HomeMy WebLinkAboutWTR2700294 PLAT OF GLENCO W-294
BEGINNING
OF FILE
fl« .MLEuLrQ-I
)2t, A--r O F GLeA/ca
J
� M
l
i
C � ,
t
f
I
P
n:
w .
r
Y'f ,
I .
I
I
I
.q!
' A 9 ��'i It qt to Jt r :. '.fir : , t t- •r " � ,�i 'I '
U 1+
2255 - 116th Avenie Northeast, Bellu:oe, Washington 98004 Are. (206) 455-0790
November 17, 1969
City of Renton
City Hall
Cedar River Park
Renton, Washington 98059
Attention: Mr. Olsen
Water Department
Gentlemen:
Subjects Glencoe Division No. 1
At long last, we are in a position to enclose two copies of the
-built drawings of the water system for Glencoe Division No. 1.
1 hope these as-builts are what you require.
The location of the fixtures was measured in the field and they
are located in the attached drawings exactly to scale.
Yours very truly,
MqTH �TI�
A. Grice, Naaaq�
Land Development
AG:cvd
&ic to so r.,s
,t
.,
tiY 2170
ORIGINAL
DEPART M E N T WORK ORDER-DISTRIBUTION A E NY
OOF
N
MATERIAI. i
NO. SIZE KIND S ISSL D S RETU2NED
I
ESTIMATED COST _ INSTALLED BY CITY ❑ _ CONTRACT ❑
CONTRACTOR SUBDIVISION
WORK STARTED WORK COMPLETED
REMARKS
•.--,-_�.r. ------/tea,
PROJECT NO.A DATE--.
NAME_.- _ -ADDRESS
i SIZE OF WM NO. MAKE READING _ w ACCOUNT NO-
MATURE OF WORK /ND DIRECTIONS: -- ----
_Z
s d
L-..
SUPT. SIGNATUR
S
j
t:OR ATgN
2255 - 116th Avenue Northeast, Bellevue, Was -ngton 98004 Area 1206) 455 0790
June 11, 1969
City of Renton
City Hell, Cedar River Park
Renton, Mashirgton
Attention: Ron Olson
Engineering Department
Gentlemen:
Subject: Bill of Sale - Glencoe Division No. 1
We are forwarding herewith the Bill of Sale on the
water system in the plat of Glencoe Division No, 1,
Yours very truly,
T
�RAIION
A. Grice, Wasintender.t
Land Development
AG:cvi
Enclosure
a
v15ns/t1; rUv atconte's ust,
Filed for Record at Request of
I
f
Name.... '
Address.....__........................................_.. _.......__.._ ...... l
City and State............................ I 1
BILL OF SALE
KNOW .Al.L 111r.N sY Tr1ESF PRESENTS: That McGrath Corporation
of Bellevue
Courtly of King , State ni Washington_ the part Y of the first part,
for and In coneideratkm of the sum of One and no/100-----------------------------------
----------------------------------------------------------------------Dollars
lawful money of the United States of .America,to it in hand paid by City of Renton
the part Y of the world part. the receipt whereof is hereby acknowledged, do as by these p2sents grant
bargain, sell and deliver unto the said part y of the stcnnd part tire following%?crgbed lvaersonaleprffty now 'I
kutedat Flat of Glencoe, N.B. 19 St., N.E. 1§ St„ an n on venu fl
in the City of Renton , County of King and State of Washington, to•wit:
Approximately 1740 L.F. of Big CI., 2095 L.F. of 6" C I„ 647 L.F. of Orr C I.,
water main and all appurtenances pertaining to said watertaain, expressly
warranting said watermain against any expens. ,, costa or liens hereto Incurred '
thereon by, through or under sellers herein.
TO HAVE ANT) TO WILD the s;,nie to t4r ,aid pasty of the second part, their heirs, exrcutnrs,
administrators and asci,m forever. And aid partY of the first part, for their , heirs,
executors, administrators, covenant and agree to and with the said part Y of the second part, their
executors, administrators and assigns, that staid part y of the first part , owner of the said
property, gaxis and chattel. and ha s go,:,,l u.,ht and full authority to sell t,' same. and that they
will warrant aind defend the cde hereby made. unto the said part y of the second part, their
executors, administrators and assigns, agairut all and orgy person or lMrv,ns, whomsoever, lawfully claiming nr to
claim the same,
IN WITNESS WHERFOF. Vie .rid party ,,I tit- first part ha s hereunto set his h.,rul
and sealed ibis llth da ,t Julle 1 69
McGi'tATH COR'`cJ
-- 3kTION, President
Purr^ let
1 ,mo of KIM;
On this 11th dn. ,d lung. Ig69 . lwtorr me. the undenµned,
n N 'lary full" in and i,,, ,L, .rally appe.ard
T, A. McC:rath, ><>
to mr known I" Le the I'n ri,nt dh7lxxxxpexxxxNx7eata4spXtl�wwrt+M. „f MrG iamb Corporation
tiro torpwatN,n II1a1 ,%,,, I 16, Ill'. "I n itinunt to hr thr free anti
voluntary ut and de,d f " I „ o. I..r IN. I, u I l try th I, oid ,m ,th ,alr,l Ill It
he is aull rw"l o. 0,- do ,.,1 iu•' ;It I Ihal fi, di. , r tl..,. "'Ile rat, -1'.d .i<I
"rlaxadnn.
tithe+ my land and 41,1;11 "'d Ir,u I,, .dlwd tit- - .aril }rd' :
Puld"ra y{ul /,+r flit nt It'.++lrir
A.kMr.l.danr.at b/CagatHia•, !t '�! ...c.�.
Lund Idle t of Ball Ish County, Im.
INTER-OFFICE MEND
TO= Grace Crow - Utility .,ej-t DATE June 18, 1969
MON• Ron Ulsen
RE: Thin is to inform you that the legal transfer of water mains in c
the plat of Glencoe has t. ken place. Our w.ter _ :oject W is a-294.
Involved were : followint;
Appro. i .a�elyy 1740 L.F. of 8" C.1. "895 L.: . of 6" �.I., end
GGI.7 L i , of 4" "'.I. `ater , i , qnj 9 - t", to - 6", and 4 - 4"
Gs" 'halves. OOMWOO O for a cost of J24,189.00.
AlsoLL
/ !-ire Nydr:.nts at a coat of . 3,SUU.00
t
ela,�ae Luke this into plant,
Th.mkr :on )1sen
. . .,,nay..
CORPORATION
2255 - 116th Avenue Northeast, Bellevu3, Washington 98004 Area (206) 455-0790
June 9, 1969
City of Renton
City Hall, Cedar River Park
Renton, Washington 98055
Attention: Ron Olson
Engineertug Department
Gentlemen:
Subject: Glencoe Division No. 1 - Water Mains
The following is the post breakdown on the Water Main Distribution
S•,stem in the Plat of 31enc. :-
Cost of 7 - 5" hydrants @ $500 $ 3,500.00
Cost of Balance of System 24,189.00
Total Cost of Slstem $ 27,689.00
The system consists of:-
1740 L.F. 8" Cast Iron Pipe
2895 F. 6" Cast Iron Pipe
647 L.F. 4' Cast Iron Pipe
4 - 4" Valves
10 - 6" Valves
9 - 8" Valves
7 - 5" hydrants
Yours very truly,
MAR A'I l jy/CAR P0RA7 I ON
A. Grice, rintandont
Land Development
AC;cvd
f.
4
NY ISIS
ORIGINAL
DEPARTMENT WORK ORDER-DISTRIBUTION R E N T O N
MATERIAL
RETURNED _..
I NO. SIZE � KIND ISSUED s� t �►
I
ESTIMAIM COST _ STALLED {Y CITY,.,❑ CONTRACT
CONTRACTOR SUEDIYISION
WORK STAT WORK COMPLETED
REMARKS
PROJECT NO. � .� ..!- ! DATE .-
s
NAME_ - _._. ..----.. _. __...- ADDRESS_..- _. ___.. ----.- ---- - -.
SIZE OF METER -----NO. _.MAKE_. -_.._ READING ___ _ACCOUNT NO.-
NATURE OF WORK AND DIRECTIONS:
r •
,�
SUPT. SaN/tTIM
7,
I a
3 `
l:
y ,
Y
MINISH , WEBB A ASSOC-
D A3SOCIAT.S
Professional Engineers & Land Surveyors
V 200 BROADWAV SEATTLE, WASHINGTON 98127 M0.�n 3 1981
MERVIN A MINISH
WILFRED L. WEBB
AIJI MIYAMOTO
City Engineer
ARCHIE W. I.EVA city Hall
Renton, Washington
Attention: Jack Gilson
Re: Glencoe Development
Main Location
(pr
Dear Sir:
gn,,,-osad are two copies, of a Preliminary study of proposed vote* main
through the Glrncoe Develo- nt. If you have any further suggestions,
please mark them on one Print and return to our office. Any future
revisionr to our present routes of Water Mains, we will inform your
office.
Sincerely,
KERT.SR, WM & ASSOCIATE`•
2Ct•,�•-1
Fred R. Robinson
MR --
El 1 .
r
r
Noteelber 22i 19R7
^inish, Webb •A Associates
201 Broadway
3eattl*, Washington 98122
At,teWens Fred H. Robinson
Dear Mr. Robineone
Enclosed is a ,apy of the Proposed Water 'kin Layout in North-
east Renton Area an per our tolephom -onvsrsati r this data.
tnoarely yours,
-,c'.ald Ilsen
%fat,rr F]�vineer
ROsm
IVVER-OFFICE MEMO ✓ATE. May 28, 1968
TO:Ron Olsen --
FROM. Don Taylor
RE: Water System Pressure Tests-Glencoe Addition
Wed. May 23, 1968
Decided to put test on entire system. Pumpeo lines up to 2Sn pds, but they
wouldi,'t hold the pressure. After many trials we found the existing valve at
132nd SE and SE 106th to be leaking by. We then shut off the next valve
east of it and pumped system up. After pumping it up to 255 pds. we checked
all other valves in system to make sure we were testing everything. This took
about 30 wins, and when we came back the gage read 248 pds. with a loss of
only 7 pds. in 30 mins. I okayed the test.
We then tested a short section by the faulty valve and a leak in 2" Line to
blowoff assembly at end of 132nd Place SE . Fixed leak and I okayed test.
Don
„ r -
p'
i0. The required "PRESSURE TEST" has been taken by ,i Do" re yLC 4
At a pressure of PS. , for _ minutes, on
The test: Failed , Passed Comments
It . The required ''PURITY TEST" has been taken by D,,H -r Avk oR
On Date of Reply Failed
Passed ✓ Comments
12. Is there an Easement required? if so, give dates for:
Preliminary Submitted Recorded
And Recorded Number
13. This Project included 1 -74 O LF of bS�Wete air,
(�4 7 4'
And 4 - ��� Gate Valves 1 ,ate Valves
°I rs Gate Valves and Gate Valves,
And ell miscellaneous accessories for a total value of $ ¢� Ig`j. 00
Also. 7 Size 5 nJC Make 1, -%A type Crd Fire Ilydrants for a
total value of S 3�SOC)
14. The .ransfer or "Bill of Sale" is in; Preliminary _ Ix
Submitted -�� decorded form.The recorded number
15. This project information was sent to the Utility Dept. for recording on
and taken into "plant" on
16 What drawings does the Water Shop have on File.
Preliminary AS-Bull .
r
�f
sf
Form Ccmplcted on
City of Renton
Utility Department Project Form
1. Water Project k `,'J-,2`14 Date Project No. given
2. Project Description and location Pt.AT OF (,LE N(Xe '
3. Developer's Name McGRATH CORP —(If City check ) 4
Address 1255 - I(of" ME. N E ART GrtICE
BELLEVNG JASH Phone # GL 5-0190 r
Engineer's Name MINISH k'e BB + ASSOCIATES (If City check )
Address 200 e1 D.1AY MR MIYAMOTo
'ifATTLE ,. SH Phone d MA3-1981
Contractor's Name L.D. L. LAND DS LGPMEiT CO. (If City check )
Address 145'1 DASH Po1nIT ROAD
FEDERAL . JAY WAcr4 Phone J`
4. Is there an ACTIVE Late-Comers Aqreement in the project area? too
If so, give File Name
Recording Date And Number
5. The Utility Department Work Order Numbers on this project are as fnI 'ams:
6. What plans have been submitted? Preliminary ✓ As-Built
7. Has an Estimate been Prepared for Project 1JO If so, give. Date Prepared
And Total Amount of Es.. lmate
8. Is there to be a Late-Comers Agreement on thi; pro) ic _ If so, give
dates for; Preliminary Submirt_d
and Recorded Number
9. Date of "Start of Construction" _� _Date of "Ccr�Iriton". .