HomeMy WebLinkAboutWTR2700369 MAIN AVE S & S 4TH ST. Tq-3 6 9
` q.s
yy..
f!
l
i.
ENDING
Idi OF Fl
ME MU
Y
u
A
October 4. 1971
MEMORANDUM
TO: Ron Olsen
FROM: Bert H. McHenry
SUBJECT: Relocation of Fire Hydrant at
South 4th Street and Main Avenue South
------------------------------------------------------------------------
Would you please '.nit ate the worK order to relocate the fire hydrant
es showr on the attached print.
Bill against Main Avenue South UAB oroject for relocation as hydrant
in the way of retaining wall .
er�T'etf.� ..
Assistant City Engineer
BHMC:sn
Attach.
10. The required "PRESSURE TEST' has been taken by
At a pressure of PSI , for _ minutes, on
The test: Failed , Passed Comments
11 . The required "PURITY TEST' has been taken by
On Date of Reply Failed
Passed Comments
12. is there an Easement required? J If so, giv4 dates for:
Preliminary Suomitted Recorded
Aid Recorded Humber
13• This Project included _ (1 EF of G�_Watermain
u
n
And Gate Valves Gate Valves
Gate Valves and ,ate Valves,
And all miscellaneous accessories for a total value of S e`ti
r,
Also, _�_Size qi/Make 3M ,.� type _Fire Hydrants for a
tots; value o' $
14. The transfer or "Dill of Sale" is in; Preliminary
Submitted �""Iecorded--- form.The recorded number . w.
15. This project information was sent to the Utility Dept. for recording on '� n,
13
and taken into "plan:" on � (/.i , r.
16. What drawings does the Water Shop have on File.
Preliminary As-Built -'
1
1 }
a+r
•i
� 4#
. F
r q'
Nnr
�1�t
Form Completed on <
City of Renton
Utility Department Project Form
I. Water Project I GJ _�r.g Date Project No. given
2. Project Description and location t
/ q_/
-- -� 4ex, OIL 3. Developer's Name �(if City check )
<p
Address
Phone
Engineer's Name �j„ G��f.� (If City check
Address
Phone I
Contractor's Name _ _ (If City check (/ )
Address
Phone N
4. Is there an ACTIVE Late-Comers Agreement in the project area? A/
If so, give File Name
Recording Date And Number _ I
$. The Utility Department Work Order Numbers >n this project are as folloq,;:
6. What plans have been submitted? Preliminary As-Built
7. Has an Estimate been Prepared for Project If so, give Date Prepared
And Total Amount of Estimate
8. Is there to be a Late-Comers Agreement on this project /,J 6 If so, give
dates for; Prelim;nary Submitted Recorded —�
and Recorded Number
9. Date of ''Star, of Construction" Date of "Completion"
1
rr
tn in
BEGINNING
OF
•
FILE TITLE
Fp
n
t
< '
i \ >` '