HomeMy WebLinkAboutWTR2700386 SHATTUCK AV S - FROM S 2ND - S 3RD � � 2 W-386
_ � _ _ _ _
r
1
� � - ..
_.
•
t
. �
�� ,, � . /
���
;;
SHATTUCK AV S - FROM S 2ND - S 3RD Z41 Z. W-386
r
ENDING
OF
Lim
10. The required "PRESSURE TEST" has been taken by
At a pressure of PSI , for _ minutes, on
The test: Failed , Passed Comments
II . The required "PURITY TEST" has been taken by �
On Date of Reply Failed
Passed Comments
12. Is there an Easement required? of !J If so, give dates fer:
Preliminary Submitted Recorded
And Recorded Number
r� fl
13. This Project included 2 7 1�) _CF of _O C T — We to rmsin
„
And — Gate Valves Gate Valves
"Gate Valves and Gate Valves,
Aid all miscellaneous accessories for a total value of$7 ,.�.
Also, Size Make type --- Fire Hydrants for a
total value of $
14. The transfer or "Bill of Sale" is in Preliminary
Submittea recorded form.The ^ecorded number
15. This project information was sent to the Utility Dept. for recording on
and taken into "plant" on
16. What drawing= does the Water Shop have on File.
Preliminary , As-F It
Form Completed on
City of Renton
Utility Department Project Form
1 , Water Project # V 3 S V Date Project No. given
2. Project Description and location c, 44,i /r- S ti J 4
3. Developer's Name (If City check (/ )
Address
Phone #
Engineer's Name _1/..,.,v ISM, , (If City check �/ )
Address
Phone #
Contractor's Name ,_ (If City check V )
Address
Phore # _
4. Is there an ACTIVE Late-Comers Agreement in the protect area? U
If so, give File Name
Recording Date And Number _
5• TMe Utility Department Work Order Numbers on this project are as follows:
2& if
6. What plans have been submitted? Preliminary r As-Built
7. His an Estimate been Prepared for Project V If so, give Date Prepared
l.nd Tocal Amount of Estimate
8. Is there to be a Late-Come rs Agreement o� this project If so, give
Hates for; Preliminary Submitted Recorded
and Recorded Number
9. Date of "Start of Construction" Date of "Completion"
1
V
BEGINNING
OF FILE
tiJ - 3<o) 61
FILE TITLE Ay 5-7�- �-
S 3Ra