Loading...
HomeMy WebLinkAboutWTR2700370 NE 12TH ST FROM KI RKLAND AVE NE TO LYNWOOD AVE 11-3 7 0 NE x t 1j �J i . J m i 10. The required "PRESSURE TEST" has been taken by At a pressure of PSI , for minutes, on The test : Failed Passed Comments J I ,. The required "PURITY TEST' has been taken by On Date of Reply Failed Passed Comments ,.. 12, Is there an Easement required? h.l J If so, give dates for: Preliminary _ Submitted Recorded �V And Pecordeo Numbei 13. This Project included rj LF of termain h ryf. „ „ V. And Gate Valves Gate Valves Gate Valves and GateValves, ::.: � Ard all miscellaneous accessories for a total value of $ J C1Q ' Also, - Size Make type Fire Hydrants for a r total ,alue of $ yy +d 14. The transfer or "Rill of Sale" is in; Preliminary Submitted .2ec�rded form-The recorded number 15. This project information was sent to the Utility Dept. for recording on r and taken into "plant" on 16, What drawings dces the Water Shop have on File. Preliminary As-Built i �N Y (I Form Completed on - City of Renton 's utility Department Project Form 1 , Water Project # 270 Date Project No. given 2. Project Description and location ( C r l— a- Me 3. Developer's Name Cif City check ) 'I a rE' . Phone # - Engineer's Name 611 i)e_ CJiNr,:Id (If City check Address _ Phone # Cont-actor's Name (If C;ty check ✓ ) Address Phone # 4. fs there an ACTIVE Late-Comers Agreement in the project area? N C If so, give File Name Recording Date And Number 0 5, The Utility Department Work Or +r Numbers on this project are as follows: C11) 0 -,& � , 7 6. Whar plans have been submitted? Preliminary _l,�, S-Bu; lt !/ 7, Has an Estimate been Prepared °or Project V--if so, give Cate Prepared i And Total Amount rrf Estimate 8. Is there r� be a Late-Come rs Agreement on this project if so, give dates 'or; Preliminary '- Submitted _ Recorded and Recorded Number _ 144 !t654 9. Date of "Start of Construction" Date of "Completion" "b L BE%m KING OF FILE FILE TITLE ME 12_+h kvp N +o Lyh�woo� A v4P, ►�