HomeMy WebLinkAboutWTR2700379 HYDRANT RELOCATION FOR RENTON AVENUE PAVING PROJECT
1,V-�7
TENDING
OF FILE
W- 3r) q
FILE TITLE (-} r
en-� Vi e.n5 v
{
RELOCATED HYDRANT
USED E.YIST T£E ! VALVE
`i. EXISTING /2' WATER LINE
STA ,07 . 91? EXIST HYDRANT
RE LOCATED To SS' RT
INT. RAIN/EN, AIRPORT WAY. ? FENTON
STA. /09 +99.0
RAINIER AVE .
WO• 262T
As BVILT 4-IV72 71 C.v <..q
CITY Of RENTON
rha:niwnina oaprnTra"T
w- 379
HYDRANT RELOCATIONS
I
i
,w
P�
/ yl
�O
2
h
RENTON ACE EXT.
STA Or00 7AYLOR AYE
STA f/ + 6 L RENTON AVE
I5 TA j t 30
24 LF 6" C/G/PE
{4S' BEND (MJ Y MJ)
I REUSED 'FIRE HYDRAW
�— RELOCATED HYDRANT
STA J � 30 SIDEWALK &
STA- r• // CONS_.
Exrsr. HYDRANr -- WO* zrsi
l,s BUILT a xs-rs /L �r cw.s
y` CITY—OF R MTQN
{MOIM[{Il"s O[IAII/YLMT
�W- 979- 579
MYCRANT RtLOCAToONf
1
STA liO + 97
RFLOCArFD HYDRANT TO jHVDRANr
USED EXISTING TEE, PIPE EXCHANGED i' G✓(FL X FL)CONC. SIDs
/2 W y
EXISTING /2- WATER MA/N w y I.
+t�
ott
P-
ww4
4 —
—
RAINIER AVENUE
WO 0 24.30
As BUILT + 23.?s caws
1 C17V OF I iNION
t Mel"Ka lma C[�I10 tY tad
W- 379
HytmAmT ftLocwT6*mS
l'V-
February 24, 1972
To: Ron Olsen, Utility Engineering
From: Dick Houghton, Des, n Engineerng
The following hydrants must be relocated as indicated: ,
1. Renton Avenue and Hardie Avenue S.W. - S.E. corner.
From existing location to Station 5+30 58 feet right of centerline
Renton Avenue Extension.
2. Rainier Avenue South - Station 107+98+
From existing location to 107+98± one foot behind proposed walk.
3. Rainier Avenue South - Station 110+87+ fron existing location to
110+87+ 50 feet right of centerline of Rainier Avenue South.
Prime contractor to start February 28, 1972. Most desirable for above
work to be done in advance of this date.
Charge this work co U.A.B. project Renton Avenue Extension, #8-1-102(13)
Phese I.
-5i c . Houghton ---
DH:sn
0
Pacific Nor#vwest F*41
3UU S.W.-tn Street
Renton.Wash¢gton 98055
Phone 4206)BA S-0283
September,20,1972
Utility Engineer
City Municipal Building
200 Mill Avenue South
Renton, Washington 98055
Re: Renton Avenue South
Renton City Limits
Attention: Mr. Ron Olsen to 76th Avenue South
f
l
Dear Sir:
In answer to your request enclosed are your water main plans with
Pacific Northwest Bell's existing and proposed underground plant
shown in red.
If additional information is required please contact John Moseley,
BA8-0275. Call BAS-0070 if exact field location of existing
underground plant is desired.
Very truly yours,
Engineering Manager -
Valley-Sound District
JWM:lh
Attachment
t
�• a
10. The required "PRESSURE TEST" has been taken by
At a pressure of PSI , for minutes, on
The tes': Failed Passed Comments
11 . The required "PURITY TEST" has been taken by
On _ Date of Reply Failed
Passed Comments
12. Is there an Easement required? f If so, give dates for:
Preliminary Submitted Recorded
And Recorded Number
13. This Project inciuded 1� . '_t LF of Watarmain
And fate Valves Gate Valves
Gate Valves and mate Valves,
And all miscellaneous accessories for a total value of $
Also, Size Make type Fire Hydrants for a
total value of $
L..
14. The transfer or "Rill of Sale" Is in; Preliminary
Submitted .,,ecorded form.The recorded number
15. This project information was sent to the Utility Dept. for recording on
and taken into "plant" on
16. What drawings does the Water Shop have on File.
Preliminary As-Built
{
64 Y
Al
R
Form Completed on
City of Renton
Utility Department Project Form
!. Water Project M W—D 7 1�Date Project No. given
2. Project. Description and location 113'JfCA , - P, (,;,,A,u,d 1'
3. Developer's Name (If City chock )
Address
Phone N
Engineer's Name (If City check (� )
Address
Phone N
f/
Contractor's Name (If City check
Address
Phone 8
4. Is there an ACTIVP Late-Comers Agreement in the project areal �C,
If so, give File Name _
Recording Date _ And Number _
5. The Utility Department Vrrk Order Numbers on this project are as follows:
_ � '1 (c�2��3 )
6. What plans have been submitted' Preliminary As-Built t/
7. Has do Estimate been Prepared for Project V_If so, give Date Prepared
And Total Amount of Estimate
8. Is there to be a Late-Comers Agreement on this project VJ If so, give
dates for; Preliminary Submitted _ Recorded
and Recorded Number
9. Dar:: cf "Start of Construction" Date of "Completion"_-1 Z 3 7
�` i
B I NNING
OF FILE
3 ' 9
FILE TITLE �� [irn �- 'l• Inrn�� o.� S
}or �Qrl�0y1 Ave l<ten510rLav�nq�ro1 .