HomeMy WebLinkAboutWTR2700583 W-583 Renton Valley Professional Bldg. Springbrook Condos
BEGINNING
OF FILE
r ,
FILE TITLE w Now
#1 Tkk,JF &
1
��y rovtr•
.�art..NA�i1P:
FPS iI 'i* Igo
Pill ic,M°*xs 0e9"sI
'a,
,00 i{i\\ *WO b 50
Wog
Anton.
Talbot
,Sohn Radoricn: 1/9U0 Perfor#„ce
mar Mr• UniU'd ic Oefe`ral release
Kullber9 Pacif
ve
o„ file lease °dd care of this
Boyd 43 q4 96• be released apse to. in
(f this b`A cdn Pacific lnsu
letter to
sffice. �—
t�ir/y``Rre�
4h George• CPCi1
r.L: J4hn �' �d„piC1.
NSU LT ANTS EFpPtOYfiE BENEFITS
1NSUR AyCE Co
rsrrnoirres CORZEE POID !IC9
Date December 31, 1980
r
To, Nike McCarty
r1bum Arlene Haight, Utilities Engin?ering
StJ2M Renton Valley Professional Bldg.
Water Project No. 583
Take into plant the following inventory under the above referenced project:
Watonnain:
8" - 300 LF
Cost $5,400.00
Valves:
3- 8" Gate Valves
Hydrants:
1 Fire Hydrant
Cost f1,700.00
TOTAL COST S7,100.00
L.
Arlene Haight
Wohlman & Sargent, Inc.
3024 Rainier Bank Tower
Seattle, WA 98101
William D. Kullberg
Public Works Department
200 Mill Avenue So.
Renton. WA 98055
SnrrY.Na Y8101
1'rir rlrrl l'�I rr rl r�r'�1'lir�rr'
S
I
I