HomeMy WebLinkAboutWTR2700387 SHATTUCK AV S - FROM S 3RD - S 3RD PL W-387
R
:Y
03
ENDING
OF
LFILLE MLE
• • •
•
10, The required "PRESSURE TEST" has been taken by
At a pressure of PSI , for minutes, on
The test: Failed Passed Convients
Il. The required "PURITY TEST" has been taken by
On Date of Reply failed
Passed Comments
12. Is there an Easement required? If so, give dates for:
Preliminary Submitted Recorded
And Recordec Number
13• This Project included 7 'Z L LF of - Watermain
And t � l�/YI TX(Y;�Pate Valves Gate Valves
Gate Valves and Gate Valves,
And all miscellaneous accessories for a total value of $ LJ 5 00 1
4-9-
Also, Size type Fire Hydrants for a
total value of S --
r
14. The trans'er or "Bill of Sale" is in; Preliminary
Submitted Aecordt'l form.The recordrd number In, �J_C
15• This project information was sent to the Utlli *y Dept, for recording on
`— and taken into "plant" on
16. Wh drawings does the Water Shop have on File.
Preliminary As-Built
- �,
r.
Form Completed on
City of Renton ''
I Utility Department Project Form
sW "
1. Water Project N 7 Date Project No. given
2. Project Description and location ,✓,,c
f ?r t
iI
3. Developer's Name (If City check ✓ )
Address `
Phone A
Engineer's Name (if City check ✓ )
Address
Phone N
Contractor's Name i_ —(If City check
Address
Phone N
4. is there an ACTIVE Late-Come.s Agreement in the project area? 11 i
If so, give File Name _
Recording Date _^ And Number
5, The Utility Department Work Order Numbers on this project are as follows:
6. What plans have been submitted? Preliminary _As-Buiit J�
7. Has an Estimate been Prepared for Project If so, give Date Prepared
And Total Amount of Estimate
8. is there to be a Late-Ccmers Agreement on this project ._ _ _ If so, give
dates for; Preliminary Submitted _ _ Recorded
and Recorded Number _
9. Date of "Start of Construction" 1JtiiI 7�L Date of "Completion"
1
'1 t
13
BEGINNING
OF
V
FILE ME .
r
SHATTUCK AV S - FROM S 3RD - S 3RD PL W-387
A
u
•
D
ENDING
FILETITLE
• ••
Y
10. The required "PRESSURE TEST" has been taken by
At a pressure of PSI , for minutes, on
The test: Failed Passed Comments
11. The required "PURITY TEST" has been taken by
On Date of Reply Failed
Passed Comments
12. Is there an Easement required? If so, give dates for:
Preliminary Submitted Recorded
And Recorded Number
13. This Project included "+ :w LF of I Watermalr
And � � iF /Y '�rr,-._" ate Valves Gate Valves
Gate Valves and Gate Valves,
And all miscellaneous accessories for a total value of $ -1 5 00 r_.o
Also, Size Make type Fire Hydrants for a
total vale of $
14. The transfer or "Rill of Sale" is in; Preliminary
Submitted _^ ecorded form.The recorded number
IS• This project informatior was sent to the Utility Dept. for recording on
and taken into "plant" on
16. What drawings does the Water Shop have on File.
Preliminar As-Built
Form Completed on
City of Renton
Utility Department Project Form
1, Water Project S 1J -3 8 7 Date Pro! t No. given
2. Project Description and location , z}i,�ch .`. 5 -- ,J `4 4ci
S Z
3• Develop.:r's Name (If City check V )
Address
Phone N
Engineer's Nar•e (If City check `� )
Address
Phone N _
Contractor's Name (If city check )
Address
Phone #
4. is there an ACTIVE Late-Comer, Agreement in the projec area? tl 1
If so, give File Name
Recording Date And Numbef
5. The Utility Department 'Work Order Numbers on this project are as follows:
/
6. What plans have been submitted? Preliminary As-Built
7. Has an Estimate been Prepared for Protect if so, give Date Prepared
And Total Amount of Estimate
8. Is t'..ere to be a Late-Comers Agreement on this project f., .. — If so, give
dates for; Preliminary Submitted _ Recorded
ana Recorded '.umber
9. Date of "Start of Construction" _ _ _ Date of "Ccmpletion"_____
�- flow
{c
BEGINNING
M FILE
aa • •�
r
J
r �1