BARBARA Y. SHINPOCH June 16, 1983
MAYOR
MEMORANDUM
TO: Bob Bergstrom
Ron Olsen
FROM: Richard Houghton
SUBJECT: Westhiil Tank Site
The School Board ineets June 23, July 14th or August 18th.
We MUST obtain the necessary easements A.S.A.P, for the water line
across the school grounds at Dimmitt.
Also, keep in mind we have to construct the line through the school
grounds before school starts in August.
RCH:pmp
• 0
INVOICE
CITY OF RENTON
Project Typ l.j��oFisr-wm—T. serve r, et<.
App .l wt.. SsTw'3'r i7;Tj$4�'eayrent Ow O.te: tob�)'�'§Ef'—
ul Yr r•�A.
_ _ .Iw Yrt IW M IYM
rY M,w•Ar M,rY, N IY, W IY�
.Y.I.r wor
nY.�..y�nr„r FI. Rr. Yrti Iw r.
xw tM l>.r
300-00
�tiw
III
)1��Wsr ;.T ;My, IrA I�N1
.Wa�a.a.- .Txl .rxr W Y
•arY
WaW
w roa,o oar
waYyw� W �� IAr W
•rr.,M
,YY)a Naa r,YM
w.w.
_ I
wwrr WrWr,
.Y.YIr, o,.• nr1.. wr.r
wr r:rr.
T.wwr• W 1�� —_ IJrY
tt—d rw�r W �Y W rW
•Awe,Y,��.
•rr
.wI r•y.�
W Y
Peru)n
1 �'aYNIPM 1 rvN�FBENi�• .:.�
cw..-
..rru u
w ar 4i1
.).....rl. ...
TOTAL AMOUNT DUE )00.00
rrs .:IFt'+rc�a1.I-G`r�bt��bc, /Avl.
OF
RFti
` > OFFICE OF THE CITY ATTORNEY• RENTON,WASHINGTON
.OSr O..iR•O•ii! I00 9 YM fr43. • RwrOM,w.SwFGiM SWS) )31.3{r3
nFN
09 LAW RENCE I.WARREN, c.,•rrow,i• r^t
q DAN :G, •sss*wr orr ora•rs.
yy �P DAVi. .N..DEAN,
DEAN, sssrwi o*r•)rpr<r
1TS0 SEPSE MARK E.BARBER. •sa3.wr orr•nowt.
ZANET,A L.rONTES, •sstrwr orr urp•r2r
September 12, 1984 MARTHAA FRENCH,•smtrw• orr•not t.
TO: Ron Olser, Utilities Engineer
FROM: Lawrence J. Warren, City Attorney
RE: West Hill Reservoir Bid by Relio'31e Steel Fabricators
Dear Ron:
I have reviewed the ' d document. That document as presented
to me consists of tt City's bid proposal and specifications
contained within the plastic circular binder as well as certain
papers attached down in the lefthand si-le of the interior cover.
Those papers consist of Addendum 1 and 2, the bid bond and a
sketch.
Th- only item that might be considered irregular is the inclusion
of the sketch. The sketch does not indicate that it is an
alternative to the specificarions to the bid, does not indicate
that it conditions the bid in any fashion, and as far as I can
tell, may be an inadvertent enclosure. Since the bid is not
conditioned on the sketch, nor is there any indication that it
is an alternative bid, I view it as surplusage to the bid and
not to be considerei.
That being the case, the bid appears to be responsive.
My review is limited to the sole issue of whether or not extra
documents submitted with the bid`invalii ate the bid in
any fashion.
"o••""`a Warren- ran
LJW:nd
Encl.
cc: Mavor
N95CZZis Li'6iY965s SL'�'ttSf Ol'Cil'9m I9'EWWA LI01
7"996'CK E1'2II'ZK G'Qle'o1S 01'6(6[4 ll'9Et'AS (1OL1 OIL Sm
W'ou a[s W'LO14K% 96'tot, W'KO'66K wim'WSS 'Wyk i6
W 0999 wpm W'Slts W SILS woo 00'0991 W'OE91 VMS$ OYWC% W ON'% ifs dffl nw LW WOW NLLAOUL '21
WWE'9n W'Xivs GTOW&S 0700,•6ZS CLTOLV n W'OLt'LZC W'000'929 W"ODD'921 0 OW CES MWO'OES MS dffl W LUB 'ii
oo*ov9Es W'mcws ovocu s W'OWfff W'ols'LEs W'm9'[Cs W'Q9'ITS W'OW'M W'WOSES W"Im'SO WE dffl JGjW R[I�NIMSNM�N 'm
W":In (1O(SS'In UTWE'tls W[ff'fif Wrav'ls W'WvIs WW1'in woev in Nowfilf 1 OUV611 "dcl QM D113W'WIdd7AW '6
W'006Mg W'oD5'Us oOOAW WIN'M W'WI'IK W OOVIK W'WOK W'WWOrf W"WD'SK W'OM'SK M6 an S9 IK1 '9
ffW1'SIES W'O91'StCs W OM'Kn W'OW'6Cn fff0IS'SSn W'ol9'S9n W'OW aU OD'Wft=W'WD'SM 00r%WSEn 1f6 ddll 3NAGL~9 6IQ163S31 Tills "[
W'mi'% Q'Ils 1f0 IN'99 01'Zls Q''Ea'% 22'111 W'62OSS D['D[s WWI% Orbs 'W"0S W1 IOGd 3131Om 1-dld)( '9
(rGW9[f W'o91s arawso W'9L11 W'OK•L% %'lets ID'W9,sLs ?.lists OOQH'9Lf 9OW1S "OA"W W1 wuaww uxam 's
W'0E'9C 01'91S orom'% 0rm$ DD'WS'91 91'1Is W"WY91 O.91S OT(5Ces W'IL$ hm 005 TILWA VdU3klf 9 SM '1
(Uobi'n L'S'lls W SA'ZS 00'61% SCEW'n will W'SZI'n W'LIS OVISr2s OS'[Is IOl set 'E16YlD 04 JOW all m 'C
W(Fil'm W'U61'S1s OYOW'OA WW'OA l0'W1'9K W'WI'9K WWs'9K W"ui'9K mrwm W"WENA ME dill dV&�9M)ll�LNS Z
WOOL'OIS W'ODL'0IS W'oW'WS W'W6^9ES 0D'OVIIS_W'D0D_IIS W'oOC11% W'00L'ZIS IVWOSIS W'OOO 51% M6 dol_^_1OiI17I'119CAMMOIAZlll®1 '1 •
IMOM DIW LIM1 1M W DIN IIMl MOM DIN LIMt MUM 301M IIM 1MW 331M LIME LIMI ALIAWV IOI1dIK630 KILL "I
MLI s MIN 03110 SIIDAIMI -mm RM 9 1W1 A9LLM IM TIN11311 3LMOL53 S'Y3d117Q
lVIiv7 LI OLD
60('Ot L'301M Kuhn 'M'd OE Z- M l 'S O&OL 3S
MIOYL63U"0'M 1'I TliM Iidl R,-wm 1C Lin :a i fm
September 12, 1484
S109b.19 (10/38)
CITY OF RENTON
200 Mill Avenue South
Renton, WA 98055
Attention: Mr. Bob Bergstrom, P.E.
ingineering Supervisor
Subject: West Hill Reservoir
Recommendation of Award of Contract
Dear Bob:
We tave completed our review of the bid proposals for the City of Renton
Water project No. W-489, West Hill Resevoir, and we recommend that the
Contract be awarded to Reliable Steel Fabricators, Inc., the low bidder on
ttic Project. The legal documents submitted with Reliable's bid have been
reviewed and appear to be in order, However, we suggest that the City
Attorney review the bid proposal before the award is made.
Very truly yours,
RH2 ENGINEERING.
P.S.
� /'/y��I
icharoarpert
CC: Mr, Ron Olsen
Attachment - Bid Tab
1410 Market Street,P.O.Box 1180,Kirkland,Washington 82033(208)827-64W
OF RE
PUBLIC WORKS DEPARTMENT
r1FSiGN/UTILITY ENGINEERING S 235-2E31
n g MUNICIPAL BUILDING 200 MILL AVE.f9. RENT001,111ASK MIOBS
e
rep BEotP
BARBARA Y. SHINPOCH
MAYOR
MEMORANDUM
Date: September 12, 1984
To: Larr Warren, City Attorney
From: Ron Olsen, Ut,lity Engineering
Re: 1.4 Million Gallon Vest Hill
Reservoir Bid Prupotal
Attached herwith is the original bid proposal for the construction
of the West Hill Reservoir by Reliable Steel Factricators. Maltby
Tank 6 Barge Co., the second lowest bidder, is making the assumption
that Reliable Steel took exception to the tank as designed In their
bid. RH2 Engineering has rev ved the ducueents and has determined
that no exception to the bid was taken by Reliable Steel Fabricators'
bid.
The City, therefore, feels the bld proposal was made on the design
as called for in the bid proposal as required.
Would you please review this document and give us your opinion as to
whether exception as to the tank was taken as represented in their
bid.
:jft
Attachment
0 September 13, 1984 •
The Honorable Mayor Barbara Shinpoch E
Members of the City Council
City of Renton
200 Mill Avenue South
Renton, Washington 96055
Subject: City of Renton
Ref. 38. Proj. /383320501
West Hill 1.4 M.G.Steel Reservoir,
etc.
Dear Mayor Shinpoch E Members of the
City Council:
Enclosed is the Department of Social and Health Services approval letter
for the subject project. On the reverse side of this sheet is the invoice
which details the review and approval fee for this project. Please remit
your complete payment in the form of a check or money order within thirty
(30) days of the date of this letter to:
Department of Social and Health Services
Administrative Support Unit
Mail Stop ET-26
Olympia, Washington 985"
Thank you for your cooperation. If you have any questions or wish to check
our records, please contact w at ( 206) 464-7672.
Sincerely,
Moe R. Ba[ra, E.
Regional Engineer
Water Supply and Waste Section
mrb:bv
Enclosure
cc: Administrative Support Unit
• s
UTILITIES COMMITTEE REPORT
SePtember 17, 1984
WATERMAIN IMPROVEMENTS - W-489 - WEST HILL 1.4 MG RESERVOIR
The Utilities Committee concurs in the recommendation of the Public
Works Department to accept the low bid of Reliance Steel Fabricators
in the amount of $536,713.10.
The Committee also recommends that the Mayor and City Clerk be
authorized to execute the contract documents.
Nancy Mathews, Cha rman
:(achy Keolker, Vice-Chairman
Thoma—s Tr,,.-;, Member
�F RF
� rYT
v i PUBLIC WORKS DEPARTMENT
RICHARD C HDUGHTON • DIRECTOR
MUNICIPAL BUILDING 20D MILL AVE.$O. RENTON,WASK 90M
�9b wee 206 235.2569
�>ED sevYE
BARBAR.A Y. SHINPOCH
MAYOR
September 13, 1984
Nancy Mathews, Chairman and
Members of the Utilities Committee
Subject: V-489, West Mill 1.4 MG Reservoir
Dear Committee Members:
The bid opening for the subject water project was held on September 5,
1984. Attached herewith is the bid tabulation and a copy of RH-2 Engi-
neering's recd ..ndat7on to the department.
It is the recommendation of the Public Works Department that the Iow
bid submitted by Reliance Steel Fabricat n s in the amount of $536,713.10,
incl Wing tax, be accepted and the contract for the subject nroject be
awarded to said contractor.
This project is budgeted in the 1983 Water and Sewer Construction
Fund which has been carried forward in 1984.
The Engineer's original estimate T this project was $424,000 (1980).
The estimate at the time of this „id was $568,243.67.
Very truly yours,
Houu
a chard C. ghton
Public Works Director
RLO:jft
Attachments
UTILITIES COMMITTEE REPORT
September 17, 1964
WATERMAIN IMPROVEMENTS - W-489 - WEST MILL 1.4 MD RESERVOIR
The Utilities Committee concurs in the recoa ndation of the Public
Works Department to accept the low bid of Reliance Steel fabricators
in the amount of $536,713.10.
The Committee also recommends that the Mayor and City Clerk be
authorized to execute the contract documents.
Nancy Mathews, Chairmen
Kathy Keolker, Vice-Chairman
Thpmas1rrmm, Member
e ►" rw r�''-a V
'fRlrt ENGINEERING, P.S MINA
60 1 8 1961
MICE 1; 2606
I AWUST 31. 1�
pENtON 51098.19
200 Nlll AYC98�5
RENT ON,
NA 14
CO14
3
UNCt10N MltH SERV10Es
1♦U6UST 31• 1984 0.ESERVOIR:
FOR ENGINEERING SERVICES THR OFT11E NEST Hill
DURING DIODIPG AND CONSTRUC110N
S1 s --
_—�--- �ARr of cf�-
310.00
_ —�— - pS62/►R 533.00
PR17iCIPAI 9 00
HOURS ENGINEER 11 @S36/NR 110.00
5 HOURS ENGINEER I OS2010 212.50
13 HOURS SfCRETARI @S251HR 344 1
26 HOURS CNG. If I @S161HR
5.5 HOURS OFFICE ALOE 2,445.50
g.5 HOURS
21.5 2_ Og�07
DIRECT EAPENSES:
12 654.57
TOTAf DUE THIS 1NYOICE
I C"WTR NTH CER11i1C
\LOOC\MY'f'.lV�l.„OV���Oi~1.0 EP\I•t •O
• tl
5
City of Renton Engineering Department
235-2631 .
PRECONSTRUCTION CONFERENCE
DATE: Thursday, November 1, 1984
TIME: 10:00 a.m.
PLACE: 4th Floor Conference Room.
DEVELOPER / CONTRACTOR OR SUBCONTRACTOR / NAME OF PROJECT
ham: Reliable Steel Fabricators, Olympia
Phone: Bart Olson_352-7575 b 824-1772
Project: West Hill Reservoir 1.4 M.G.
Proj. 0: _ W-489
NAME OF APPOINTED INSPECTOR
Dan Ervin, RH2 Engineering, 453-0241
Please check departments to be notified and specify person to attend.
x Engineering Dept.
x Fire Dept.
x Police Dept. _
x Street Dept.
x Traffic Dept.
x utilities Dept.
x Water Shop
x Other Bob Bergstrom.
Additional outside departments you may wish to notify.
x Renton School District, Mr. Belmondo, 235-2340
x Pacific N.W. Bell Company
x Water District e14, Tan Earwood, 772-I5BO
x Seattle City Light, Dennis Ouvries, 625-3076
x Washington Natural Gas Company
x Other Kinq county inspection 244-0770
x Fire District $20, 772-1430
SURFACE WA'if}2 MAl1Pa-MF2df DMSICN Srste 'Axt�r:
REEMPON/m"TwION FxrL _ _ _
INFC�'ATZCN grcc'�' _ _ _ _ _
Project Mirtmer:
D9
(no VVr MtTTF I`. THIS RIlJm
Plat Naze/51nrt Plat k
Street Address
Section _ Townshsp _ Range Drainage T,.i...in _
Area Served (A.�)• No. of Lets kTamndated `
Class of Fe, Ihty: Retention _ r)etet.tim Infiltration
Type of Facility: Conveyance Only _ POrd _ pipe _ 7V* Infiltration
Facility Characteristics:
Surface Area (sq. ft.)
volctae (cu. ft.)
(storaoe rccnnred/pnpviAed)
Release Rate (cfa)
LeMth (ft.) _
Width (ft.)
nepth (ft.)
Diameter (in.)
1L'cber of Mi or (M
Ienoth of Fence (LF) _
Filter rag (No.) _
Surface Area of Access Road (ft.2)
Rode Riprap (e . yd.) '—
Clnteyance Characteristics:
Type: _ stream _ Ditch __Pipe '"le v Cmbination
Surface Area of Fasemt!'IYact (m. --.)
Length (ft.)
Pottom width or diameter (in.) _
M,aiber of W or C R
Rode Riprap (cu. ye..) _ —
value of Facility:
Land Iprovenents S Total 5-
Sided by:
(Engineer)
Date:
miless facility only has a mnveyance syster
2/25/81
-
■
king County Fseavrhe
flam1, Wh tilt
UePmrunent of Public Works
November 14, 1994 ex"uxf r haHlr Ix..,-„" NOV
1 5 l004
P,H2 Engineering
1410 Market Street
Post Office Box 1180
Kirkland, HA 98033
Re: Notice of Surface Water Management Division Review of C84-6348 - City of
Renton
The Surface Water Management Division (SWM) has revi :wed the drainage portions of
this app;ication.
The application is inadequate incomplete as follows:
1. Prior to approval, the enclosed Retention/Detention Information Sheet must be
completed and returned to SUM with the plans and calculations.
2. Address all comments marked in red.
3. Prior to approval the enclosed Bond Quantities information Sheet must be
completed and returned '.;o SUM.
4. Per King County Code 20.50.100 Section 0, the person required to construct the
facility pursuant to Section 20.50.050 shall maintain a liability policy in the
amount of one hundred thousand dollars (E100,000.00) per individual, three
hundred thousand dollars (MO,000.0(l) per occurrence and fifty thousand
dollars (b50,000.00) property damage, which shall name King county as an
additional insured, and which shall protect King County from any liability up
to those amounts for any accident, negligence, failure of the facility, or any
other liability whatsoever, relating to the construction or maintenance of the
facility. Proof of said liability policy shall be provided to the Development
rrspection Section, 155 Monroe Avenue ME, Renton, WA 98055 (206-255-2531, or
Operator-isslsted, toll-free ZENITH 5050) prior to setting up a preconstruction
meeting, provided, that in the case of facilities assumed by King County for
maintenance ,ursuant to Section 20.50.110, said liability policy shall be
terminaLed when said county maintenance responsibility commences. (this
paragraph must be shown on the storm drainage plan.)
S. We do not allow a 12-inch pipe to he used as detention pipe. This pipe
(12-inch) is considered as conveyance pipe only.
6. Address the effects of the overflow and the drain pipes to the downstream
system,
Soo KNara,aam Mnw,rnnm aua,M Soo YwuM1A A„niur Ga1Je 11 iJxry{,q�yKi r+ i1ro�.u..L;1'
� r
RH2 Engineering
November 14, 1984
Page 2
T. Provide a downstream analysis for a minimum distance of 1/4 mile from the point
of release of each flow discharged from the site. This analysis must address
any existing problems with flooding, capacity, overtopping, scouring, slough-
inn, erosion, or sedimentation of any drainage facility, whether natural or
mauxude. Probable impacts due to construction of the project most also be
addressed with respect to these same concerns. Where this analysis reveals
more restrictive conditions, more stringent drainage controls may be required
than would otherwise he necessary for a project of this type. These controls
may include additional onsite rate andlor volume controls, offsite improve-
ments, or some combination of both. Any offsite improvements will require the
approval of all affected property owners.
You may pick up copies of your marked plans from SWM, Room 976, King County
Administration Building, (344-3874). Please bring these marked plans with you to
,ny subsequent meeting with SWM staff.
Within 21 days of the date of this letter:
1. All necessary corrections must be completed.
2. An approval meeting must be held with the reviewing engineer to review your
corrections.
[f�o_u�ca�nn_o�t meet the 21 da�dea�dline, an a_lterrate date must be arranged with toe
rev a—i wf"n en Tneer wfEFTdha s oI A a�of tFfss ot�-ra ure o mee
applicable deadline3 will result n deactivation of this app ication. This moans
that you may resubmit the application to SWM only after you pay the fees required
for reviews already conducted. Then SWM will begin the review process again.
In order to schedule your meeting and/or ask any questions relating to this review,
please call Desiree C. Lazaro at 344-3874 between the hours of 1:00 and 4:00 p.m.,
week(, ys.
Under ,.he provisions of King County Ordinance No. 6602, applicants will be charged a
fee for SWM review (see enclosures). Final approval/recording of your permit will
take place when all fees are paid.
The fee charges which have ac cu ulated on this permit TO DATE are: Engineer Review
2.0/hrs. at $t(26.On per hour - 2.00; plus Basic Fee rFTW00; total of $492.00.
,FO I RMAT N 0 Y -- NOT PAY AT THIS TIME.
WIISEY A. TON
;1evelop. n Review Section
Surface t r Management Division
WAH/DCt:mw
Enclosures
cc: OIS - Renton City of Renton
200 Mill Avenue South
Renton, WA 98055
4� �ntlineeri�nq C�
January 3, 19R5
51098.1R (10l611
Mr. Bart Olson tjAN 7 IM
RFLIARLF sTFFL FARRICATARS, (Hr.
P.O. Box 4
Olympia, Washiogton gR507
Subject: Submittals for the City of Renton
I,4 W, Weft Hill Reservoir
Dear Mr. nlson:
The review of the submittals for the West Will 1.4 MG Reservoir have been
completed and the reviewed shop drawings are attached to this letter for
your use. The shop drawings and submittal literature are approved as noted
in this letter and as detailed on the reviewed plans, Please note as
indicated on the review stamr that "corrections or, comments made on the
shop drawings during this review do not relieve the contractor from
compliance with requirements of the drawings and specifications". We have
noticed that submittals for some items required in the design pians and
specifications have not been included in this submittal . These items
include all fabricated and "huy out" items specified under the following
sections: Landscaping and Fencing, Concrete, Mechanical, Electrical, and
Telemetry. We will process these additional submittals As soon as they are
received by our office.
The corrections and modifications to the submittal drawings are oatlined by
Sheet, as follows:
Sheet 1 of 9-
Contractor to provide exterior painter's T-Rail ,
' Design and construction shall comply with AWWA nlnn 79 APPfNniX A as
well as C.
' The top plate dimensions for the ANCHOR CHAIR shall he q" x 1" x V.
' A steel course with thickness .9R72" is clarified.
sheet 2 of q:
No Ca.ment
Sheet 3 of 9 (Original Submittal):
A 12" Ductile iron Transition Coupling shall be used at the bottom
overflow pipe connection,
1410 Market Street,P.O.Box 1180,Kirkland,Washington 98033(206)827.0400
RELIARLF STEFL •
January i 1985
Page 2
Sheet 3 of 9 (Revised):
The revisions are not acceptable, Rosen on onr evaluation Of the
o
drawings the Il" steel overflow pupa would require ffold welding to
fabricate. The field welding would damage the interior coating of
the pipe which could not be repaired (See AWNA C203). Given that the
interior of the pipe will he in an aggressive environment (exposure
to high humidity and air) thiS cnnftguratir,n 15 disallowed. The
original un revisM sheet 3 of 9, which details a flanged connection
ductile iron overflow pipe, is arteptaAie.
' A flange is required nn the inlet/outlet.
Sheet A of 9�
1/4" deep welds are required or, the exterior ladder.
Brackets for the exterior ladder shall be as shown on detail 26 of
sheet 11 On the design, plans.
Anode port weld shall be all the way around.
Sheet 5 of 9:
Stiffner plate is required between the stairs and tank at tank wall
thickness less than 0.3794'.
A submittal for a detail of the stair stringer support connection to
the tank is requi-ed. Submit to both RH2 Engineering and Monte
Clark of RATTI-FOSSATTi A ASSOr,IATFS (1,411 Fourth Ave. Rldg„ Suite
720, Seattle, MA 981n1)
Sheet 5 of q;
3/4" bolts shall be used rather than 5/R" bolts in the tank
platform.
The manhole tube on the roof shall extend down to the red line to
allow access t0 the lighting fixture.
Sheet 7 of q;
' NO Comment
Sheet R of 0.
' NO Comment
Sheet 9 of 9.
No romment
Sheet of proposed changes in the foundation piping (submitted by Ralph
Co,);
A flange is required on the 12" inlet/outlet.
Any damage to the coating both interior and exterior by field
welding or otherwise shall he reccated. We anticipate that the pipe
RELIABLE STEEL
January % 19R5
Page 3
,ha'.1 be cmpletP-1,y fabricated Prior to coating in accordance with
AWA Cm3, unless affected area is raailly accessihle to recoating
and ingplction.
The 5-112 sack design nix iuw t*M by Stnnoway roncreto (f'c • 10i10 os, at
PR daysl is approved.
If you hdY! any gUlSCIOns regarding these pro,j ltt submittals,LLals, d0 not
hesitate to call,
Sincerely,
R112 EMIREERIrM6r. P.S.
-'D
C 8n Ervin
Staff Fngineer
Attachments
CC: A�r. Ron Olsen - City of Renton
Mr. Monte Clark - Ratti-Fossatti and Associates
E�esing
January 14, 19R5
51078,19 (10/70)
Nr. Ron Olsen
CITY OF RENTON
200 Mill Avenue S.
Renton, NA 08055
Or. Ronald Ringwood Mr. flan Teegarden
Arts OF RENTON
Arts Commission
CITY OF RAvenu CITY OF RENTON
Renton.
on.Hil Avenue S. 200 Mill Avenue S.
Renton, NA 9$055 Renton, NA 98055
Or, Nat Xloes Mr, Rill Pelmondo
RENTON DISTRICT RENTON SCHOOL. DISTRICT
Rentoonin s.S. 235 Main S.
Renn, NA 98f Renton, NA 9R055
SuhJect: paint Selection for Nest Hill Reservoir
Dear Graphics Cemmitt" Members:
The final selection for the specific Color to be used 31, the exterior of
the West Hill Reservoir is ready to be made. 1 am proposing a meeting of
the Graphics Committee on Monday. January 2P, 1985, at 10:30 a,m., at the
City of Renton Administration Building, 4th floor conference roan,
The Nest Hill Reservoir contractor, Reliable Steel, has proposed to use the
°TNEMEC" painting system as specified in the design specifications.
Previously, you had decided that a light blue/gray color would be most
appropriate for the Reservoir exterior.
The color selection guide contains several light blue/9-ay colors. I
believe this meeting is necessary to make the best selection, Please
""tact me if you have a proolem attending a meeting at this time and date.
Sincerely,
RH2 ENGINEERING, P.S.
Richard H. Harbert, P.F.
Project Engineer
1410 Market Street,P.O.Bor.1180..,ukiand,Wasrington 880.3 �206)8278400
*MEMORANDUM
i0Ser.. , E '
FROM
SUBJECT
74
w.11 4f / f✓,�d ()w 74 (... -W Hill �u•�.�,.;
L[ A447
; Py
January 24, 1985 Eng�r�eering
S1098.19 (8/22)
RELIABL' STEEL FABRICATORS
121E West Bay Drive
P.O. Box 9
Olympia, WA 98507
Attention: Mr, Bart Olson
Subject: West Hill Reservoir
Surface Water Control
Dear Bart:
Shirley Jurgensen of King County Surface Water Management has requested
that we perform the following work at the Rentoi west Hill Reservoir site
as a precaution against soil movement and contaminated off-site runoff:
1. Extend the filter fabric fence to the west as far as necessary to
intercept any soil movement or runoff that may occur from our
stockpiled material .
2. Place a 2-inch layer of mulch on the western slopes of the
stockpiled material to the west of the excavation.
Please respond to these requests as quickly as possible. If you have
questions, please call .
Sincerely,
``RR\M2 ENGINEERING, P.S.
LJ(tw, AL ,v
Dan Ervin -"4-
Project Fngineer
cc: City of Renton
W. Ron Olsen
Ralph Company
Mr, Dewey Rollins
1410 Market Street,P.O.Box 1180.Kirkland,Washington 98033(206)827-6400
• • • RtR1 NUMBFRCR Ne 35633
PACIFIC, TB%TIY LAS®IIATAIIIBS
\Nbr![weOa.aaTaT�eN F114CYT�Vt of�ttE Rp00eMwa_wru'[p�
����rn ,Y]p 1.T N♦V[NSF wEfT 1]D6 3f]p5{y rpp\y_y/N(w
WT\pW R1tW fF.1111.1TfSN MOTOw pp f• e1'e{:]011ple
e01.�7
ca PNESSMIMONUMn
aooRtEe Ohl. wx -—
♦R wtw --
r«atcT ENalIMA R N 2 ra161 M MS kS
.wsitR o(k. -4 A a"° - ooNTR.croR .tal�
we Bat Ma MR4 MMf T awx eroaN AT
T
2 st.Z.-I _ a
-1
G_ _ L
fRoroR*�awpu.p//E,w�vtiw Q[.Q.Ma Ow.t`. — QKBrQr. ----
ngr4Tprgr
taMleq YMxollwF[rawrR�--• .� .`.._ Bi Y1dM��11A181f J�' _
Err.]e.wt Dote uo we.� -_ JFS
rouR[ocarroue]oxe _$tXR9 7}Mtw t�T'.Nrolsnae1 B,�e, [e/rie�. ,5i`p/,q�„ -
'L-i7 a� G' 14usb f e�l?c 7H
mi.pMrrwo.f4O rN M aM wN1w aw ae ppb rr amr r ow..pe rob arww.++e.wwtnwepa e+.sn r a.["ae[oba camas..w
IIS[fOyYMNd/tM\r�f.�FwP'Yb lV{WYaOliwr�R'.M.wa'a'T1aCW/�b�a\/Ct/O.Ir(fyep�lpn��'
heftheft Taodr4 LeA.wooff" - - _ ,J C` , ls�`t"•-+�"`-s7'�O- S^ wu
e
F4]G 77nr� -- y
Seca NaIM _ WE (1'NEMF.h N$E$
Rli G Ole c-k' 334,:{p °$'o`�OE oa orf R;a,- .cF ,�No--�-a—MOW
�—
NItRT NlMBERCR N" 35632
Nf a vqus an.No�� SlC6�1
PACIFIC TEST111 LABORATORIES
lfYglyYLV�.lrlb E EECVTIN q f rCEt
~�� Y!K 1 fln.Vf N V(VIIL•:}pL !L}gLL �L�f�
wrpLy lHrrL iF�ltff w�Lni4G rOw H�rL �KWA
Y1�IrOn1�
/��� fR�Yllt1
�1�_ OMTEST K'MK7f Lt?� fL\:_/ /♦
�tNTU N �c�L—(�.p4�• ".,e'°"�J T//�[�j F�an 2-?_-95`,
waw
-- --
f Cl u.btsr etiL ►.til �r.A 12AS*•C[�eL�_ weNrrf p i4 t g/„co --
aanff.cro.FaVoN co
rip—
tdrYt EQ fnEARG.MJ OLR UR OLRM01!! ____
F.M[If�G,,.rl.3�FLLdRL-r?Z�-RSY�M�P....t�-!41/.-_ 3RbOMh - .s[-
adpr c"Aft f11K om
nfdfrULsTuN❑m O1f'LYOsw ❑{EL Mr. []fy _ ❑�yOA— _
om
.fncuu ( —/�����s — fir' Ii�w�iwN�ir/��., �►�Jr] _ _
• LMAT }ML wTn
nM rArrrrn dYr•b NlmrLfl'd M irr.rY ePrre rm ti n� �fAlHf f HYa dwiw4�wH!dfwti MHf dLlf 1f HrMY rin.C7Mi�00
b r aware e.orr+.�rdsa ww.ra ncgwaawrrfrMdLHf�gpL}fPrrrwfHrdy�r�}��R.
Cart""Repo"pT
PmMc TMNng LabwmorW �6E c eprr
b
FEB 2Doffi
C.F• 3JT�JC.J.. OO{1 rCG�TCt T_OM ar n• p
t014 npg5• �__. IOTY
• 4,TkUWERCR N° 35631
.DEVIOUS R" 140c L3S6�
-------------
rAflFil' TB�TI�P I.AR�RAT1)RItlC
�iRef� [iECYR[vE pi1C[a CbilTUCM1OY�I11YfYJY IIA�ITF�Nwy[afii•tM N]C4ff ��
W i1Aq illiYE E!f Ti taLLO`LM t4A.(A
if •lSw�MGTO�ff•q f«l�TaOi�<t
correcstior��n
�ielSS2eL��-Qr.�'� .'�.'a'7?-nNxse owl-it-�9S
Zia_ tlt4lt___ wanes 2H 2 1:«2 ibAMP y
wa.criFll�i.L tS.�` ��3'1.t� r I+ t E,J;tr ---
al�rr cum" wf, .ma
V* OUL13h Ma OM
POP lttwTf,w E apTn
Pu�cars
TMfarrrf•n.�awf aa[raTawf w��SritEE�SwFYt111 � gwft F M
mrm+a arew.r.fnraw.raf.rf. �garMpmmwu*by
iE«E'�Y[lflo
/St� �
:.R CW CM G.rMi r[F ;.._bM1IA[lRw s -1
F® ? 0 -
N�RT NumEFCR N? 35630
►NEv�0uS OR" NO
PACIFIC TEST BORATORIES _
rr�k( I,Is UM IIT-wblwui Is, M2yKOOI'�asWlA
u•rr�. wwsw�wc+Ow n��f p.rurp„p
Y YSWIq
�ht'aw Bujc O.�i- _-- H�0"'�aeL�S4Lt_oa ?-12
ft ----
2.ta •E•••
wt..t, l4G is�2fr.50-._�Miwr�'na�L�-
P,GRCT 8�L4i i�14._L••.'1.Y"' ALLA—'d UQAM— ----- e«o ae, P.L+_Z, RLrAAjA Afe.A(6 —
wcrv.e{.+�st�s_ �Z.1 Wawa ao
R�IOk--k-------
TCW muuaor) a,r[t+rr o,arclft
At
o
Comm CUAM Nl,ft far
*rwoaErin r -.tur .. —.w ,w ----apwnm a..�►
nw,.ounob�.larea PGLLQ.rd TA.Jt FEOIN.�A_jjd�[-__SAS--f.'��__�, IaM,S
�.
A -r-
'�..arwa.e-nwe i,e..��a.b�..,�a.r„era.r/wYbwNyr.,y�,w...v�ti nr.r►�.w��r Yww a.+....�w
�c»siviyebnrw+�swsn.aswaa v'M,orerr +w,a swnrhMr,!'.rwbY1�MMMsi�Me�wlilwM�-
GrtNMA Npor1 by
PK k THting Lmb"O jMGY*. ks —
b
MOIM{ _.OTKA�II�
f® 2 0 can coop-o Ta_ M or '� �awo�rann
e
rMYnOtM' p{p
V/ • CR N4 35096
R
MEyRT NWABERious RFT NO.
PACIFIC TBST/. LABORATORIES
d«awleNpppeeRi.Tp InctA Vt OFFOM
xcaaftMRNq�
sc�rTaa Yes««tGiO«M.TF aAmmulOAaw~
axespa�Nn
np cowlWts"mToma"
N �p RVORrtD�l-�dJiQ�RiwR 1�Z=_81=
Ml[ ------
M _
s?L.Y7 M11I G.a8 SD '1afa1R 1L!- `:'L M' cja"S-
FdlpWOCT ----
.OW Oe GAkt�.Mar C. 6o 124 SIG
„""" aia MsspG N.l frAn asT osrF snos¢RAT
IL W.21 x
TI
non NL r/eJ4 ----K 4f1rt . OE.RN
-----� t Ian"—aReamh —A OC.%y Pti_
uww cac•oa NEsao soNN
>e NP . 5-Ye..c„n pus wr pus. �__._ (7Raarper ° / VL A 4.
narrvwbF T:.o:. —
Y101.Na Ndp�paayNe�Mfdlfr� —.— dA __YO{WTNry `-
.+..c.ad a w
�tE.lb TA..J k _,^--wT�_� ,'�ww�°n_ �/N�,Q _
ooua.00nr;p,d«pTFd '2PA-7zo __-�iS�__.SdfIFR�� 6 jde-c
w e.m+suMasossns p,'e,.�"arorr+ro.tirwrwrw+n.u�aa m.«.vwr«.s w.�snNm,vo- MN Obsesses,
J'��• awp�an..W�.rasw�seNslys�eee�' �t"�
C*n
W Report by
Pacific T�tlng LatiWtlorwitk ww
35 G3d mnRooe m oneR_codws
..._. .--_.�� TOTU _ I
1 ,
1
1
1•
M Law
HHE
ll
� �a use
F = Cm
Mowas
fff dnfffffffe■ff_■ q' ■erorrmlorffr! �
ves as
a as
■e■i■1■lMgpR/nlm
f rfrrr,j��fSO rah 1
i1 ■
� ' Nf!■ ��\■rr■�r ��
n■ ■HYr■n1/!j�
ftw "
_ on.iii n! ■ �
sq\Nfffri rent ff.
M/fez
riifa�_ifie'rifN 're Nei
r ■ 0
� fge
■nNff
1
Reporttf In-Place Denlity Tests
Client `.ITS!
/ --�'.//- 1 �?'k!_�— - Certificate yumbeeF-"t•2_c.czs-
Project �C� ryl��!,i'1'dyL Report Number
Summarized below are results of in-place density tests performed on the above
referenced project.
Test Location Moisture In-Place Max. Dry Dptimm Percent
I Content TDensity Density + Moisture Compaction
-- Percent PCF PCF Content
Reference To Grao: Percent
1370 (AGE /ac�f
sr" VIV ay'
4 74
92 /one
.r ft, ry
r. I
- -�'---�-'may - - -- - --_- ----
Remarks: ty�1BL'.2'fL,ti'llrr° 1i2S�ite�.£ '��+Xrr/ ✓�/,�,a
Note: 'estsL: -._-J_ require t compaction as per specifications.
Tests -- require ._.__; compaction as per specifications.
All tests are perfarnred in accordance with applicacle ASTP standards unless
otherwise noted. /r'
7
est erformed b P Fesults cnected b -n t
• REPORT NUMBER ♦ ,
EVIOUS RP-T NO
PACIFIC TBTI\ LABORATORIES �—
f NGINE E RING CONSUL TAT ION -
."I" CTION E%ECNIVF OEE%:Efi AAO�OLFAPwK rNV EC1rON
MwIEMAt TEET,NG Solo f"Immoo GEOIOLICA,SOFVE IS
9EATTLEwA&,*lIGIONTv" Sort'EST"PINGS
MAILING Z�,,,'f
ADDRESS
'✓ AjC!/f DATE
PERMIT
"WOE.Ayi z_�c.
'v,E�� NUMRER�G l.�
ARCNrTECT
PROJECT /l,z
T1 /e+'VtCr
s�ff./r e
fOC��0N`�•j.`+�'• _B���iNINENAOwEN RO
CONTRACTOR
_. ..—. .I
.4-y""; ,may—i✓.Sliy /GSJ'.s. _ _.._ -
N,/.c,/rc �-. .r,�fcl ✓r,6 Sl��fs /.t=`-�;.v. ✓o� sttl�_--
�illYCir'..eYY� T�/�"u�'F.r✓' GN f4!-' S'l��+efCB c �f7�' __
�r7'n`��-'��� — j fl�r!✓ fs' ��.rf:�c:e'.}`• lr'.,rtr•C v�•/T�N/��/.-'Y
i •P /i"✓/�ti11 O��/,/iY,'�ttr9./ '.' �Yif 1�iFF
.�rf•.Prxr-✓l ��.f-y �. �rVll�... !ar /, -Le..�• .. _. ...
e `� _ .���1 0 .f��l�ex- Soy!/i,•c,//u9�// ?�i�irr
�'z. �i�.IJ.E GleP'.,�. ^ i!vo/�G•�L�-/Fr`�. G;;c2f/"�,�p,,,
.9-�/�'.v�f•.�� «��z� �r.Ff.f,� .isFr//ae .�-/s,7`.•>, ,fy„�':.
!r/sl.Lif ,'P .G./iFs�.,ry,�,✓ ��Si717!'1'FTvre ` - ..
..Thor otrtif,,AUOn atl,Ui 10 1M aCWraCY of IFN refUlp Obta.n•d From the IIE, am tell FM,IOrmtO and'Or OFxervatronf made wrthm dre St'oPe
of the wort n deFrned ato f CerT.frCllron Shall not Ne Construed to
rrprexm �myttwn,aC'xorai al otyle anCe o1 ade^ af+OC4ted wpr%
o'a wanwnV o1 CMS.gn or win L•b,hte of,he Ipepimabon ggmrerr"ts"
Cel Report ,E I / / 1
PRCiI¢Testinestm g ERAoratones
DATE
1° __ NDURS MILE OTNER E%eftffES
CAST CODE ON f6F RT OT AGE %INC AMOUNT
TIME VERIE r(DR
REMAN r5
.•nry,FNNOICE NO _ _ L. J...- iljTAl IEOURS —
- TOTAL
1104 LAW,
AT0Ftfmn
— RiF.ATTIa. Npp+tHf.Tpn, 9b,i0
__ IPpe) p9Y-nB6R
FIELD DENSITY TEST REPORT
WASHINGTON DE115-0-METER METHOD
PRWUT_ Report hoKcate o 2 fK
w _ 4ertificate o,�Sbo
Date_,_ -zx- s
_ Inspector � ;�=�{
Page No.._._���—.
_-tati pn t Mol
_ -�'--_—
R Terence To �,f_ r.` _ y
Reference To Grade s
Densometer Final Readim_-"A!
Q •1�� 20
Rf_ng_Contpnt "G`
Sun of Final ill t" 0 2u i
nsometer—Initi i T
tug t
Yol. of * MatEnal H+ 1 3 E —
^ --
401. 'of Mate�isiM 11
Wt. Net Soil - Lbs G
+ Ma erial
nsity - lb Ft. 14F J
r2Y nsj 4bs/ u It-J
Y1 c3y�4
dlex. Densi�.,Lb3�-ui-Ft.
Y Of 11a><iwun_ttensity (K:� � ppt -
- -
MOISTURE DETERMINATION
Mt_._o qw—P i 1"M"
Wt. of Dry Soil 7•N� -- -_--
r�
Report If in-Place Density Tests
Client
`���// �! - ------ Certificate Numbe boa-u2r
Project YJe'-s<-'.�lJ���a' _ Report humhe
Suxmarired below are results of in.place densit tests P Y Performed on the above
referen;ed project.
Tess Location- _ Moisture In-Place Max. Dr
a — --Content nsit) fiensit Y DPtimum Percent
Percent PCF Y Moistu-e Compaction
Reference To Grade PCt Content
Percent
----------
sy
�.��f �� /�YY i;'r.9 0' �4 1, y6•S,�
- { p'{� 6°•dui
1 _
�• ,�bow .
Pemarks:
,tote: 7estsY42'_ requirejs ( —
ar,�actior as her spec itu n5 atio . -
toropactior, as
All tests are Per specifications.
performed in accordance with applicable ASTM standards unless
of henise noted
Test performed -' — Results Crecsed by:
UlpetlOb(5-
e '�f npRT NUet!!ER
• �EVi0U5RP'T NO/-I- 1"_Z_�7�—a WG'.wEER�NU CONSUkT4n„• F - -�
.wYif• Ow EiCCUbYE OiiKlfi RnO1OGRUHIC iN9kCn ON
4RTFRu• lE8iew0 321617 AMARLLWi►OIIORE Mile eleEla SCh,TEST
MINGS B
elilTtE WaKEWpipi NlN eO.f TFeT ROR�N W
iOEI YICHMYrCB
/lfXl�'� �ivlN�laG/ir� GlL'f
ADDALSw�� REGC
�OORESS aLO /7i/AJ ,T'i�0� �O ' liHi�jjjkk�$$,,,,...
✓ vlx 047E Z TE
nFRMI X�
,t — CERTIi.C1T�
f`; �1 ) _ ��l' ixRaeER yfa7yr(" NuueEl�,Tc2-«,2s
L �'//T 1��'//7i�' f/�✓ CIlO�/ J ARCHITECT
IOG RttoN I•iV�/�S RIRCN. 11G 0 . .T'/�•
J S GNM�IMER rQ_ _CONIPACrps_.�R f/� �v v��s✓Y
di+/.57c..Cii:a IV' N" ,1e,6 S. ��o�G'z,:.r�/ x/ ----
C:=.r�slyCYr.' J oY <fE S C Gfi�H/ir 6tlirG�Io/�i7.Nvi
,e.+�`'.<�ro'�rti•>/rt�,�r/- f:.r�- .�fi. i�+.E'„/�-•e ��rva�a S�r-r/
�.a':^yfyi.' {�� /I7�//�v lf' .��f'.a`.If "!!"aL�l t•f/FBI �/�/
/^� E"4 •1r,=.E v•Cr.r Sy�.C,/!` - f�!!'.P.-sr✓,!� P/r Gco„e;0e14;L Y
„Swr�-6dSf J
/dam ff `F oar! - S '=.Cr .fw;/tEstr �A<Or J r-"
fg/C.,�i . !-l�,F�/'�6sr.•Fr "�'cG,o��J�" 'i`6:C�r.Tz-
wipli, t.on attifts to the KWrKY of the fmil, oEEa.nM ftom the Kt,%, rr: oe�fyrtr��..ttp aild.q ebaaTvp.bns.,Cl,w.Mm In!KOpt
of t>ra wak K denne0 inO.e Gn,of the Nall not Tx Is 1 to to, 'I'n.NPE""4I o' K(`PPWce Of other aEsobalc0 work
o•a wYrMty Of fMHyn Or wCkab.IHy Of the EpipA¢inOP,pwRmMls" .
/ -
'r I�t -A Kttn
CaTestin Laborepowt l i
Pacific Testing Labor-atarls (•l.///. _, i _ _,JORTE J ,'f/
_ HOORe �MILE OTHER fRnENSEe
QQet COOk -- ON�Oii PIT,- firE '-RINp iy0UN1
t y
hYE \FRIE IEO eV _ Y .,ram
NFM4RRc
en:kO fN«INtOKE __— _ TOTaI Hq/R5 TOTAL
• CITY OF RENTON REW iEO MAR 0 5 1985
Eh,at 1 of 1 PUBLIC WORKS DEPARTMENT
_ _ lasso.
Au CHANGE ORDER nrdrr ]
fantasy
Ix Oy,sO.J by lot:.... unuI,« tam. of Sect.w 4-11 of Ur
l� staft"M sptnralo„r fans) toner... no. ,CAG-067-84
El oases. Pmpus.d by [ammo., To: RELIABLE STEEL FABRICATORS
_ P.O. Box 9 _
udem" by: Reliable Steel Fabricators Olympia, WA 985C7 _
Attn: Mr. Bart Olson
wt -'--.'- ul� S side Roue. —
P.danl Aid ft.
Tie1i ._ 'P'Rf31DEuT Pro)«t Title West Hill 1.4 MG Reservoir
Cenaewr gown by sa.aet/' le4e aew:atdl
Rr:
awty-u- .............
�.__
• • • • • . • • DRSCRI"%ON Of NORR • . . . . . . . . . . . . . . . . . . . .
You an omemal to perfov the foilorles dsacrlbed soya upon nnlpt of an app Tired copy of this eMesf order:
Extend contract Completion time by 45 working days due to weather
conditions prohibiting contractor from beginning earthwork.
All nark, est.rlal. and anasur.esnt to be In accordance a1,n the provisions of the Standard specification. and special
Rtertalons for the try. of conaruct ion involved.
ORIGINAL CONTRACT CURRENr CON'rk C ESTIMATED NET CHANGE tSTIMATEO CONTRACT
ANOWT AMOUNT THIS ORDER TOTAL. AFTER CHANGE
I
E 536,713.10 f 536,713.10 d 0.00 s 536 713.10
AGENCY USE AGENCY USE
APfayar" ReOnacNOEg APPROVED:
rulte"All", P.E. �1GIJ' I e
O APP"AI RSCuPchDED p ArnoveD
EISTIIICT STATE-AID
ENGINEER
BY Date:
. • W-4V7
11no teewing
April 17, 1985
S1098.19 (15/101
Mr. Bart Olson, President
RELIABLE STEEL FABRICATORS
:218 West Bay Dri e
P.O. Box 9
Olympia, WA 98507
Subject: City of Renton - West Hill Reservoir
Electrical and Telemetry Submittals
Dear Part:
We recently received and reviewed the second set of submittals for the
electrical and telemetry equipment for the City of Renton's West Hill
Reservoir, This submittal is not complete. Please resubmit and
specifically address the following items:
I. Pressure Gauge
The face plate of the pressure gauge shall indicate from 0 to 140
feet Of water with major graduation every 20 feet and minor
graduations every 1 foot as specified,
2. Interior Flood
The flood light shall he a 1,Ono watt HPS lioht with a diffused
reflector, teflon lens, remote ballast with wet location
construction as required on the plans and specifications.
3. Fluorescent Liyht Shield
The intent of the shield is to reflect. light into the enclosure thus
eliminating direct glare for the maintenance personnel .
4. Light Mounting Details for all Liyhts
Please detail the way you intend to mount the interior flood light,
the exterior reservoir lights, and the inter--or enclosure lights.
5. Obstruction Li9hcs
Obstruction lights will not be required, ds based on FAA review.
1410 Market Street,P.O.Box 1180.Kirkland,Washington 98M(208)827-8400
RELIABLE STEEL FABRICATORS
April 17, 1985
Page 2
If you have any Questions regarding this ^equest, do not hesitate to
contact me.
Sincerely,
RH2 ENGINEERING, P.S.
c�J
Daniel R. Srvin, P.E.
Enclosures:
(6) Submittal
cc: 1&10�ity of Renton
R112 ENGINEERING, 1• LEYVIS®T,mQ�ffiomQVpL
1410 Market Street
P. 0 Box 1!80
KN KLAND.WASMWGTON 98033
a. —
June 5, 1985 a.,"
_ U098.19
. Ron 01sen
TO _CITY OF RERTON NFM Supplemental Ilotice
_ 200 Mill Avenue S.
Renton, MA 98055,_
WE ARE SENDING YOu J[. Aaaaa ho [ UneN wpwok Cora. w_. --�
tha bxuwme aams:
Shot/anrnnes ^ pmft r PMna 0 9ewlptft
Copy of W to cton"oran SpadAoaEI0I0
i CeIES oaa Ro.
r i - o[aca,nxx
FM S4DDlettten4l Notice
,1ESE ARE tRANSNITrED as chakod bm"
For appm,ai L: Am ovW as subm.tW Resubmit_.__
'.X For gyros for app'W'I
You. use Aw'oRotw a4 as now _� bob" __-__oophs for INstribution
El As ngwstad .._ Raturnaa for corrections bob"
�—_CorrecNo pnMa
:j For neien ar-0 comment _ __ _
it FOR NOS DUE_ MME1r8 RETURNED
REMARKS—ROn• ash AFTER LOAN TO US
---A i:.ched-1i_the_propon n !S ecft of he U.eelemw;,Ll Nnti nHi h _
_M t figs the FM that_the Structure has reached its LaxlNute height,
This copy is for veur,files. The fore itself has been sent to thq_FM__
COPY To --.,
SIGNED. Daniel R. Ervin, P.E.
Fa.^I.eIPP•Of Ytl U3ae Np N-PW J'�, ���'�•r' `� ��ri .a
PRopot RiTsco.r 1F1p1'a44OC
DEPARTMENT OF TAANSPORTATI��%
•.OEN..,N'=JM AIW,,1R.•M
Nfim OF ACTUAL CONSTRUCTION F+R ALTERATION
1 CONSTRUCTION
K.OE9Gb^t1(Y etlhF«Y'�T•
2 CONSTRUCTION L.YCATAIN -HE!GHT
a coa5raw.T:a.r wlwTlo
100 feet west of the Intersectioa of ate[: Mil. S.
.a "'°' "`•' -„�V.i and S. 126th Street'
1/4 mile west of the City of Renton, WA
po ndary❑ ❑ corporate bou
, _. -- - - - ----
IRE Intersection of 82nd j
A". S. and S. 126th Street � � (112 Grille)
3 LONSTRUCTION NOTIFICATIONS
♦.. A61 Kt M MTIC4 TO Fl!enl n r aGWaTIIUOlNa4AlOr{(� .'�!!
5„flr •41 Ner vl.(pllll{n y, '
ll 1
* ,!ICpI4TIVLTKM°'Iltl{f1n! � �� r11 NYOOM[O
* "IFTRtKT .. ....,•f{!!MWX!
l WMLINO AND LIGHTING
,,,.w a ! • .w+.f o �
S ANTENNA AEOUIRING FCC LICENSE
H/A N/A N/A N/A
` a PREPARERS CERTIFICATION - --m--
-' Dan Ervi , - RH2 Engineering, P.S. Ron Olsen - City of Renton
1410 Market Street Dept. of Public Works
P.O. Box 1190 200 Mill Avenue S.
a.irkland, WA 9SO33 Rento., WA 98055
(206) 827-6400 (206) 235-T-631
- S TRUE cOMPLE'f OF NV ANOW.EDOE. _
T City Inspector/Englneer 6/5/85
YJ'ICEwrp{n.WMPart i:_!IMFWay,WIM•pn gyulaLMt!:eC Fq Pan lh WneaM'c SKIWn 1rp yFWynKAamoocAc.
3,t9lS.M amarMwt iASU SC I1011 PNTa•naAoanoe+r!yq al!a.0110N v!date the•Mnce.anu•FhaNY:.1*.I?Two•wlanroaRne
IcrunmN wnRT)dnamwmN+35COb^•^al•nidNnw ananpliM)roeMnff2,pNiw sueaeo..+nil orlensf!e pre auMtic Sechan Sp2:A
o1 en Fa9are,Matron AO 01 TNS Be ar aW 06 U s C 1472(AI)
..'Pee r.NT„aSJVeAKMi•nRVT:R rc:vy, PROPONENT'S COPY Part 1A
10*4904 Engineering 0 040 -
August 10, 1985 Qrxk�,
S1098.19 (15/31)
Mr. Bart Otson AUG 2 0 19b='
RELIABLE STEEL FABRICATORS
P.O. Box 9
Olympia, WA 98507
Subject: City of Renton 1.4 MG Reservoir
Cellular One Antenna Mounts
Dear Bart:
This letter responds co your letter of August 9, 1985, wherein you
requested additional information regarding the antenna brackets and coaxial
cable supports for the West Hill Reservoir, The following additional
information is provided for each item noted in your letter:
1. The 4-inch antenna mounting pipe is loaded by its own weight
(approximately 1000 lbs.) and wind loads (approximately 40 psf per
UBC).
2, Enclosed are two copies of an additional detail for the intermediate
coaxial supports.
3. The coaxial cable weighs approximately 1/4 pound per foot. Since
the brackets are spaced 3 feet on centers and can support six
coaxial cables, each bracket must support approximately 4-1/2 pounds
of cable weight.
Our construction drawings require that each bracket be painted both
before and after construction to minimize rusting on the mating
surfaces. In addition, we suggest that the "mating edge" of each
bracket be caulked to eliminate the possiblity of rain water washing
through the mating surface.
We have made a field change to the bracket mounting bait
configuration and intend to use a wider plate with the bolts located
along the horizontal rather than the vertical plane.
When we originally designed the mounting bracket, our approach was
that rain water could not reach the interior of the o'strut bracket.
We will review this in greater detail regarding the use of
galvanized material if that is your request.
1410 Market Street,P.O.Box 1180,Kirkland,Washington 98033(208)827.6400
RELIABLE STEEL • •
August 19. 1995
Page 2
4. Our prior discussions with Cellular One indicated that they would be
responsible for all work that is necessary at the tank, as
determined by the owner, to provide a complete system that does not
adversely affect the life or operation of the tank. Since the City
will not accept the completed tank without the guarantee required in
the contract documents, we request that you outline the requirements
that you will impose cn Cellular One's painting contractor so that
you will guarantee the tank coating. You may transmit these
requirements to Cellular One directly or you may route them through
our office.
As you are aware, the City has processed a 20 working day time extension on
your contract to allow you sutficient time to coordinate with the work of
Cellular One and complete the project. In addii.ion to the time extension,
the City will require the following from you regarding the West Hill
project:
1. A statement that confirms your guarantee of the tank for one year
from the date of acceptance as required by the contract documents
including the work of Cellular One. We anticipate that you will
want to review the coaxial and antenna support designs, and inspect
the completed work before issuing your guarantee. Cellular One has
indicated to us their intent to accept the costs of your work
regarding this matter.
2. A statement confirming that all additional costs incurred by you, as
a result of Cellular One's construction, have been or will be paid
by Cellular One, and that previous arrangements to this effect have
been agreed upon and finalized with Cellular One. The statement
should state that no costs will be assessed against the City as a
result of Cellular One's work.
3. A statement confirming that you will coordinate with Cellular One as
necessary to assure proper completion of the reservoir and final
acceptance of the contract.
Thank you for your cooperation in this matter. Please call if you have
questions or require additional information. We look forward to a rapid
and successful conclusion of this contract,
Sincerely,
/R_H2 E F iNG, n
aniel R. Ervin, P.E. —'
Enclosure: Coaxial Detail
cc: Mr. Ror Olsen, City of Renton
Mr. Bob Bergstrom, City of Renton
Mr, nhil Oxley, Cellular One
M L�+Ns9 nerd . V 7/v1DQ
31/9 772' 4a;
;lvOHd 37/POW :)WI
• � rinno Vh.Y O/_YAOi3
/su
(ssca>K.p r/sr/ca.,M) (rc•S•"'21 Ng J, ` �d bts ' --
ao>orai sBD �c ,..
r
yE•q•q� �ae i)y J•C
sg nsp
xOr'I 7N �>�>O O»•y
bDCOY] �
/t>r l>)vea>:v rc ffe 1/l0 • ii.?.,—;
.ma].vp[�ar••�> . s=cam
s vn_.,>lvs Waal>/p.]Nn> f P
ur.�s+>rs r.Ol stw,o)jar A/`
Lnf R bbnq r3>A'C•DJY (, _ rr�pp lI '!•q
M1 p„p ••,C bP/]l>lr 7.M1l Yn rfi![.� (M1p!• 1Y21��/' in�J
Ld>/YO hsaD c"Pp.,&
f NOKV iP_ rrvo•1lJH• ��
3f•vo ,o.r/n aYlti - ('r,/,C •IPIDs
v r[•-+•A 71w11
�Mt:�Y>I Q]S•N.n>/i lnN rYV
� c
• rcwi
RELIABLE STEEL FABRICATORS, INC.
OLYMPI.A.WASHINGTON 96507.0009
♦c tke
mop q:it c>atp�
Mr. Phil Oxley August 20.1905
Cellular One
PO Box 9159
Seattle, WA 98 1 1 9-42 16
RE: City of Renton Reservoir
Deer Mr. Oxley.
This letter Is in regards to the Installation of the antennas by Cellular One
an the r*ssrvolr which we are constructing for the City of portion. By now
You should have recelved a letter from RH2 Zegineering to Reliable Steel
dated August 19,t985.
As per our conversation Of this date we are demanding that you Immediately
atop all work on the tank.
We ask that you provide Reliable Steel with the guarantees requested in
RH2's letter of August 19, 1985. We further request that you provide us
with a letter confirming that you will authorize al- Costs Incurred by
Reliable Steel in regards to the work you have undertaken on the tank. We
ask that no further work be done on the tank or in other areas that affect
Our performance of our cOntfsct with the City Until these guarantees are
accepted by the Clty of Renton.
Should you t• unable to comply with the above, we request that you remove
all attachments you have made to the lank and return the tank tO Its original
Condition as existed before you commenced your work.
As our contract for this tank has a completion date, including liquidated
damages for late completion, we request that you have these documents
approved by the City and in our hands no later than August 27,1985. This
mCludes en approved drawing indicating adequacy of the attachments.
Sincerely,
Reliable Steel Fabricator
Hart Olson, president
cc: Mr. Ron Olsen, City of Renton
Mr. Bob Bergstrom, City of Renton ✓ C:���"a :.`�
Mr. Dan Ervin, RHz Engineering
AUG 2 1 ISM
STRUCTURAL a PLATE FAERtCATION a SHOP AND FIELD ERECTED TANKS a LARGE 0.0 PIPE --
PLANT LOCATION 121a WEST IsAy DievE
August 22, 1985
G we=
uall U�` L9-j
•e00 Mr. Ron Olsen
139 City of Renton
•me ■ 200 Mill Street
.�i Renton, Washington 98055 AUG 2 T 1985
.mom
Re: Letter of Guarantee
Dear Mr. Olsen:
The purpose of this letter is to formally address the
City of Renton's concerns regarding the additional costs
resulting from Cellular One's construction on the West
Hill Reservoir.
This letter guarantees that Interstate Mobilephone Company
(dba Cellular One) will incur all additional costs as a
result of our installation on the tank. These costs will
include:
• Construction Delay
• Additional Painting Services
• Review 6 Inspection Work by Reliable Steel Staff
We will be working closely with Reliable Steel to ensure
the pro]ect's completion will be swift and satisfactory
to all parties.
Thank you for your cooperation. Please call me at 284-5555
if you have questions.
Sincerely,
.r�
Phil pdey
Engineering Staff
Approved
GeraldJ. Baker, P.E.
Director cf Engineering/Operations
Interstate Mobilephone Company
cc Mr. Bob Bergstrom, City of Renton
Mr. Bart Olson, Reliable Steel
Mr. Dan Ervin, RH2 Engineering
Cellular •
one
•
September 9, 1985
`ea Mr. Ron Olsen
City of Renton
`eau 200 Mill Street
wae� Renton, Washington 95055
w 0aa
,w0
Re: West Hill Reservoir
Dear Mr. Olsen:
After consultation with RH2 engineers regarding the concerns of
Reliable Steel, I would like to follow up my letter dated August 22,
19d5 with the following warranty.
Interstate Mobilephone Company (dba Cellular One) shall be liable
for its attachments and for the tank's coating in their vicinity on
the West Hill Reservoir.
Please contact me if you have any questions. Thank you very much.
Sincerely,
�) n_ 0 1
�
Philip C. Oxle
Engineering Staff
Approved
Gerald J. Baker, P.E.
Director of Engineering?Operations
Interstate Mobilephone Company
PCO:r
cc Mr. Bob Bergstrom, City of Renton
Mr. Bart Olson, Reliable Steel
Mr. Dan Ervin, RH2 Engineering rr��s�rr�� ,—
1 It-L�
SEP 1
xtitk •ti\dd'v'M`�w
in Ea rn�a.r„e 2ik F ..e....
SHrtr.NM 98".`}1i:6 �
1m628y5555
OF NF
PUBLIC WORKS DEPARTMENT
DESIGN/UTILITY ENGINEERING 235-2631
no R MUNICIP, L BUILDING 100 MILL AVE.SO. RENTON.WASN.961055
4
%191le0 SEP fai
8AR9ARA Y. SHINPOCH
MAYOR
Tktober 10, 199S
S:098.19 (1y/42)
K14G COUNTY DEVELOPMENT INSpErT ONS
15s - Monroe Avenue N.F.
Renton, NA 98156-4199
Attention: Mary Lynn
Subject: City of Renton
Nest 1011 1.4 MG Reservoir
Dear Ms. Lynn:
In accordance with your recent discussion with Mr, Dan Ervin of RH2
Engineering on-site at the West Hill Reservoir, this letter confirms that
the City of Renton will accept all responsibility for servicing and
maintaining the on-site Stormwater System upon completion of City
annexation of the site. We expect annexation procedures to be completed by
the beginning of Decemher, 1985.
We understand that Kiry County Surface Water Management has not approved
the on-site improvements, and we accept the System "as is".
Thank you for your crnsideration. Please call if you have questions nr
require additional information.
Very truly yours,
CITY OF RENTON
Ronald L. Olser
Utility//�Englnee-
PM � 94S.-
cc: Tian Ervin
Renton city council
10/14/85 Page two
Consent Agenda continued
Resolution Policy Development Department submitted proposed resolution
Supporting in support of November ballot issue HJR 23 enabling local
RJR 23 - government to finance public improvements through the use Of
Community community redevelopment financing. This program would
Redevelopment allow murfcipalities to finance public improvements through
Financing increased property assessments on those whose property values
increase because of improvements, rather than assessing
each property caner in the community. Refer to Mays and
Means Committee.
West Hitt Public Works/Utilities Department submitted final costs and
Water Reservoir agreement adjustments for West Hill water reservoir, pump
Final Costs Station and water mains, joint use facility with King County
Water District No. 63, constructed in 1983. Final costs
are projected to be S2,098,186.07, plus interim interest,
with net cost to the City and District estimated at
$1.445,124.72 plus interim Interest after grant funding in
the amount of $653,061.35 (City's share is $1,083,845.55).
Refer to Utilities Committee.
Renton Airport Public Works Department submitted CAG-049-85. Renton Airport
Water System Water System Improvements; and requested approval of the
CAG-049-85 project, authorization for final pay estimate in the amount
of $5,293.39, commencement of 30-day lien period, and release
of retained amount of $7,715.32 to contractor, Manfred Duske,
if all required releases have been received. Council concur.
Latecomer's Public Works/Traffic Engineering Department submitted request
Agreement for by John E. Phillips, attorney for Centron, developer f
Traffic Signal Brighton Ridge Apartments located at NE 3rd Street and Edmonds
at NE 3rd Street Avenue, that the City enter into a latecomer's agreement
b Edmonds NE or reimbursement agreement with Centron for construction of
a traffic signal at the aforementioned intersection in the
amour;t of $62,500.00. Refer to Transportation Committee.
MOVED BY REED, SECONDED BY STREDICKE, COUNCIL APPROVE )HE
CONSENT AGENDA AS AMENDED. CARRIED.
Consent Agenda Policy Development Department submitted letter addressed
Item 6.9. to the Washington State Department of Transportation (WSDOT)
1-405 "S" Curve outlining Renton's preliminary position statement on the
Project Position 1-405 "S" curve project. Councilman Stredicke submitted ?
substitute letter which expressed stronger concern, particularly
in regard to displacement of homes, residents and business
by the proposed project. Policy Development Director Larry
Springer welcomed Council Input to the letter, but cautioned
that at this point it would be preferable to raise concerns
rather than suggest specific mitigation measures. It is
anticipated that mitigation measures for Council-s concerns
wii! be included in the Environmental Impact Statement to
be published at a later date. Councilman Stredicke noted
that the suggestion for a stairway for pedestrian access from
the hill as well as other concerns had been expressed by
Renton Kill residents at recent WSDOT open house. Following
discussion, it was MOVED BY STREDICKE, SECONDED BY REED,
COUNCIL REFER BOTH LETTERS BACK TO THE POLICY DEVELOPMENT
DIRECTOR FOR PREPARATION OF A SINGLE LETTER TO BE SIGNED
BY COUNCIL PRESIDENT REED. CARRIED. Councilmembers
expressed desire for use of strongest language of both
letters and inclusion of additional concerns contained in
Policy Development letter.
CORRESPONDENCE Letters were read from Catherine Lavery, 107 Main Avenue S.
City of Renton Apartment N106, Renton; Edna Parrow, P.D. Box 361, Renton;
(Jones Park) and Marget Toorac, P.O. Box 361, Renton, objecting to
SA-061-85 Installation of playground equipment at Jones Park in
Va'la Appeal view of Impending Wells Avenue Bridge replacement project,
alleging danger to children. (Matter of City
of Renton Park Department application for playground
equipment at Jones Park was appealed and referred to
Planning and Development Committee on 10/7/85.)
Engineering
put
October 15, 1985
S1098.19 (15/44)
Mr. Bart Olson
RELIABLE STEEL FABRICATORS rCT .1 -il 1J5
PO BOA 9
Olympia, WA 98507
Subject: City of Renton
West Hill Reservoir
Punch List No. 1
Dear Bart:
This letter will serve as Punch List No. I for the West Hill Reservoir,
1. Label electrical breakers.
2. Provide O b M Manual for transducer.
3. Certify backflow preventer.
4. Replace sprinkler meter with City-aiproved model.
S. Replace pressure gauge face plate with potable water scale.
6. Touch-up chipped paint on north side of tank near manhole.
7. Touch-up caulking on anchor bolts.
8. Re-drill top entrance manhole for padlock.
9. Touch-up damaged coating on ladder rungs at top manhole.
10. Install missing painter's port plugs.
11. Repair damaged top vent screen.
12. Install City's padlocks.
Please call us at your convenience when you have completed the punch list
items to schedule a final inspection of the reservoir.
Sincerely,
RH2 ENGINEERING. P.S.
Dan Ervin
cc: ,R6n Olsen
Jack Crimiley
1410 Market Street,P.O.Box 1180,Kirkland,Washington 9BO33(206)827-6400
• s
E�•li.eerir.y
October 23. 1985
S1098.19 (15/46)
Mr, Ron Olsen
CITY OF RENTON
200 Mill Avenue S.
Renton, MA 98055
Subject: Nest Hill 1.4 MG Reservoir
Notice of Project Completion
Dear Ron:
This letter transmits Final Pay Estimate No. 9 for the West Hill Reservoir, and summarizes project status. 1.4 MG
We completed a final inspection of the project and noted the foll Owing
items of work as incomplete:
1. The City has not received an Operations and Maintenance Manual for
the level transducer.
2. The City has not received certification that the backflow preventer
has been tested and approved in accordance with DSHS requirements.
3. Caulking on the tank anchor bolts has not been completed.
4. Two painters' ports on the top of the tank have not been installed.
5. Damage to the tank vent has not been repaired.
6. Affidavit Of Wages Paid has not been received.
Reliable Steel Fabricators, the contractor for this project, has indicated
that they will complete these punch list items by October 25, 1985. We
recommend that you process Final Pay Estimate No. 9, but hold the check and
the Contractor's retainage until these items are completed, inspected, and
certified as acceptable by our office.
All functional testing of the facility has been completed, and the
Reservoir and its appurtenances are ready fur use.
1410 Market Street,P.O.Eton 1180,Kirkland,Washington OM(206)827-8400
CITY OF RENTON
October 23, 1985
Page 2
Thank you for the opportunity to be involved in this project. The City can
be proud of this facility, and expect many years of trouble-free service.
Please call if you have questions or reg0 re additional information,
Sincerely,
RH2 �*INEERIN6..P.S.
Daniel R. Ervin, P.E.
Enclosure
CC: Reliable Steel Fabricators
For Us* By City Clerk's Office only
AGENDA ITEM p. l I —
RENTON CITY COUNCIL MEETING
SUBMITTING :.............................
Oept./DIv./Bd./Comm. Public Works/Utilities Eng. For Agenda of
Staff Contact Richard Houghton/lion Olsen Neett^R Date --
Wa,e
Agenda Status:
SUBJECT: Final Payment for W-489 Consent
(CAG 067-84) West Hills Reservoir Public Hearing
Correspondence
Ordinance/Resolution
Old Business
Exhibits: (Legal Descr., Maps, Etc.)Attach Mew Business—
A.— Summary Sheet for Final Pay Estimate Study session
Other
B.-
C. —�— Approval:
— -- -COUNCIL ACTION RECOMMFNDED. A rOvdl Of Finance Dept, Yes_ NO, N/A—
project a11Q ft nal Da n _ I�th rt a kn Other Clearance
begin TO day lien period is of OCtaber 8, 1985.
FISCAL IMPACT,
Exnenditure Required $ Amunt S Appropriation-
Budgeted Transfer Required S
Su+sARY (Background Iniormatipn, Prior action and effect of implementation)
(Attach additional pages if necessary.)
The Public Works Department recommends the project and Final Pay Estimate be approved
and that the retainage of $26,633.61 be released after thirty (30) days if all taxes have
Iwen paid and no liens have been filed.
This project completed October 23. 1985, and accepted by the Fublic Works Department
October 24, 1985. It is recommended that the City Council accept Completion of the
contract as of October 28, 1985.
PARIIES OF RECOROi1NTERESTED CITIZENS TO BE CONTACTED:
SUBMIT THIS COPY TO CITY CLERK BY NOON ON THURSDAY WITH DOCUMENTATION.
Renton City Council
11/4/8$ Page two
Correspondence aonti ,ved
Financial requested that the matter be referred to the Council's Ways
Advisory and Means Committee to explore Mr. Mulcah ' proposal r Service (cont) determine the benefits to the City. MOVED BYCLYMER, SECONDED
By HUGHES, COUNCIL REFER THIS CORRESPONDENCE TO WAvS AND MEANS
COMMITTEE. Upon Inquiry, Atministrative Assistant Parness
advised that to his knowledge, no legislation exists which
would prohibit execution of a contract for consulting services
with a former employee. Ways and Means Committee Chairman
Clyme; asked that Mr. Mulcahy be Invited to the next committee
meeting on Mondav, November 11, 1905.
ULD BUSINESS Councilwoman Keoiker asked whether landsoa n requirements
Lincoln Property for Lincoln Property L pi g
Company been met by the pdevel per. development on Renton Hill have
Landscaping - in open. Mayer fencing
Is indicated that
s tallztion of landscaping and fencing is anticipated this
nenton Hill week, followed by inspection by City staff. Keolker indicated
desire for City enforcement of requiremer is promised by City
staff prior to development.
Utilities Utilities Committee Chairman Hughes presented a report
Committee regarding the Heather Downs storm drainage maintenance
Heather Downs agreement proposed by Leonard Builders. The Committee
Storm Drainage concurs in the recommendation of the Public Works
Maintenance Department to accept the storm sewer outfall and easemert
Agreement for continued maintenance in the Plat of Heather Dams fro,
(Referred Leonard Builders (property described as an easement over
10/7/85) the south 80 feet of Lot 6 of Heather Down_ Division No. 2).
MOVED By HUGHES, SECONDED BY KEOLKER, COUNCIL CONCUR IN THE
UTILITIES COMMITTEE REPORT. CARRIED.
Vest Mill Utilities Committee Chairman Hughes presented a report
Water r Sedtem regarding computation of charges to Water District No. 63
(Referfor the West Hill water reservoir, pump station and water
10/14J85) mains, joint use facility with King County Water District
No. 63 constructed in 1963. The Committee concurs in the
recommendation of the Public Works Department to amend
the agreement to clarify the meaning of Item 8(d) of the
contract agreement (CAG 011-83). That section pertains is
computation of charges to Water District No. 63 and shou'.d
be changed to reflect costs for operation and ma inteoance
associated with production and transmission only instead
of the entire operation and maintenance costs. The Committee
further recommended that the Ma oY r and City Clerk be
authorized to sign the amendment MOVED BY HUGHES, SECONDED
BY KEOLKER, COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED.
Bid Award - Utilities Committee Chairman Hughes 1985 [BD Sewer 9 presented a reps n
concurring ;n the recommendation of the public Works
Rehabilitation Department to accept the low bid of King Construction
(Referred Company in the amount of $82,439.22 for the 18
5 COD
11/4/85) Sewer Rehabilitation Program, 5-384, 5-385 andS-366.
Due to budget constraints, only Schedule 'A" will be
awarded. The Committee further recommended that the
Mayor and City Clerk be authorized to execute the contract.
MOVED By HUGHES, SFCONDED BY CLYMER, COUNCIL CONCUR IN THE
COMMIITEE REPORT. CAkRIEC.
Trans ration Transportation Committee (Aviation) Committee Chairman
Aviation Mathews presented a report regarding Faucher Flyways, Inc.
Committee Leaee, LAG-06-76, (west side office area) application for
and cher Flyways, approval of proposal to build hangars. Fancher has
Inc. Letse for submitted a proposed layout for phased construction of
Hangars in three hangar buildings nn their leased office area property
West Side Office located on "le southwest corner of the Renton Airport. The
Area proposal rt,erences negotiations with Cessna Aircraft
LAG 06-76 Company for a Cessna dtalersh;p, The Committee recommends
that Fancher be authorized to proceed with the proposal
subject to following all administrative processes. MOVED
BY MATHEWS, SECONDED By TRIMM, COUNCIL CONCUR IN THE
COMMITTEE REPORT, CARRIED.
s �
n9
December 9, 1985
S1098.11 (11121) DEC 1 1 19$.
CITY OF REMTnN
200 Mill Avenue S
Renton, H>'hingten 9H055
Attention: Mr, Pon nisen
Subject: Hest Hill Pump Station
Notice of Project Completion and Acceptance
Dear Pon:
We have completed our final inspection o.- the Hest Hill Pump Station and
are gneral recommending that this facility be accepted by the City. M. D. Moore.
the general contractor for the Project, has satisfactorily completed all
outstanding punch list items and has compiled with all requirements of the
contract documents.
Thank you for the opportunity to be involved in this project, please call
if You have questions or require additional information.
Sincerely,
RH2 F1IGINEEgIRG, P.S.
Daniel R. Ervin,
cc: Mr, Chris Funk, M.D. Moore Co., Inc.
1410 Market Street,P.O.Box 1180,Kirkland,Waahirigton 980?3(206)827.E
e e
2
Engineering
December 9, 1985
S1098.19 (11/34)
RELIABLE STEEL FABRICATORS
PO Box 9
Olympfa, WA 98504
Attn: Nr. Bart Olson
Subject: .lest Hill Reservoir
Notice of Warranty Work
Dear Bart:
We recently noticed that the asphalt paving at the West Hill Reservoi has
settled in several places and is in need of repair. We suspect that this
condition is a result of rainwater washing the sand backfill in these areas
into the quarry sPalls that were used to stabilize the site last winter.
Since edditional settling may occur, and hecause of the possihlity of
encountering freezing conditions, we prefer that this item of wc-k be
repaired in the Spring.
We are, therefore, waiving the rejuirement in Section B Of your contract
which states, "The contractor shall take immediate steps to correct and
remedy any....defect..." and wish to extend your obligation to perform
until June 1, 198E for this item of work. Please call if you require
additional information or wish to discus, this procedure. Thank you for
your Consideration.
Sincerely,
RH2 crINEERING P.S.
—Dan Ervin
CC: Ron Olsen, City of Renton
Dewey Rollins, Ralph Co.
1a10 Market Street,P.O.Box 1180,Kirkland,Washing tun 98033(206)827.6400
iD WJ
(December 9, 1985
S1098.19 (11/12)
g ink
CITY OF RE NTON DEC
200 Mill A.anue S
Kenton, Washington 9805h
Attention: Mr. Ron Olsen
Subject: West Hill Reservoir
Notice of Project Completion and Acceptance
Gear Ron:
We have completed our final inspection of ,.,e Wpsr Hill Reservoir and are
recommending that this facility be accepted by the City, Reliable Steel
Fabricators, the general contractor for the project, has satisfactorily
completed all outstanding punch list items and has complied with all
requirements of the contract documents.
Thank you for the opportunity to be involved in this project. Please call
If you have questions or require additional information,
Sincerely,
RH2 ENGINEERING, P,Sr
" 0aniel R. Ervin, PF
cc: Mr. Rart Olsen, Reliable Steel Fabricators
1410 Market Street,PO.Box 1180,Kirkland,Washington 98=(206)827-6400
.e ea4
RELIABLE STEEL FABRICATORS, INC. ��
OLYMPI0.WASHiNGTGi�98fi07-0008 Ar Fie:
mo,■-itAsva*to�
December 12, 1985
City of Renton
200 Mill Avenue S.
Renton, Wa 98055
Attn: Mr. Ron Olsen
Re: City of Renton
Rest gill Reservoir
Dear Mr. Olsen:
This is to advise you that ve have received the required
releases from both the Department of Revenue and the
Department of Labor b Industries for the above reterenced
project.
Please initiate release of our retention worries or advise if
something more ib needed.
Sincerely,
RELIABLE STEEL FABRICATORS, INC.
Bart Olson
PresiderL
BU:bf
STRUCTURAL B PLATE FABRICATION a SHOP AND FIELD ERECTED TANKS a URGE O.D.PIPE
PANT LOCATION.1218 WEST BAY DRIVE
Ht N1
RELIABLE STEEL FABRICATORS, INC. s s
sw lw+m
()LVMPIA WASHINGT(N!98507-0009 at Ay
T w K INaAOI
December 18, 1985
r.. - ..
City of Renton
200 Hill Avenue S. G
Renton, WA 98055 DEC axi ism
Attn: Hr. -on Olsen
Re: City of Renton
West Hill Reservoir
Dear Hr. Olseri
Enclosed 1s the copy of "Intent to Pay Prevailing Wages"
for Quality Electric as you have requested.
Sincerely,
RELIABLE STEEL FABRICATORS, INC.
Bart Olson
President
BO:bt
Enc.
cc: Dan Ervin, RH2 Engineering
STRUCTURAL A PLATE FABRICATION a SHOP AND FIE,D ERECTED TANKS a LARGE C.D.PIPE
PLANT LOCATION 1218 WEST BAY DRIVE
KING COMITY DEPARTMENT OF PUBLIC WORKS
SURFACE WATER MANAGEMENT DIVISION
January 28, 1986
RE: C84-6348 _ City of Renton West Hill Reservoir
CONSTRUCTION PUNCH LiST
This is tnerofficial punch list. No changes will be made if corrections are
made within 30 days and/or agreed upon time. If there are major changes in con-
ditions after the list was prepared such as damage to or failure of construction
or facilities being found not to be working according to County standards those
items may be included as added requirements for construction approval, Anv
changes to the punch lis: must be approved by the Manager, Development Inspec-
tion Section, Deviations from this policy should be reported to the Manager at
ZSS-2531.
9— - .,
�,Repatr,ali asphalt failures,
Z.,.grj- t lfting
s lnf. as and around pipe openings and under Irames -n all catch
.a. 5t�
3. Remove 'Property of King County from all grates,
4. Grate .for catch basin No. 4 must have •Dump no Pollutants, Outfall to
Stream• printed on it,
S:' Coeld,4et'Candle line between catch basin No. 1 and control manhole.
Strilyhten"line or,provide proof that the line is clean,
6•. hoyidt ,ladder fqr catch basin No. 3.
47*f all
/e0lido'atld attach Chain from cleanowt gate to frame.
B, <3!tmehang in9laddee.
C.T.1 ava low 1.4•feet or provide proof that we have proper
�91Von.,
1Da;;',7rovlde T-section with correct orifice size:
8. Reshape ditch along 82nd Avenue S. so that the side slope is no steeper
than 2 to 1,
C84-6348 - City of Renton Nest Hill Reservoir
January 28, 1986
Page Two
9. Provide headwalls for culverts or tut ends of pipe to 3 to 1 slope.
ary ty rt s e for
oil
• SPEED LETTER
TO: �.L )[ GATE: ,
_ PROJECT:
SUBJECT: - If.A y .i , (l,i ( \✓r -
C 7 t (2`e
= rtTll
t (�•
eA �.,Z J/< ( I! (f!'J (•f.. PCC L i ./<
f41
� l
IME
En ineerin
9 9
December 9, 1985
S1098,19 (11112)
CITY OF RENTON NOV b
200 Mill Avenue S
Renton, Washington 98055
Attention: Mr. Ron Olsen
Subject; West Hill Reservoir
Notice of project Completion and Acceptancp
Dear Ron;
We have completed our final inspection of the West Mill Reservoir and arc
recommending that this facility be accepted by the City. Reliable Steel
Fabricators, the general contractor for the project, has satisfactorily
complet0 all outstanding punch list items and has complied with all
requirem,.nts of the contract documents.
Thank you for the opportunity to be involved in this project. Please call
if you have questions or require additional inforaaation.
Sincerely,
RH2 ENGINEERING, P.S
L�J
iel R. Ervin, PE
cc: Mr. Bart Olsen, Reliable Steel Fabricators
1410 Market Street,P.O.Box 1180.Kirkland,Washington 98033(206)827-6400
•Renton City Council •
10/28/85 Page three
Consent Agenda continued
Bartell Dr-n, Finance Department submitted request from Bartell Drugs for
Utility Bill increaae in utility bill collection fees from Collection Fee item, Refer to BuAget Committee. 30C to 354 per
Appeal of Appeal filed by virst City Developments Cor ti
First City Examiner recommendation for final lanncd unit adevelop op Nearing
p
Developments File No. FPUD-042-85
Corporation consisting of , for Phase Ilof Victor is Hills p
FPUD•042-85 nt,
196 multifamily units on 16.48 acres cf property
located south of S. Puget Drive, west of Benson Road S. and
(Victoria Hills north of S. 26th Street. Refer to Plenr.l Se PUD - Phase III Coswlttas. - and Develta5mzAt
Renton/Kent Parks/Housing and Community Development Department requested
Rental Rehab additional $45,000 appropriation of Block Grant funds for
Program Renton/Kent Rental Rehab Program HLD/
$130,000 of Rental Rehab Entitlement mon less 2allocatedato l the al
program. Refer to Ways and leans Committee for ordinance,
Proposed Renton- Polity Developwnt Department requested Council authorization
Tukwila Boundary to initiate negotiations with the City of Tukwila regarding
Adjustment proposed boundary line adjustment to straighten borders Of
both cities; adjustmnt wilt readily identify boundaries
for citizens and will significantly improve delivery of public
services and facilities. Council concur and refer to
Plannin and Oevel
_-3— oDment Committee for progress reports and
regular monitoring.
Final Approval - Public Works/Utilities Engineering 'Jepartmlert submitted CAC
West Hill 067-84, West Hill Reservoir; and requested approval of the
Reservoir project, authorization for final
JAG o67-84 of $54,037.21. commencement of 30•dayPAY slien period,
in the amount
Of retained amount of $26.6 67 period, and release
Fabricato. s, If all required 3rol to contrac e , Received Steel
R loses have been received.
Council Concur.
Final A ,ovs) - Public works/Engineering Department submitted CAG 048-85, 1985
1985 Cbu CBO Sewer Trunk; and requested a
Sewer Trunk authorization for final pay estimate vOf $104,147-29. c,
CAG 048-85 of 30-day lien period, and release of retained amount of commencement
$21,146.57 to contractor, Trl-Scats Construction Company,
if all required releases have been received. Council concur.
Railroad Public Yorks/Traffic Engineering Department requested ado
Crossing
Signs of RCW provisions identifying and limiting Installationopftiw
signs adjacent to railroad crossings. Refer to Ways and Means
Committee.
MOVED BY REED, SECONDED BY KtOLmER, COUNCIL ADOPT THE CONSENT
AGENDA AS PRESENTED. CARRIED.
CORRESPONDENCE Letters were read from H. Hayden,
Valea Appeal regarding the Valla appeal f Hearing 5ng Cedar Avenue $rota,
Examiner's approval of
(City of Renton playground equipment att Joneses news
Park. Letters cited recent news
Jones Park} articles regarding new City Par
$A-061-85 Park in Enumclaw, and urged reten In Bellevue andive nature go re
Jones Park, part icular!y in view tion of of children's play equipment
available at Liberty Park within one block. MOVED BY REED,
5LCONDED By MATHEWS. COUNCIL REFER THIS CORRESPONDENCE TV
Pt ANNINC AN- D,iVELOPMENT COMMITTEE.
DLO BUSINESS Public Safety Committee Chairmen Trim pre tented a report
Public Safety recommending that the Board of Public Works establish Committee re ardin Y TRI ,
Curb Paint�n C g painting of house numbers CONC on curbs. MOVED BY TRIMM,9 SECONDED BY $TREDICKE, COUNCIL CONCUR IN THE COMMITTEE REPORT.
CARRIED.
Complaint - Councilman Clymer asked that a complaint he received last
Noise from weekend regarding noise emanating from Jocko's Tavern be
Jocko't Tavern referred to the Administration for review and report back.
The complainant, who in
in an adjacent apartment complex
on
NE 4th Street• west of Union Avenue NE, has contacted the
Police Department, but they report that the noise does not
exceed the limit specified in the City's noise ordinance.
RH2 ENGINEERING, P.S.
P. O. Box 1180
1410 MARKET STREET
KIRKLAND. WASHINGTON 95033
Projects 1098. 19.00 RENTON WEST HILL RES. SER/CON Invoice No, 3644
April 30, 1986
Pape number 1
CITY OF RENTON
200 MILL AVENUE S
RENTON WA 98055
FOR ENGINEERING SERVICES THROUGH APRIL 30, 1986, IN
CONJUNCTION WITH SERVICES DURING CONSTRUCTION ON THE
WEST HILL RESERVOIR.
PROFESSIONAL SER'VICESi
PROJECT ENGINEER E IV Hours Rate Amount
15.00 50.00 730.00
--------- -----------
SERVICES TOTALS 15.00 750.00 750.00
REIMBURSABLE EXPENSESs -----------
----------------------
Amount
Mileage 6.So
Telephone
3.70
-----
REIMBURSABLE TOTALe10.30 10.30
Total Due This Invoices 760.30
Outstanding R/R „`
_-
Document Date Type Asroy�vCHA'IrFR 116' LAWS OF I
2958 4-30-85 Invoice 5.567.11, OF RENTON CERTIFICA
7423 6-13-85 Cash Receipt 5,567,,87- '
2994 5-31-85 Invmce ♦,094.71 '.
7715 6--27-85 Cash Receipt 4,094 ,71'- '"",^•� C'.v 1Q na,3�a,^Me
CIiY Vi R(NfBN 3043 6-30-83 Invoice
2,906#4a4an ro MON
R r�re,us.n„nc css,,,,so w 8249 7-25-85 Cash Receipt 2,906f1�+IQ�'1"['.a..L_>d',.
3092 7-31-85 Invoice
4,348.29
8852 8-30-85 Cash Receipt 4,348.26-
�dT1! f! + 3153 8-31-85 Invnlce 4,049.el
9708 10-21-85 Cash Receipt 4,049.21-
111KIM.`A4ulF. 3215 9-30-85 Invoice 5,394.36
9708 10-21-85 Cash Receipt 5,394.36-
wo. 3 ¢zIY 4zA/pu,/K "vi,4w(w) r XO �L
PAYMENTS RECEIVED AFTER 4-30-86 NOT REFLECTED
•Projects 1098. 19.00 TON HEAT HILL REs. 8ER/C� Invoice No. 3E 44
April 30, 1986
Page number 2
_______________________________— ---,y_
Outstanding A/R
-----
Document Date Type Amount
3280 10-31-85 Invoice 3,265.84
10494 11-87-05 Cash Receipt 3.265.84-
3311 11-30-95 Invoice 2,397. 98
11284 12-26-85 Cash Receipt 2,397.96-
3389 12-31-85 Invoice 2.987.70
11669 1-16--86 Cash Receipt 2,987.70-
343' 1-31-86 Invoice 1, 141.35
13269 2-27-86 Cash Receipt 1, 141.35-
3518 2-28-86 Invoice .710.74
13915 3-27-86 Cash Receipt 310.74-
3577 3-31-86 Invoice 657.50
Total RVCelvabless 657.50 657.50
Total Due This Accounts 1.417.80
PAYMENTS RECEIVED AFTER 4-30-86 NOT REFLECTED
• RH2 ENGINEERING, P.S. • W-0'
P. O. BOA 1180
141!, MARKET STREET
KIRKLAND. WASHINGTON 98033
Prp Jectc 1098. 19.CK, RENTON WEST HILL RES. SFR/CON Invoice Nu. 3677
June 1. 1986
PagR number I
CITY OF k1ENTON
200 MILL AVENUE S
RENTON WA 98055
-------------------------------------------------------------------------
FOR ENGINEERING SERVICES THROUGH MAY 31. 1966. IN
CONJUNCTION WITH WEST HILL RESV. SER/CON.
PROFESSIONAL SERVICESt
---- _----------'- Hn
PRINCIPAL E IX -urs Rat" Amount
PROJECT FNGINFER E IV 11.0!, 6'.el ' 682.00
ENGINEER TECHNICIAN T 1 13.00 50.00 650.00
3.00 27.00
SERVICES TOTAL, 27.00 1.413.00 1.413.OA
REIMBURSABLE EXPFNSE9: -„'--------
_----------
- Amount
Mllea4e
20. 10
REIMBURSABLI 'TOTAL% 20. 16 c:A. 10
Total Due This Invoice: 1.433. 10
Outstanding A/R `--"------
Document Date Type Amount
295B 4-30-85 Invoice 5.567.87
4HARTER 116 LA7:S OF7TM 6-13-85 Cash Receipt 5,567.67-
r1rY OF RENTON CERTIPJWION-31-85 Invoice - 4.094.71
' a woc :D w.q,w a.m,."Z.an 6Y L7-85 Cash Receipt 4,094. 71-
vw ma m; "Ma'w,, e,,alto (R-30-85 Invoice :.906. 18
ace➢4l.GN�.sq+u,s���ypp�Mwwu�o -
^• •,o rw a C-. ., .. ••1, c'.•C.�iYw -a5-85 Cash Recel Dt 2,906. 18-
.ar•.ua pn o, rt«w*.30901 1/0-31-85 Invoice
•.w�MMJy•ro n.+o cum .. 4.348.28
aaw '/R/ � A�-�0-85 Cash Receipt 4.348.28-
3153 8-31-85 1 ue 4.C,49.PI
9708 IO-21-85 Cash Receipt 4,049.21-
32i5 9-30-85 Invoice S.394.36
9708 10-21-85 Cash Reeviot S.394.36- CIiY Gp RENr.n
RECFivi:n
VJO 4z1Y 4Z1/"v�S r °� CBII/ 31,7�) .111N 11.1 1 '
PAYMENTS RECEIVED AFTER 5-31-66 NOT REFLEC1r:D MI "VsIN6Mr.
PrGJWCt1 1098. 19.00 REN,7N NEST HILL RES. 5ER/CDN Invoico No. 3677
• Page milbsl' _
-_--_--_..-.__--._--_------------------
Outstanding R/R -'-"-----"
---------------
Documont oat, Typo Amount
3280 11-1-31-85 1nvalc. 3,265.84
10494 11-27-65 Cash Roceiot 3,265.84-
3311 11•30-e5 Invoke c'1377.90
i1204 12-26-05 Cash Roceiot e.397.98-
3309 12-31-85 invoice �.987.70
11669 1-16-86 Cash Recoiot 2,987. 70-
3435 1 .31-86 lnvoico 1. 141.35
13269 2--27-86 Cash Receipt 1, 141.35-
3518 2-28-86 I,Y,ice 310.74
13915 3-2'7-86 Cash Roceiot 310.74-
1577 3-31-8b I.voles 657.50
14829 5-(,8-86 Cash RBPeipt 657.Ott_
.3644 4-30-06 Invoice 760.30
15156 5-19-86 Cash Revelot 760.30-
Total Rorelvables:�- -- )_ .50
)c•ta: Doe This )Account, 1,433.60--
U l y fN RFN l,)N
RFC(- IVI1)
IIIN 11;1 I I ,1.
PRYMEN13 RECEIVt'- :., TER 5-31-86 NOI REFLECIEO H INC11gyING DFPI.
fk;artmenl d Irons mFJabtt VVVI 12/96
us Depalmem f:;:2-,::AeiTtamefffniY0000(pR
d im5pty1n1,L5n r''.:� •.•:' rKSayMlq lO
'lIL'In 17Cn1�L1 ANKNWJTCM ATUDT
iAtlAr' hon r. ' _.._ 6t:hwey swlh D0.
'YitftG�b^ 1�,- 84-AM-844-OF:
lC 10I'M
PROJECT STATUS REQUEST
City of Renton
llepartment of Public Works CONSTAUCHOM LOCATION
200 Mill Avenue South wckw
'Renton. WA 98055
Attn: Ronald L. Olsen Renton, WA
4� 1 9'24" 15�211'48"'
MFRTRUCTgN nacwrlaa.:
ro1w+pFlraan
Fl1010AN 1./. MO Steel StnndpIpa Resereoil
inn CwICamF IN AEen aµ1 d pr0pegp c
A iNn551MN/1 ""'Menon For W" yp„ No Ma* SIWr�MNY A Aainbn AnminytrlUon w' M rb IIAprO b Alr INVIOFIIOII Y,r♦b111lA u1W W AI!AMeryIIYIAI a4M'nFwMnO tlw�
YYA MNroIaCPOd Nlmp roCMMII MIIlIeIl rnplrurrp nMbgKllM eonanVCYgI>AYNMAdwa.n aErbwNNnl pW»xmrwll lne
aWW dIN woNClnpN a{uce ElISIW ArIL'Mum nxa Mllro lMMbuNyoVr ArYUl pAl1YlYIIMo
A// spr'vAYFI. JAN 7
\:ow IAbdlonr nulllpAl• 206) 431-2521 -
----- -- —--- = tl ypV Nva MY auHhwla w rwu.H �Tb
PROJECT STATUS
1 TN prOlhl J71S WantlOr:en tJylprlWndanl0
1 CwlSIIVCI�Vn alelm ntlld10w5
a Censlrunrn n scnrful.o a EFpr�en w.can __ O.rs AJ /$ lbYnPC
❑slrucluN Ip:cNa lu ga"n:Ngnl of /C D n AOL f A.A St)w
OMllucl:m ManeO ❑Yes Iff'No
OOaIIVCINn LNnIeC �N9n lnNnylY NT:Ie ORAL ❑Ouse(slyn IIIM WNI-AV%d) tJ Nw< ❑i
lnNaAry
5✓-. 4p of 9� nlAl ,w C/4NnN4 o,f gWiG,c;.uGS t✓f.Pl
❑a�I Sogwa b FCC Io .V sutllody
I.bW'10 FCC IKlrl n a~ey.M AppNA1Nn br F wirNsnclNn prmq D}Na yin ❑NS„d OMn nM win Ily FCC
NOTE IIIN a1rla:Nn Na WlnANlgwyp.w.:I MAalrutyVAFl�Abptyy�'lgINalNFe111srNN ArNw nKIMlrfwNl:M auMunFSndFM Fwm IaBp}Ssp�WMl�r�»���y� �IW In AeeorEAZA n:M
UL Fn aN:swe+ uz7 -�Of
MOIA:(y'M.wIdY M1'rlM+�SF W,Y�Iy�rSa..:IIc.N ILltal/::Ir♦llaytSw INIM�Fh►�.rp.Aal,yly Yw�✓♦v�.IV F C�NI:NMW
Wrrru~r�W.wi :bsu�4+4�4 a1/lp/:�NI/�•Vt ISNI�Il1vtiYNnMiawxl'w�5slw�s'FMSS®Ywi�a++n115::
IM faYro)M6Tt:.v:su.Fsaeoes.weoy swY.oll
ORIGINAL
Klemm
1098.19
25!4
March 11, 1987
Mr. Ron Olsen
CITY OF PENTON
200 Mill Avenue South
Renton, MA 98055
Subject: West Hill Reservoir
UncmPleted County Punch List Item,.
Dear Ron.
As ya requestad, enclosed is a COPY of the original County punch list for
the West Hill Reservoir. The yellow highlighted items have hem
satisfactorily Completed.
Iteh:s 3, �. 8, and 9 were not completed, since the City was in the Process
of annexing the reservoir site, and these items did not affect the
".ration of the reservoir. At the time, these it.was would have been
change orders to the original contract, and since :hay did not affect
operation or maintenance of the facility, the County allowed us to complete
the project and the City of Renton accepted the stormwater system "as is`,
without Items 4, 8 and 9 resnlved.
Thank you for your consideration. Please call if you have questions or
require additional information,
Sincerely,
RHZ EN- NEERI!5,-5s.
_--�--
Daniel R. Ervin, P.E.
RECEIVED
M A k 1 6 1g87
;."Mitoc OEM. I
Of AF1CIp1
UIO Market Street.P.O.Box 1190,Kirklano.Washington 99030(208)827-8400
a 0047" DEM44 int of Public worb
IIti116 AILS m alaDa of Ux" nepsr=o
Dew.loptrit Ittapectianm 'Section - .5G mwzm Aveiem NB - Rentntt, t0'. 985E6
wx rq u- CONP82'I{t,IC^l'Z.31V .".PYF;tKw AL.
Fenjact Nero:
Pile ib.
Atldeaea: _
dotaeiSned that tta dew a tinal lnepeotlm wes Bsld by thta mdersiQrd and it wee
Ipw"t listed alcove Bee been ompleted and that all P�stdt list
deficlOwl� have tart =Tvcted. Aefsistne Pe'aclt list detsi
ad eaAlflatlseth dead -_.:-;_`-._...__.. ..
Of tne + t Of
tooeetd:; be sent to the UPPMPriate epeny listed below, that
of prtoaUeetoe bond or other sty P®ttri this
!.a cane dsvelcl enpt hum been satlsfled. If You yostsd a p rt wean, boiri or ccm elabtytraMim of of whits
further Snforation about band relsse cr rsooiyiM Pe�oasdmee, Piesss o.,.t:
SLbdivialan: Platting QV1Nest', Daphrtrnt of pt&Uc Rrb. SFI-3020
Ctesteeclal: Aallding Tiapectlon, Sending and tend Dsvelup mtt Division. 344-79W
mw ilmna ile!.
Sfsvt Miebar i*Al'a1c Private Rori Surf* x
-- . Length --------- E, 'r th Width Type C 6 G de-wsc
bEP 2 A TSB's
"MMI 1S: *abst Required ._. _. can" 9s•, I ] Yes
tl' -sate'._._
AMYT=N►L m[ nmmm: Construction -IraFectlon no a-.._.-...
RM NOlntananos Pst son..-y: beltleiatWD;e InhpsLtlon Fsss _._—_...
facility iyPe IN" napectien Pee a----._.
TCIM. Dupwrlm Fm
-- BMWs) Reatirad:
I "Onteetrtee
I Defect
I Other
------ ------- -----•----
rair - OA Pile Cessry PlettM<WALD %dt Dwelopw GQkWMm - koppetw roar niAaly aAe
Anf. I9ea
OF kF w
a ti
PUBLIC WORKS DEPARTMENT
DE31GN/UTILITY ENGINEERING 0 235-2631
MUNICIPAL BUILDING 2DO PILL AVE.SO. RENTON.WASH.YSObS c, y4
YT Pm
CC
IENTLE/EN-
"E ARE SENDING VDU O ATTACHED a UNOER SEPARATE COVER VIP
D SHOP mAwImG5 a PRINTS o Rf TNE FOLLOWING ITEM:
PRODUCIBLE PLANS a SPECIFICATIONS
o COPY OF LETTER D
-•r�ett�r a..- .
THESE ARE TRANSMITTED AS CPEDLED BELOW:
a FOR APPROVAL a APPRWEO AS SUBMITTED D FOR YOUR USE* AS REQUESTED D APPROVED AS NOTED a RESUBMIT ` COPIES FOR APPROVAL
0 REVIEW AND CANENT a WTUAWD FOR CORECTIONS o �N __ COPIES FOR OISTRtBUTIOI
a — a PRINTS RET�OCAFER LOAN PRINTS
COPIES T0: —'— AFTER L(NN TO US
1 -1 1tV l-V fp9ICEi
IF EIE7.MMS NE NOT AS NOTED, KINOLV NOTIFY US AT ONCE
sC
r
�r.
s" +
c
: 2 8
P
r l
4
SpO=d
ie3�'3w K
of T
1... xer.r.,l �•4hrt'- s ,�
5uh t%x
Cp gib•H atE� �CS1F `� Mom„
9
G1�i��tnBp�P S�N�e285?.1 as a,VdA 3802 '
uma°g4vd..
1A28NW'G-
ENDING