Loading...
HomeMy WebLinkAboutWTR2700368 80TH AVE. S - FROM 130TH STREET W-36 8 Y a in 1 ENDING OF FILE TME • I J �y i �. FROJECT NO. Y-3� _ 17ILITIFS DEPARTMENT CITY OF RENTON WORK ORDER NO. WASHINGTON DATE SUBMITTED 10-13-71 DATE COF.PLETEO _10-13-71 DEPARTMENT dater DESCRIPTIx1 OF WORK 6" Hater Main Fytension in Roth Ave. S. from S. 13nth Street to Approximately 330 feet south. f NECESSITY i_ —-- WORK TO BE DONE BYs City Forces �] Property Owners Request Contract Others Cm ITEM CAANrITY wiTT COST AMOUNT 6" C.I. Hater Pipe (T.J.) 342 LF 2.45 837.90 Installation of Water Pipe 3+2 LF 2.50 855.00 6" Gate Valve (FL x M i EA i00.70 100.70 4" Gate Valve (FL x MJ) 2 EA 75.34 150.68 6" x 4" C.I. Tee (All FL) 1 FA I " 51 46.51 4" STL Adapter M x PE) 2 EA 11 24.00 4" Dresser Couplinq (STL) 2 FA 9.50 19.00 L" x 24" C.I. Gate Valve Boxes 3 EA 1i ,00 48.On 2" Blow Off Assembly 1 EA 75.00 75.00 As�hait Restoration 17 SgYd 5.0 85.00 Se''ect Sackfill 10 CuYd 4.00 40.00 h nc. Blockinq 1 CwYd 35.00 35.00 Sub Total 2,316.79 511 Sates Tax 115.84 TOTAL COST 2,432.63 APPROVED BY SUPT. OF UTILITIES DATE APPRO✓EL — t h! PROJECT NO.— W-362 UTILITIES DEPAR:YEI+[ CITY OF RENTON WORK aiDER NO. WASHINC70N DATE SUBMITTED 10-13-71 DATE COMPLETED.ID-13-71 DEPARTMENT water DESCRIFTI011 OF WORK 6" water Main Extension in 80th Ave. S. from S. 130th Street to Approximately 330 feet south. NECESSITI' WORK TO BE DONE BYs City Forces r---1 Property Owners Request contract Others ITEM QUANTITY UNIT J COST A"Nr 6" r.I. water Pipe (T.J.) 342 LF 2 45 837.90 Installation of'water Pipe 342 LF 2.50 355.00 6" Gate Valve (FL x MJ) 1 EA 100.70 100.70 4" Gate Valve (FL x MU) 2 EA 75.34 150.68 d ' ` 6" x 4" C.I. Tee (All FL) 1 EA 46.51 46.51 1 4" STL Adapter (FI. x PE) 2 :A 12.00 24.00 4" Dresser Coupling (STL) 2 EA 9.50 19.00 8" x 24" C.L. Gate Valve Boxes 3 EA 16.00 48.00 2" Blow Cff Assembly 1 EA l5.00 75.00 Asphalt Restoration 17 SgYds 5.00 85.00 Select Backfill 10 CuYdsl COO 40.00 Conc. Blocking 1 CuVds 35.00 35.00 Sub Total 2,316.79 5% Sales Tax 115.84 TOTAL COST 2,432.63 APPROVED BY SUPT. OF UTILITIES __ DATE APPROVED r I JOHN O. /►E—LUAN CI ) CHRie J. LOUT91000UNTY[XECUTIVE j OFFICE OF PROPERTY AND PURCHASING .'. :$_. PROPERTY MANAGEMENT DIVISION KING COUNTY. STATE OF WASHINGTON b KING COUNTY COURTHOJSE SEATTLE. WASHINGTON 98104 October 14, 1971 ! ,K Ronald L. Olsen water Utility Engineer City of Renton Municipal Building Renton, Washington 98055 Re: Installation of Water rain 80th Avenue South Dear Sir: This letter will confirm ouc c :7n-iersations of October 14, 1971, on the installation of water main on 80th Avenue South for a distance of approximately 330 feet south of South 130th Street. The City of Renton will install this main and till King County for material only as the City will furnish the labor. King County will do the asphalt restoration. Pleaee send itemizedlill to King County Property and Purchasing, RM E531 King County Courthouse, Seattle 98104, attention Frank Jacobs. Thank you very much Aor your fine c000erition on this matter. Very truly yours, for CHRIS J. LOUTSIS, Manager Office of Property i Purchasing CJL/FEJ:kh 4 �I. a T 10. The required "PRESSURE TEST' has been taken by At a pressure of PSI , for minutes, on The test: Failed Passed Comments 11 . The required "PURITY TEST' has been taken by L On Date of Reply Failed Passed Comments 12. Is there an Easement required? tf 0 If so, give dates for: Preliminary Submitted Recorded And Recorded Number _ 13. This Project included i LF of Q7 Watermaln And Z - �/ � I Gate Valves L _ Gate Valves Gate Valves and Gate Valves, And all miscellaneous accessories for a total value of Also, (0 Size _ make -- type — Fire Hydrants for a total value of $ 14. The transfer or "Bill of Sale" is in; Preliminary Submitted iecorded --- form.The reco•,ed number 15. TM s project informatio., was sent to the Utility Dept. for recording on and taken into "Plant" on 16. What drawings does the Water Shop have on File. Preliminary As-Built 1 � w Form Completed on City of Renton VW ;y Department Project For 1 , Water Project k Date Project No. given /� .. Project "`eseription and location a�� i 4 A ' -!,n,n � 304A i 3. Developer's Name (If City check Address Phone A Engineer's Name -„� (�Ie��J (If City uheck V ) Address Phone 8 Contractor's Name (If L;ty check ✓ ) � ' Address Phone N b, Is there an ACTIVE Late-Comers Agreement in the project areal P/ O If so, give File Name _ Recording Date And Number $. The Uti . ty Department Work Order Numbers on this project are as follows: y v F h Q V ca `.) 6. What plans have been submitted? Prc' ;urinary _✓ As-Built t/ ). Has an Estimate been Prepared for Pro' -t _ ✓ r so, give Date Prepared '-i! 71 And Total Amc _t of Estimate 8. Is there to be a Late-Comers Agreement on this project N O If so, give dates for; Preliminary Submitted '- Recorded and Recorded Number _ --- 9. Date of "Star! of Construction" // 7 7 Date of "Completion" t '� 1 LATECOMER AGREEMENT RECIPIENT : l r+r fi ±_ LCA tl PROJECT: 11 PLAN FILE 0 PROJECT 1 DESCRIFTION: PROJECT COST (BILL OF SALE) MATERIALS S LABOR S ENGINEERING COST (IF APPLICABLE) S LESS OVERSIZING, ETC. ( " " ) $ TOTAL ASSESSMENT COST $ TOTAL ASSESSABLE FOOTAGE (FRONTAGE/AREA) TOTAL COST PER FRONT FOOT/SQ. FT. $ In y P ' I 4