Loading...
HomeMy WebLinkAboutWTR2700386 SHATTUCK AV S - FROM S 2ND - S 3RD � � 2 W-386 _ � _ _ _ _ r 1 � � - .. _. • t . � �� ,, � . / ��� ;; SHATTUCK AV S - FROM S 2ND - S 3RD Z41 Z. W-386 r ENDING OF Lim 10. The required "PRESSURE TEST" has been taken by At a pressure of PSI , for _ minutes, on The test: Failed , Passed Comments II . The required "PURITY TEST" has been taken by � On Date of Reply Failed Passed Comments 12. Is there an Easement required? of !J If so, give dates fer: Preliminary Submitted Recorded And Recorded Number r� fl 13. This Project included 2 7 1�) _CF of _O C T — We to rmsin „ And — Gate Valves Gate Valves "Gate Valves and Gate Valves, Aid all miscellaneous accessories for a total value of$7 ,.�. Also, Size Make type --- Fire Hydrants for a total value of $ 14. The transfer or "Bill of Sale" is in Preliminary Submittea recorded form.The ^ecorded number 15. This project information was sent to the Utility Dept. for recording on and taken into "plant" on 16. What drawing= does the Water Shop have on File. Preliminary , As-F It Form Completed on City of Renton Utility Department Project Form 1 , Water Project # V 3 S V Date Project No. given 2. Project Description and location c, 44,i /r- S ti J 4 3. Developer's Name (If City check (/ ) Address Phone # Engineer's Name _1/..,.,v ISM, , (If City check �/ ) Address Phone # Contractor's Name ,_ (If City check V ) Address Phore # _ 4. Is there an ACTIVE Late-Comers Agreement in the protect area? U If so, give File Name Recording Date And Number _ 5• TMe Utility Department Work Order Numbers on this project are as follows: 2& if 6. What plans have been submitted? Preliminary r As-Built 7. His an Estimate been Prepared for Project V If so, give Date Prepared l.nd Tocal Amount of Estimate 8. Is there to be a Late-Come rs Agreement o� this project If so, give Hates for; Preliminary Submitted Recorded and Recorded Number 9. Date of "Start of Construction" Date of "Completion" 1 V BEGINNING OF FILE tiJ - 3<o) 61 FILE TITLE Ay 5-7�- �- S 3Ra