HomeMy WebLinkAboutWTR2700370 NE 12TH ST FROM KI RKLAND AVE NE TO LYNWOOD AVE 11-3 7 0
NE
x
t
1j �J
i .
J
m
i
10. The required "PRESSURE TEST" has been taken by
At a pressure of PSI , for minutes, on
The test : Failed Passed Comments
J
I ,. The required "PURITY TEST' has been taken by
On Date of Reply Failed
Passed Comments ,..
12, Is there an Easement required? h.l J If so, give dates for:
Preliminary _ Submitted Recorded �V
And Pecordeo Numbei
13. This Project included rj LF of termain
h ryf.
„
„ V.
And Gate Valves Gate Valves
Gate Valves and GateValves, ::.: �
Ard all miscellaneous accessories for a total value of $ J C1Q '
Also, - Size Make type Fire Hydrants for a
r
total ,alue of $ yy
+d
14. The transfer or "Rill of Sale" is in; Preliminary
Submitted .2ec�rded form-The recorded number
15. This project information was sent to the Utility Dept. for recording on
r
and taken into "plant" on
16, What drawings dces the Water Shop have on File.
Preliminary As-Built
i
�N
Y
(I
Form Completed on -
City of Renton 's
utility Department Project Form
1 , Water Project # 270 Date Project No. given 2. Project Description and location ( C r l— a- Me
3. Developer's Name Cif City check ) 'I
a
rE' .
Phone # -
Engineer's Name 611 i)e_ CJiNr,:Id (If City check
Address
_ Phone #
Cont-actor's Name (If C;ty check ✓ )
Address
Phone #
4. fs there an ACTIVE Late-Comers Agreement in the project area? N C
If so, give File Name
Recording Date And Number
0
5, The Utility Department Work Or +r Numbers on this project are as follows:
C11) 0 -,& � , 7
6. Whar plans have been submitted? Preliminary _l,�, S-Bu; lt !/
7, Has an Estimate been Prepared °or Project V--if so, give Cate Prepared
i
And Total Amount rrf Estimate
8. Is there r� be a Late-Come rs Agreement on this project if so, give
dates 'or; Preliminary '- Submitted _ Recorded
and Recorded Number _ 144 !t654
9. Date of "Start of Construction" Date of "Completion"
"b
L
BE%m KING
OF FILE
FILE TITLE ME 12_+h
kvp N +o Lyh�woo� A v4P, ►�