Loading...
HomeMy WebLinkAboutWTR2700345 REPLACEMENT JONE S AV NE 2 4 TH ST - NE 2 6 TH ST. 11-3 4 5 e • PROJECT NO. UTILITIES DEPARTMENT CITY OF PENLCN WORK ORDER NO. WASHINC70N DATE SUBMITTED DATE COMP:.ETFD. DEPARTMENT ' DESCRIPTIiXJ OF WORK 14ECESSITY WORK TO BE DCNE. BYs City Force$ r--1 Contract Other$ ITEM _ UANTITY UNIT CO6T AMOUNT •^'• f"/ ''u/%.;r _sin�� i 1 TOTAL COST APPROVED BY K. OT UTILITIES DATE APPROVED V." 2205 ORIGINAL DEPARTMENT WORK ORDER-DIS i RIBUTION RENTON MATERIAL ISSUED RETURNED NO. SIZE KIND � f u u I ESTIMATED COST INSTALLED BY CITY ❑_ CONTRACT ❑ CONTRACTOR _ SUBDIVISION _ WORK STARTED WORK JMPLETED REMARKS PROJECT NO.- DATE fev 19 NAME_ ,ADDRESS I SIZE OF METER`—NO. MAKE READWG _ ACCOUNT NO NA OF WORK AND DIRE01 SU►T. SIQN RE N: 2204 ORIGINAL DEPARTMENT WORK ORDER-DISTRIBUTION RENTON htA 'FERIA1, ---- — NO. SIZE KIND I ISSUED $ RETURNED -- i ESTIMATED COST INSTALLED BY CITY ❑ CONTRACT ❑ CONTRACTOR SUBDIVISION WORK STARTED WORK COMPLETED _ REMARKS /_ PROJECT NO.. _ 4 1" � DATE_ � 11 jaw, NAME _ADDRESS _ SIZE OF METER __NO. MAKE -READ4NG ACCOUNT NO NATO OF WORK AND DIRECTIONS: r rr SU►T. SIGNATU r 10. "rhe required "PRESSURE TEST' has been taken by At a pressure of ,_ PSI , for _ minutes, on The test: Failed , Passed Comments Is 11 . The required "PURITY TEST' has heen taken by - Ia On Date of Reply Failed Passed Comments 12. Is there an Easement required? '! If so, give dates for: Preliminary Submitted Recorded 2 T�I And Recorded Number !3. This Project included /orS LF of Vatereain n And Gate Valves Gate Valves Gate Valves and Gate Valves, And all miscellaneous accessories for a total val of $ Also, / - 5%r' ' Size Make tyr . Fire Hydrants for a tcral value of S 14. The transfer or "Rill of Sale" is in; Preliminary Submitted leco rded form.The recorded number 15. This projrct info,mation was sent to the Utility Dept. for recording on and taken into "piant" on 16, What drawings does the Water Shop have on We. Preliminary As-Buil, f r.. Form Completed on .g City of Renton `) Utility Department Project Form 1, Water Project III::� Date Project No. given G 30 69 2. Project Description and location /Z' c.' Mnii I a.�::2a.' ,tLV'3xAN a 7on�F �/•Y yF Zx _ iyit T< -% .✓r 07f.! SY 3. Developer's Name (If City check ✓ Address Phone H Engineer's Name (If City check ) Address Phone N Contractor's Name --(If City check d ) Address Phone M 4. Is there 3n ACTIVE late-Comers Agreement in the project areal {/p If so, give File Name Recording Date And Number 5. The Utility Department Work Order Numbers on this project are as follows: 6. What plans have been submitted? Preliminary As-BuiIL .fas an Estimate been Prepared for Project If so, give Date Prepared * And Total Amount of Estimate B. Is there to be a Late-Comers Agreement on this project ' If so, give dates for; Preliminary Submitted Recorded and Recorded Number 9. Date of "Start of Cc.istruction" �,r wlY Date or "Completion" d .ly . G 9 1 BEG-INNING OF FILE �LE TITLE tF � 1 2►i}� S +o N (c}h S �N1