HomeMy WebLinkAboutWTR2700303 PLAT OF INTERLAKE #2 W-30 3
v
tt ,
v
ENDING
OF FLE
FILE 6/
r / <
1
Y
7 l
r N 0.
w P 23 N, R 5 E, W t/I. X
1"ASHINGTON
G114EER - APRIL 1963
= 106FEET
I
' NILLMANS LAKE 1'/ASkI1NG?1�N GARDEN OF EDEN ADDiI I^L7 To SffaT7LE
DIVISION NO 4 VOL. it PAGE 82
y4�7 53
I ?,Sti 6.7 ;57 ZS✓`
r U,
G'frjl Nor IN PLAT
I�
AaJr /N PLAT o y,I f r.` • ,7
Z� � �t �I
r
40 �;�
10
c, Kdik I n.�
w L /" ° I + �: h� ka
Z).i
A of
� Y 5
tp
Y
e
r.
10. The required1 'PRESSURE TEST has been taken by
At a pressure of PSI , For _ minutes, on
The test: Failed Passed Comments
I1. The required "PURITY TEST" has been taken by
On Date of Reply Failed
Passed Comments
12. Is there an Easement required? If so, c,ive dates for:
Preliminary Submitted Recorded
And Recorded Number +« .
13. This Project Included LF of Wate,maln
And Gate Valves Gate Valves
Gate Vol yes and Gate Valves,
Ani all miscellaneous accessories for a total value of $ I.
Also, Size Make `_type _ _—,Fi,e Hydrants for a
total value of S
14. The transter or "Bill of Sale" is In; Preliminary
Submitted `- .2ecorded form.The recorded number
15• This project information was sent to the Utility Dept. for recording on
and taken intr "plant" on ,
16. What drawings dens the Water Shop have on File.
Preliminary , As-Built
n
c
•r
!J
Form Completed on
City of Renton
Utility Department Project Form
1 , Water Project X Date Project No. given
2. Project Description and location
3. Developer's Name (If City check )
Address
Phone N
Engineer's :.ame _,(If City check )
Address
Phone p
Contractor's Namn _(If :ity check )
Address
--
Phone M
4, is there an ACTIVE Late-Comers Agreement in the project area?
If so, give File Name
Recording Date And Number -
5. The Utility Departrent Work Order Numbers on this project are as follows:
6. What plens have been submitted? Preliminary As-Built _
7, Has an Estimate been Prepared for Project If so, give Date Prepared
And Total Amount of Estimate
8. Is there to to a Late-Comers Agreement on this project If so, give
dates for; Preliminary Submitted Recorded
and Recorded Number
9. Date of "Start of Construction" Date of "Completion"_ _
vo
BEGINNING
OF FILE
FILE TITLE UIrQ-I W :3 � 3
of /NrEaLnIds7#4-�a