Loading...
HomeMy WebLinkAboutWTR2700546 PRE-CUT I NT' L - SW 16 TH & SENECA SW T'V-5 4 6 f V 03 ENDING OF A FILE TITLE U3 r slawY� INTERNATIONAL HOMES OF CEDAR INC. I H FO.9O%768-WOODIMIUL WAIA!IN(,F(,N 90M-1106,MN 450 I�yi June 8, 1979 Mr. Ron Oisen City of Ren on Utilities Department j Renton, Wasiington Dear Mr, Olsens Your are hereby authorized to install a fire hydrant on the corner of Seneca Avenue _-W and SW ljth and we will reimburse you for whatever the charges are. Yours truly, INTERNATIONAL HOMES OF CEDAR INC,. Toga DeGra£f Vice-President TGDsph J j U Talbot Hill pump station was operating at 1500 gpm o Two pumps were operating at mt. Olivet and Windsor Hills pump stations respectively o All fire flows were computed using a residual pressure of 20 psi A copy of this analysis is kept in my office and is available for use by your staff at any time. We would like to thank you for the opportunity to assist you in determining these fire flow capabilities. Plcase contact RH2 ENGINEERING if you have any com ents or concerns regarding this analysis. Respectively Submitted, Richard H. Harbe. t, P.E. • Project Engineer 4 IR ' r . April J0, 1979 51017.0 a PRECUT INTERNATIONAL OF WASHINGTON, INC, s P.O. Box 98 Woodinville, Washington 98072 - Attention: Mr. Tom DeCraff Subject: Water supply capability for fighting a fire at S.W. 13th and Seneca Avenue S - I Dear Tom: This lett^r documents the present water supply capability for fighting a fire fire flow) at the corner of S.W. 13th and Seneca Avenue in the City of Penton. Results of the analyses indicate that the fire flow capability is 1935 gallons per minute (gpm) at a residual pressure of 20 pounds per square inch (psi). This fire flow capability was cca- puted using the criteria stated in the next section and also recent verification that the pipeline in S.W. 13th Street from Seneca Avenue to Raymond Avenue is a 6 inch diameter pipeline. SYSTEM ANGLYSIS CRITERIA •� v An aaeHmption node here is that the necWP4 iA 6amUiat with .the City wateA ey,tem. System analysis criteria were developed using the Insurance Servic.s Office (ISO) guideline°. A rum., ry of the criteria is Iisted here: o the demand condition used was the average rate df the 1974 mr °mum day demana with a tire at pVn determine! .ocations. n Wells I, 2 and 3 were operating while Well 8 (largest source) was out of service n Springbrook Springs was supplying the system at 1300 gpm 001.114th Av. _ue N.E.,KlrklanO,Washhi0ton 99= Oft:co(206)828-n489 Res.(206)822.3757 pytt ;�i °�,k`..•. ' :aMic .�hvdK++�r.. ,«}..+_�:.`,d., � .'t+�K='' .. „µ, 8i' h„�R 1 1, , e - % n Talbot Hill pump station 1500 Rpm was operating at Two pumps were operating at Ht. Olivet and Windsor Hills pump stations respectively All fire floes were computed using a residual pressure of 20 psi s copy of this analysis is kept in my office and is available for se by your staff at any tire. We would like to thank you for the opportunity to assist you in determining these fire flow capabilities. Plcase contact RH2 ENGINEERING if you have any co..m.ents or concerns regarding this analysis. Respectively �Submitted, ' Richard H. Harbert, P.E. ' Project Engineer r . • �y. J April 30, 1979 S1017.0 f 5 1{ PRECUT INTERNATIONAL OF WASHINGTON, INC. P.O. Box 93 ' Woodinville, Washington 98072 ' Attention: Mr. Tom DeCraff ( Subject: Water supply capability for fighting a fire at S.W. 13th and Seneca Avenue Dear I=: This letter documents the present water supply capability for fighting a fire (fire flow) at the corner of S.W. 13th and Seneca Avenue in the City of Renton. Results of the analyses indicate that the fire flow capability is 1935 gallons per minute (gpm) at a residual prersure of _ 2C pounds per square inch (psi). This fire flaw capability was com- puted using the criteria stated in the next section and also recent i verification that the pipeline in S.W. 13th Street from Seneca Avenue to Raymond Avenue is a 6 inch diameter pipeline. 1 SYSTEM ANALYSIS CRITERIA 1 - •� .J An aswmption made here ie that the )tudeA is 6amitiai with the City w2.tPA Ayatem. System analysis criteria were developed using the Insurance Services Office (ISO) guidelines. A eumaary of the criteria is listed here: a the demand condition used was the average rate df the 1974 maximum day demand with a fire at pre-, detemived :ovations. ° Wells 1, : and 3 were -ati.ng while Well 8 (largest source) was o 4 service ° Sp=ingbro, springs was supplying the system at 1300 gpm 6001.114th Avenue N.E..Wridand,Washington 98033 $ Office(2(l8)828.448g Res.(20G)822-3757 7 5. ' e �1 BEGINNING OF FILE FILE TITLE LA) - S 4 S w -4 �e,ne C a . 1 y i rs