Loading...
HomeMy WebLinkAboutWTR2700376 WATER EXTENSION - NE l 3TH PL AT DAYTON AV NE t^l-3 7 6 y7y 7 ENDING OFFILE • • / ♦ 1 11 III i A O c�40►+ E T r l FORTE, INC. 11C0 Bronson Way No. Renton Wash, PHONE BA C-1414 Contractor & Residential - f t 1 f 'y i City of Renton• Utility Dept. J� PRESSURE TEST FORM Plater Project `lame of Project T2AY71 A Al� /C This test was taken 'ay mi nu[es. P-i . for At a pressure of — The test "Failed" _ on —_ Pas sed ,,mments: ,-_ _JE =f-- f I ti. 1 10. The reouired "PRESSURE TEST" nas been taken by At a pressure of PSI , for _ minutes, on The test: Failed Passed Comments H . The required "PURITY TEST" has been taken by ' 0n Date of Reply Failed Passed Comments 12. Is there an Easement required? IV y If so, give dates for: Preliminary Submitted Recorded And Recorded Number y 13. This Proiec[ included jWELF of �n Waternaln And 6 Gate Valves Gate Valves Gate 'Valves and Gate Valves, And all miscellaneous accessories for a total value of $ Also, r✓UrR_Si ze Make type Fire Hydrants for a total value of S 14. The transfer " "Rill of Sale" is in; Preliminary Submitted 3ecorded form.,The recorded number 15. This project information was sent -o the Utility Dept. for recording on and taken Into "plant" on 16. What drawings does the Water Shop have on File. Preliminary As-Butlt is err Su /�✓j" Form Completed on 1 =� City of Renton Utility Department Project Form I , Water Project # l/J - ?76 Date Project No. given / 2. Project Description and location u,14.�.� 4� Y 3. Developer's Name (If City check sat Address Phone Engineer's Name �Je lie O Vvoc, (If City check C/ ) Address Z is _ Phone # d,ys ,ajw Contractor's Name % rj fG1 N II s e (If City check J , 4 Address S) C!c �xa a• . LJe. Phone # (o 52(7� Cr ; 4, Is [here an ACTIVE Late-Comers Agreement in the project area? /✓c� "r x u'_k If so, give File Name Recording Date And Number b 5. The Uti Iicy Department Work Order Numbers on this project are as follows. hY Z& yr: '� 3120 ac 6. What plans have been submitted? Preliminary V/As-Built # ` f t 7. Has an Estimate been Prepared for Project L�cif so give Date Prepared 5 And Total Arrount of Estimate { a "'.A 8. Is there to be a Late-Corre rs Agreement on this project ��- If so, give dates for; Preliminary 36 Mnl ttA4_'_'f Recorded - and Recorded Number 9. Date of 'Start of Construction" ate, of "Completion"izzle—_ :f w• ry1 R� • BEGINNING OF FILE TITLE . • L /• .ice• r l � A I l • s J I r