October 1 , 1911
10 TO: Avery Garrett, Mayor e
Ds1 Bennet, , Public Works Pdministrator
.,lack Wilson, City Engineer
Gordon Ericksen, Lirecto: Planning Department
FROM: Charles Ede
Federal Programs Coordinator
SUBJECT: E. D. A. Funding for Third Street and Miller
Property Projects
preli,ainary discussion with Ken Lakcholia, E. D. A. Field
Representative indicezes that the subject projects are
within the scope of E.D.A. and that E.D.A. Funding ir, possible.
Both Projects fulfill the requirements of stimulating the
local economy through industrial growth and expansion thus
creating additional new jobs.
E.D.A. Funds are currently available and will be distributed
on the basis of $2000 per new employment opportunity created.
Mr. Lakcholia also indicated that we shoul .resent the total
project in our application. This will allow us to extend
the Third Ctreet watermain to Rainier Avenue, and possibly
include the arterial street in the Miller Project.
We should be prepared to discuss these projects with Mr.
Lakcholia when he visits Renton early in No-ember. I feel-
that we stand a good cnance to receive funding for at least
one of these projects if a well prepared proposal is presented.
C arles Ea Fea3era1 Programs
- Coordinator
CE;lh -«
X TPE:R-OFFICZ MEYA
TO: f4-'NLLRING JCPT. - Rom OLgmtl
LATE`
FROM: M, ti�L; S, TIRc GrPr
RE:
AITER RE-REV CLING THE WATER PLANS FOR Sp.
w TQRANTy WIT" v u r-1 j110 ARID OIJ00071u;1 THE RE40GATI Oq OF &ORE
0 g 1FTE RNUOM - & OlAgtg0ATIOU THAT
I. I MT REC _ Z RQTHE ONO[ HYDRANTS
bL INAT4l[C TO CONRL ETE THE TOTAL �. 3R4 PRO J(C T. 1
'•:MANES ARE AT THE SW CORNER .or XZ RjQU[gT /QO THE
OD0I TIONAI
$U. }RO AND MORRIS Avg. So. AND Ts;( SW C-0RN(R OT S�.
SN6 •-,,, $M, 1wfNp 4VA $Q.
■
M.C. kA t
ll 6l CHIEF 9
i
t
I
5
1
E
�s
LP
T
INTL''R-OFFICE FIEMO
TO: AA- t ,1 snl.. ^11 . I;Ir(7
FROM: M. r.HlrF
RE* iYGr:f,, 165TFLLA7IOJS
'HE LOCH"r10'4 CF H%DO A'173 AS WE DISCUSSED TH: OTHEf
I IIC^UES, ONE HYO^l.yT ON THE 'A-f COAIJEA OF �O. 3PD A"v
O9E HYBPYJT OY TI-C ".! Cn--C" OF '0. 3"D
ow
City C F REN TON NO.
DATE 4.24-72 — REI&I$ TLcN
DEPT— J;ter Maintenarce TOTAL AMOUNT —
all ACCOUNT a 401 , 534/32/64 _ ArOVvi
Pacific Water Works Supply Co.
Al'COUNTa_—_—•L,—__ AMOVIT 2900 First Ave. S.
OTY DESCRIPTION IN DETAIL 7m �� _=Uttle, WA-98134—_ —�
2 ea -"-Gate Valve L xFL) @ 173.30 ------._
1r6 ea 6" Gate Valve (M)xF11 @ 79.E
L 8 ea 83x24" C.I. Gate Valve Boxg$_j 1h, r0 _jyl
--- ------------ total
AS PER MATERIAL RTn :,wMK1)ED BY CITY (_0 NU CIL IIaPCM 13, 1972. _—_—
I y I PURCHASING TO ORDER —
J C..ITM B1'
A
As per material bid awarded by City Council March 13, 1972 NO POW 0016$
CITY OF RENTON
I REOUISITION
DATE 4/20/72 TOTAL AMOUNT —
DEoT water Maintenance VENDOR
ACCOUNT V_ 401 1534/32/I4 _ AMCUN7- _ Pacific S n P
States Ca^t Iroi F.� C
C. ACCOUNTR I _ AMOUNT
211 6th A•:�.
Seattle, WA 991C9
OTY DESCRIPTION IN DETAIL
r—w---- 1ti1G.3U 1
7 I MV; Fire Hydrant (MJ) M.del M2 (Modern Style)
167.65
1 12"s8" C•Z. Cross (MJxFL)
— 328.63
3 I 12"x6" C.I. Tee (MJxFL)
�--
j 1 9"xb" C.T. Tee (MJxFL)
2 8"A6" C.Z. Tea (ALI, MJ) -
)2.k, )
4 e" C.S. 45 Pend (MJx"1J)
55.2C
9Co Hcnd (Ma, MJ)
62.OI,
2 H" C.I. Solid Sleeve (LP)
47.ru
2 6" C.I. Solid Sleeve (L)-) _— __
28.75
1 12" C.I. P1211 (T.J.)
27.90
2 C.Z. Plug (MJ) Tapped 2"
_ 412.30 I�
7 -_2" Hydrant : cension 3062.29
I S 3.11
❑ PLRCHASING TO ORDER S'ryST:3T
AUTH 8Y _.—
f ' I
I �
t
3G77 Pr S. 3Ra ST. To 'd, kuc�T)
c
r
INTER—OFFICE MEMO -
�; Purchasing Del,artrent
DATE AF.it 20. 1'd7.--z—
Pon Olsen
FROM:_____
RE: Flcasc have drli'^ - fran pacific States Cast Iron Pipe Cc., ton requisition
Ave.
North, Seattle, : 98109 as per a portion of materials ordered on requisition
#19173 (based or -naterials bid dating January 27, 1971) as foll, wing:
910 L.F. of 12" 0uctile Iron water pipe (T.J.), Class M2 @$5.59/LF $5086.90
$00 L.F. 6" C.I. water P:p'., @ $3.10/1,F 3,. 92 40
160 L.F. 6" C.I. water Pipe, @ $2.18/LF $7029.30
Tax 351.07
$7360.77
The following naterial to be used on S. 3r,: St. Mill Avenue F. to Furnett
Avenue s.
W i Vinp
I{
I
1� y
r.J.Jwil....H11..Yu►JI�eY.Wu.YI...�u..i..Y...i......r.'JY.u....._du _ sJ�I.r..u�w.i,YJCS..Ja�i'u. ..• :I.iaYi��u��.6 if2'
10. The required "PRESSURE TEST" has been taken by
At a pressure of PSI , for minutes, o,,
The test: Failed Passed Comments
11 , The required URITY TES'"' has been taken by /
On Date of Reply Failed
Passed Comments
12. Is there an Easement required? 1',j_ If sc, give dates for:
Preliminary Submitted Recorded
And Recorded Number
13, This Project included _� / Li: of Watermain
O_
And .Lr "> Ga :e Valves .ri �a Gate Valves
Ga.e Valves and Gate Valves,
And all miscellaneous accessories for a total value of
Also, Size Make _type .+Fire Hydrants for a
total value of S I/, I ✓:7
14. The transfer or "Bill of Sale" is in; Preliminary
Submitte. .ecordad form.The recorded num!,er
15. This project information was sent to the Utility Dept. for recording on
and taken into "plant ' on �- -
I,r what drawings does the Water Shop have on File.
Preliminary As-Built
r
�r.r -.•.. _-.ara;.�.........r...r:ai.S.waa�rf.aa..tiri.�u.iYY,YN,:.�ir...ir:iaYW.^a�Yh�. [aYJla� �i4YirrY�WlaW.utiu�Y.�iuiirYMYMn r.asWraual:r.u`s,.u.:awuu.,.'..we.�....r,a r.0,,...a..�o�:w„tK.a
a
irg
Form Completed on
City of Renton
Utility Department Project Form
Water Project k W— 3G 7-A Date Project No. given
2. Prr•-ect Description and Irc ation ,�'� -3 r .__-_._.v_i, 'r•-• /�! H_�, • 'J
3. Developer's ilame (If City check ✓� 1
Address
Phone N
Engi .eer's Name (If Ci t^ check )
Address +,
Phone N
Contractor's Name _ (If City check
Address
Phone p
4. Is there an ACTIVE .ate-Comers Agreement in the project area?
If so, give File Name
Recording Date And Number
5. The Utility Department Work Order Numbers or, this project are as follows:
Jv z, C, <,eJ
6, '-What plans have been submitted? P-eliminary ✓ As-Built _
7. Has an Estimate been Prepared for Project _If so, give Date Prepared
And lo, Amon.It o' Estimate --�-__
8. Is there to be a late-Comers Agreement on this project T„ _! If so, 3ive
dates for; Preliminary �"- Submitted ____ Recorded
and Recorded (lumber _
9. Date of "Start of Construction ' ._Date of "Completion" 41 - % 7