HomeMy WebLinkAboutBehauden Townhomes_Meeting NotesDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 |www.rentonwa.gov
PREAPPLICATION MEETING FOR
Behauden Townhomes
1608 Shattuck Ave S, Renton WA 98055
PRE25-000316
October 23, 2025
Contact Information:
Planner: Ashley Wragge, 425-430-7314, awragge@rentonwa.gov
Public Works Plan Reviewer: Huy Huynh, 425-430-7384, hhuynh@rentonwa.gov
Fire Prevention Reviewer: Corey Thomas, 425.276.9582, cthomas@RentonRFA.org
Building Department Reviewer: Rob Shuey, 206.550.8523, rshuey@rentonwa.gov
Please retain this packet throughout the course of your project as a reference. Consider giving
copies to engineers, architects, and contractors who will work on the project. You will need to
submit an PDF copy of this packet when you apply for land use and/or environmental permits.
When the project application is ready for submittal, you may email the project planner to start
the prescreen process. Similarly, you may contact the assigned planner if there are any
questions regarding submittal requirements.
The pre-application meeting is informal and non-binding. The comments provided on the
proposal are based on the codes and policies in effect at the time of review. The applicant is
cautioned that the development regulations are regularly amended and the proposal will be
formally reviewed under the regulations in effect at the time of project submittal. The
information contained in this summary is subject to modification and/or concurrence by
official decision-makers (e.g., Hearing Examiner, Planning Director, Development Services
Director, Development Engineering Director, Department of Community & Economic
Development Administrator, Public Works Administrator and City Council).
M E M O R A N D U M
DATE: October 7th 2025
TO: Ashley Wragge, Associate Planner
FROM: Hugo Sotelo, DFM
SUBJECT: Behauden Townhomes1608 Shattuck Ave S.
Comments based on the assumption that these units will be built under the International
Residential Code. Starting February 1st, 2021, townhomes over 4 units will require sprinklers
per Washington State building code amendment.
1. The fire flow requirement for the proposed building is 3,500 gpm. 4 new fire hydrants
are required, one within 150 feet and three within 300 feet from each of the proposed
buildings. There is one existing fire hydrant that would meet the required 150ft. and
another within 300 ft. from the buildings. A looped water main is required for 2,500
gpm and larger. The existing 8in water main appears to only provide 2,500 gpm.
Alternate methods, such as fire sprinklers may reduce the requirement for the quantity
of fire hydrants and the looped water main.
2. The fire impact fees are currently applicable at the rate of $579.41 per single family unit
and or duplexes. This fee is paid at building permit issuance. Credit will be provided for
any homes removed or retained.
3. Fire department apparatus access roadways appear to be adequate from Shattuck Ave
S.
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: October 21, 2025
TO: Ashley Wragge, Assistant Planner
FROM: Huy Huynh, Development Engineering
SUBJECT: Behauden Townhomeses
1608 Shattuck Ave S
PRE25-000316
NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-
binding and may be subject to modification and/or concurrence by official City decision-makers. Review
comments may also need to be revised based on site planning and other design changes required by
City staff or made by the applicant.
I have completed a preliminary review for the above-referenced proposal located at parcel(s)
7222000321. The following comments are based on the pre-application submittal made to the City of
Renton by the applicant.
Water
1. The project is within the City of Renton’s water service area in the West Talbot Hill 300 Pressure Zone.
2. The static water pressure is approximately 68 psi at ground elevation of 142 feet.
3. There is an existing 8-inch water main located on the east side of Shattuck Ave S that can deliver a
maximum flow capacity of 2,500 GPM (see water plan No. W-113201).
4. There is an existing ¾-inch water service and meter serving the existing residence on property.
5. There are two existing hydrants within 300 feet of the property (MTR-014720 & LAT-014323).
• HYD-S-00141
• HYD-S-00523
6. Based on the review of project information submitted for the pre-application meeting, Renton
Regional Fire Authority has determined that the preliminary fire flow demand for the proposed
building is 3,500 GPM minimum and two new hydrants will be required. A looped water main is
required for 2,500 gpm and larger.
• Applicant may provide alternative methods, such as fire sprinklers to reduce the requirements
for the quantity of fire hydrants and the looped water main. Applicant will need to provide an
updated site plan as well as confirmation with RFA that meets the requirements for the
reduced fire flow.
7. Based on the review of project information submitted for the pre-application meeting, to provide
domestic and fire protection service to the development, developer constructed improvements will
include but are not limited to the items that follow:
• Installation of a separate domestic water meter and service line (minimum 1-inch in size) to
each new townhome unit. The sizing of the domestic water meters shall be done in
accordance with Chapter 6 of Uniform Plumbing Code. Water meters shall not be located in
the driveways, and there is at least 3 feet of space between the back of the meters to the
face of the buildings to allow the connection of private service lines to the meters
• A double check valve assembly (DCVA) shall be installed behind the meter on private
property per City Standards if a fire sprinkler system is installed
• Installation of a landscape irrigation meter with a backflow prevention assembly (DCVA) is
required if applicable per COR Std Plan 340.8.
• Installation of a “Storz” adapter on the existing hydrants if they are not already equipped
with one.
8. Watermain relocation may be required if the proposed ROW improvements impact the existing
watermain along Shattuck Ave S.
9. The existing ¾-inch water service shall be cut and capped. Removal of the service and water meter
shall be done by City forces, a separate water permit is required.
10. A conceptual utility plan will be required as part of the land use application for the subject
development.
11. The development is subject to applicable water system development charges (SDC’s) and meter
installation fees based on the number and size of the meters for domestic uses and for fire sprinkler
use. The development is also subject to fees for water connections, cut and caps, and purity tests.
Current fees can be found in the 2025 Development Fees Document on the City’s website. Fees will
be charged based on the rate at the time of construction permit issuance.
• The SDC fee for water is based on the size of the new domestic water to serve the project.
The current water fee is $5,025.00 per 1-inch meter.
• A credit for the existing service will be applied if it is demoed.
• Water service installation charges for each proposed domestic water service is applicable.
Water Service installation is $2,875.00 per 1-inch service line.
• Water cut and cap fee is $1,025.
• Drop-in meter fee is $400 per ¾-inch meter and $460.00 per 1-inch meter.
• The full fee schedule can be found at:
https://edocs.rentonwa.gov/Documents/DocView.aspx?id=11438465&dbid=0&repo=Cityof
Renton
Sanitary Sewer
1. The project is within the City of Renton’s sanitary sewer service area.
2. There is an 8-inch gravity wastewater main located in Shattuck Ave S (see record drawing S-002208).
3. There is one existing 6-inch concrete sewer stub serving the existing residence. The stub can be
CCTV’d and if found acceptable to the sewer department can be lined and re-used else it shall be cut
and capped at the main.
4. Individual sewer stubs and side sewers are required for each townhome unit. All new sewer stubs
shall conform to the standards in RMC 4-6-040 and City of Renton Standard Details. No side sewers
allowed under buildings (walls and roof).
5. A conceptual utility plan will be required as part of the land use application for the subject
development.
6. The development is subject to a wastewater system development charge (SDC) fee. SDC fee for sewer
is based on the size of the new domestic water to serve the project. Current fees can be found in the
2025 Development Fees Document on the City’s website. Fees will be charged based on the rate at
the time of construction permit issuance.
• The current sewer SDC fee is $4,025.00 per 1-inch meter.
• A credit for the existing service will be applied if demoed.
• Final determination of applicable fees will be made after the water meter size has been
determined.
• The full fee schedule can be found at:
https://edocs.rentonwa.gov/Documents/DocView.aspx?id=11438465&dbid=0&repo=Cityof
Renton
7. The development may be subject to King County Wastewater Treatment Division capacity
charge. Information about the charge including rates may be found here:
https://kingcounty.gov/en/dept/dnrp/waste-services/wastewater-treatment/sewer-
system-services/capacity-charge/about
Surface Water
1. There is an existing 12-inch concrete stormwater main along the east site of Shattuck Ave S (no
record drawing available).
2. Drainage plans and a drainage report complying with the adopted 2022 Renton Surface Water Design
Manual will be required. Refer to Figure 1.1.2.A – Flow Chart of the 2022 Renton Surface Water Design
Manual (RSWDM) to determine what type of drainage review is required for this site. The site falls
within the Flow Control Duration Standard Matching Forested Site Conditions. The site falls within the
Black River drainage basin and Rolling Hills Creek sub basin.
3. The current Surface Water Standard Plans shall be used in all drainage plan submittals. The current
City of Renton Standard Details are available online in the City of Renton website
https://edocs.rentonwa.gov/Documents/Browse.aspx?id=990403&dbid=0&repo=CityofRenton
4. If the new plus replaced pollution generating impervious surface exceeds 5,000 SF, the applicant will
be required to provide basic water quality treatment. Any proposed detention and/or water quality
vault shall be designed in accordance with the RSWDM that is current at the time of civil construction
permit application. Separate structural plans will be required to be submitted for review and approval
under a separate building permit for the detention and/or water quality vault.
5. Appropriate on-site BMPs satisfying Core Requirement #9 will be required to help mitigate the new
runoff created by this development to the maximum extent feasible. On-site BMPs shall be evaluated
as described in Section C.1.3 of the 2022 RSWDM. A preliminary drainage plan, including the
application of on-site BMPs, shall be included with the land use application, as applicable to the
project. The final drainage plan and drainage report must be submitted with the utility construction
permit application.
6. A geotechnical soils report for the site is required per the 2022 Renton Surface Water Design Manual
Section C.1.3. Information on the water table and soil permeability (measured infiltration rates), with
recommendations of appropriate on-site BMPs per Core Requirement #9 and Appendix C shall be
included in the report. The report should also include information concerning the soils, geology,
drainage patterns and vegetation present shall be presented in order to evaluate the drainage,
erosion control and slope stability for site development of the proposed plat. The applicant must
demonstrate the development will not result in soil erosion and sedimentation, landslide, slippage,
or excess surface water runoff.
7. Erosion control measures to meet the City requirements shall be provided.
8. The development falls within the R-8 zone which has a maximum impervious surface area of 65% per
lot, and maximum building coverage of 50% per lot.
9. The development is subject to a surface water system development charge (SDC) fees. Fees will be
charged based on the rate at the time of construction permit issuance.
• The current SDC fee for townhome is $0.94 per square foot of impervious surface
• A credit will be applied if the existing home is demoed.
• The full fee schedule can be found at:
https://edocs.rentonwa.gov/Documents/DocView.aspx?id=11438465&dbid=0&repo=Cityof
Renton
Transportation
1. Per City code 4-6-060 frontage improvements are required for new construction in excess of
$175,000. The proposed project Shattuck Ave S to the west and private property on all other sides.
• Shattuck Ave S is classified as a Residential Access street. Existing Right-Of-Way (ROW) width
is approximately 36 feet per the King County Assessors Map however the ROW centerline is
offset. To meet the City’s complete street standards for Residential Access streets, minimum
ROW is 60 feet. Per City code 4-6-060, minimum half street improvements shall include a
pavement width of 32 feet (16 feet from centerline),10-foot travel lane, 6-foot parking lane,
a 0.5 foot curb, an 8 foot planting strip, a 5 foot sidewalk, and 0.5 foot of clear space behind
walk, street trees and storm drainage improvements. Dedication of approximately 12 feet is
required pending final survey.
2. Refer to City code 4-4-080 regarding driveway regulations.
• A minimum separation of 5 feet is required between driveway and the property line.
• Maximum driveway slopes shall not exceed 15%. Driveways exceeding 8% shall provide
slotted drains.
• The maximum width of single loaded garage driveway shall not exceed nine feet (9') and
double-loaded garage driveway shall not exceed sixteen feet (16').
3. Undergrounding of all existing utilities is required on all frontages per RMC 4-6-090.
4. Street lighting is required for a project that consists of more than four residential units. See RMC 4-6-
060 for street lighting requirements.
5. Paving and trench restoration within the City of Renton right of way shall comply with the City’s Trench
Restoration and Street Overlay Requirements.
6. The development is subject to transportation impact fees. Fees will be charged based on the rate at
the time of building permit issuance.
• The 2025 transportation impact fee is $6,987.79 per townhome.
• A credit will be applied if the existing house is demoed.
• The full fee schedule can be found at:
https://edocs.rentonwa.gov/Documents/DocView.aspx?id=11438465&dbid=0&repo=Cityof
Renton
General Comments
Dedication of approximately 19' - 24' is anticipated pending surveyDedication of approximately 19' - 24' is anticipated pending surveyDedication of approximately 19' - 24' is anticipated pending survey
1. If frontage improvements are required, all existing and proposed utility lines (i.e. electrical, phone, and
cable services, etc.) along property frontage or within the site must be underground as outlined in
RMC 4-6-090 – UTILITY LINES - UNDERGROUND INSTALLATION. The construction of these franchise
utilities must be inspected and approved by a City of Renton inspector.
2. Adequate separation between utilities as well as other features shall be provided in accordance with
code requirements.
a. 7-ft minimum horizontal and 1-ft vertical separation between storm and other utilities is
required with the exception of water lines which require 10-ft horizontal and 1.5-ft vertical.
b. The stormwater line should be minimum 5 feet away from any other structure or wall or
building.
c. Trench of any utility should not be in the zone of influence of the retaining wall or of the
building.
3. All construction utility permits for utility and street improvements will require separate plan
submittals. All utility plans shall confirm to the Renton Drafting Standards. A licensed Civil Engineer
shall prepare the civil plans. Please visit the Development Engineering Forms page for the most up-
to-date plan submittal requirements:
http://rentonwa.gov/business/default.aspx?id=42473
4. A landscaping plan shall be included with the civil plan submittal. Each plan shall be on separate sheets.
5. Fees quoted in this document reflect the fees applicable in the year 2025 only and will be assessed
based on the fee that is current at the time of the permit application or issuance, as applicable to the
permit type. Please visit www.rentonwa.gov for the current development fee schedule.
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2025\PRE25-000316
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: October 23, 2025
TO: Pre-Application File No. PRE-25-000316
FROM: Ashley Wragge, Assistant Planner
SUBJECT: Behauden Townhomes
1608 Shattuck Ave S, Renton WA 98055 (APN 7222000321)
General: We have completed a preliminary review of the pre-application for the above-
referenced development proposal. The following comments on development and
permitting issues are based on the pre-application submittals made to the City of
Renton by the applicant and the codes in effect on the date of review. The applicant is
cautioned that information contained in this summary may be subject to modification and/or
concurrence by official decision-makers (e.g., Hearing Examiner, Community & Economic
Development Administrator, Public Works Administrator, Planning Director, Development
Services Director, Development Engineering Director, and City Council). Review comments
may also need to be revised based on site planning and other design changes required by
City staff or made by the applicant. The applicant is encouraged to review all applicable
sections of the Renton Municipal Code. The Development Regulations are available online
at https://www.codepublishing.com/WA/Renton.
Project Proposal: The subject property is located at an interior lot between S 15th Ave and S
19th St at 1608 Shattuck Ave S (APN 7222000321). The project site totals 17,400 square feet
(0.40 acres) in area and is currently developed with a single-family home and a detached
garage. The site has a Comprehensive Plan Land Use Designation of Residential Medium
Density (RMD) and is located in the Residential-8 (R-8) zoning district. The applicant is
proposing to demolish the existing single-family residence and detached garage and
construct six (6) townhomes as a middle housing development. The conceptual site plans
include two redevelopment proposals. The first proposal is for six (6) attached two-story
townhomes with three (3) driveways, each driveway is proposed to serve two units. The
second proposal is for two (2) structures, each structure has three (3) attached townhomes
with two (2) driveways each. For each structure, a driveway serves one (1) unit and another
driveway serves two (2) units. The site access from Shattuck Ave S is not proposed to change.
According to City of Renton (COR) Maps, there are no critical areas on site.
Current Use: The project site is currently developed with a 1,360 square foot single-family
home built in 1947 and a 570 square foot detached garage built in 1977.
1. Zoning /Land Use Designation, and Overlays: The subject property is located within the
Residential-8 (R-8) zoning classification and the Residential Medium Density (RMD) land
use designation and the property is partially within the quarter of a mile middle housing
walkshed (lots that partially intersect or partially fall within the walkshed are treated as
Behauden Townhomes
Page 2 of 7
October 23, 2025
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2025\PRE25-000316
entirely within). The quarter of a mile middle housing walkshed allows up to six (6)
dwelling units per lot. Development in the R-8 Zone is intended to create opportunities
for new single-family and middle housing, where there is opportunity to reinvest in
existing single-family residential neighborhoods through infill development or the
development of new residential plats.
2. Development Standards: The project would be subject to RMC 4-2-110F, “Development
Standards for Middle Housing” effective at the time of complete application (noted as
“Middle Housing” standards herein). Middle housing developments shall comply with
the standards applicable to single-family development, pursuant to RMC 4-2-110A,
“Development Standards for Residential Low Density and Medium Density Zones –
Primary Structures.”
Density – For all zones in which middle housing is applicable, lots are allowed up to four
units. Lots located within a quarter of a mile walking distance of a Major Transit Stop are
allowed up to six units. The applicant would be required to demonstrate compliance
with middle housing development standards at the time of formal application.
Minimum Lot Size, Width and Depth – The minimum lot size in the R-8 zone is 5,000 sq.
ft. The minimum lot width is 60 feet for corner lots and 50 feet for interior lots. The
minimum lot depth is 80 feet. Submitted plans would need to show compliance with
the required lot size and dimensional standard with the land use application.
Building Standards – The R-8 standards allow a maximum building coverage of 50% of
the lot area, a maximum impervious coverage of 65%, a maximum of two (2) stories, and
a maximum wall plate height of 24 feet (24’). Roofs with a pitch equal to or greater than
4:12 may project an additional six (6) vertical feet from the maximum wall plate height. If
the height of wall plates on a building are less than the stated maximum the roof may
project higher to account for the difference, yet the combined height of both features
shall not exceed the combined maximums (e.g., if the maximum wall plate height of a
zone is twenty-four feet (24') and the wall plates of a structure are no taller than twenty
feet (20'), the roof may project up to ten feet (10') instead of six feet (6')). Common rooftop
features, such as chimneys, may project an additional four (4) vertical feet from a roof
surface. The proposed building coverage potentially exceeds the maximum building
coverage of 50%, pending a survey of the property. Compliance with the maximum
building and impervious surface coverage and height requirements for the R-8 zone
would be verified at the time of formal building permit application.
Setbacks – Setbacks are the minimum required distance between the building footprint
and the property line. The required minimum setbacks for the R-8 zone are as follows:
Front yard: 20 feet for the primary structure, except when all vehicle access is taken from
an alley, then 15 ft; Rear yard: 25 feet; Side yards: 5 feet; and Secondary Front yard: 15
feet. Corner lots required to have a front yard and a secondary front yard are relieved of
the requirement to have a rear yard; in place of a rear yard setback, the side yard setback
of the zone shall apply. Compliance with the maximum setback requirements for the
proposed residences would be verified at the time of formal building permit
application.
Middle Housing Typologies – a) duplexes; b) triplexes; c) fourplexes; d) stacked flats; e)
townhouses; and f) courtyard apartments.
Behauden Townhomes
Page 3 of 7
October 23, 2025
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2025\PRE25-000316
Maximum Number of Units per Building – A maximum of four (4) attached dwelling units
is allowed per building.
3. Residential Design and Open Space Standards: Middle housing developments shall
comply with the design standards applicable to single-family development, pursuant to
RMC 4-2-115, “Residential Design and Open Space Standards.” Residential design
review and the requirements related to garages, entries, modulation, windows/doors,
scale, bulk, and character, roof forms, eaves, architectural detailing, and materials/color
would be reviewed as part of the Building Permit Review.
In addition, middle housing developments shall comply with the following standards:
Entries – All ground-related dwelling units fronting a street and/or common open space
shall provide a covered porch with a minimum depth of five feet (5'). Dwelling units that
are accessed entirely from an internal common corridor are exempt from this
requirement provided the shared entry features a covered porch with a minimum depth
of five feet (5').
Pedestrian Access – A paved pedestrian connection at least three feet (3') wide is
required between each middle housing building and the sidewalk (or the street if there is
no sidewalk). Driveways may be used to meet this requirement.
No building elevations were provided for review. Application(s) subject to the
Residential Design and Open Space Standards must demonstrate compliance with
the applicable standards at the time of building permit submittal.
4. Landscaping: With the exception of critical areas, all portions of the development area
not covered by structures, required parking, access, circulation or service areas, must
be landscaped with native, drought-resistant vegetative cover. The minimum on-site
landscape width required along street frontages is 10 feet and shall contain trees,
shrubs, and landscaping. Street trees in the ROW planter will also be required.
Landscaping may include hardscape such as decorative paving, rock outcroppings,
fountains, plant containers, etc. Minimum planting strip widths between the curb and
sidewalk are established according to the street development standards of RMC 4-6-
060, Street Standards. Street trees and, at a minimum, groundcover are to be located in
this area when present. Street trees shall be planted in the center of the planting strip
between the curb and the sidewalk at the following intervals; provided, that, where right-
of-way is constrained, irregular intervals and slight increases or decreases may be
permitted or required. Additionally, trees shall be planted in locations that meet required
spacing distances from facilities located in the right-of-way including, but not limited to,
underground utilities, streetlights, utility poles, traffic signs, fire hydrants, and driveways;
such spacing standards are identified in the City’s Approved Tree List. Generally, the
following spacing is required: i. Small-sized maturing trees: thirty feet (30') on center; ii.
Medium-sized maturing trees: forty feet (40') on center; and iii. Large-sized maturing
trees: fifty feet (50') on center. A conceptual landscape plan shall be provided with the
formal land use application as prepared by a registered Landscape Architect or
other certified professional.
5. Significant Tree Retention: When significant trees (greater than 6-inch caliper or 8-
caliper inches for alders and cottonwoods) are proposed to be removed, a tree inventory
and a tree retention plan along with an arborist report, tree retention plan and tree
Behauden Townhomes
Page 4 of 7
October 23, 2025
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2025\PRE25-000316
retention worksheet shall be provided with the formal land use application as defined in
RMC 4-8-120. The tree retention plan must show preservation of at least 30% of
significant trees. Please refer to RMC 4-4-130, Tree Retention and Land Clearing
Regulations for further general and specific tree retention and land clearing
requirements.
In addition to retaining a minimum of 30% of existing significant trees, properties subject
to an active land development permit shall comply with minimum tree credit retention
requirements of a minimum of 30 credits per net acre. Tree credits encourage retention
of existing significant trees with larger trees being worth more tree credits.
TREE SIZE TREE CREDITS
New small species tree 0.25
New medium species tree 1
New large species tree 2
Preserved tree 6 – 9 caliper inches 4
Preserved tree 10 – 12 caliper inches 5
Preserved tree 12 – 15 caliper inches 6
Preserved tree 16 – 18 caliper inches 7
Preserved tree 19 – 21 caliper inches 8
Preserved tree 22 – 24 caliper inches 9
Preserved tree 25 – 28 caliper inches 10
Preserved tree 29 – 32 caliper inches 11
Preserved tree 33 – 36 caliper inches 12
Preserved tree 37 caliper inches and greater 13
Significant trees shall be retained in the following priority order:
Priority One: Landmark trees; significant trees that form a continuous canopy; significant
trees on slopes greater than twenty percent (20%); significant trees adjacent to critical
areas and their associated buffers; significant trees over sixty feet (60') in height or
greater than eighteen inches (18") caliper; and trees that shelter interior trees or trees on
abutting properties from strong winds, which could otherwise allow such sheltered trees
to be blown down if removed.
Priority Two: Healthy tree groupings whose associated undergrowth can be preserved;
other significant native evergreen or deciduous trees; and other significant non-native
trees.
Behauden Townhomes
Page 5 of 7
October 23, 2025
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2025\PRE25-000316
Priority Three: Alders and cottonwoods shall be retained when all other trees have been
evaluated for retention and are not able to be retained unless the alders and/ or
cottonwoods are used as part of an approved enhancement project within a critical area
or its buffer.
The Administrator may require independent review of any land use application that
involves tree removal and land clearing at the City's discretion.
The Administrator may authorize the planting of replacement trees on the site if it can be
demonstrated to the Administrator's satisfaction that replacement requirements in RMC
4-4-130H1e can be met.
Tree retention standards shall be applied to the developable area, as defined in RMC
4-11-040, Definitions D, of a property. A formal tree retention plan and tree retention
worksheet, prepared by an arborist or landscape architect, would be reviewed at the
time of the land use application.
6. Screening: Screening is required for all surfaces-mounted and rooftop utility and
mechanical equipment as per RMC 4-4-095, Screening and Storage Height/Location
Limitations. The proposal should include elevations and details of the methods used for
screening any equipment if applicable. Screening measures should address visual
impact reduction for areas where vehicles or contractor equipment may be stored.
Compliance would be verified during the formal land use review process.
7. Fences/Retaining Walls: If the applicant intends to install any fences or retaining walls
as part of this project, the location must be designated on the landscape plan and
grading plan with top of the wall and bottom of wall elevations. A fence and/or wall detail
should also be included on the plan. A retaining wall that is four (4) feet or taller, as
measured by the vertical distance from the bottom of the footing to the finish grade at the
top of the wall requires a building permit. The maximum height of any fence or retaining
wall is 72-inches subject to further height limitations in setbacks and clear vision areas
noted in RMC 4-4-040. A fence shall not be constructed on top of a retaining wall unless
the total combined height of the retaining wall and the fence does not exceed the allowed
height of a standalone fence.
Retaining walls shall be composed of brick, rock, textured or patterned concrete, or other
masonry product that complements the proposed building and site development. There
shall be a minimum three-foot (3') landscaped setback at the base of retaining walls
abutting public rights-of-way. No fences or retaining walls were shown on the
submitted materials.
8. Access/Driveways/Parking: Middle housing developments shall comply with all
driveway and parking design standards applicable to single-family development,
pursuant to RMC 4-4-080, Parking, Loading and Driveway Regulations.
Along the street frontage, the maximum width of single-loaded garage driveways shall
not exceed nine feet (9'), and the maximum width of double-loaded garage driveways
shall not exceed sixteen feet (16'). Within the property boundary, the driveway may
expand beyond the maximum allowed width; provided, that the maximum driveway angle
is met in conformance with subsection I5 of this Section, and the driveway width does
not exceed forty percent (40%) of the street frontage. There shall be no more than one (1)
Behauden Townhomes
Page 6 of 7
October 23, 2025
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2025\PRE25-000316
driveway for each one hundred sixty-five feet (165') of street frontage serving any one (1)
property or among properties under unified ownership or control.
Middle housing developments are subject to the following parking regulations:
Lots 6,000 sq. ft.
or Less
Lots greater than
6,000 sq. ft.
Lots located within 1/2 mile walking distance of
a Major Transit Stop
A minimum of
1.0 per dwelling
unit.
A minimum of
2.0 per dwelling
unit.
No off-street parking required. Developers that
provide off-street parking spaces, when not
required by this subsection, are eligible for
parking incentives pursuant to Parking Incentives
for Middle Housing Development Located Within
One-Half (1/2) Mile Walking Distance of a Major
Transit Stop.
Parking Incentives for Middle Housing Development Located Within One-Half (1/2) Mile
Walking Distance1 of a Major Transit Stop: Middle housing developments that provide off-
street parking spaces as shown in the following table, when not otherwise required by
this subsection, are eligible for the following parking incentives, provided the increase is
feasible and consistent with the Surface Water Design Manual. For each increase in
number of parking spaces provided, the applicant is eligible for an additional parking
incentive. For example, applicants that provide a minimum of 2.0 parking spaces per
dwelling unit are eligible for the incentives below.
Number of Off-Street Parking Stalls
Provided
Incentives
A minimum of 1.0 per dwelling unit.
10% Increase in Maximum Impervious
Surface Area permitted by the subject
zone, pursuant to RMC 4-2-110A; and
A minimum of 2.0 per dwelling unit.
5% Increase in Maximum Building
Coverage permitted by the subject zone,
pursuant to RMC 4-2-110A.
9. Critical Areas: According to City of Renton (COR) Maps, there are no critical areas on
site. It is the applicant’s responsibility to determine whether any other critical areas
are present on the site prior to formal land use application.
1 The lot’s proximity to a major transit stop, measured by walking distance, shall determine parking
requirements for middle housing and ADUs. The distance is measured through the creation of a
walkshed, which represents the collective spatial area within a defined walking distance from major
transit stops (e.g., one quarter (1/4) mile or one half (1/2) mile). Geospatial tools incorporating major
transit stop locations and mapped pedestrian networks are used to approximate and map the
walkshed boundary. Lots that partially intersect or partially fall within the walkshed shall be treated
as entirely within.
Behauden Townhomes
Page 7 of 7
October 23, 2025
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2025\PRE25-000316
10. Environmental Review: The proposed development is categorically exempt from SEPA
review due to the proposal containing less than nine (9) multifamily residential dwelling
units in accordance with RMC 4-9-070 and WAC 197-11-800.
11. Permit Requirements: A building permit must be obtained to build buildings and
structures. A Construction Permit must be obtained to install utility lines, transportation
improvements and undertake work in City rights-of-ways. Building and Construction
Permits are separate permits. Each modification request is $299.00. A 5% technology fee
added to the total cost of the reviews would also be assessed at the time of the land use
application. All fees are subject to change. Detailed information regarding the land use
permit application submittal requirements can be found on the Short Plat Submittal
Requirements checklist. The City requires electronic plan submittal for all applications.
Please refer to the City’s Electronic File Standards.
12. Impact Fees: In addition to the applicable building and construction fees, impact fees
would be required. Fees change periodically and the fees in effect at the time of building
permit issuance would apply. For informational purposes, the 2025 impact fees are as
follows:
• Fire Impact Fees are currently assessed at:
o $579.41 per dwelling unit for multi-family residential buildings;
• Transportation Impact Fees are currently assessed at $6,987.79 per townhouse;
• Renton School District Impact Fees are currently assessed at:
o $3,268 per dwelling unit for multi-family residential buildings,
o In addition, a 5% administrative fee of the total School District Impact Fee.
• Parks Impact Fees are currently assessed at:
o $2,659.70 per dwelling unit for multi-family building with two units;
o $2,531.21 per dwelling unit for multi-family buildings with three or four units;
o $2,222.84 per dwelling unit for multi-family buildings with five or more units.
A handout listing all of the City’s Development related fees is available for your review at:
https://edocs.rentonwa.gov/Documents/Browse.aspx?id=8217302&dbid=0&repo=City
ofRenton.
13. Next Steps: When the formal application materials are complete, the applicant shall
contact the building department at permittech@rentonwa.gov to submit a building
permit application.
14. Expiration: Building permits expire 18 months from issuance date. Extensions are up to
the discretion of the Building Official. Extensions must be applied for prior to the permit
expiring. It is the applicant’s responsibility to monitor the expiration dates.