HomeMy WebLinkAboutWTR2700429(4) 24 Is TRANSMISSION WELL TO MT OLIVET TANK
W-429#'D
CONSTR. COPPFSP.
;a
Mf. OLIVET TANK CITY OF RENTON -
PAINTING FOR INTERIOR MODIFICATIONS
Specifications = AWWA D102
e
System = Inside Pint System No. 1
3 coat 4 mil dry film thickness i
Surface Preparation =
SSPC - SP 3-63 Power Tool Cleaning or `;dS
SSPC - SP 6-63 Commercial Blast Cleaning
i4
Primer: Red Lead Phenolic Paint
Federal Specification IT-P-86a T.vpe IV
2.0 mil dry film thickness ... '�
Intermediate: Aluminum Pigmented Phenolic Varnish
2 lbs. aluminum paste per gClon —jO
Federal Specifications
TT-A-468a Type II Class B 6 �
TT-V-119
1.0 mil dry film thickness +�
Finish: Aluminum Pigmented Phenolic Varnish
2 lbs. aluninur paste per gallon
Federal Specifications
TT-A-468a Type II Class B &
TT-v-llg
1.0 mil dry film thickness
�n
'.f
•SM,
I
I
i
c. Inrtallation
Cut 2'-9" x 3'-9" hole in flocs plate. Excavate to
about 20" under ring wall. Keep excavated wall vertical.
Do not undermine adjacent floor plate.
Excavate trench out-side ringwall radially to 20" below wall.
Make up 5' length, of 12" D.I. pipe adapter, and 900 bend.
Install under ringwall. Set 12" spool or, bend and adjust
pipe to correct elevation for meeting existing floor.
Pour concrete block behind 900 bend against undisturbed
soil.
Backfill with pea gravel to 4" below floor. Use hand
mechanical tampers and compact from inside and outside
ringwall simultaneously.
Finish backfill with V of oiled sand.
Set floor cover plate and weld to 12" riser spool and
existing floor.
2) New Manway:
Install as located drawing. Existing tank shell plate
is 0.92" thick.
Curve doubler plate to fit shell radius,
Provide hinge and handle on cover plate. Submit shop drawings
for approval before fabrication. Include 26 - 3/4" x 2-k"
bolts and nu,s and gasket.
Install flange on existing silt stop. (This may be dune
in shop. )
Fabricate 20" steel pipe spool 3/16" wall, 5' long and
install on silt stop.
5. Clean Up
Do not allow debris to accumulate in tank during construction.
Limit working area inside tank to minimum.
After completion carefully clean work area and sterilise by hosing
with chlorine solution per Section 5.3.3 of A6WA Standard D102.
—2-
s'
+ c
a µ.
a.
R�
t
k
TS^ .:
TANY. KgvISrm
1. General Description:
This secti. .i rovers revisions to the existing Mt. Olivet steel Lank.
All work shall conform to this specification, the drawings, and
to AWWA Specification D10O-73. Original erection drawings may be -
examined at the City Department of Public Works,
2. Cathodic Protection:
The tank has cathodic protection installed. Coordinate all work
with the Renton Department of Public Works, Utility Engineering,
to avoid damage to the installation and hazard to personnel.
3. Welding:
All work shall be in accordance with AWWA Standard DIOO-73 and
the relieving requirements:
Electrodes shall be class E70U.
Welders shall hold current ASME certification for
welding pressi a vessels.
Surfaces to be welded shall be ground or sanded
to bright metal.
All welds on the tank bottom shall be vacuum tested
with a partial vacuum of at least 2 pai.
All welds in the new manway shall be checked for cracks
by the dye check method.
4. Revisions:
1) New 12" Pipe Inlet.
a. Description
Install new 12" pipe inlet as located on the draw-
ing by tunneling under ring va11 and connecting to the
steel floor plate.
b. Materials
12" D.I. Pipe Cl, 6 Per AWWA Standard C151 with cemcat
lining per AWWA Standard C104.
Cast Iron Fittings per AWWA Standard C110
12" 900 bend F1.
12" Adapter MJ x F1
Steel Pipe Fittings per AWWA Standard C201
12" Steel pipe spool F1. , 1/2" wall.
12" Steel Pipe 4 piece 900 bend Flx PE 3/i6l, well
Spool only coal tar enamel coating.
Bolts and accessories as required.
3' x 4' x steel cover plate for tank floor.
t
t!
INT R-OFFiCF MEMO
TO: Ron Olsen, Water Utilities ORTE_eptember 19, 1977
FROM: Ron Heiret, Park Superintendent
SUBJECT: Water Line - Cedar River Park
In reference to our earlier conversation regarding the sunken area behind the
backstop at Cedar River Park caused by w..at I assume is a water leak in the large
line that was iretailed there last year, it appears that the hole is getting larger
every time I look at it. Mr. DiOrio did call me an, say he would take =are of it,
but that was some time aao anC. there has been no effort to repair the problem as
yet.
I feel a registered letter to DiOrio is in line at this time to assure prompt repair;
due to the heavy use of the fields in this area this hole could be a dangerous hazard.
RH:sn
v '
4
VJ- 4 z7
INTFR-OFFICE MEMO
TO: Ron Olsen, Utility Enginceriny DATE August 25, 1977
FROM: Ron Heiret, ?ark Superintendent
SUBJECT: Cedar River Park Water Line
The water line that was 'astalled at Cedar River Park is sinki y
quite extensively in the asphalt area behind the backstop.
Please contact the contrac`.or anc inform him to repair same.
ji JI l r K.L�C
RHtsn
7�i ,
C)V
��
''+M7ut!'.fiR',i '/A 71.1t11g1etIQ11 RYFTf-'
tL�m arrd tat ono rn,�.,rc
�nDall
"f!ry too f Raron
Pranwteslon
.4NAar
t den1,i vat.
11!Ct ormw — iy
'a "-
1265 sd Ave. 90 7/2G/y6 PpapJbls for fro
'IreYt lnY Yeet 'fAI09 %�
Carl t110rie
PrH.
Lr Rt r:_._�J q^
on•ra Adrector or ou n
por • nn, '^^' r•n> fit��!r
bps Gn.s t/L,r.t.�. t
ddmal
�J
Ylfi t
l Cwmr �10
/mvmn �—
en cam
e
ame A —
Poreren
It coo
,ew &1PN
Poreang
Dorn n --J
Pormmen
.n
Po n
c .a
men Ilea
a
OYrnr n -•
en cep �`-
bnryra —
t re
.ontr male
tffu eattw Atttpr tart,; or µropu,d !o 1 u:rease rnfner+t,. "T'moorU.etfor. fr the cork forv:nr
When we i.tre nar aeoloyeal we ga through the ur fen. We do esY i almrtty OW10/ae•,
b. Distributing wr tten questionnairs to all
lower-paid employees, inquiring as to
their interest and skills with respect to
any of the higher-paid trades , followed by
assistance, counselling, and effective
measures to enable employees with interest
and potential to qualify themselves for
such trades.
7. I will assure non-discriminatory pay, other compensation,
and working conditions in my company, taking appropriate steps
such as:
a. Examining rates of pay and fringe benefits
for present employees with equivalent duties,
a and adjusting any inequities found;
b. Not reducing the compensation of existing
employees whom you have converted to on-
the-job trainee status;
C. Advising all qualified employees whenever
there is an opportunity to perform overtime
work.
8. I will assure non-discriminatory demotion, layoff and
terminAtion by first consulting with my company's Equal Employment
Opportunity Officer to insure that no violation of the aforemen-
tioned provisions occur.
9. I will encourage ncn-discriminatory subcontracting for
my company by taking such steps as;
- A. Encouraging minority-group sub( ntractors ,
j and subcontractors with minority representa-
tion amon,7 their employees , to bid for sub-
contracting work;
b. Counselling and assisting minority craftsmen
j who have :he interest and potential to become
f subcontractors , with respect to securing per-
formance bonds, writing contracts, and making
bids.
%V
1
i
a
1
a, Instructing personally those of your staff
is(onsthat
who make t:iririg dec ncl uding mng
h super-
applicants for all jobs (including
visory, journeyman ut discrimi-
, office, and technical
jobs) are to be considered witho
nation;
b. Where upon agreements exist
1. Cooperating with your unions (perhaps
thro": Ih your contractors' organization)
in the development of proyramsincluding to e
qualified minority persons for
apprentices -- of equal constropportuction
' employment in the construction trades;
've non-discriminatio
Z, including an effect
n
clause in new or renegotiated union
agreements:
C. Using as many apprentices and summer and
).art-time trainers particularly from the
minority group as work needs and union
agreements, if any,
will permit.
I will assure that my company makes maximum use of
5,
apprenticeship and other training to help equalize opportunity
for minority perr:ons by taking al'p`Opssistate steps such as: I`
minority youths
a, Sponsoring and aaistin4 r®mice
as well as others to e , andr"king such -
and apprentice *rainingg, extent
t-wining available to the maximum {
within your company;
b, Actively encouzaging rr,inority eir mplkills as
well as ot. grs to increase theationlins and
rticIP
job pot, ti" 1 ti P and helping
*.raining and education programs,re g ado uate
to assure that such programs a onst
and are in fact available to minority nperserso
c.
Actively Participating in Joint APP
ship Committees'
d, Working with civic, labor and contractors'
ng to organize a
organizations (pifinecessary) to conduct
sponsoring grcul i resource for the
an open-admission trip your area.
construction trades in your
and prometiOn
ure non"discriminatory p
6, I will ass within my company, taking appropriate steps such as oar staff
a, Instrueti."7 Porn
onally those o! Y romo•
who make decisions on placement and be
promo.,
tion that minority employees are to and that
considered without discrimination, Or no
job areasYepresentationgahouId is ibenruviewed
minority a results Prom
to determine wYethor this
8iscrimination;
i
AFFIRMh TIVE ACTION pROGRA
OP
DlUtaU UT,LITIES COWANf INC.
1. I will establish an equal employment opportunit% policy
for Di.Orio Utilltes_ Ccmpany and make this policy known to all
my employees and potential sources of employees, to all contrac-
tees with my firm and ask that they lend their full cooperation
to the implementation of said olicy. I will inform the above
people of my program for the use of circulars , letters, handbooks
and the like to make certain that my program is well understood
i
and in all cases here possible ask for signed acknowledgements
and assurances of cooperation before entering into binding agree-
ments with the above.
i
2. I will appoint a top management official of Di.Orio
!I0_l_i_tie'.i_ Company to im,plement the equal op
portunity employment
program and will also serve as a coordinator and liason with the
rest of the construction company and all Mployees, subcontractees,
materialmen and suppliers.
I
3. I will assure nondiscriminatory recruiting for my com-
pany by taking such steps as :
A. Placing employmc advertisements in news-
papers which sere the largest number or
minority-group pce.Iple in the recruiting area;
b. Recruiting through schools and colleges
having substantial proportions of minority
students;
C. Maintaining systematic contacts with
minority and human relations organizations,
! leaders, and spokesmen to encourage referral
of qualified minority applicants (including
those in related work such as fabricating
shops and home repair) and minority youths
I interested in construction occupations;
d. Encouraging present employees to refer
minority applicantsi
e. Making it known to a),I recruitment sources
that qualified minority members are being
sought for consideration for supervisory,
journeyman, office, and technical jobs as
well as others, whenever the company hires.
4. I will assure nondiscriminatory hiring by my company by
tak A9 appropriate. steps such ass
s}
l
orrrnnr,Tr; ; ;: 1170MIATI0N REPORT
and Location of Pao,iect
Np'- mr.+, ro,ject Id7icationr
City of Renton Transmission tfumber
main Wa,
ame raspp no
DlOrio Utilities- Comoeny Inc. i1 �26�76`Ixf°7265 2nd Ave. So 6/
Seattle, Nash 98108 Carl A D10rlo
Pres.
•� + CR. OCCU� ,OU AND RI- _ . _
—�)i'";r't ;*n n••fm Ori.nnt Indirn her
cae ontractor ST'uporLternton�: ._.-``
Mane and Address rom + — �Z--
!5«dti.c
Apprentices
r
n
:ub--Contractors �Cenera2 Contr Totals me CRl1F'nr --
Foremen
en ces
orers
.ama CR1FY► i�- ---T..�
OU=Mw en
prcnt cos
oorers —J .�_�.� CIUIFT• ._
Foremen
�iurnmrtnen � --I--.�.—..--
prent�ce"
Ishorcrs -
+ame GRAFT*
Foremen 7--
ournevmen _
snt ccs —
borers_ _...........
CRAFT+
Foremen
ourne . rL —
A enL-tceB 1 Laborers
canr'r+
Forcmon
ournevmen I —�
Laborers —
rlarrk — —_
Foremen
Journ�^y nTn I_
nprkeM,ices I —) t_
T.eh�orers —�� ---
Sub-Contr To':a]r;—j I ----- —�--`�
.,Lriative Action taken or r,ropo; :r—^acJ+ .mr r;r tst in the wwc•-Y, forcoe
When we hire new employees, we go through the union. We do ask for minority employees.
Idontify Trae..o
DEPARTMENT OF LABOR AND INDUSTRIES
OLYMPIA, WA 98504
August 11, 1976
pi-Orio Utitt' 'As, Inc.
7265 - 2ad A . as S.
8"ttle, Washington 98108
a ntlemser
We have bean notified that you have been awarded a contract on behalf
of the City of Renton. Oitice of City Clark, License Division, Rastoo
Hasicipal aui.idiag. 20 Hill Avenue 8., Reston Washington 98055.
O This contract calls for transmission main at Well I8 to !bunt Olivet
Task is Rtn; County, Contract No. CAC 043 76.
All work under the iurisdictiom of the. Workmen's Compensation Act on
this contract is to be reported by your firs under clessifioatios 1-1
which "a the 1976 rates of follow; $,1188 for industrial isaurssce,
(1 $.1142 for AdWical aid and $.Olb for suyplemental pemsioo, making ■
total composite rate of $,4510 per workmen hour.
We are anclos inn a supply of our forms for your assistance in **curing
a raises* end certification that prevailing wage rat** have been paid
�l /7 on this contract.
1 / Very truly your@,
AMi� e=1.�
nis tNt t
Assistant
sac
anclosura n'
cc: City of Reetem
Cell v
le, V(.'.t
�L.Z��Gfr�kT�
,4
t XC
J v
� Y
Y
BEESON & CO., INC.
SURET'(BONDS • INSURANCE
21A CENTRAL BLDG
SEATTLE.WASHINGTON 9BI04
6226330
To. D1Orio Utilities, Inc. DATE. July 23, 1976
7265 Second Avenue South
Seattle, Washington 98108
Attention: Delores
SUBJECT: CITY OF RENTON PRWECT NO. W-429
Enclosed are duly executed bond and certificate of insurance togeLuer Ith
the original contract and spec. book.
The insurance specs. require copies of the policies covered by the Certificate.
I have requested copies from the two companies involved and will send them
to the City upon receipt - - you might advise them of same so that they will
know to expect them in the near future.
Tka.
Carol
MCI.
/s>
iL.
V.
}1,
. +j
o F:'
p
4
tt
ih
�1
'4V
0%
%V munETR0
municipality of metropolitan se..ttle
Me(ropo/i(an June 2, 1976
councn
c«.,..•.
c.c....Daww..
AUBURN
Srwa.r I.Kxxr
BELLEVUE City of Renton
Rill..»M fw.r.. 200 Mill Avenue South
M.f.(M.•)v.,.,. Renton, Washington 98055
VENT
�••••�Na'° Attention: Mr. Ron Olsen
MERCER ISLAND
A..,D.r...,.- Gentlemen:
REDMOND
S,..r.«(.n», Y—. Cedar River Park Sewer Revision
RENTON
^•^^Ma•^••«11 We have reviewed the construction plans for the above
SEATTLE project and hereby app[ove them, subject to the following:
w.r u.a...
I`,;,',� 1. Mr. Leo Morales of this office (phone 447-6670) shall
Nip,K..•». be notified prior to construction.
w.,«.D.1..•s
2. Metro manhole R30-9 shall be uncovered all around or
R.w•R. xw
s...s..,,, structurally supported to avoid unbalanced soil loading.
OTHER CITIES 3. The connection to manhole R10-9 shall not be backfilled
a°•••'I N•i. antil it has been inspected and approved by the Municipality.
KING COUNTY
I..D.$1........ 4, No construction debris shall be allowed to enter the
R...R•...«
R«,.C. existing 42-inch interceptor.
Raxr R.Da«
RR R'.ia.r. In accordance with Metro's Rules and Regulations, it is
M.aa lows
»moo»°, requested that the Municipality be furnished with a copy of
a..R...., the test results upon completion of the project.
N..n.Sl... -
'n ICORGORATED Very truly yours, v„
AREAS
"^°'-'•"'•""° Richard S. Page
,a«fw.wa.J.
R•oa Nw•.^r,,.. Exe CUtl ve Director `
A D..«War+r.sra
SEWER DISTRIC'Ts
e ore . a ory
Director of Technical
E,ML Services
TWM:jhd
enclosure
t cc: Department of Ecology HUD - Attn: Mr. William Speer
Division of Nt1ee EPA - Attn: Mr. Warren Montqomery
tuget Sound CouL�c� '1 of Governments
Pioneer Building . BOO Fi,et Avenue a Seattle, VVaenington W04 . 447-6666
f
410
■M
to _
of
ice'" L/�
c
i
I
s
f
I
�'' /�,�,,...,f S•Y PLC' .��;d-.� io ��/�G � .r
fjiamo�. r,q f+�r /C's/" .-� ��' .`/2'• !J/t'J ,,-, .r ��r�" �'
�a,-,� • (/mil �"�
_ ow
A
.�iz.,,�iCssw�s %ln '• Wrn �ro-►.,» �'+-+�, /-�Qde � wQ.T t__
Off+'" l�l/�i✓��f /owsv,rrp/ �11�s�saY` /�r�ce.
Q''G�;s,or, rr'Sc o-.-a%`.�t• 4r4....,',�r o.�/a*�G ••as�C�'.
•jh Ot'' i7//Cd✓l � M" 4��'`/ i c/t`9"//!X % ►`r C�l�o->/ 40
�/i.3Tr+ „�lrs,- .�li✓�✓" 7T��sSI� A'�/•JC�/X4in- ��
400(
�4
AAWOO i'I'l �•JGI/ `i I-J1// K ,
V
r4/y t op
/qrf+� -
10 a,*
7
,, �/may ru..�/ �•s-ad�...a--t �
,oRl- s
.:a..� �.�7� - /tom
�,t�-a� t..w�
♦ : �GF'4d! '17i/pC/ " �. ^/�'%yy J}.r-�i••- Gc.�-'!l.Cla--.
Y
wo
i
1
i
�V
Wlv
\�v l
.r
..
76
1do
7,1
so
-C" « rim �ynew�e41 /
« 00- /� .04
17
dip
. a
1 \ 1 �
�� � ��,`�
,��
� , �.
� �
� ��
�� � � �� � .
. i � ��
-� . � � �{
ti �
� , � , ,
� � �
� �
Q
� � � �� �
�� � � �, �
� �
r
� � �
3� .. ,
�;a
AN �A -
,may
7
op
k
1 A'
�" E./T—i �6Z�.�G6-! N�+l.�,(...F-V�.. (.�'!/!C +<�iL/✓��'^L eGL�'^^""v-"i 1..CL rL.IZi � S . 1'�Sy�Apj� r
two
r� �� :L ��� .( `��.rF1.t'..'� ��•-.ice_ '.. .�d'_..I�,
1 sr
s.
,.
OF
/ dw
pit
�` 3 G., clu-L- � ��►.i..¢'EL.r✓ ..la-<t-Z'.�C.y'�.c/�-Q'I--' .
�lGL�a�..c.�/✓ �---/
.ruses •. of e�(/"Gud*�L, 0 w
U4 ! ✓ �j.
r �
7 ..
w
IN
y 1
-s
"WI
-17
41,
ex 42
t:
r
� ../ � rT".�/ /�t.: r/i. �jta•/ r-s�<-<H't'/ � v l l
or
�t
�A
`5
1
.•ti
® SIW .1 WaSF„plan
Oryrorlr,wnr el b.mu. � I
FIELD O•EEATIONS Div!SION reg.
Awu er...e.... A R. .w
Oly,q,a. WOAinyl.n 9a50a I
Certificate of Payment of State Excise
Taxes by Public Works Contractor
Contractor:
Ji OK) U[ILITIFS INC.
7t53 .Ni) AVSV(E SOMM - PWC N° 35512
:3F'ATTU, WASHINGTON 9BIOR
We hereby certify that taxes, increases and penalties due or to become due from the above named
contractor ,.nder Chapter 180, laws of 1935. as amended, with respect to the following public works
ontract: _....__.;: ,;y...ut.. _..................... ........................................................._._......._..._
__._. _.._....>l'a..�j _c0-;.lt�-i�'LY-0i...�aNk-311iii a+...1dN�.R._(:r+•=R�L9�'•. .. .__.__. _ »._ _.._.__.__.._...
togather with all other taxes, increases and penalties due from such contractor, have been paid in full
or that they are, in the Department's opinion, readily collectible without recourse to the state's lien oil
the retained percentage.
This certificate is issued pursuant to the provisions of Chapter 80.28 Revised Code of Washington
for the sole purpose of informing the state, county or municipal officer charged with the duty of
disbursing or authorizirg the payment of public funds to said contractor that the Department of
Revenue hereby releases the state's lien on the retained percentage provided by this Chapter for ev-
1
cise taxes due from said contractor.
This certificate does not release said contractor from liability for additional tax which may be later
determined to be due with respect to the above mentioned contract or other activities.
Dat- at Olympia. Washington.
STATE OF WASHINGTON
DEPARTMENT of REVENUE
Auu1t:L.t_...........
c<nytAao opteL r
ROUTING White Copies-Diabunin`Olflmr,Canary Cr .py.._Contractor,
Pink Copy--"rile.Goldenrod Copy-Special Fite �..}
room esV BE OW ims,
:APLY kIF.:,AGE
1M.Y I011Y 4VA]V SJ IIyYI N11YAI16 C4.. �.,�Y/N1110 AYt.��WRYI/.M.Y. IIW
C
-rrN—__Lol_ - FFM
---- SEATTLE B!IUR WORKS, INC.
° Lb�/l�b GcwSfM+cfioiy
L 2 - 2 "� o,.-e --� SEEArr�WASHING ON WAY �M
(206) 7d2-0736
SUBM=:__ MT �! VAT M SC. Si L• DlLW x�s�7 DATt3U
ILe V. 1_ D toM O P-0i d W 14 t �i Rw oog AL
_ F_NCLo Slt ,G Fo/2 S/Uv/t k PP/u�✓4GOP
j -LFIZR�ICR _ Z>nAoJ , Plyn AtStnvcr?ows ,
A& q o rA 93 II Mt f u wnr i r- h,S�"
C G M 11 noN OL S Gh/ i M R. A(On Z C)Qui C.0
Pud(.ic wonxs PxPr•, ciry oK roAf
r 72
PLEASFF PEPLY 70 SIGNED
1
DATE SIGNED _ --
5: .D V?!'_ 4%jD f'IPSK GOPi€, lNtTk tARFQU INYAt1.
n
>t. L. 71N6i61t1r -
UPAS
wt tle. is 03Mn a '—
am" Wanks Dwparttt
0Il>,r of 8mtm
k }
c.
T OARONER ENiIINEERS, INC.
CONSULTING ENGI,JEERS ! PLANNERS SURVEYORS Since IS83
Arctic 8u0ding Penthoiw, Seattle,Washington 98104 Telephom 1206) 624-5266
5 Oc+. ber 1976
File: 1068
City if Renton
200 Mill Avenue South
Seattle Washington 98055
Attention: Mr. Ron Olsen
Dear lion:
! I
Enclosed are shop drawings from Seattle &filer Works. -
Yours very truly,
G7ERGINEEPS, INC.
ft �
Mortimer H. T.Jomas
RECEIVED
OCT 719?S
ROY L GARONER MORTIMEN N. THOMAS AL99RT J. MURANR ALOENT I AAMETT L. J. tJACRI LOCK[
AM6ered wrrR Consultog Englnears Courrcrl American Society at Civil Engrnean:Land Surveyors Association of Washington
� 4
MT. LLi�L"" TANK cll:y SP' RINTON
PAIYTiNG FOR INTERIOR MODIFICATIONS
Specifications = KdWA D102
System = Inside Pint System No. 1
3 ecat 4 mil dry film thickness
Surfsce Preparation =
SSPC - SP 3-63 Power Tool Cleaning or
SSPC - SP 6-63 Commercial Blast Cleaning
Primer: Red Lead Phenolic Paint
Federal Specification TT-P-86a Type IV
2.0 mil dry film thickness
Intermediate: Aluminum Pigmented Phenolic Vaimish
2 lbs. aluminum paste per gallon
Federal Specifications
TT-A-468a Type II Class B &
TT-V-1 19
1.0 mil dry film thickness
Finish: Aluminum Pigmented Phenolic Varnish
2 lbs. aluminum paste per gallon
Federal Specifications
TT-A-468a Type II Class B &
TT-V-ll9
1.0 mil dry film thickness
ryp�*i
a r
t �
,... w
A
A
M
�'Y
e^y
� .ram ,. , �
�,
1
G7 �l 4 r• /- f...
/
. ,. - /
/ ,/n ,, �
y',° _ �►
C�
r ....e.. ,.."
:.� {�
�'d+";,Ag^ , i'^ ;^aa.f �� . �. .�-,, // f v /.;>/,s.+..T�:Xc'y i r i /.. ;1' �7
sre�✓.r /ter/ ,.'/ rYr+ �a/ re/r,/�M c+/+v.� '�../rt ,L'i.' f'" r r+ -,'/ C.J
fit' cY"1t7../'"��'kJ ,C--'.:1.pa /Z. S�^_.� �L .�n;�.' r,,r0�.' ,���0� Y,r �;R a �a7 s�.� w,.�
� �1
9 �
x � �/
1 / / ^ �`�!
�.
f
- _. �'
J
�.. �„ ��
c
r.
PA,
o,;
d '►`
40
op
dw
ol
wj
A
�p. -.P�rzrc�-'r•� r ,�.1` /.✓of;C niJ!`�e!'' /,�I'�/rr+>, - •�, w,
,/ Yitf ::.:•,al� , J � . ,. ., y " .i +. sfrn��'rr� �� � / >�.r//..,�Li,
�,✓/. ' .Y.�f. 5'a[.y G.;Or't � r> � r��fii' ,{;.;.,jG'Oj.
-'� //%C� L/ .v �•.I•hrz/ � 7"ac�{,',cFC/ �.,. •��rf°Y^, ,/,'/!'mil r✓�
�r
ti
. a
r
w
*w
00►
r
.s
.f
�x.
cs►
'�'��
'�� it �i `G` �l� �a'C� J�- �✓ 1�
f
omIL
4
o
� � V1
/1
f
M
k
t
v.e
41 Y
r.r
R
r�
�ti
w �
J 4 +\ 1
' F
t
OWN
aw
.. � ,. /, •..��,.i'"� Ux'c.�,. /.�•• �ey-Yt=°"+._I-N�GG'/"Y..-4h�K.. '•. ��.e. ,. �. { °y� gg�_.,�.
�.. c4:"_. -ri 2. C.�i.�K�-C.-lra•<. .L-r.._a/.r° ,� � ' �,;`,G,E.•, ,�' " �'+W iy
®.-....riot � �G�..uc�w �-.zu.✓l� �Y.u�',y�'.���•.;, -
' ifi� ,i,9•....I�C/� ,7f•, (Zu-�,. -eC..�-v.:... .n-.,..� O�'�-T ,�,7Y+..lK..:. ,...:,.
yW'
�+.nJ
i
4'
k
"'N
os
s:.
4
.Qoav" erne.... � •,� ,a - ..�. ";
if
ow
Fla
soft
� � a
too M
7 `7'
lbo
W.
�11
w
r
yt ;
fat f
/
t
TK ww ,
'+ e7
in otd/
d �
r
w
•
rr
010
M
V
M
Y
M
EMI
60
fAO
rr
'► 1
A
Mw
aw
mr
aw
r
4wr
«0
r`
r..
4r
rr�
r~
AV'
or
.p
w
r
r
•r
sr
w
W4
� 1
.r;..
r �n,
�p 11Alx. {
i f'a
I �a5a
!y
M.
AS
4a4 � {
�1 1ty 't r
.i _�r� _.�i.titi �*..!-�-v"' -��'G.� .fRt.-..•tom . - x4 I�iw..
/�M1.• r-r/.i+� /v�iKi. _ �Ia.H-�X� 64,
4.log
t A ,
. arr ...ram-.7�C�-G� ��- ` i::lGa.i._..., �,-L.:•.-4- ----`- `^-�-C4-�/ .-r--�.-_>
'
�w � .t
"Ol
i
a
�_ Y
r.•S, a� - 4 r.
"1... 4�..,.:
".x' � '.
t � �
, �
� ��"
�� ' �
3
C � � ��
�=�
� �
N �, � ,
,��
� � � �,
,,g �
` 1
'� � � �
0
I
WATER MAIN PROJECTS
PRESENTLY UNDER CONSTRUCTION
IN
THE CITY OF RENTON
WATER PROJECT N W-429 DATE September 7, 1976 i
WATER PRCJECT TITLE Well 48 to Mt. Olivet Tank.
Transmission Main
PROJECT LOCATION _ Cedar River Park to Mt. Olivet Reservoir
5
DEVELOPER City of Renton
ADDRESS 200 Mill Ave. S.
PMONE 235-2631
iC
EMERGENCY
PHONE Dick Houghton, 228-5949 Ron Olsen 782-6478
CONTRACTOR D.Orio Const, Co.
ADDRESS 7265 2nd Ave. S. , Seattle, 98108
PHONE Carl DiOrio 762-1850
EMERGENCY
PHONE Carl DiOrio 731-2366 (Home)
FOREMAN Norm Elness 1.
PHONE 762-1850
EMERGENCY
PHONE 822-8449 (Home) _
i
t
i
1'
I
1
n-+4
MEMORANDUM
TO
Bob Bergstrom Engineering Department DATE 4/15/76
FROM __ Ron Heiret Park Superintendent a
SUBJECT Water line installation at cedar River 'ark
Please include the following items in your water line installations:
1 . Place a time limit of one week on installation and clean-up of the grass areas
adjacent to the ballfield.
2. Specify hav'ng sod placed back in the ditch area after proper filling end tamping.
Soecify too six inches of ditch be filled with too soil .
3. Specify astroturf covers on manhole tops.
4. Storage area is limited to the asphalt area under the large maples and north of
the guard rail behind the beckstop.
Spocial care must be given to flagging sprinkler heads to avoid their damage.
The contractor shall be responsible for replacinq any damaged sprinkler heads.
6. The working area should be limited '1 a 10 ft. wide span to assure min;mum lawn
damage. Damaged lawn areas outside of the ditch line shall be leveled, filled
with tnp soil and seeded with approved seed mix.
7. With proper notice (one week) to the Park Department, the Park Department will
expose and uo existing sprinkler lines to avoid their damage during construction.
This must be closely coordinated with the Park Depar'.,ent so they will know exactly
which day the liras will need to be exposed.
8. Ditches must be backfi'led within the confines of cedar River Park at the end of
each day.
WWI
City of Renton, Utility Dept. r '
PRESSURE TEST FORM
Water Project --
Name of Project .
This test was taken by
r'< ,vdCrr on
-.PSI , for y�, ,, minutes
At a pressure of Z
�-
The test "Failed" on/�-- --
t/ on
"P as s-d•' --
comments: / % •�
L o `"
City of Renton, Utility Dept.
77 A PRESSURE TEST FORM
Water ProjectY)L _
Name of Project �/ G ' lh- GIJLT
This test was taken by rn
At a pressure of ���=� PSI , for /. minutes.
The test "Failed" on
"Passed" on
Comments: N
O F Z-/.vE G-tnl-al u
1
C`y
M
A y
o�
I 'V _
Y _
4
+ d
City of Renton, Utility Dept. r
PRESSURE TEST FORM
Water Project 4�9
Name of Project �tG.G '�(� 7?J i�/l(/L�!/rT T�iNA-- L/`,ri?w5
This test was taken by rY70rll y on z ef-Z"7Sr
At a pressure of CCU PSI , for minutes.
The test "Failed" on
"Passed''"// L on
Comments: /[{O e-O SS OG �//1-Crs1 r✓.� �
1
i!
�••
Alft
oV RA,
ti 'x
a� THE CITY OF RENTON
\%
MUNICIPAI BUILDING 200 MILL AVE SO RENTON,WASH 99055
CHARLES J. DELAURENTI ,MAYOR 0 PARKS and RECREATION
4p p GENE L. COULON -DIRECTOR
�44,0 SE Pt F.011"'
MEMORANDUM
November 18, 1976
To: Dick Houghton
Ron Olsen
Bob Bergstrom
From: Ron Heiret
Subject: Cedar River Park - Pickups for Diorio Construction
.... .................................................................. -
Add top soil to those areas adjacent to the ditch line that have been
scraped of sod. Add top soil to low areas in the sodded ditch line.
Fertilize and seed these areas.
Ditch line and adjacent areas should meet in a smooth and gradual way
to form an overall level area.
Repair broken concrete in sidewalk.
Area near highway - needs top soil , leveling and seeding; remove rocks
in northwest corner, add top soil and seed.
Parking area needs 5/8" minus crushed rock to original gravel thick-
ness with all holes leveled.
t
d.
40 war
INTFF-OFFICE MEMO
TO: Ron Olsen DATE i1/4/76
:a a
FROM: Ron Heiret, Park Superimendent
SUBJECT: Cedar River Park
Oi0rio Construction has satisfactorily completed the
clean-up and restoration of their construction in
Cedar River Park.
There may be a need to seed sane small areas in the
spring. I assume 0 ere is a one year guarantee of
their work if there is sinking in the construction
area, within the guarantee period.
1 .
p.
Arir^�
� I
r+
i
M"+
c:
_ to
r
4�.
L.r -
M
Co
r,
r-•
r,.
bt sl.
60
r/
40
M
M
r
,.
lots 4tt � : ili � � tlia : : :
N
J4
vd.
• � !(?zr.rr/i+'[7 rs�^/�7.C� ..� P. ��.f/!% �,�> ..n�'r:�!ff�/
dGyf6s'9
Xax
Ar
4o,,e- ,r✓ivr'
>.n.'Y//a�1i'1 \���'� �ff� �1rTo•'R•.' VI/G"
• (�
Rr
}
�r y'//OAr�7F '. yF�.0 f!,..4a.`y. ,f,�9 •ya_� f�- �.,,,j" rJU/
1 ✓
' 1 4w
14
. . �1/4+ .�r� fsl�. J:. /� ,f ,.:) ve-�-../ ..5•/ /i:.v, CYC� .�jw- �'1i1ML �
-lp
.:... . _ firw.
ow
w.
60
1hr
y ,r
.. .. �.y rJ,'C•J�"e�Y;`�Ci'�C,^Oi�e;,,yl.,. �et'i.rroC t..-�/C' �I
M
40..
vjl`L•rlL M
rj
K.
r�
or Oft G J
9
4
�-� 2 2
.�'•�'- yam' IQ1Yl
2-L-
`,,,5 y� ....n+i- �� ., !/1'/C-sij:i.,,..._'.-�r v.u^>!�� f- mil' �G`• r,�r/ �.-./vim
�. ell/. /. `"1e`r/ ,y+i,srty ^', .., /s•,. -r fir / ( ,.. �� i
SPT /✓/ fJ�d'fl /•L�!/`//lPl�y �.. ,� k�i '�'J� �
flAo
loo
z R!
B1w�
up
M
t
� L
4
1
i
v
w � •
Y
J
ENDING
jo
•
r
t
r
4
' A
1
e
M1
1
1
A
1
.16J. IJ S`_ Yt. y.IV1T i.YQ pK:.MpP 5 L1:'yPT1 C1Ch:e .'CTttryeelw+ Yft Itwlin Cunt. •t9N WIYw'!D(byt. Mt lmKtuetlw Ova! .bpat. lnc. SCDe.CI�t Cana..
Mi]] tID1c Oelt a Oeat .alt IDit lmlt :,Llt DfJ ttiaalMl F21_)t DODR. Ttlw )t#al Rlw )aYl Tr1w StMal vt
`D.:. IYtar•aL r1. 1 N 35.w Ws-wN. W.m 43 W.m Sl.m S{,NJ.m s5.m SO,I^s.m w.m a5,5m.m
] N` DZ raDsle U. ] fY 6i V Jt.m 3.SO{.m )a.m 1,31t.m aD.m 1,N0.m - J,}m.m :m.m b. .m 1l.09 a,9so.m f0.D�0 J_fa0.m
TJk
-_
f id .m foD.m 112
Cl, l TJ d)S V 10.m 9.i -w 1) m b.i .m Je.m 11.I50.00 dpm 3f Omm 30 os,w1),SY..m•.fm _ef t 1,raJ.m P r0 m i Im.m 4.T90.m ! d .m
15.M b10.m .m 11976..
10 ii
1lL7LTLLw rc ]m.m Im.m )o0.m 1 0 ) .m _SCC.m S .Cf Jf
) S
Daw4 L l4 OLwa Twt - { sm.m 4.5m.m J,m .m 3.m0.m J,om.m l,Om.m a.ODO.m 1,000 m
Dw T tyaetly at w k L.t. :-m0.m 5.m0.m s.Wm 51Om.m s,m0.m 5.m0.m
a SAM,00 a a ),om.m )m_m S
I.A M r a." lm.m I.m JIM.m a.r a.m."
"eW W. _yt
a_
la t Dtewt fafb.a<!m r am 30.m 1.M .m a0_m 0D.m 1. 25. ..M.m x.m I'M.r r.m 1.m0.m
t
.m a,•.m a,DDD.r a.m a.]r.r 1o.m 1.Om..m ao.m a,mD.m lt.r S,Sm.Oe
a, m )m.m )m. r Sm M.m t .r _ .m ml9 m ]SO.m »D.m SOO I,W,W I. .m
P�DtC:at 116.919.m M,faf.m 11i.SD).0 121.930.00 114.126.00 13S,1+5.m 1N.1d0.m
5.4f
taA1 1I1.117.» I:OI.]OS.J] 11).f0f.l) 1241,514,12111 ]».fl lal a+I.a! IS6,140,64 ]j]
� 1
i
t
4
fE•6W �„71Tt•60t: .._.. ,M�1.'LtT'f[I �� '- -^-- ,�_
l5'S±o' - EE'9EL's LL'60C9 .._ -- a!a SiT*8 �YS
e
1
0H'EHS' � OG'6%'9u � 00'oZ1J'9iLt t . -
OO'OOL loot. 00'009 Ow6a— -rids . `� V.�.-�.
00 OD 00'QOI 'lull 00,00019 00'� "- L 00 - EUTNOOTB dtRR5'
00' 100'f£ 00'000'Z CO'C9 _ -CO'005': 00'OE ooy OS - aoTlv.xozsaa :aai;g ;l�j'st� tI
Ci 'TEiat L fif Ot'OS£'S QO'OOu'L 0n'000`Z" '13 T — TIA ?aTTwd mnr".N 2W .
00' 0 OC'0tt _ i 00'0E -- -00'U05 00'OZ oW. SL X
THPTe9 9L
1 bb'L (oC'000'8 5 rJoy LTF3X3aH 4ovaW. :�ai§' SI
r oo8'i' ' S6ore
rS -'OOOjy
cuocsTnax Tawas dsa:T.. P
O0'000'S t 00'000'S C4'000'S 00'OOfi'S 00'400'S Ovwo'S •9.'t �..__ wt,I 7• svoFi SSO ldFi �Mll
OO' -4'7bO'OOS`C"00-J09'i '00.�.'I'_fwm%
w"N!"C._j_ '000'T .ym £
00'00L —00'00L -00'OOL OU'OOL CJ'OSL 00'05L-_"_- -,�3 ;� —_ xoq ani•'
A UtTn aal�j
OO'�f " �'DO'6� fi0'95L Urn 07OT9 7'00'TT 3 4 L 'iI vteaw3lel
QO'i7i£ ► -t. 00*00i'i` 'OQO'£ - OTf'S�L�-._ •v3 6 Srti! t!
M diCg/aatted S"I!J'"„
00-OS6'i �. 0 •. -OO,oo8r2 00'ppBrC ��--(}
Z10'�OL'L d0 "6 •13 L ..-�-_. linll�anis • ;Ts.ra33nv -„yi
I 00'JnS'4T 00'00S'£ 00100019T OO'C�i9'E 00'000'SZ -0p'p0p g og . -.
' S :TncNawsiA dtisa:3nS .fL- 9
00'OSL'ZT CC'9Z _.i 00'SLO'e 90'Ll 00•COS16 00'0L t 3': SLIP ' ._.._. fW Z 'LJ aTWO"Zva 'I'0
OD'0K 00'Of -D8'GIY'T ! OO'06 O0`S25 00'ft""`_ -Tff ;S Z 'T9 i T
0b`09419 OC-6C '$ .Ot - r � _ t
E t 0ti'009 S OC•5£ 3'i 09L _ rz Z •i�
00 ' �cF �gt 'I'G t
' K 00.805 L f 00'PS SI 4Y ;i,l to .St.
for ►aTad IIOaL ro;sd tlaoy b3>ra �. ��_
�..a►•�1 3Fo0 _ �.. aT00 '•L`K�` 9L-£L-9 6lR•+°O PR
,.,.._ ; .._.. 6t" `
'WON" mowFVaC %"a �ti�aslW OFaoFO &t18EIi00 SAID ; riIYS d4AT SO '3M QL B♦ Ti791
{ y
Prank Coluccio Conet. � . Moen Cogetruction T_D_Ybd Sow
Cogat, Inc. H. bcfiNicht COnet.
Unit unit GWa Total Jn it
ult ry
ct of 1 Psice oral price To
46.]83.00 S3. .00 1 50.00 45,500.OG w
._.. _ ... ,SAN IC "Pt t ;
__4.AQA_ 90.00 5,940.00 ,
} IS Z.0 i
50.W_--A*W 53.00 i. 96l".00 g 50.00 8,000.CPO,
$0.00 900.00 60.00 1,030.00 106.00 1,r40.00 _. 50.00 900.00 t -=3+.a
40. _23 00 �0 t 29.00. �3:Q0, :9.00 13,300_.00 ,
1.000 3.600.OG, �A fD&. 90..1.300_4 21.SO0.Ql tri13w "P- a
2,OO�J.00 2, 0,0 .00 r 3,400.00 3, 21000.00 31000." 2,W.00 1 2,S00.00 ;�--
4.000, .ZJOO 1,200.00 4.BQQ __1Lmoo 5,400s.QQ
?5.00... .00 . 25.00 0 15.00 e1,,.00 •5.00 2,970.000
�t'lsQa. 700.00 �.. 200.00 20+.o. . 50Q.00 500.00 .
0 .
51100.06 ,
4, Q 3 0 *100 S 3,000.00 3,000 !f0 i,000.00 6 000.00
V � _..___. _._.__ ._ .'- _ A V"
3.400. _-1.40OA0 .-_€.41�Q,w0 0,000,QQ
4,QOOjQ( ; 7.000.00 7,000.�,4 6.700.G�.. 6,700.00 Sfl".00 S,Of '.00
0.0„5 WOO _4 ,,. .160.00 2.00 3,200.00 _ 5.00 91000;00�
I RJ
-.500.00 16.00 400 00 20.00 500.00
2.2GII.0G1.I00 OD _2•.SMc0 2.304a
i
t0, 3y000�C0 3lt.is 1,250.00 50.00 2,500.00 i 30.00 1,500.00
40.00 4,300.00 10.00 J,000.00 40.00 4,Ori0.00 55.00 5,500.0G
l90 50.00
1r0Q 500.00 z50.00 3M.00 1,500.00 11500.00_
T,0 _
121,b30.00 ....+.....�_-. ,,. _._._._ 135,175.00 140,100.00 _
.Q l'�f,�. ''.�... •f 7,299 45 �6.000 L4lAl
.r
_ei Le"R4.4a I{ i60.f4
4. Traffic Engineering
No problems.
5. Police
If Cemetery Road has eny closures, there will be needed signing to top
of hill and use lighting.
6. City Surveyor
All centerlines are staked. Pipe is off set from tiese survey centerlines.
Several days notice required for survey work.
). r.ity Water Department
Problems with shutting dodn Mt. Olivcr. This leaves us with only one- ` t ,1„•�:
half million gallon storage. It will take 3 days to drain Mt. Olivet = ..+
Tank.
8. Park Department r.T
September work wtll cause problems with park users. Where pipe is stored,
the rail must be reinstalled. Sprinklers will be pu led out where the
pipeline is to go. Need 5 days notice. Ditched filled and m.h.s
to be covered each day. Park Dept, asked about MN Lid covers and "yes" ,
they would be paddeu.
Meeting ::oncluded at 10:30 a.m.
;
. y
PPECONSTRUCTION CONFERENCE
FOR
WELL A8 TO MT. OLIVET TANK
TRANSMISSION MAIN PROJECT W-429
August 14, 1976
10:00 a.m. .a
ATTENDEES! (See
Bob Bergstrom City Utilities Division
Les Phillips City of Renton Engineering 235-2A31
Peter Addison Puget Power
Stan Kin. 225-2464
9 Puget Power 225-24(4
Jerry Cronin Wash. Nat. Gas
Joe Rei.hman Wash. Nat. Gas 627 0767
A. J. Rowe Renton Water Department 2 M. A. Kohl 35-2646
R. W. Puhich
R. J. Millatt DlOrio Construction r
Bob Smith Pacific N.W, Bell R02-1850
Ray Saude Police Dept. 228-0276
Clint Morgan T 235 -2549
Traffic Engineering
Gene Coulon 235-2620
Parks 6 Recreation-City 235 2560
I. Pacific Northwest Bell
On Benson Road there is a large telephone conduit. Upon request they
will do the markino and locating. Contractor Indicates that work will
begin in mid-September and so they will contact the phone company.
Also phone company will have a major construction project In the same
stretch )f Benson Road in Uctnber. Requested extra copies of plans.
2. Puget Power
On Benson Road there is one crossing 11 KV - 3 phase. Will mark upon
request. Contractor asked about guy wire relocation on east side of
Cedar River Park for short sewer relocation. Work will be done upon
request. Requested extra copies of plans.
3. Washington Natural Gas Co.
On Bronson and N.E. 3rd St. , 8" High Pressure Gas. On Maple Valley
Highway 4" High Pressure Gas- In Park near ,anftary sewer work there
is a 4" gas pipe. Location will be made upon request. Need 24 hours
lead time before location can be marked .
1
Affidavit of Publication CA"poppop a"
Ssard bier wis he Is,,ei Wxs
STATF.OF WASIIINGTON l 2 W adri RegistW" Aso n
COUNTY OF KING I x" 1974 a M MU a M G*pase
ond Pa*tags srad or Egg
4"dsy, a gr,
10*"W Y
,g AiFdloy Wallis .. ............. . ..bang(Int gulrwornoa �-mwodaaa Ida
Guar raa Was trYt%"pa,
oath deputies and mys that gM is the Oft 12*14 of t leg p Ogb ly palh 1F_gr IS
Toor of
times a werob Thal
THE RF:NTON RE('OR"I NRONt",E,a"*"Per published four IQ �NE jig 1 ��Al'va
sold orwepaPer is a legal newspaper and It n slow and sell off do.Iswed In
has been for more than ss munl',prior Ili the date of publication referred pslasf y
,or.printed and Published inthe ringhxh language continually ex a news- obagr upok"only a 1, ft
torpor,puhhrheel four t(I timer a-VIP in Kant,King Count Y.Waxhmwn g 4uaoga
atilt is now and during all of said II me was printed in an office me trained gib ta,Mrgabrfrgr sties a•the afurexard place of publication of said newspaper That the Renton ry
Record-Ch -nick has ban rn approved as a le�al newspaper by order td the plan is arg~��ggp�ypg be
urt led the County in which It is prl hshed,to wit,King County, a,a.LalambobaMaalb
Wmr obeow,salt IMd Washington.That thrannexed tso Gu Bids deposit of gp sa ga a
IBM to Plat.,yesep g arlyg
7w tpplag siress son be
10~, flee daposu woo ,a
lwbuad, ones„ pi ens ...
ovwftwfim"quo~0 P"
orgalit was published in regular lssueatand dy�apP �i 20)��`w
not in.ruJPiemrr form of sold mwepape,i once each Issue for a period A wMg(anra v ap bond,
1 bilges to)PWo"a to
I t o1 the bill aw,l
a. -. � conse,:wl to issues,commenctngon the f00O1TfA'asY bed
. ._ _ .. . WswrlYtgtan ire. Sale. 70,
w w p/Ppalgla P4 Na
U _.daraf....... _JUM __ . _... ,1976 _. ,and end ins the Too mow�ft raw
�w
any anM9e m WN maM:af In
IS dayof Jul* ..19 T6 .both darn �44 a Renton Mosby
inclusive, and that such newspaper was regularly distributed to Ire sub- MMM Iralaps trio saanay
Scribers during all of said period That the full amr•unt of to, (cc ararrftg(tgllr.gMalddfw
Ile/appwf♦t;+.,slag a1/1 a
ragaO•gW Fat oom fora we
charged hIr the forrgumg publication is the sum of g44s91 which sal gl aygglvlafa fgarr mY
has been paid Infull at the rate of Per fn d ho. one hundred words for the PaaW a 100.Pan,a nslbr,
,,,, inabriuin and per folio of one hundred words for each subsequent odes^ow"etltr— bmsw,d
uixerlwn "rnabe PmWdw d&,,",
the ragwrsa 'CarilllCataa of
/ 1 glagn,a',ra n Aar*no
asgamawrbg.
fa,Ito Oand &Wwd Npn,
10 promaf aria • laa s�afl
faarela segaurs sole" e Y nr
and bPwv b ashift yin
1e NWOM 0W based o!shift of
SuhxcnMdanJ sworn I.More,me this .iM .._. ... ... day of o wN �ugya 6d1*,
soft
iuro . 19 sr,, ghyawed, son"v nnkd
g owow Now
/ 7W �a�+r�Y• 6,every
R'f�5 [(. N aamoor gtaP:Ma,.
�.,.. gaam rota aa,rr
Nourb'Public in and Inr the Slate of Was norm.
residing at Kent. King County DAWN A,loos.CUP CISIa
pa14Md aft pstnrn%=it
'—'—" Ifwally j"Or r h\ him
,blase
Paxsrd by the IxglPlature.196,known as Senate Rtll 781,effectse June
901, 1455
Western Vapor Telegraph Cc rule, for ellunring Words and haures.
adopted by the newspaper,of the Staid.
ese ,..silos 11
July i , 1976
f .nance Department
Shari Norris, Engineering
Plan Deposit Refunds - Mt. Olivet
Please prepare checks In the amun, of S1^.f10 each for the below listed contractors:
was Construction
Bert Robinson C-met. Co. , Inc.
Frank Collucclo Const Co. Robert F. Marsh * ($20.00)
Nowrd Schwicht Comst. CO- Western Utilities Supply CO-
Morin tOrlo Const. Co. Inc.
Dyad Const., Inc.
Hinds Supply Co.
Thank you
chart
* Two sets checked out to U.' Pipe C Fodndry but paid for by Robert F. Marsh
r
BID TABULAT iON SHEET
PROJECT : fij%ccc_ b f� n'Ir l�L�uri
DATE = /,, - 2j- 7c,
BIODER 131D
r/ n.ie,..zc /u/ t; . 7
2 #27- 7 L/
AV
s
75
s'
1
i 1 i, _, � I �. .... '_ �,;: .-.c_-. .; .....ar_ :z:-:�+er:wr. :.,r•.c:-�o..x-..:�.:os.n- �.�:
AI
1
ij
r
M
9 n 6
_
y // S
L J
Bid Z)lrl,lheAk P
l;Je(I 8 'k?� 0bvc/ To-.ik Tires /�iSiJs,
old
Rao/T
4t
IL
{
S! -pp
{
a,
u !'
15 Q.�GJAas/LC 44r
11 -.___ i _ C4Ai[� Lam✓/� 9B et z
_ 01
20
zi zl
za
23
24
-
/����
26
21
// t
to
34
� n
,
- 1
40
H. D. FOWLER COMPANY, INC.
'3440 S. E. 30th STREET
POST ORRICE BOX 160
BELLEVUE, WASH 98009
PHONE (200) 746-8400
Date: August 2, 1976 reference: City of Renton
Water main job
City of Renton( Cedar River Park to
To: Renton Municipal building i ; .'at:,: Mt. Olivet Tank
200 Mill Aven^je South
Renton, Washifgton 98055 June 23, 1S76 at 2 p.m.
Gentlenen:
'Je are returninn under separate cover Ong sets of plans and specification;
covering' the above referenced project:
XXX please return Our 10_00 ripposit.
Yours very truly,
;1. .tl. vo tr? co,mn•!Y, c,C.
Estiratirn' ')epartmont
Check .o.
PUMPS
3EWERAOE
WATERWORKS
TURF IRRIGATION
Lit
;
M
RECEIVED
INTEROFFICE MEMO JUL 15 1975
i
y
TO; Dick Hwighton, Utilities Engineer DATE:
,
Gerard M. Shellan, City Attorney ' ''
FROM:
SUBJECT: Well #8 to Mt. Olivet Transmission Main Grant
,env r„
Thank you for your Memo dated July 7 , 1976. Wt! are returning, to you b};`
herewith the verification of ownership duly executed, based
haven the
checked
information tt:+t you had submitted to me. We assume y
d.ecermined that the site is under the
out the legal descriptions and
owrership of the City.
If we can be of any further he1D to you in this matter. , please advise.
Gerard M. Shellani
GMS: cis
Enc.
1
f•
4