,g-jj. � 2-0 _ -6- ao -- -t ---- -- - - - i -29.1 ADJUST VALVE CASE EA. 25.00 7�•O0 II-30. ADJUST MONUMENT CASE FA. 25.00 - -- 1I-31 MONUMENT CASE d COVER EA. 50,00 /$ 7TO.pp 11 •32. TOP SOIL C-T. 6.00 /70 - /Q.�o q0 I 11 II-33. JARK - ( .Y 6.00 � 11-34. FINISH i CLEANUP`- - LS. 000.0i, --- --_ -. 11-36. 2' x 4' TRENCHING L.F. 25 i;�,/V i 5//.aQ _._ �-/42_ 11-36. 1 ' ■ 2' TRENCHING-- L.F. 5a 9-Zo -6-cl4, 92n __ •bCi(Qg� II-31., S LECT TREliCH B CK ILLL R ^ - TRENCHING TON ;70- TRENCHING l - N, URS TON 3.50 _- - 11.39. CLASS "B" ASPHALT CONCRETE FOR - TRENCH_ING TON 20.00 II-40. PLASTIC CONDUIT 1 1/2" L.F. .58 GALVANIZED ;TEFL CONDUIT 1 1/ ' L.F. 1 .39 $Q- -_ y SG 6 9 er0 - E T II 42. F A6fiT6A�� (TYPE TWi I.F. .23 6 /90 i YZ3, II-43 (TYPE UF) L.F. .2' � 114C` /Z 696,00 13 / (oZ5'oo /3 /, /o2Sm /3 (os'a. co /,3 >a o0 �. : . LY 37&, . co zU 596.ao //.J Z. 9, oSlo 00 /i3z `/' 6.o0 a z.3 s.3 zso.00 Z,a,oO o. .m G laic ' 6" COW, — .5S7.-sa .,Z o,oo qa6 �-... ......:.t' _ /oo /00 97 Zo /00% 97zo h. oo >o (p0• 00 /00% bQ oo zoy! (o0 3 6917 . 2os!Coo �' looZ. Bo oe�a z Yz_ �, roo�a z•!z /QIO % 7,5,00 E cb a K';*R Am SHEET 2 of 3 Sf,HEDt11-E, 1 ^ATE--- ---- 'CONT.) rSTIMATE --•- ITEM DLSCRIPTION UNIT UNIT PRICE TOTAL QUANTITY LAST ESTIMATET TOTA' QUANTITY THIS E',TIMATE �T Uti'ALUA N-UN Ll-&MR-G -- 1 l l_43. - STANiUlRD 35, M.N. __ _._.. EA. 370.00 ___ _ ___ I11-44. 121ALUMINUM BRACKET ARM EA. 50.00 (p ,300 00 6 joUoo 0 r4 REMOVE EXISTfNG CATCH BA IN EA. 6.IlIi - - + �7JroU �/ l!'s � 0 1 5A ROCK RETAINING WALL TON Y' 15.00 U u- z 8�• /�'D ZS-` - ?`y r� U e56 -FELLER MATERIAL FOR ROCKLkY TON 3.00 94 Yo �- tfp /9U.00 SaZSO O 46 18" C.N.P. L.F. 14.00 36 co Zz 30b� 0_9A CATCH BASIN TYPF 1 EA. 160.00 - 6 f0 9B CONNECT TO EXIST. STORMLINE EA. 3¢.00 -- __ ____.__-J_- .3 /GS.00 ;0 `9C CONNECT TO EXIST. C.B. OR MH EA. - 35.00 .3 ------ CO _-__- _lOA 6" CONC PIPE L.F. 5.00 /(0 80• ao _ _-`16_ CO lOB 4" CONC PIPE _ T L.�, 4.00 - _ _ 9 /^s4:-<?0 39 �SEsoa FURNISH 8 INSTALL FLAT SLAB — CO _ll CO 19 -SREAKKINTO EXIST. C.S. BA. 2S_00 CO 24 ROCKERY RETAINING-BACK OF • 12120 WALK TON 18.00 2 /p/, 69.0 CO 28 j Mir-s. ASP. Class N Paving TON 35.00 I , 1 - _._ _ ftTOTAL------------- --------- --------• ---.._. f S! 79j- zz %1L1RAt;4, (ref. Siieet 3 rd 3) 1CYTAL LAST EST. f•_ �.-,_.__.-,._.- TOTAL fill ; EST. f Q- ---- -----. -----•------- -•f TUI'/L SCIIEpULt Ill---------------------------------.......-------_ _ R • STORAGE ITEMS sCetLo'vLR coat. DATE /-.z -7/ .T of 3 ESTIMATE NO. ITEM DESCi1PTIi;v — 6i ' =IT TOTAL LAST -- _.. _ _-- IT J?1iT PR T TQTAL This _ �llA_. L B,qm ni ?ITY_ ST AArF ill-42 Lighticr: units-lot: N I BA. 105•' hu i III- Alain. Ll i.tire Tv. -A. � 370. � 222.J.i' 12' Alwi. 3racket Ariz EA. q j0. j 3,;,_, ' . O ESTIVATE----4-.... �^ STREET .MPROVEMEMT SCHEDULE 111 CON'sQACT C.A,G. 1733-70 PROGRESS ESTIMATE / SHEET l of 3 KENNEMICK PLACE N.E. AND N.E. 30TH STREET FROM SOUTH R/W LINE DATE--6 (i�7/.___---- OF OLD P,C.R.R. TO INTFPSTATf 4ti5 ITEM -- DESCRIPTION UNIT UNIT PRICE `TOTAL QUANTITY LI;T ESTIMATE TOTAL QUANTITY THIS ESTIMATE I[1-1, MOSIL17ATION `v L.S. 1000,00 - 10070 / OOO.gp 1,1-2. CLEARING 3 GRUB/ING -' --'-- -- L.S. 1500,00 � TDO•CO , 111-3. UNCLASSIFIED EYrAVATIO"t rY. 1 .00 ,3 S�6 00 -_- �- - Z- - �yG7 y6700 111-4. BANK RUN GRAVEL CLASS "B^ TON 1,15 `/ fl3-6--S. III-5. WATER (PER M GALS) M -G�AL�_ 3.(wpoo III-6. SELECT TRENCH BACKFILL III-7. CRUSHED SURFACING COURSE TON 22 8n /Zy-Xo - p Pvy;b II1-8. ASPHALT TREATED BASE TUN 7.00 5 SS-oo y jrS ��S.oO j rP.S�oo 111-9. ASPHALT CONCRETE CLASS "B" TON 8.40 Z9 7 a - '- -- III-lU. CEMENT CONCRETE SIDEWALK S.Y. 4.50 6z9• `?Y Zp,35! y6 6-5963 2, 969.Z c 111-11. CEMENT CONCRETEDRiVE'VAY S.Y. 5.75 - _ _ _.- �G. // .Zo7 II.-12. CEMENT CONC ETE CUR NO -- _--- - - 1 GUTTER L.F. 1.90 /2�/0';`0 3 �6 �� /3// oa 2.*✓Q0.90 11Il13. 12"CONCRETE PIPE IN Pl10E L.F. 6.00 LIoT 6 �o.00 Z®GJ /, GBD.cso 711-14. 10"CONCRETE PIPE IN PLACE L.F. E. rO 00 99 S9y o0 II1-15. 8" CONCRETE PIPE 1N PLACE L.F. 6.^n /09 dlsyQ, /09 6-S-S/00 I1I-16. 48" DIA.STORM MANHOLE - F.A. 360.00 Z 7kj, o0 2 111-17. CATCH BASIN TYPE 11 _ EA. 160.00 /_ _ - / 60 00 / i6o ob I11-18, CURB INLET TYPE IV EA. 130100 If1-19. ADJUST EXISTING CATCH BASIN EA. 50.00 III-20. RELOCATE MAILBOXES EA. 1 �0.00 y�.00 _ 3¢ Qo - �/- _ �111-21. MAILBOX POSTS �EA. 25,00 - 75 p� Z So. o0 1II-22. ADJUST VALVE CASE CA.+25.00AD-JUST f9NHOLE (WATER V,iLVE !II Z: VAULT EA. 25.00 �1 11-,'4. ADJUST MONUMENT CASE " EA. 25.00 -- _ 1I1-25. ADJUST OATEk METER 'SOX EA_ 15.00 �- 4111-26. MONUMENT CASE 8 COVER EA. 50.00 111-27. TOP SOIL C,1. 6.00 "- II1-28. BARK C.Y. 6.u0 --- ---- _ 1I1-29. FINISH 6 CLEANUP L.S-.-I}-150u.UU I11-30. 2' x 4' TRENCHING ' L.F. I 1.2S - 111-31 1 ' x 2' TRENCHING L.F. .5r, ACKFILL FOR 111-32 TRENCHING TON .7� tif[2Ti16-St1Af7CCTNA III-33. TRENCHIN.;, fI 14- TON 3.57 - --�B" ASYH� - iI1-34. TRENCHING TON 10,10 III-35. PLASTIC CONDUIT 1 58 /,u o _ __.._.'72S_oo _/z � - - �15_.cx� 111-36. GALVANIZED STEEL CONDUIT 1 7/2" L.F. 1. i9 /70 2.34-'ts �7'? . --I- L / TlGr[ I -._- III-37. TYPE TW L F. .23 - 1.6ro - .� G. Vol /6po �%n. 1/O W C 7iUCT61< - I11-38. N !•OOp TYPE t1F _ t .F _2!% 3ao - _.__ - _ �OO..__ _6o.op 111.39. INLINE 30 AMP FUSE KIT - '_ 16.000 / /4. oo - -- / 16,on ill-40. J-20 TYPE JUNCTION BOX EA. 58.00 7 b_Z1. q _� lfl-�1, CONC,IFTE FOUNDATION EA. 125.U0 's''W "v 6 ",SbaO - r7i(!Si t + 3 .+ I11-42. XTERNAL SHIELD _ --- EA. 165TW 4 _'� 990.E - i r STORAGE ITEMS ycI iL ._. 11 con.* VATS 3? F.:.T 3 of 3 BSTINATE NO. PTIOtJ I P..x FM_ ue 3 _ _ UNIT R, 6J UNIT ". C .. LAST TOTAL —PIT THIS YRIc ' .dANTT71 EST -`d Llphting Units-/ i(, W LA. 165.0 s 99. - — — -- All. •. Lichtin,- 3td. FA. 37U U 222. , . --- II Al .r:. uc>: -A. i i I h Y I ^.TOTAL STORA„a C%rax;up 'r.t. rl( 'VT .CON5TVJ-I 1:IN COM i"' CONTNACt C.%,..Or 113 70 • SC�`Ytlu$d Y LM^nrt�> AvenNe M.Q. 'may set Fc V.• . . ' Amount PoWned �l LIS f ANA%unt frev. Na Lx U, t .e 5d•e�aie 1 911.9�'IO I N.T. �W L if of f'f kiii Arno- t 'r,,v. ' SG^ed:�le t li u:au nlYwic.. � ♦:e . . _ A•�:v= ' 5/, 793.?e 4/3,363, Z3 d.&i INTER-OFFICE MEMO T.: Ron Olsen DATE January 26, 1971 FROM; waterworks utility-Grace C-ow PE: WO 2460 - W/ C. Frost installation on Edmonds Ave., N.E. to intersection of :1r N. E. 28th and Kennewick Plac.: on N. E. 27th St., Job Project 245 lease find attached copy of mAterial issued to above work order in the mount of $10,154.72 plus overhead amking a total of �r9YG3: Please include this sum when compiling data to take project into plant.' ' Y Gr ..:. G` ' ,.... .++•.a.,. n-.tis!:vY;_.pt d+C'FTF'm�'<M. MMXP.MN'M"d"+9°`V!w'w+.mv ,..w,w.v.,.,.w...u......... ..wylA�. r`- CRY OF RENTON ATERiALS ISSUED s o No WATERWORKS UTILITY T y60 w o No STOREKEEPER: ��-y.• —� ou.rn UNIT j .ccouM — -- .. oeirveuo _ _HtxreR MATERIAL AMOU C� NY 4 6 fir_ . arty > ' S •F7. 3Y} . z —� c. .--- „ n a _ 22 L - J.,j ,3� Y-7*7- 1 — /. Cu by a utit r a WA I, �k INTER-OF'FI is M,,n, Rot) i,ui ich, Wat,.r ;,uverintendant TO Pot) October 14, 1970 FROM: Fie+rt r.. McHenry, ASUStant City Engineer RE: 8" Castiron Water Line - N.E. 27th Street Edmndk Avenue to N.E. 28th Street Upon reviewing the jobsite on K.E. 27th Street, it would appear that the existing a" waterline and services must all be lowered to provide for adequate construction of the street project. Alao the services to all houses and all hvdrants and valves dill have to be lowered or adjusted to the new grade elevations of the street. The steel pipe currently installed on the project would sustain undue damage should we attempt to lower the existing pipe for other than temporary use. Provided the water utility could provide new 8" castiron nips, we will provide the placement cost by the co: tractor on the project under change order to the project. Please provide me with a confirming memorandum. We are reriuesting [,.on )i3en to provide water plans for the relocated w terline. BI]Kc:m j cc: Pun 01aen RT r` October 14, 1970 To: Bert McHenry From: Ron Ulsen, Utility Department r�': Street Project 0745 - NE 27th Street (Your memo dated October 12. 1970) I have reviewed the existing 8" steel water main in NE 27th Street and it appears too shallow for the rood construction. This main will have to be relocated or replaced. The Utility Department would like to see it replaced with a new 8" C.I. water main . If the street project will nave this new main installed, the Utility Department will furnish the materials. An estimate of the street Project's participation could be S10,000,00 and the Utility Department's portion for materials woulc be $11,000.00. If further information is required, please contact me. i Ron Olsen RO:sn I