HomeMy WebLinkAboutWTR2700299 COTTONWOOD GROVE WATER W_2 Y9
J
U
r
y
i
M
•
10, The required "PRESSURE TEST' has been taken by
At a pressure of PSI , for minutes, on
The test: Failed Passed Comments
II . The required "PURITY TEST' has been taken by
On Date of Reply Failed
Pass-d Comments {{
12. Is there an Easement required? If so, give dates for:
Preliminary Submitted Recorded
And Recorded Nufrber
13• This Project included LF of Watermain
f
u
And Gate Valves Gate Valves
Gate Valves and Gate Valves,
And all miscellaneous accesscries for a total value of S
Also, Size Make type Fire Hydrants for a
total value of 5
14. The transfer or "Rill of Sale" is in; Preliminary
Submitted recorded form.The re, orded number
15. This project information was sent to the Utility Dept. for reu-rding on
and taken ;nto "plant" on
16. What drawings does the Water Shop have on File.
Preliminary As-Built �__ w
T
Form Comp!eted On
City of Renton
Utility Department Project Furm
I . Voter Project d vn)- :ZIT Date Project No. given MA2u4 I41,4k
2. Project Description and location ('077''H Wo ou GrLc;,L)� OFP
or rnAALC 0AL«y NPoHwity
3. Developer's Name H2 C:A AR eCS SN ANE (If City check )
Address
Phone N (3A G 24L4-
Engineer's Name (If City check )
Address
Phone N
of
Contractor's Name r_ (If City check )
Address
Phone N i
4. Is there an ACTIV2 Late-Comers Agreement in the project area? ijp
1
If so, give File Name
Recording Date _ And Numbs
5. The Utility Department Work Order Numbers on this project are as follows:
6. What plans have been submitted? Preliminary As-Bailt
7. Has an Estimate been Prepared for Project If so, give Date Prepared
And Total Amount of Estimate
8. Is there to be a Late-Comers Agreement on this P. lect If so, give
dates for; Preliminary Submitted _^_ Recorded
and Recorded Plumber
9. Date of 'Start of Construction" Date of "Completinn"_ __
l.'•
�l Y
r
J
I
A
r �
6
Y
t`