HomeMy WebLinkAboutWTR2700568 W-568 Bronson Way N. 24" Watercrossing @ Bronson Bridge
,i
1
BEGINNING
OF FILE
*40
FILE TMEW"0668
J 40VII
i vlvatfte
w
laFw Moss Cons#rurboe Inc.
(y P^ST OFFL';[ 90y 9oi.
p,A COS 1921 ZENITH WASHINa7DN 9e18S 1978
— 7
- 55
ANI
1 i
'may 2?1 1979 8784t26 RR
7/G
City Of Renton
200 Pill Avanm South
Renter., Washington 98055
Res Rroneon Way North
Water Main ?ossing
Attsntiont Ron Olsen
a
Dear Sir:
As requested ve wish to quote the following prime for installing
24 inch ductile Iron vatersain crossings
1. Pipe Crossing S Restoration $ 9,300.00
2. Install 2' 8lov-offs, Test h Flush 950.00
$ 10.250.00
Sales Tax 543.25
Total $ 10,793.25
The following stipulations apply to the above quotationt
1. The City Is to furnish the 5 lenghts of 24 inch ductile iron
pipe and 2 caps required for installation.
2. The contractor will do the necessary exploration and installation,
including the concrete pavewent restoration, curb And sidevalk motora-
tion, and all necessary cleanup,
'le are Fm pared to do this work in conjunction with our street project.
If you have any question rewarding the above quotation, please contact
Us.
Very truly ,fours,
MOSS CONSTRUCTION, INC.
.%rbert P. Moss, President
i
ENDING
OF FILE
, y
FILE TITLE
N
6nowix, A4 #
i
p