HomeMy WebLinkAboutWTR2700590 W-590 N. 30th St. Undercrossing SR405 18" Watermain in Bridge
BEGINNING
OF FILE
FILE TME Wm590
N . V&YAdo ,�
ON (W
WASPINGTON STATE aruwa
DEPARTMENT OF TRANSPORTATION M1FrEA 2
WTf ♦'OVY OPMP4Wff,1 •411ffMLNI NNySP fll(.ECf YyYpfP ,•YCE NMYCP
March 9, 1984 GC 6219 1976 169
TO' / Make checks p ode to WASHINGTON STATE TREASURER
200 Mill Ave. $
City of Renton /1+(�r�Irf�' DEPARTMENT OF TRANSPORTAI
. "$to. DEPARTMENT OF TRANSPORTATION
Renton, Wash. 98055 Transportation Bldg.
j Olympia, Wash. 98504
.oeacworww ---- —
Fftel Nlllll0
To reimburse the State of Washington, Department of Transportation, for
costs incurred in connection with Federal/State Project
1-405-3(598)160 N.E. 30th U/Xing - Structure Replacement
I
Total Costs
Group 6 Payments to Contractor $21.122.45
Sales Tax .00
City of Renton's Obligation $21,122.45
Construction Engineering Prorated
Gab Payments to Cont. x Total Const. Engr.
Iota zyments to ont.
ITTUS 7 p .02040
.02040 x $169,150.74 - $3,450.68
City of Renton's share of Construction Engineering 3.450.68
Total City of Renton Obligation $24,573.13
Less Previous Receipts -23,657.14
Balance Due 3--MTD0
The total costs a� shown above are subject to Federal Highway Administra-
tion audit and review. Any resulting adjustment may necessitate a
revised final billin(tI�
CHARTER llb, %,., :,r ,.
CITY OF RENTON CRTIrI,;:.(i0N
PtM lYY O,N IYL YIUY Y.p rl r ,
upon Pr wrYerlp•e oua•e._ .a
•Yf NO XII+ t'y,t.YiMLr1lC.,iC,lll..] ILPIIIY !]
w.aa: — , cooiAC&I. p w,�S, �9S cc, 6219
__,T- TOTAL AMOUNT DUE 1" S 915.99
ppi fCWM 1]]R
PfNrcao.a+. AGENCY
410