Loading...
HomeMy WebLinkAboutWTR2700387 SHATTUCK AV S - FROM S 3RD - S 3RD PL W-387 R :Y 03 ENDING OF LFILLE MLE • • • • 10, The required "PRESSURE TEST" has been taken by At a pressure of PSI , for minutes, on The test: Failed Passed Convients Il. The required "PURITY TEST" has been taken by On Date of Reply failed Passed Comments 12. Is there an Easement required? If so, give dates for: Preliminary Submitted Recorded And Recordec Number 13• This Project included 7 'Z L LF of - Watermain And t � l�/YI TX(Y;�Pate Valves Gate Valves Gate Valves and Gate Valves, And all miscellaneous accessories for a total value of $ LJ 5 00 1 4-9- Also, Size type Fire Hydrants for a total value of S -- r 14. The trans'er or "Bill of Sale" is in; Preliminary Submitted Aecordt'l form.The recordrd number In, �J_C 15• This project information was sent to the Utlli *y Dept, for recording on `— and taken into "plant" on 16. Wh drawings does the Water Shop have on File. Preliminary As-Built - �, r. Form Completed on City of Renton '' I Utility Department Project Form sW " 1. Water Project N 7 Date Project No. given 2. Project Description and location ,✓,,c f ?r t iI 3. Developer's Name (If City check ✓ ) Address ` Phone A Engineer's Name (if City check ✓ ) Address Phone N Contractor's Name i_ —(If City check Address Phone N 4. is there an ACTIVE Late-Come.s Agreement in the project area? 11 i If so, give File Name _ Recording Date _^ And Number 5, The Utility Department Work Order Numbers on this project are as follows: 6. What plans have been submitted? Preliminary _As-Buiit J� 7. Has an Estimate been Prepared for Project If so, give Date Prepared And Total Amount of Estimate 8. is there to be a Late-Ccmers Agreement on this project ._ _ _ If so, give dates for; Preliminary Submitted _ _ Recorded and Recorded Number _ 9. Date of "Start of Construction" 1JtiiI 7�L Date of "Completion" 1 '1 t 13 BEGINNING OF V FILE ME . r SHATTUCK AV S - FROM S 3RD - S 3RD PL W-387 A u • D ENDING FILETITLE • •• Y 10. The required "PRESSURE TEST" has been taken by At a pressure of PSI , for minutes, on The test: Failed Passed Comments 11. The required "PURITY TEST" has been taken by On Date of Reply Failed Passed Comments 12. Is there an Easement required? If so, give dates for: Preliminary Submitted Recorded And Recorded Number 13. This Project included "+ :w LF of I Watermalr And � � iF /Y '�rr,-._" ate Valves Gate Valves Gate Valves and Gate Valves, And all miscellaneous accessories for a total value of $ -1 5 00 r_.o Also, Size Make type Fire Hydrants for a total vale of $ 14. The transfer or "Rill of Sale" is in; Preliminary Submitted _^ ecorded form.The recorded number IS• This project informatior was sent to the Utility Dept. for recording on and taken into "plant" on 16. What drawings does the Water Shop have on File. Preliminar As-Built Form Completed on City of Renton Utility Department Project Form 1, Water Project S 1J -3 8 7 Date Pro! t No. given 2. Project Description and location , z}i,�ch .`. 5 -- ,J `4 4ci S Z 3• Develop.:r's Name (If City check V ) Address Phone N Engineer's Nar•e (If City check `� ) Address Phone N _ Contractor's Name (If city check ) Address Phone # 4. is there an ACTIVE Late-Comer, Agreement in the projec area? tl 1 If so, give File Name Recording Date And Numbef 5. The Utility Department 'Work Order Numbers on this project are as follows: / 6. What plans have been submitted? Preliminary As-Built 7. Has an Estimate been Prepared for Protect if so, give Date Prepared And Total Amount of Estimate 8. Is t'..ere to be a Late-Comers Agreement on this project f., .. — If so, give dates for; Preliminary Submitted _ Recorded ana Recorded '.umber 9. Date of "Start of Construction" _ _ _ Date of "Ccmpletion"_____ �- flow {c BEGINNING M FILE aa • •� r J r �1