Loading...
HomeMy WebLinkAboutWTR2700303 PLAT OF INTERLAKE #2 W-30 3 v tt , v ENDING OF FLE FILE 6/ r / < 1 Y 7 l r N 0. w P 23 N, R 5 E, W t/I. X 1"ASHINGTON G114EER - APRIL 1963 = 106FEET I ' NILLMANS LAKE 1'/ASkI1NG?1�N GARDEN OF EDEN ADDiI I^L7 To SffaT7LE DIVISION NO 4 VOL. it PAGE 82 y4�7 53 I ?,Sti 6.7 ;57 ZS✓` r U, G'frjl Nor IN PLAT I� AaJr /N PLAT o y,I f r.` • ,7 Z� � �t �I r 40 �;� 10 c, Kdik I n.� w L /" ° I + �: h� ka Z).i A of � Y 5 tp Y e r. 10. The required1 'PRESSURE TEST has been taken by At a pressure of PSI , For _ minutes, on The test: Failed Passed Comments I1. The required "PURITY TEST" has been taken by On Date of Reply Failed Passed Comments 12. Is there an Easement required? If so, c,ive dates for: Preliminary Submitted Recorded And Recorded Number +« . 13. This Project Included LF of Wate,maln And Gate Valves Gate Valves Gate Vol yes and Gate Valves, Ani all miscellaneous accessories for a total value of $ I. Also, Size Make `_type _ _—,Fi,e Hydrants for a total value of S 14. The transter or "Bill of Sale" is In; Preliminary Submitted `- .2ecorded form.The recorded number 15• This project information was sent to the Utility Dept. for recording on and taken intr "plant" on , 16. What drawings dens the Water Shop have on File. Preliminary , As-Built n c •r !J Form Completed on City of Renton Utility Department Project Form 1 , Water Project X Date Project No. given 2. Project Description and location 3. Developer's Name (If City check ) Address Phone N Engineer's :.ame _,(If City check ) Address Phone p Contractor's Namn _(If :ity check ) Address -- Phone M 4, is there an ACTIVE Late-Comers Agreement in the project area? If so, give File Name Recording Date And Number - 5. The Utility Departrent Work Order Numbers on this project are as follows: 6. What plens have been submitted? Preliminary As-Built _ 7, Has an Estimate been Prepared for Project If so, give Date Prepared And Total Amount of Estimate 8. Is there to to a Late-Comers Agreement on this project If so, give dates for; Preliminary Submitted Recorded and Recorded Number 9. Date of "Start of Construction" Date of "Completion"_ _ vo BEGINNING OF FILE FILE TITLE UIrQ-I W :3 � 3 of /NrEaLnIds7#4-�a