HomeMy WebLinkAboutWTR2700369 MAIN AVE S & S 4TH ST. Tq-3 6 9 ` q.s yy.. f! l i. ENDING Idi OF Fl ME MU Y u A October 4. 1971 MEMORANDUM TO: Ron Olsen FROM: Bert H. McHenry SUBJECT: Relocation of Fire Hydrant at South 4th Street and Main Avenue South ------------------------------------------------------------------------ Would you please '.nit ate the worK order to relocate the fire hydrant es showr on the attached print. Bill against Main Avenue South UAB oroject for relocation as hydrant in the way of retaining wall . er�T'etf.� .. Assistant City Engineer BHMC:sn Attach. 10. The required "PRESSURE TEST' has been taken by At a pressure of PSI , for _ minutes, on The test: Failed , Passed Comments 11 . The required "PURITY TEST' has been taken by On Date of Reply Failed Passed Comments 12. is there an Easement required? J If so, giv4 dates for: Preliminary Suomitted Recorded Aid Recorded Humber 13• This Project included _ (1 EF of G�_Watermain u n And Gate Valves Gate Valves Gate Valves and ,ate Valves, And all miscellaneous accessories for a total value of S e`ti r, Also, _�_Size qi/Make 3M ,.� type _Fire Hydrants for a tots; value o' $ 14. The transfer or "Dill of Sale" is in; Preliminary Submitted �""Iecorded--- form.The recorded number . w. 15. This project information was sent to the Utility Dept. for recording on '� n, 13 and taken into "plan:" on � (/.i , r. 16. What drawings does the Water Shop have on File. Preliminary As-Built -' 1 1 } a+r •i � 4# . F r q' Nnr �1�t Form Completed on < City of Renton Utility Department Project Form I. Water Project I GJ _�r.g Date Project No. given 2. Project Description and location t / q_/ -- -� 4ex, OIL 3. Developer's Name �(if City check ) <p Address Phone Engineer's Name �j„ G��f.� (If City check Address Phone I Contractor's Name _ _ (If City check (/ ) Address Phone N 4. Is there an ACTIVE Late-Comers Agreement in the project area? A/ If so, give File Name Recording Date And Number _ I $. The Utility Department Work Order Numbers >n this project are as folloq,;: 6. What plans have been submitted? Preliminary As-Built 7. Has an Estimate been Prepared for Project If so, give Date Prepared And Total Amount of Estimate 8. Is there to be a Late-Comers Agreement on this project /,J 6 If so, give dates for; Prelim;nary Submitted Recorded —� and Recorded Number 9. Date of ''Star, of Construction" Date of "Completion" 1 rr tn in BEGINNING OF • FILE TITLE Fp n t < ' i \ >` '