HomeMy WebLinkAboutWTR2700600(6) W-600 SOUTH TALBOT HILL PUMP STATION WTR-10 1+
#6A Cons'lruction Correspondence
2�waG �SaJ�" �
Cd
dWnd Ap
774 (# 7 S
Mill 311:1
3llj AO
ONINN1038
sluv,JAis dlYnot 01 -VJX�
SUB JECT..L�.S.P`�Y .SIl.e_�.� RY _ _ DAN-
SRE AND ---..-AA
-.- PROJEAt NO
.-Bc Miller IS"i$v*Sr is5-s000 CH2M-41 GL )OWAL4A
OJe//#V.4 ", e-�r
"Osy _6 ,
L e g Aldo Ci 'QtVAa 2352631 S ei
4'r>-v.
`,'"J11MeLbw��o 2(8?D-6e°`So WSDO-t MAJUTeu�tic�
I(tuY 87764?c
�i/atc= GcE' CI?y oF.e,eT-rtr�
:^L'BC/C LvJJCJe'S 1�Ei si
•
�/T'/ /•F�rn/, up/. • 5r�d/•,/r. ttr
�-carN 'TNL/!G7 f�•LL /-�c...r/.: Gr•v �L ,,iur , , Igo
written Ium► sum stated in LUMP SUM BID and the arithmetic total of the
/ollowina BIDDER BREAKDOWN, the lug► sum stated in writing shall have
recedence.
(The Bidder must submit with this Pro►osal the a►►ortioned
amounts for the items listed below. )
Section No. Title Amount
01?015 Move In end Site Pre►aration a.... )4 O!r
02200 Earthwork
03301 Reinforced Concrete a. ...17.05.:1kF.
04230 Reinforced Hollow Unit Mosor.rw a. . . . .4•,
T500 Fabricated Metalwork and Castings a. , , ,,2r (—5-.
07540 Fluid Applied Roofing a,,,,,�r_p,7
07900 Sealant a SOON
08110 Hollow MetalworM a I, Z2Z-
/ 08700 Finish Hardware a '• C4 AbrG
09721 5e861ess Quartz Flooring a �j,~�, 4�`..
09902 Painting SDO'%
)IDo4 cwN62 a• • • ••• :••• , • • •
15003 Duon Fire and Cast Iron
Fittings oS
15160 Valves and Flowmeters a,,,,,2
15260 Vantila( ina Swstam aZ /-7
15400 Plumbins and Miscellaneous Piping a, .,,,Z�q
16001 Electrical O:Fe.on ✓
BASIC LUMP SUM BID a,,,.7 �,�3?,-
(Not including Sales Tax)
Estimated Sales Tax (5.4%) 4. L o,4od
(Not A Bid Item)
l T77,Y3 �
Q,i 3S`
2y 4,
Pre+asal
� WA
S�i63lwr.4s•
t5e�/./i L1 f�i flGLr,,IE S f,� Awb.C�sT.
SA_S AND USE TAXES
----- ___ ___ -----
The Bidder agrees to ►aw all soles and use taxes for the work conteaplated
herein as reouired in the State of Washington and as separately listed in
the space provided in this Proposal.
Where the estimated soles (use) tax is called for in this Proposal fors,
it shall be considered as an estimate only of the amount of sales tax thot
will be ►aid by the successful Bidder on materials incor►orated into the
work. The estimated tax will not be tabulated as a coapetitive bid item
in determining the low Bidder. Should the low Bidder's estimated soles
tax items appear unbalanced. the Bidder shall furnish such evidence as sow
be reauasted low the Engineer to substantiate his estisate. Prior to the
execution of a Contract for the conteaplated work, the estimated tax after
review and approval by the Owner will be added to the lump sum or unit
►rices bid for the work..
LUMF' SUM OR UNIT PPICE WORK
____ ___ __ ____ _____ ----
The Bidder further ►roposes to accept as full ►aysent for the work
proposed hare'n the amounts computer, under the ►rovisions of the Contract
Documents and based on the followins lump suo or unit ►rice amounts, it
being expressly understood that the unit prices are independent of the
exact auontities ,resolved. The Bidder agrees that the lump sus ►rices and
the unit ►rices represent a true measure of the labor and materials
reouirod to ►erfor■ the work, including all allowsnr-s for overhead and
►rofit for each type and unit of work called for in tilese Contract
Docusa� ts. The amounts shall be shown in both words and figures. In case
of a discrapancv, the amount shown in words shall oovern.
U4IT PRICE BID
TALBOT HILL PIPELINES
---"- ---- __-____'_
Item Ouse.. Unit Figures Unit Price or L.S. (Words) Ext. Total set.
____ _____ ____ _______ ____ _____ __ ____ _______ ____ _____ ____
01001 GENERAL REQUIREMENTS
____ _______ ____________
Move-in and Temporary Facilities
LUMP SUM .............. .............. ........ s. .. . . ..
02221 TRENCH EXCAVATION AND BACKFILL
_____ ______ ---------- __- --------
Trench Excavation and
Selected Backfillr
0 to 46feet Deptjyfa✓
It-Mch Aa.( cG-iad�P,/< Sag; 4G. 91a "
E cT� LF f. . ..:. s. .. .. .. ... t .✓
4,515 ¢ 1Cs f dG, 396
(�F6ET Ta 6 FtET LF
[G,1IC] LF Proposal
3
It** Ouen. unit Ares Unit Price or L.S. Qrds1 Ext. Total Aat.
.ranch Excavation and
Selected Sackfiilr
mta 10 feet Depth
Imported Pipe Post and
Pin Zone Sackrill
CA®561 TONS 6. !eS s....Qt.44 zte
lo►orted Trench
Zone Sockfill
C7,"4 TONS f.:7£` •....52:�-
Trench Excavation end
Selected Rack.fili.
24-inch Water Pipe
t1,7C0] LF f.i°.1 .......................... f.../O4, Z.Os
Trench Excavation and
Selected 6ackfill,
8-inch Oravity Serer Pipe
0
t 46C l LF f.: . .......................... f.... ZO,064=.
Foundation Stabilization
_-
02560 MANHOLE CONSTRUCTION
Manhole Construction
[ I EA f.fr�7........................... •......6 1. w
02616 SURFACE RESTORATION
--_._ ._----- ___.._.._..__
Asphalt Concrete Poveoant
/r!K 'r'CavcNa3 K-
t 4%63 Sy 6.9... .......................... f.... .. ..:s,.
Concrete Pavesentr
Sidewlksr and Curbs
,
rx" ec r Gent /fi'+rr
717.ar M.G< e'Mw ,
5— �-
proposal
Ites
Ouan.
- •urns Unit Price or L
Unit _ . .S •rds)
]gvel Surfacing --- Ext. Total Aet.
IWO -
] BY f••Z?e
god C7 SY .
................. 6.....�/ gOC
�0
12-inch Plpe I5003TILE IRON•PIPE•AND•CA8T •IROp� •FITTINGS f•,••�,QZ S!�
16-inch Pipe ...............
e .......... f... iQpti
LF f.2 ..7f
24-inch Pipe . ..............
a.. 47 C 17:r LF 4tQ-
f 4'f<S -
Sloroff Assaablies •.....................
t.... ..8t
C , ] EA f.LP,Qo= .... �35=
,
ConneCti to ..........
Existing Pipe �=
es
(4 lin
z ] EA f �051=
........... it
........
Gravity $ara O PiGRAVITY SEVER PIPE AN0 SEVER SERVICE CONNECTIONS .�.3 '
t1t•-Nl LF f. '�zi
.........
Blrvily ................. / L•.
COnn"tions ..,
rq LF
Television Inspection •••••••.••••••........
f... G Y
of-
'+ LS f./Q Sb'' •• r "4po•. Sao
15140 WATEp SERVICE COHNEC •"'•••�i oS
r rvace Connection Transfers__'---- ------ --- TRANSFERS ��
C7Z ] EA
�r
Proposal
■
Item Gunn_ Unit Fie•s Unit Price or L.S. (Words) Ext. Total Ast_
' 15150 FIRE HYDRANT ASSEMBLIES
Fire Hydrant Assemblies
{. . .. .
, 4sF��s1Ve 15160 VALVES, VALVE BOXES, AND VALVE CHAMBERS
EA t 5T5 ! 575= ✓
9-inch Gate Valve
and Valve Box 7 440'
C 10 ) EA $. 744� {. . ... . (.. .....
. . .... . . . . .. . . . .. .. . . .....
12-inch Gate Valve
and Valve Chamber • (�• ,w s•�
C S ) EA {.::7? . . . . . . . . . . . . .. . . . .. . . . . . . . s. . . .. .
16-inch Butterfly Vslve
and Valve Chamber �(EA p
L ) {.ZP.(4� .. .. .. . ..... .. . .. ... . . . . . . {... . . ./... .. ..
16640 CATHODIC PROTECTION
----- ----------
Test Stations — ✓
7 {.. . . . ..4'�.. .
SUM OF EXTENDED TOTALS
Estimated Sales Tax for -77 O/1•of
Extended Totals Above {• •Y• •�••
15003 DUCTILE IRON PIPE AND CAST IRON FITTINGS
Fittings (in-Place) se.
CZV?� LBS { . . .. .. . .. . . . ..... .
Proposal
CH2M
::HILL
cngmeer�
planners
economists
scientists
October 28, 1980
513631.A1
Mr. Ron Olsen
Department of Public Works
200 Mill Avenue
Renton, Washington 98055
Dear Ron:
Subject: South Talbot Hill Pump Station
It is my understanding that you wish to proceed with putting
the pump station out for bids. Accordingly, I am sending
you a copy of the
the date and s Call for Bids on which you must fill in
ignature. Following receipt of this, I Will
proceed with document printing.
Do you have revisions to the specifications?'hem when you return the Call for Bids. Please include
Enclosed is a set of blueprints for the pump station and
also the pictures of the pipeline you loaned to me.
At our last meeting you questioned the operability of the
pump station if the 12-inch line was not fully constructed.
The pump station was designed assuming the 12-i:,ch line was
fully constructed. Efficient operation of the pump station
is dependent on this occurring. However, if the 12-inch-
to line is not, then for a short period of time, like 6 months
are apyear, we feel that the
thep station is operable. There
able, but there will be a shakedown pperior, i=foreaa are adjust-
tem
is worked out for pump operation without tn., 12-inch sl3
complete.
We have contacted Puget Power and it is our understanding
that want use toemaket up n anfeasementl 10 scr iption the cabe has been a forothis? Do you
fua4 Oft*
lie)lllih l.,•nw•5 1 Hrl4�w Nu.hmQlon was 20 4SLSpY1
Mr, Ron Olsen
Page 2
October 28, 1980
S1363I.A1
I contacted the Department of Transportation about the dirt
removal at the pump station. They are just now working on
it after an initial delay with regard to adjacent property
owners. It might take more than a month to secure it.
Sincerely,
R.
Joseph R. Miller
IC
C.
CH2M • •
RN HILL
engineer.
planners
economists
scientists
November 21, 1980
513631.A1
Mr. Ron Olsen
Dept. of Public works
200 Mill Avenue
Renton, Washington 98055
Dear Ron:
We have contacted Mr. 44a Zorn regarding the telemetry
to be provided at the south Talbot Hill pump station.
Present telemetry provisions to be provided are: (1) pump
ON-OFF indication, (2) pump ON-OFF control., and (3) pump
failure. Future telemetry provisions will be pump flow.
If this is contrary to what you have in mind, please
contact me immediately.
Sincerely,
Joseph R. Miller
ab
ISM 114M Menu S f Bn14�w.W�,h�nNtun 9BIIM Y16:'451 UM
CH2M • •
::HILL
er>gineen
{>fannets
economists
scientists
December 9, 1980
$13631.A9
Mr. Ron Olsen
Department of Public Works
200 Mill Avenue
Renton, Washington 98055
Dear Ron:
Subject: Telemetry and Schedules
Since the telemetry for the South Talbot Rill Pump Station
will be provided by others, described below is what we have
provided and what must be provided by others so that the two
systems are compatible.
The pump station design has provisions for connections to a
telemetry system. These provisions are in the form of a
terminal strip in the pump control panel as shown on the
drawings. Pump status and control are provided. In order
to utilize these provisions the main control facility at the
City's water shop requires the following indicator lights
and selector switches:
1 . One PUMP ON indicator light for each pump
2. One PUMP STATION FAILURE indicator light
3. One ON-OFF-AUTO selector switch for each pump
The indicator lights provide the Operator with pump status.
The selector switches provide for remote control of the
pumps when the local pump controls are in the REMOTE condition.
When the selector switches are in the AUTO position the
pumps respond to th, local automatic controls. When they
are in either the ON or OFF position the pumps are controlled
manually by the remote operator.
The telemetry system must include transmitters, receivers,
and interfacing relays as required to communicate each
signal as shown on the drawings.
M.We Old"
tVe IwM ...... +dxu ;ib H t:dn
Mr. Ron Olsen
Page 2
December 9, 1980
513631 .A9
Enclosed is a set of pipeline drawings showing revisions
that were made in order to divide the work into schedules.
The following is a list of cost estimates for each schedule.
However, the costs are based on the job being constructed as
a whole by January 1981 and not by schedules as now contemplated.
Schedule A $ 73,000
Schedule a 74,000
Schedule C 236,000
Schedule D 317,000
Schedule E 35,000
Schedule F 179,000
Schedule G 116,000
Schedule H 84,000
Schedule I 57,000
I will call to schedule a meeting to discuss the pipeline.
Sincerely,
VJoseph
lc
Enclosures
w-�
131 a NET
RENTON WA
PNONE 9)2- 055
I
I
I .
There-$a t , ..
Pe cent Merest per month ch r
Date a gea o^past aue
Description Charges
Balance Forward — ha�BS `� Credits
Balance
,A
c—__G
ww'
Journal oommerce
(Lumbib"Its.
of 0=5191A ST. (304-633J279) UATTGE.WASH.HIS,
wa..Jane 29, 19AL
City of Renton
office of City Clerk
Municipal Bailding
200 Mill Ave. So.
Renton, Wa. 98055
Notice of Bid Call 6129-B
Pump Station
5+ lines 2 90c per line 47.70
10; lines (a Roe per line R4.80 $112.50
Publibned January 4, 1F, 21, 1RA1
ekne ixlade Amuw'9amb.r with Pnmw
.; ;a..
,•121 Affidavit of Publication
all
db"
Ful
GII M.la plibShmon R 9a
a - STATE OF WASHINGTON
wNIM er HILL KING COUNTY—SS.
-Ind bid. wr11°Inlr
III it m'el>W
4� - Imwl Ilmn, n
.1e t.,a dwy al JANUA A; INI
••1 I^r 1 A....,it p bini, „ra wlli The undersi
woth
•' w"Nrl•„ eon:;!',;.,:n:° dhorised representative of The Daigned. on ly Jouranal of Commercltes that he is n
Milk A Ymannml mm�onw sa daily newspaper, which news }•Yol "rr"°r tliu11' paper is a legal newspaper
T^• .«.n Iw a u..aallw Y.- general circulation and It is now and has been for more
a<Iniw nonlr..a.nwu inma•;
.nun.narunu.n ,r w , n« . an six months nor to the date of publication hereinafter
nr> euilalnl:.'inn^I,e. Iend to, ublisheri in the English tangos
Iy^ ,and " a ylean.. P language conlinuoush'
iY1, woe rAZII nw •a In- a daily newspaper in Seattle, Kin
r> nn r•.Y. >«re•,n i.rmw« g County, Washington,
Irr.°ic°n:i"'"«'"`rd•Iwlrl. d it is now and during all of said time wan printed in an
rn! 191ir'r«":... In. nrnl e. ire maintained at the aforesaid place of publication of
alr 11:ny All bid.1...�..Ii. N new'Bpaper. The Daily Journal of Commerce was on the
—bY.••..n nI... And wY«,Jn•'ww IN day of June. 1941, approved as a legal newspaper by
n«1."nd rom.r.„�mr„«I d—n. Superior Court of King County.
Atn In Y b •Alwlnla al In.
'it.lir won,. I1•YnYlmenl Urns The notice in the exact form annexed, was Published in
1 un a d.n YunwY.I U.J.
'"I pi."r^.a I ,"fir:.r•`m",„1::I "Inc issues of The Daily Journal of Commerce,which was
u m.u•e.'lr!a.w..11 nl In,r,•- ularly distributed to its subscribers during the below
IVM"d YYnn llur1 l «f W N..n
Una a.evlI.,xn mn It an, ".11.
lap .11 In II•Ln d.Y..rl.r 1a ed Period. The annexed notice, a . ._..__. _._...war n•!m.nnlw.•now!.'u _..
net
A.InnWd rn.ek nr Dla n.na ........._.••--'•'._
in .a. • .1. .r nlY• al wr- pOt1C["'OE-slid-Cfi'1-'---.. .__.. ..
rvnl N Inn Irul A an l ../qe1 .-_....._......_. _..
LIA MQ
nmR wR'IgnYun ....•••___..••...••.._._....y .weM1 _.__............._..
"Mm-�rlmlwll.n IN11.9n.M1
published on ......
nxl.(IaRa n. YEAR ._._._.._.
fll1 cirri ......._...'.^...._......
0.1•.ur eu11I.n1"I In Ib X. _..........•••.._...••••.....-.•._..
....................
wale 611>it nd . camnxrl'e. •-----•-•--- -,
n
Subscribed and sworn to before me on
_.._....._........._.....r-Ji fttar �. �:........ %...
..........
r.r In-eat..r ww,an.
rwlaa. 1. arpia
Affidavit of Publication
STA IF: IIF IV Aslll\r,I♦
t'11 Vf1'of hlpt. ( rs 0AIL an
lOHflf MOM MLL
P{Ig!9TATM
Road 1004A M be her
bemsf(rst dul;awornon oshwd ua l i 2to pm-.mosl
ditto, M M 2110s ray of
•`,,.,y .walry. IWt, M Aa Pry
po ,'the .__...._J_.....__... Of Q2it'a alto YH sea b
path.de sex and sxyntMt
THEDAILY RECOROCHRONICLE,a newspaper pubiabed six(d)timesa wand PA"exist b
week.That sold newspape r is a legs l newspaper and it is now and has been go grit Rpm Cwftm
fur morr than six month,prior to the date of publication referred to, Agdm Ratllpn Munk'"
printed end published In the English language cominuall}as a newspaper { 2W li Aegitta
publishedfnurlal threats ,,it in Kent.King Count) Washinpon.andil is
im now and during all of mid ie max printed In an office maintained at the TRa amAtapp0a11wp1M
aforesaid gylace of publication fit said newspaper That the UdIT Record Yr1MI Ua mom Wall
Chronicle Aas beeuapprurrdasa legal newspaper 5y nrderafihe Superior gown.
Coup of the County in whicfi if is pubfished,to wli,Kmg Conml, ONOWA20MMOWWM
Mad
Washington Thaithe annexed ...........___. gym M
as it was published in regular Issue,tend "^L"
ndl id roppkment form ni and newspaper�once each issue far a penral � el"MMwM
d/� gRe
t aw 11111110♦♦m df
W .............. .. .. .._consecutive issues,commencing on the =4=0 1�(fg�f✓Y�a
*4110i„�M Illir�l%a
.9tte .._. ,_ _ . .. mathe m
kea
dayof, ,la andend olt pad
da of IQ Mtthdotes t4%0" IMtln ama
mdusrre,and that such❑eweData•r wusreeularlY JisUlhutrd ro iLs wh p� m
scribers during all of said Period That the full amount of the fee 1 w g„gfgp y,,,ry
gig ppuetW. rho
charged for the foregoing puhhcatwa is the sum of g ' , which wd M a
has been paid in full at the rate of per folio o(aM hundred words<w the s
ifirsti asemm�insertion and per fobo of one hundred wards for each subsequent A neglect awgl -
. Cmbbb sn����
� pa`aant a The mat arrmwg
watch laid
aamun.00anhanr
iJJ I TM Cay1 Fear Ptacaws
�, •1,,,��_. and Men-Discrhnlnalmr... .. ...
..-. . PaNGaa aa apply
Oa kloawrM it Maas
Subaeribedand swornmMoremetfis _.dated City Cities
Ash
Pw
/ Puglehed an Itta Dadf
19 . '.`/"� iTi tS�I" rotl 23 �Chantaa B.1E
Nutnrq Pubi¢in sod for a tit a nl N'ashmgnm.
rcatdang at Kem�Kmg Q,umy
Pnsi ed b)the Legislature,ta5l ktmwn ax SeMw Pdl:gl.<ftcUise JUM
s`th, MIS
—Western timon Telegraph Co. rules for counting words and tigurea,
adopted pY the neospopers of the Stale
110.pawY"Man rfe
ADDENLUM 40. 1
to the
CONTRACT .000MENTS
for the nstruction of
SOUTH TALDOT LL F'UMF' STATION
Fenton, Washington
In All Planholders:
January 20, 199,
Gentlemen:
Fro�ect No. S13631 .Al
The following changes, additions, andlor deletions are hereby male a Fart
of the Contract Documents for the construction 01- South Talbot Nill Fume
Station. r_ateH June 19t30, as fulls and completely as If the same ere
fully set forth therein:
1. SPECIFICATIONS
---------------
A. Section 11004, Page 3. Item FIFE PUMPS NO. I AND NO. 2 Ekiaranteed Performance. Delete entire par3gTe�h 'substitute: and
Fire F'umps No. 1 and No. 2 Pull hake two oper3tIng Points:
3500 nim at 230 feet total
at min hear (guarantee Point) and 5000 0,
minimum 140 feet total head.
D. Section lt1609 Page 2' Item PUTTERFLY VALVES. At the end of
the second Peraaraph, t6- the following sentence:
Provide operators with POfltlon ♦ndlcators which Ir.dlcste
Position of valve from full open to full closed.
2. DRAWINGS
A. Drawing No. S13631.A1, Sheet S. See ONE LINE DIAGRAM. Delete
'2500 and substitute '300' for the 'Ire pump motor horsepower.
B. Drawing Nc, S13631.A1, Sheet o. See POWER FLAN. Delete •250'
and substitute '300' for the fire pump Delete ' motor horsepower.
'750 MCM for' for h' and •500 MCM' and substitute '3-1/2--Inch' and
the fire PVMP's conduit and wire sl:e.
C. Drawing No. S13631.A1, Sheet 11. See MOTOR, CONTROL DIAGRAM.
Delete 0250' and substitute 1300' for the fire Pump motor
horsepower.
Addendum Na. 1
I
All Bidders shall ackno•daa recei►t •
No. t by •igu ng in
with the bid, Bids Submitted
s►gc• ►rovideoeandgsubmi!linsolMAsisnddenduentlum
ubmitted without this gtldentlue will be considered
informal.
Very truly wours.
C�RM
IJv. ... ...... . .
F'Pcei►! urn er
dittoes agreed ltos this r.l con.
day of ... . ...I. ..... .. 19.. .
Eidtler........ . .. .. . .. . ......
Fa......... ... ..... ..........
t s s 0 ► s
Addendum No. 1
2
0
CITY Oh RENTON
Plan Holders List •
PROJECT: SOUTH TALBOT HILL PUMP STATION 810 DATE: 1-28-81
PRICE: $13.00 + $2.00 Postage PLACE: 4TH Floor Conference Poo. TIME: 2:00 P.A.
UN TE EHTEK
._ NAME PAID ISSUED RETURNED REFUNDED
3.__Utility Systems, Inr. $13.00 1-9-81 _
495 Rainier Blvd North
Issaquah WA 98027
392-1207
. . . . . . . . . . . . . . . . . . . . . . . .
4. H.D. PoMler Cwioany, Inc $15.DO 1-12-81
_e.0, BOA 160 _ T
3ellevue WA 98009
746-84DO
. . . . . . . .
5. Industrial Pump Sales Co. $15.00 1-12-81
P.O. Box 3512 _
`Seattle WA 98124 _
624-8673
. . . . . . . . . . . . . . . . . . . . . . . .
6. Stang Hydronics, Inc. $15.00 1-12-81
13251 Northrup Way
Bellevue WA 98005 _
641-3867
. . . . . . . . . . . . . . . . . . . . . . . .
7, Western Utilities Supply Co. Si5.00 1-12-81
P.O. Box 3524 ---
Seattle WA 98124
. . . . . . . . . . . . . . . . . . . . . . . .
8. Eerkes Contracting,_Inc. $15.00 1-13-61 _
�1579 Dunbar Road _
"bunt Vernon WA 98273
424-1101
. . . . . . . . . . . . . . . . . . . . . . . .
CITY OF RENTON
• Plan Holders List •
PROJECT: SOUTH TALBOT HILL PUMP STATION BID DATE: 1-28-81
PRICE: $13.00 + $2.00 Postage PLACE: 4TH Floor Conference Pon. TIME: 2:00 P.M.
UAt'—�A'fE—D7R�ITL�NS—DAI E�HEEK
NAME _ PAID ISSUED RETURNED REFUNDED
9. Dodge Reports (Plan Center) 1-13-81
100 West Harrison Plaza
Seattle WA
284-3811
. . . . . . . . . . . . . . . . . . . . . . . .
10. J.D. Masonry $13.00 1-12-61 _
28207 228th S.E.
M,ple Valley WA 98038
432-0702
. . . . . . . . . . . . . . . . . . . . . . . .
11, Teem Ventures, Inc $15.00 1-12-81 _
P.O. Box 4245
Federal Way WA 98003
941-1550
. . . . . . . . . . . . . . . . . . . . . . . .
12. JRS Construction Co., Inc. $15.00 1-12-81 _
P.O. Box 533
Kirkland WA 98033 _
827-3817
. . . . . . . . . . . . . . . . . . . . . . . .
13. Associated Sub-contractors of the State of ------ 1-12-81
2340 Tacoma Ave So.
n'�R'C€r7
Tacoma WA 98402 _
383-4591-Tacoma 838-314A_Qc2oiBes__
. . . . . . . . . . . . . . . . . . . . . . . .
14. Data 6 Staff Service Co. (Plan Center) ------ 1-12-bl
_P.O Box 9271 --� --
_Seattle WA 98109
622-7053
. . . . . . . . . . . . . . . . . . . . . . .
• CITY OF RENTON
Plan Holders List .
PROJECT: SOUTH TALBOT HILL PUMP STATION _BID DATE: 1-28-81 _
PRICE: $13.00 + $2.00 Postage PLACE: 4TH Floor Conference Pon TIME: 2:00 P.M.
ICM6U�T—DA7[—UAT[�CAN�DAY�tHEK
NAME PAID ISSUED RETURNED REFUNDED
15. A.G.C. (Plan Center) ------ 1-12-81 _
1200 Westlake North
Seattle WA 98109
. . . . . . . . . . . . . . . . . . . . .
16. Plan Bureau (Plan Center) - - 1-12-81 _
824 5th Avenue N.
Seattle WA 98109
838-9803
. . . . . . . . . . . . . . . . . . . . . . . .
17. Byron Jackson Pump Division (Jeffrey D. Pettey) $13.00 1-13-81
1920 116th N.E.
_Bellevue WA 98004
454-6116
. . . . . . . . . . . . . . . . . . . . . . . .
18. Biggins Construction $26.00 1-12-81 /- /Ci-$'l
6 3245 Scenic Or. S.E
19-- —
Auburn WA 98002
833-6696
. . . . . . . . . . . . . . . . . . . . . . . .
20. Kohl Excavating, Inc. _ $26.00 1-12-81
8 3330 East Valley Road
21 . Renton WA 98055 _
251-8820
. . . . . I . . . . . . . . . . . . . . . . . .
22. Seaboard Construction Co. $13.00 1-13-81
8052 23rd N.W. (George or Don Leighton)
Seattle WA 98117
784-1718
. . . . . . . . . . . . . . . . . . . . . . . .
CITY OF RENTON
• Plan Holders List •
PROJC
T: SOUTH TALBOT HILL PUMP STATION 810 DATE: 1-28-81
PRIC E13.00 * $2.00 Postage PLACE: 4TH Floor Conference Poli. ?1ME: 2:00 P.M.
AMOUNT
—DA7F-TLAFS DATC�H�LK
� NAME PAID ISSUED RETURNED REFUNDED
23. tindbrook Construction, Inc $15.00 1-13-81
P.O. Box 1066 —
Lynnwood WA 98036
776-3103
. . . . . . . . . . . . . . . . . . . . . . . .
24. Crown Controls, Inc. $15.00 1_-13-81 _
2006 196th S.W.
_Lynnwood WA 98036
775-7300
. . . . . . . . . . . . . . . . . . . . . . .
25. Stead and Daggerly, Inc. $15.00 ULAJ
2795 152nd Ave. N.C.
Redmond WA 98052
_- 885-0978
. . . . . . . . . . . . . . I . . . . . . . . .
26. Chapman Electric $13.00 1-14-81 _
77 Burnett Ave. So. _
Renton WA 98055
255-3408
. . . . . . . . . . . . . . . . . . . . . . . .
27. Hinds Supply Co. $15.00 1-13-81
P,O. Box 945 --
Kent WA 98031
. . . . . . . . . . . . . . . . . . . . . . . .
28. Omega Contractors $13.00 1-14-81
P.O. Box 428 --
_�.Duvall WA 98019 _
788-2836
. . . . . . . . . . . . . . . . . . . . . . . .
CITY OF RENTON
• Plan Holders List •
PROJECT: SOUTH TALBOT HILL PUMP STATION BID DATE: 1-28-31
PRICE: 013.00 + $2.00 Postage PLACE: 4TH Floor Conference Rn. TIME: 2:00 P.M.
AMOUNT DrfE-'DAYE-pMS DAYS-CR ECK
NAME PAID ISSUED RETURNED REFUNDED
29. M.A. Segale, Inc. $13.00 1-14-81 `
P.O. Box 88050
_Tukwila WA 98188
575-3200
. . . . . . . . . . . . . . . . . . . . . . . .
30. Martin Lode, Inc. (Ballard Constr. Co.) 3,13.00 1-14-80
P.O. Box 17244 -- --
Seattle WA 98107
789-2535
. . . . . . . . . . . . . . . . . . . . . . . .
31. Flow Systems Construction, Inc.
_13508 BroaJway or P.O. Box 477
_Everett WA 98206
258-1344
. . . . . . . . . . . . . . . . . . . . . . . .
32. Washington Mechanical Contractors Inc. $15.00 1-14-81 _
250 S. Chicago Street _
_ Seattle WA 98108
762-3511
. . . . . . . . . . . . . . . . . . . . . . . .
33. Tacoma Pump 8 Drilling Co., Inc $15.00 1-14-81
30316 Mountain Highway
_Graham WA 98338
847-6087
. . I . . . I . . . . . . . . . . . . . . . . .
34. Worthington Group McGraw-Edison Co. $15.00 1.14-81
_-IlIO South East Alder (Scott L. Paskett)
Portland OR 97214 _
232-1158
. . . . . . . . . . . I . . . . . . . . . . . .
CITY OF RENTON
• Plan Molders List •
PROJECT: SOUTH TALBOT HILL PUMP STATION BID DATE: 1-28-81
PRICE: S13.00 * S2.00 POstaoe PLACE: 4TH Floor Conference Wn. TIME: 2:00 P.M.
GNl`—DF1'F--DAI'E�iANS�SA'E—EH E EK
NAME PAID !SSUED RETURNEO REFUNDED
35. Olympia Plan Service Center ------- 1-14-81 _
P.O. Box 1246
Olympia WA 98507
943-3960
. . . . . . . . . . . . . . . . . . . . . . . .
36• Hagen Electric, Inc. $15.00 1-15-81 _
_22142 S.E. 237th, Suite D _
Maple Valley WA 98038
432-4344
. . . . . . . . . . . . . . . . . . . . . . . .
37. Renton Construction Company, Inc. $39.00 1_1 _
38. 10601 Rustic Rd. S.
8_Seattle WA 98178
39. 772-2085
. . . . . . . . . . . . . . . . . . . . . . . .
40. Bellevue Intermountain $15.00 1-15-81
13814 N.F. 16th Street
_Bellevue WA 98005 _
747-6522
. . . . . . . . . . . . . . . . . . . . . . . .
41. Frank Coluccio Construction Co. _ $1j.00 1-15-81
9600 Empire Way ,nth _
Seattle WA 98118
. . . . . . . . . . . . . . . . . . . . . . . .
42. Schneider Equipment, Inc. $1$.D0 . 1-15-81
21881 River Road N.E. _
St. Paul OR 97137
633-2666
. . . . . . . . . . . . . . . . . . . . . . . .
CITY OF RENTON
• Plan Holders List •
PROJECT: SOUTH TALBOT HILL PIMP STATION BID DATE: 1-28-81
PRICE: $13.00 + $2.00 Postage PLACE: 4TH Floor Conference Pori, TIME: 2:00 P.M.
duNl— —DATE �A1 RCANS 6AYE�EC�
NAME PAID ISSUED RETURNED REFUNDED
43. Amfac Mechanical Supply Co. $15.00 1-15-81 _
P.O. Box 668
_Bellingham WA 98227 _
733-0570
. . . . . . . . . . . . . . . . . . . . . . . .
44• Arrow Electric Cu. , inc. (James Bagne) S13.00 1-15-81 _
P.O. Box 25657
Seattle WA 98125
363-3290
. . . . . . . . . . . . . . . . . . . . . . . .
45_ Northwestern industrial Maintenance, Inc. $1, 3.00 1-16-81 _
1120 S.W 16th, Suite -10
Renton WA 98055
271-5660
. . . . . . . . . . . . . . . . . . . . . . . .
46. R.A. Johnson Co. $15.00 1-16-81
76_East Donahev Road
Coupeville WA 98'239
. . . . . . . . . . . . . . . . . . . . . . . .
47. Beaver Equipinent Specialty Co. $15.00 1-16-81 _
6075 S.W. 1:4th Avenue
Beaverton OR 97005
644-9302
. . . . . . . . .
48. Son Power Co. (Bob Bergford) 515.00 1-16-81 _
512 E. 4th Avenue
Olympia WA 98501
352-9444
. . . . . . . . . . . . . . I . . . . . . . . .
. Plan Holders List •
PROJECT: SOUTH TALBOT HILL PUMP STATION UIO DATE: 1-28-81—_
PRICE: $13.00 + S2.00 Postage PLACE: 4TH Floor Conference 16u. TIME: 2:00 P.M.
—�u�0uN1----SATE—SATE-PLAN3--DA1 L`�HE CK
NAME _ _ PAID ISSUED RETURNED REFUNDED
49. C.J. McGerry_Co. #'1 526.00 1-19-81 _
8 75 Burnett Avenue South 1-.21 -3'/ _
_Renton WA 98055
228-3172
. . . . . . . . . . . . . . . . . . . . . . . .
51. D.M. Close Coogiany Inc. �Z,�, / >13.00 1-20-81
2921 13th Ave. S.W. —
Seattle WA 98124
623-8960
. . . . . . . . . . . . . . . . . . . . . . . .
52. Sheldrup Construct,on Inc. '# $13.00 1.20-81
P.O. Box 373
Kirkland WA 98U33
827-4343 _ _
. . . . . . . . . . . . . . . .,i. '. . . . . . .
53. The Massart Co. (21! V7 $13.00 1-20-81
P.O. Box 1Z788
Seattle WA 98111
. . . . . . . . . . . . . . . . . . . . . . . .
54, Construction Data Center Plan Center 1-21-81 T _�
_P.O. Box 3165 t
`Seattle 98114
223-0320
. . . . . . . . . . . . . . . . . . . . . . . .
55_Electrical West, Inc. 13.00 1•Z1-81
P.O. 1165
Kent WA 98031
872-7240 _--
. . . . . . . . . . . . . . . . . . . . . . . .
CITY OF RENTON
• Plnn Holders List •
PROJECT: SOUTH TALBOT HILL PUMP STATION _BID DATE: 1-28-81
PRICE: $13.00 i $2.00 Postage PLACE: 4TH Floor Conference Run. TIME: 2:00 P.M.
7iFDUN A1fpLlFS DAY'EE�K
NAME PAID ISSUED RETURNED REFUNDED
6. Olson Building Company
P.O. Box 1994
Olympia WA 98507
. . . . . . . . . . . . . . . . . . . . . . . .
57. Raymond Gourley Cons Lcurtion S13.00 1-22-80
5336 South Ruggles Street
Seattle WA 98178
723-3737
. . . . . . . . . . . . . . . . . . . . . . . .
Lakevue Construction, Inc. $13.00 1-122-81
_ 2654 170th S.E.
Bellevue WA 98008
747-1384
. . . . . . . . . . . . . . . . . . . . . . . .
9. Sarth Pacific Electrical Constr. luc• S13.00
15523 NE 90th
Redmond, NA 98052
883-0121
. . . . . . . . . . . . . . . . . . . . . . . .
$13.00 1-23-81
— P A An, 1G94 — _—
wympia Washington
943 4631
. . . . . . . . . . . . . . . . . . . . . . . .
Wright Electrical _ $13.00 1-23-81
3700 S. Cenesee �—
Seattle, WA 98118
BID TABULATION SHEET
PROJECT : 7 . T"."7 'j., ,..,.,�
DATE - 1zl1w3loycc �.�u....� ,...
BIDDER 81D
SCqAF6 jMfCA XlWMs/ 223,54G oo
C o<ucuo co wsx,cT,py
3Sto,OW.op
crt"S e ,"l 25S 097.Do
R A. A,wswe Co. ZS3 t3o.oa
Kal< ye�.u,us,. 385,4Go.00
t,kk&wr,v ccrw(. 33",Soo.eo
N l teNs"f. "h-..wo
01w6u (e.rtnectll o,✓e,a 286,984.a0
(3wf[ ccvst,�.,,nu 15U.GIs.00
SG&a,.s,Z, Cw T�T,.- NW. ou* ls<...o 2,41,g67.00
s WE.eewv CauSf. 4.,ar..-.o 2-1 .Qro.00
Yea•, J6wTun31 i,•<. �cnw .,•« 203,654,00
AFFIRMATIVE ACTION PROGRAM
Team Ventures Inc., herelnaf ter known as '"fVI" agrees to the
following plan In meeting its Aqual opportunity obligation pursuant
to Executive Order 11246, and Title NI and V'II of the Civil Right
Act of 1964.
1 F.gaal 6sploysent rtunjtv_Po11cv
TVI's policy assures that applicants will be emploved and will
be treated during empL ,•nt, without regard to race, creed, color
enthlclty, national oryi: . sex, the presence of a non-fob-related
physical, sensory or mental handicap. age or marital status.
This policy shall apply to every• aspect of employment; upgrading;
demotion; recruitment; layoff or termination; pay scales; and appren-
ticeship or on the yob training.
2. Equal Wloyment Opportunity Officer
TV1 hereby designates Richard R. Mathias, Secretary - Treasurer
as EEO Officer with full authority to administer and promote an active
program of equal employment opportunity.
3. Dissemination of Policy
a. TVI's personnel authorized to hire, supervise, promote, demote,
and terminate employees, who rocimmend such action, or are involved In
any of these action+ will be made fully cognizant of, and will implement
TVI's policy and contractual responslblities. To insure the advice is
carried out, the following minimum actions will he taken:
1. Meeting of foremen, leadmen and personnel indicated in 3a
above, will be held periodically not legs than semi-annually and TVI's
equal employment opportunity policy and its implementation reviewed and
explained. These meetings will be eonduc[ed by the EEO Officer.
2. All new fore�en, leadmon and personnel indicated in 3a above
will be thoroughly Indoctrinated by the EEO Officer covering TVI's equal
employment opportunity obligations within thirty days following hiring in.
4. Recruitment
a. Any advertisements for employment in the newpaper shall. include
"Teem Ventures Inc., an Equal Employment Opportunity employer", or re-
cruitment for employees will be by Affirmative Action order to the State
Employment Security Coamfsslon when a vacancy is •o be filled by a minority
group person.
b. TVI will encourage emplovees to refer minority group applicants for
employment in discussions regarding the procedure for such referral and by
posting appropriate notes and bulletins on employee bulletin boards.
5. Personnel Actions
a. All benefits, monttary, and working conditions will be extended
without regard to raci, color, religion, sex, or national organ. The
following actions will be taken:
1. Periodic Im, ections of TVI's facilities will be made to
insure non-discriminatory trewrment of personnel.
2. sage evaluation made to inenre non-discriminatory wage
practices.
3. Periodically review personnel actions for evidence of
discrimination and take corrective action where indicated.
4, investigate in full all complaints of alleged discrimination
and take appropriate action where indicata, and inform all complainants
of avenues of appeal.
6. Training and Promotion
n. TVI will endeavor to locate, quality, and Increase the skills of
minority group employees and applicants.
b. Consistent with requirements an' �t.atted within Federal and
State regulations, TVI will fully utilise .raining programs for the
contractual area and advise employees and applicants of these programs
and their entrance requirements.
c. A program of review of the training and promotion potential of
minority group employees will be conducted and these employees encouraped
to apply for same.
7. Unions
TV] will seek the cooperation of unions in increasing opportunities
for minority groups within the unions as follows:
a. Cooperate with unions to develop joint training erog:ms for the
qualification of minority group members for membership in the unions end
increasing skills for higher paving positions.
b. Incorporate an equal amplovment ot_rortunity clause into all union
agreements to the end that each union will be contractually hound to refer
applicants without regard to their race, color, creed, ethnicity, national
origin, am. the presence of a nott-Job-related pbysical, sensory or mental
handicap, age or marital status.
c. if the union is unable or unwilling to refer minority group
applicants as requested, TVI will fill vancancies without regard to race.
color, ethnicity, national origin, a", the presence of a non-job-related
physical, sensory or mental handicap, age or martial statue maMing every
effort to obtain persons in minority groups.
8. Sub cost racting
,VI will strive to utilize minority group subcontractors or those
with meaningful minority group persona .n their smplov ami use all effort
to &$sure much subcontractor compliance with their equal opportunity
obligations.
9. Repor[a and Records
a. TVI will keep those records necessary in determining ; *oliance
with its equal opportunity obligations. They will indicate:
1. Breakdown by work claanificatlon on each city, Federal or
Federally—assisted project of minorfty and non-minority group members
employed.
2. The progress and efforts bv; .g made in cooperation with unions.
to increase minority group employment opportunities.
3. TVI's progress and efforts in locating, hiring, training,
qualifying and upgrading minority group employees.
4. TVI'a progress and efforts in securing the service of the
subcontractors noted in paragraph R above.
b. All such records will he retained for three years following
contract completion and he made available for inspection by the Contract
Compliance Division at reascnable times.
c. TVI will submit periodical reports on furms furnished by the
Compliance Division of its employees and those of Its subcontractors,
If any.
d. 1Vi will require In every subcontract of $10.000 or more a
WRI7TFSi Affirmative Action program consisting of all requirements herein
or with such modification am is necessary to obligate the subcontractor to
a program of Affirmative Action, copies of such program being retained at
TVI's office.
10. Goals
Tvl has a complement of three permanent full time employees, none
ct which are minority group members. TVI increases and decreases its
employees on a job to job basis. It is anticipated that our future
contracts will result in jobaltes in various areas within and outside
the State of Washinpton. In hiring temporary employees, it 1a the intent
of TVI to empluy minorities to the utilization that is typical of that
area.
TVI feels that perhaps toe possiblfty, for the greatest utilisation
of minorities to through awarding subcontracts to minority businesses.
It is the intent of rvi to snek out minority subcontractors in the local
of the )obsite and to award subcontracts to minority firms where-ever
possible.
�33- V9alc
TEEM
ENTURES Nu 6'd
INC.
POST OFFICE BOX 4246 a FEDERAL WAY,WASHINGTON 980M a TELEPHONE: 1206)941-15W
January 19, 1981
Industrial Electric
C 6 Chestnut St.
Bellingham, WA 98225
Attn: Estimating
Re: Talbot Hill Pump Station
Dear Sir,
Teem Ventures w.11 be submitting a bid as a general contractor for the
Talbot Hill Pump Station, for the City of Renton. In order for us to
assemble our bid we will require cub-bide in the electrical area.
Plane are available for review at the following &genet*&:
1) Associated Sub-contractors of the State of
Washington (TACOMA. WA)
2) Data & Staff Service Co. (SEATTLE, WA)
3) A.G.C. (SEATTLE, WA)
4) Plan Bureau (SEATTLE, WA)
5) Teem Ventuees Office (KENT, WA)
We estimate the electrical work to be in the vicinity of $30,000.00
Please study the plena and specifications and forward your Sub-bid to
our office by 12:00 noon on January 28, 1981.
Sincerely,
3 Men IT Aslal�:1� rMs __.-.rr. r'.—_S m ."ui! .Crl�NaA,.r✓
HMU 2faYtlS
KIUN,MUSFMt -•�r CCC o' yy a
n
c T 7
O CI1
O
TEEM jq-b 1
ENTURES po &d
=NC.
POST OFFICE BOX 4245 • FEDERAL WAY,WASHINGTON 98003 x TELEPHONE: (206)941 1550
January 19, 1981
Luken M 6 M Electric
13011 Hwy 99
Everett, WA 98204
Attn: Estimating
Re! Talbot Hill Pump Station
Dear Sir,
Teem Ventures will be submitting a bids as a general contractor for the
Talbot Hill Pump Station, for the City of Renton. In order for us to
assemble our bid we will require sub-bids in the electrical area.
Plans are available for review at the following agencies:
1) Associated Sub-contractors of The State of
Washington (Tacoma, WA)
2) Data 6 Staff Service Co. (Seattle, WA)
3) A.C.C. (Seattle, WA)
4) Plan Bureau (Seattle, WA)
5) Teem Ventures office (Kent. WA)
We estimate the electrical work to be in,the vicinity of $30,000.00.
Please study the plans and specifications and forward you sub-bid to
our office by 12:00 noon on January 28, 1981.
Sincerely,
jS o :MISLU aO{�axUM.Px r1ly �r - ]1 //n l
to Ae 46 :✓aJ
m �bfe Prahman
~ E T tV
At W, O Oy
ko
"�rl: a7a• oa83 �
ZVENTURES�
INC.
POST OFFICE iOX 4245 . FEDERAL WAY,WASHINGTON 98003 • TELEPHONE: (206)941.1550
January 1y, 1981
Art Pearson Electric
2018 S. 17th
Tacoma, WA 98405
Dear Sir,
Teem ventures will be submitting a bid as a general contractor for the
Talbot Hill Pump Station, City of Renton. In order for us to assemble our
bid we will require sub-bids in the electrical area.
Plans are available for review at the following agencies:
1) Associated Sub-contractors of the State of
Washington (Tacoma, WA)
2) Data 6 Staff Service Co. (Seattle, WA)
3) A.G.C. (Seattle, WA)
4) Plan Bureau (Seattle, WA)
5) Teem Venture- face (Kent, WA)
We estimate the electrical work to be in the vicinity of $30,000.00.
Please study the plans and specifications and forward your sub-bid to
our office by 12:00 noon on January 28, 1981.
Sincerely,
r/,
a a �rwi .X a .,w•�:�
-Se Frahman
m
ll
X IILL.. t V I f` �+ .rt )
I>;c S g
0 �
a rt
P I �A M
y :. aa
ENTMES
INC.
POST OFFICE BOX 4245 • FEDERAL WAY,WASHINGTON 98003 a TELEPHONE: (206)941'1550
January 19. 1981
Takeuchi Gardening d Landscaping Cc.
325 - 30th S.
Seattle, WA 98144
Attn: Eatimatiug
Re: Talbot Hill Pump Station
Dear Sir,
Teem Ventures will be submitting a bid as a general contractor for the
Talbot Hill Pump Station, fcr the City of Renton. In order for us to
assemble our bid we will raquire sub-bida in the landscaping area.
Plans are available for reclew at the following agencies:
1) Associated Sub-contractors of the State of
Wash_igton (Tacoma, WA)
2) Data S Staff Service Co. (Seattle, WA)
3) A.G.C. (Seattle, WA)
4) Plar Bureau (Seattle, WA)
5) Teem Ventures Inc. (Kent, WA)
We estinate the landscaping work to be 1n the vicinity of $1,500.00.
Please study the plane and specification and forward you sub-bid to
our office by 12:00 noon on January 28, 1981.
e xicerely,
v.r,•�„�imn, y,• wee
xrnxlmt}rxY YS N y t�
a -ble Prabnan
O CT:
Y ^
r^ -4 I..
_. a; r
lDee/q/ENOTURES�
INC.
POST OFFICE BOX 4245 . FEDERAL WAY,WASH I NGTON 98003 • TELEPHONE: (708)941-1550
'anuary 19, 195i
UP SD
12PC2 H.E 106th PI.
Kirkland, WA 93033
Attn: Estimating
Re: Ta'Sot Hill Pump Station
Dear Sir,
Teem Ventures will be submitting a bid as a general contractor for the
Talbot Hill Pump Statton, for the City of Renton. In order for us to
assemble our bid we will require nub-bide in the painting area.
Plans are available for review at the following agencies:
1) Associated Sub-contractors of the State
of Washington (Tacoma, WA)
2) Data S Staff Service Co. (Seattle, WA)
3) A.C.C. (Seattle, WA)
4) Plan Bureau (Seattle, WA)
5) Teem Ven,ures Office (Kent, WA)
We estimate the painting work co be in the area of $3,000.00.
Please study the plans and specifications and forward your sub-bid to
our office by 12:00 noon on Ianuary 28. 1981.
p P- ncarely,
In an
'p bbte Frahman
M
m y s
a
o• m
" m
v � O
.1
73Z)- ao�q
TEEM
/ENTURES �
INC.
POST OFFICE BOX 4245 • FEDERAL WAY,WASH INGTON 98003 • TELEPHONE. (206) 941 1550
.:anuarg 19, 1981
Arrow's Painting Co.
5440 - 26th S.
Seattle, WA 98108
Attn: Estimating
Re: Talbot Hill Pump Station
Dear Sit,
Teem Ventures will be submitting a bid as a general contractor for the
Ialbot Hill Pump Station, for the City �11` Renton. In order for us to
assemble our bid we will require sub-bids In the painting area.
Plans are available for review at the following agencies:
1) Associated Sub-Contractors of the State of
Washington (Tacoma, WA)
2) Data d Staff Service Co. (Seattle, WA)
3) A.C.C. (Seattle, WA)
4) Plai Bureau (Seattle, WA)
5) Teem Venturee Office (Kent, WA)
We estimate the painting work to be in the area of $3,000.00
Please study the plans and specifications ano farward you sub-hid to
our office by 12:00 noon on January 28, 1981.
„.i.,.,,�... No w•, icerely,
---• L conwt nc�au'.r MINI
to Rx OR
4 7R-Crn�6etntt t �c a'a ni
h1e Fr ehman
fa O Q,
M
• yYs ��
VENTURES
61d
INC.
POST OFFICE BOX 4245 • FEDERAL WAY,WASHINGTON 98D03 - TELEPHONE: (208)941-1550
January 19, 198;
Minority Paint
217 - 240th St. S.E.
Bothell, WA 98011
Attn: Fred Hemp
Re: Talbot Hill Pump Station
Dear Hr. Hemp,
Teem Ventures will be submitting a bid as a general contractor for the
Talbot Hill Pump Station, for the City of Renton. In order for us to
assemble our bid we will require sub-bids in the painting area.
Plane are available for review at the fallowing agencies:
1) Associated Sub-contractors of the State of
Washington (Tacoma, WA)
2) Data 6 Staff Service Co. (Seattle, WA)
3) A.G.C. (Seattle, WA)
4) Plan Bureau (Seattle, WA)
5) Teem Ventures Office (Kent, WA)
We estimate the Tainting work to be in the area of $3,000.00,
Pleas, study the plane and specifications and forward your sub-bid to
our office by 12:00 noon on January 28, 1981.
nM Ivte cer el y,
m
,';, NYl 4MLf WY 1tMYT ■ "N O
his Prahman
0
� Q
2 U
TEEM v a?3• )-�&a
ENTURES
=NC.
POST OFFICE BOX 4245 • FEDERAL WAY,WASH INGTON 98003 • TELEPHONE: (208)941.1550
January 19, 1981
Phoenix Painting
P.O. Box 2749
Seattle, WA 98111
.cttn: Estimating
Re: Talbot Hill Pump Station
To Whom it Hay Concern,
Teem Ventures will be submitting a bid as a general contractor for the
Talbot Hill Pump Station, for the City of Renton. In order for tie to
assemble our bid we will require sub-bide in the painting area.
Plans are available for review at the following agencies:
1) Associated Sub-contractors of the State of
Washington (Tacoma, WA)
2) Data 4 Staff Service Co. (Seattle, WA)
3) A.G.C. (Seattle, WA)
4) Plan Bureau (Seattle, WA)
S) Teem Ventures Office (Kent, WA)
We estimate the painting work to be in the area of $3,000.00.
Please study the plane and specifications and forward you sub-bid to
our ifflce by 12:00 noon on January 28, 1981.
. ...... . ncerely,
In
g m
3 muMr xtmn �i '-' ITI a', o _ bbie Frahman
1 $�
4' rn
F a
m 1T c ry m m
,o ,n, AAII
r
qqee I� e e ,
885- 05/30
TEEM �, • � �8 -,
ENTURES
INC.
POST OFFICE BOX 4245 . FEDERAL WAY,WASHINGTON 98003 • TELEPHONE: (206)941-1550
January 19, 1981
Cope Indust*fee
3823 - East Lake Samatmish Blvd.
Redmond, WA 98052
Attn: Judv
Re: Talbot Hill Pump Station
To Whom it Mav Concern:
Teem Ventures will be submitting a bid as a general contractor for the
Talbot Hill Pump Station, for the City of Renton. In order for us to
assemble our bid we will require sub-bide 1n the masonry area.
Plans are available for review, at the following agencies:
1) Associated Sub-contractors of the State of
Washington (Tacoma, WA)
2) Data 8 Staff Service Co. (Seattle, WA)
3) A.G.C. (Seattle, WA)
4) Plan Bureau (Seattle, WA)
5) Teem Ventures Office (Kent, WA)
We estimate the masonry work to be in the area of $5,000.00.
Please study the plane and specifications and forward your sub-bid to
our office by 12:00 noon on January 28, 1981.
1 esr„mnwx, ncerely,
o rn�awlws�siite wa rtts— g m
[ R w!ws"t nt tl - i O
Lk u N bble Prahman
s M
m
TEEM �
ENTURES
INC.
POST OFFICE BOX 4245 • FEDERAL.WAY,WASH INGTON 98003 • TELEPHONE'. (206)941 1550
February 3, 1981
City of Renton
Public Works Dept.
Engineering Division
200 Mill St.
Renton, WA 98055
Attn: Ron Olson
Re: Talbot Hill Pump Station
Affirmative Action Program
Dear Mr. Olson,
Enclosed please find a proposed affirmative action program prepared be
Teem Ventures Inc. Mr. Vince Lee of the City of Renton has graciously
contributed advice that was utilized in its preparation. 8v submitting
this program on this date we expect that we have satisfied the require-
ment of submission within 5 working days of bid submittal.
We have issued subcontract letters of intent to significant subcontractors.
We anticipate awarding at least 40% of our subcontract dollar volume to
minority subcontractors upon award of the general contract to Teem Ventures
Inc.
Also enclosed are copies of letters that we mailed out requesting parti-
cipation of minority subcontractors in assembly of our bid.
We expect that our promised intentions and already accomplished affirmative
actions will satisfy the City of Renton.
Sincerely,
Richard W. Mathias
encl.
u
Our Frojeot No. 5r 3(, 31 q 2
IF MATERIAL RECEIVED Ij NOT AS LISTED.
PLEASE NOTIFY US AT ONCE
WE ARE SENDING YOU
p ATTACHED ❑UNDER SEPARATE COVER VIA
0 SHOP DRAWINGS ❑ TRACINGS
IS PRINTS CATALOGS
0 DOCUMENTS v COPY OF LETTER
❑ SPECIFICATIONS ❑
COPIES DATE ITEU
3 -;I/rc �dgrLluuor fl t.Jc cis Lc(eC✓Il,a.
REMARKS �, I ,. _�J4.•—.C?'L.4. f�lwir_..._ . .ohm V��JF._5 ,. .VPT^..i�i'tl,......I.7ti us
i' t� >
.. I a C 2LEITYxt{ .Uf C'CIr•I CJ aCt.
b"rl Lc,e ::he r1/ TlsCI t xc.�.
COPY TO FORM
._._ ____.._�..._...- REV LIT
DAtea___ G /-- -- — -
To ____11o�__ t..Z-- Our 5/3Gz/.H2
Praia" Rb.`---
-"-'--" ---- IF MATERIAL RECEIVED 16 NOT AS LISTED,
'LEASE NOTIFv US AT ONCE
WE ARE SENDING YOU
A ATTACHED ❑UNDER SEPARATE COVER VIA
Z� SHOP DRAWINGS J TRACINGS
D PRINTS � CATALOGS
C DOCUMENTS q COPY OF LETTER
O SPECIFICATIONS
C(MIkS DAIF
ITEN
- -. - - c
REMAft"___Ro., Cc
car To
FORM S
REV 3m
PUCET
POSER
October 31, 1980
Joseph Miller
CHpM Hill
15K 114th Ave. S.E.
Bellevue, WA. 98004
Dear Mr. Miller:
Re: City Water Pumps, Renton
Approx. S.W. 43rd St. d Hwy. 167
Work sketch 652250 R
Puget Power will Provide a 277/480 volt, three phase service utilizing
a padmounted transformer as shown on the attached sketch, at no cost to the
city provided we can install our facilities on the site within 9 days of
the date of this letter.
It will be your responsibility to establish the grade to which we will set our
facilities. We will not raise or lower the primary or transformer due to
terracing or any other cause without a charge. You will also be responsibility
for running all servi. conductors to our padmounted transformer. We will make
the connections on our equipment.
Upon receipt of the signature of the Director of Public Works for the City of
Renton, which constitutes acceptance of our design, we will release 'his job
to be scheduled for construction, subject to an easement.
Should you have any further questions regardim-. this project. please contact
Mr. Gary Moritz in our Renton office at 255-2464.
Sincerely,
P J. Capps, Supervisor
Customer Service
Enc.
t ILA s�/12— -:2 kk<ccepted
Date
a9et Sound Wwv a l'9'���WdM aQo sou"Grout wR N.rrn .bv+inglm 4a055 (£p6)FSSNei
, r1'
tA�L2
yy>aaua-.ra.ra�.
Nv�P2 � b
{ $�'✓?1!r22 i l,4 p�
{ lk
E/�r• � jj //
!.W lin.e; d4i,d 52 SrY
RJ60cT Odb^!"uv .t,J �
• 1. AT % . INSTALL 4'C' l A'B" A 3V VAULT (76U39) ■Ilh l'C"' V S'6" COVE;
WITH 20' A N• ACCESS (7M:1.
INSTALL 1.IU AL'A TiMMIDied; 12.470/7.2UJv C T TO 277/4&)V.
Grid`A 316d27.1L6701 -
2. FROM TO %. INSTALL 3-1/0 AL. ]iF.1' CAOLES OIPLCT BURY AN ONE r PVC
CONOL 11. INSTALL SCff• 8:: PVC C04NO S' ON EACH SIf L OF
CITY UTILITY MIEN CRDSSINC.
3. MULL PRIRAPY CO;.IJCTOfL PER CAS1E TABLC. TEW11hATE ANO INSTALL CAGLE
NLMI M PEk LAL:LE UTAGkki.
�. PUGFT TO TR1A0.,bkLAFIU AW COVfA.1-0-:h1',14 TRIN:LI NMI 3L' Pk1'U1Rv.
USE SELECT b0.;l.l ILL M:EN hiLVV4'l .
5 IhS1Alt TPAhSFM4,k PER SIANIAv!. SPEC-* 41:1V.1101.
I . INSTAL PRIMARY CAL•.E MAR-LA? PEN STANjAPb SOLE.# 1'211.1147.
7. 111STALL ME CAPS ON ALL UNSSIti PR.14APv Bl'SWIflbS,
b. OLVELOPEP % PkU11L: Ah:, 1NSIALL ilLUNJ"l LVIUUCIUF1. PUGET TU MU CON-
NECTIONS AT UANSFORMEk.
9. BEVELOPEI. TO PRIV:X SUITAI:1 CA.AR014' MI, P74ri "TEV E0UPTI LNT.
to. ALL GRAOCS hl. LOI A110Y`• TO BE S1Avl 0 UEVi.LOPiP PRIOP TO CON'10'. C11'10
WMI PWtT POh'!k Z. GdLC 2tLLEa oil. 265.24",
• 11. INSTALL GRIb MOR L4S Oh ALL YAW TS Ah;. PApUII'NTEO f(MV114NT PEP
PUCi11 PUWJV, STAN.AA.R.
X
X �k
Zkw'.tf
u., a,...l'w<uwlw.nw ww w.....•.a. •.a .. It /-a49. 5.2-6I:N
am ,.l q..iu•a• P 91 ul. l( _qn.,+e..,'•. . . .. . . .�Re a?.••aR
46226.1.,�.
WORK SKETCH wR-.: .ME< A::T
wO,i39-
•W Ai^�JT. 46%ir JA0f CK NKN. 147 - Kiu:. S.e—A/7- ` G622. •R
VZvMt/v c/ry 92� — Jal7N 7944W7 R✓WP SI. - JJ u; Liao EX'
,...,235 121 f1Z2 „^Et.Vi 022 ,P/J47 RE.va'D.v . 1 -.,•, .
• 'Main�. t'^I � . • a.au .. v. . 1 ...M • , _. Y v.
a
�w
• "r
ansu16 z
yam �r • x-F
1I1 ix 4"weIW
.YG�2r•/ba71//
\`\ __-�Aw_ �w.Y>•ALL�NI4f --ram
_ZOwa/ Iw -L%K7MK:- .A4ah1i ttf.L�
OI�t Ow
CABLE D/4G E'A
CABLE NOTES
LOCAi ION CABLE LEN6T.I ;OLI CAB:i
FROM TO SIZE FEET CLASS NUMBER /L.
Y z bdc. 220' Stt. Rw.I7 So.v:_
,%C.46 di aN...
.. Z4
i OF
THE CITY OF RENTON
MLINICI►AL 1114ALDING M Ii LL AVE.SO. RENTON.MASH.9W55
n Q j•' BARHARA Y, $HINPOCH, MAYOR • DlLO RlS A. MEAD
CITY CLERK a (M) 23JJSG0
IlfO SEPIE
March 3, 19bi
Teem Ventures, Inc.
PO Box 4245
Federal Way, WA 98003
ATTN: Frite B. Bright, Vice President
RE: Call for Bids - South Talbot Hill Pump Station
Dear Mr, Bright:
The Renton City Council, at its regular meeting of March 2, 1981.
has accepted your low bid on the above-referenced project ' I the
amount of $271,881.40.
Undated performance bond and insurance certiti Cate will need to be
provided to Project Engineer, Ron Olson, Engineering Dept, for
preparation of the contract documents along with proof of state
and city licenses.
If you have any further questions, please Contact this office.
Yours very truly,
CITY OF RENTON
,,<4-Z4zr/ d Aleac(
Delores A. Mead, C.M.C.
City Clerk
DAM/st
F a
0
� I ill's
: II
I
I
TEEM
/ENTURES P O Box4245
2r Federal Way,WA 98003
N`• (206)941 1550
LETTER OF TRANSM11'I'AL
I C:tv of Renton paw March 17, 198.
200 Mill St doh So. Talbot HIll Pump Station
Renton, WA 98055
Attention Run Olson
F]ulosed are 5 eoPies of signed and executed contract documents for the So 1 lbot
11111 Plm• Sto 1 IQ, tUr1 y F R
For Approval Approved as noted
__ Returned for corrections as noted,
_ Approved I'lease resubmit:
For your further action
_ For your tiles
%XR Per your inquest
R,marks
1-«nm Ce tore.,,Inc.
Hy
� _
® SEF 9 t�fsi
DEPAnTMENT OF LABOR AND INDUSTRIES AFFIDAVIT OF WAGES PAID
INDUSTRIAL RELATIONS DIVISION
Ohm WA etsN ON PUBLIC WORKS CONTRACT
Awarding Agency_.City._cf..Banton._____.__...__._..._...
Contract Number...A=01I41......_.
Date Contract Awarded.-March.16,._1961.
Date Contract Completed AVC01; 12a ,M .... -
STATt OF WASHINGTON Co'anty in Which Work Performed Yin¢.
a. Location within County.__City-of Banton...
ovrr;Y nr _.Fifty.. ..,. Was a Statement of Intent Filed? Yesn No ❑
In compliance with RCW 39.12.040 1, the undersigned, being a drily authorized reprrxntative of
.._..Pign"imr_.Nns.cary..6._Beatoration, 2_0. Boat.J011a,...Seattle.....WA...._98107 ....
1 rage artt4 h iAddrut
do hereby certify that the following rates of hourly wage and hourly fringe benefits have been paid to the
laborers, workmen and mechanics employed by me upon the project described above and that no laborer.
workman or mechanic has been paid less than the "prevailing rate of wage" as determined by the Indus-
trial Statistician of the Department of Labor and Industries.
List below each classification of labor employed by you upon the prc: ct described above and the rate of
hourly pay and hourly fringe benefits paid to each classification. If apprentices ha-•e been employed, list
their names and or registration numbers, their stages of progression, the rate of hourly pay and the rate
of hourly fringe benefits paid to each apprentice.
Craft and Classification of. Labor Rate of Rate of Hourly
Hourly Pay Fringe Benefits Paid
WaUrproofere $16.94, $2.10
Nett: Attach Additional Sheets an Needed. pioneer :La my d 9astoration
Subscribed and sworn to before me Robert W. IKeld, Prieident T.tW
,, 'I. y
this Y ..... day of_.,-,i.4({!t(6l _... 1 aertby anifl tlui .rmNiry to tM as w ratr.act .nnae Eenciit: Ircrr�n
A./ .wam to the pnvubnp wye wywrtmrnb of R('w'W.R.Mt Mrebeen vti�fied
19 _...
"' -i INDUSTRIAL SOR CLAN
a<.st _yz(r<.. [sea-.. DEPARTMENT RWSTAATI IND1t9TR[E5
Notary in Wdshgd JM tat SiaN waMiaplen,
rtrldMe b wdN'ieabn. [('
AV—
INSTRUCTIONS: This "m reserved for certifl-atim
1. Pursuant to RCW 39.12.040 copies of this form must be c^mpleted by the contractor and each of his sub-
contractors.
2. Complete this form in triplicate and have it notarized.
3. Submit all forms for certification to: Industrial Relations Division. Department of Labor and Industries.
General Administration Building, Olympia. Washington 985n4.
4. File a certified copy with the Awarding Agency.
CONTRACTORS ARE RESPONSIBLE FOR OBTAINING AND FILING AFFIDA':ITS t: the SUB-
CONTRACTORS. This is required by law and payments can not lawfully be made until such affidavits
are filed.
u.fpr Alrq.vr a a.p Irtct .4w
I N T S R o F F I C E C o R R F S P o .9_ D F N C E
Date March 17, 1981
TO: Larry Warren, City Attorney
pppI Ron Olsen, Utilities Engineering
SUBJECT: Sout" Talbot Hill Pump Station
Please review the attaci documents as to egal form.
Please execute document in the appropriate location.
OF ft�
41
OFFICE OF THE CITY ATTORNEY• RENTONMASHINGTON
� � 2
•a sr a••,a•o.•x goo a.a«sn.e wcw.s • t«.v. ...s..,,c.m, suss »s un
0, a LAWRENCE 1 WARREN. cry.no•,.`. OANIEL KELLOGG; •smsoa. , •.• .
q jEO SEPIVW, `'arch 17, 1981 SUSAN R IRWIN, •sss••w• ;•....ems.
TO: Ron Olsen, Utilities Engineering
FROM: Lawrence J. Warren, City Attorney
Re: So, Lh Talbot Hill Pmp Station
Dear Ron:
The above docents are approved as to legal form,
except the affidavit of wages paid is not needed.
Lawrence J. Warren
LJW:nd
Encl.
PUBLIC WORKS DEPARTMENT
DESIGN/JTILrTY ENGINEERING • 235-263!
np ✓g MUNICIPAL BUILDING 20e MILL AVE.SD. RENTON.WASH.sawn
9Q b
oq E?
�'En SEP'L
BARBARA Y. SHINPOCH _ ,
MAYOR
Teem Ventures, Inc.
0.0. Box 4245
Federal May, WA 9000:
SuhJect: South Talbot Hill Pump $ten on
Gentleman:
This letter Is to serve as authorizatlun to proceed wIT, ;
Of the oforam otloned projec'. �
If You have ony questions, pleaso C�)w ac co.
VLry truly yours,
Honuld L, GIs,,
U'llitle5 E.ngineuring
RLD:pmp
TEEM
ENTURES P.O.Box 4245
Federal Way,WA 98003
INC. (206)941-1550
LErFER Of I R I IAL
To City of Renton Date March 26, 1981
200 Mill St. doh So. Talbot Hill dump Station
a..�r.,.. VA 9Rn"
.attention: Ron Olson
Enclosed is a copy of the list of Anticipated Subcontractors for the above referenced job.
The originalwd6 MIA114 to CH?M 11111. Attn: Joe Miller,
_ For Approval __ Approved an noted
_ Returned for corrections as noted.
—... Approved Please resubmit:
For your film '—' For your further action
_ Per your request
Remark.
Ab'
ANTICIPATED SHBCONTFAC!M S
Mason: Minority Subcontractor
Stan Saloy Masonry
2015 - 33rd So. -
Seattle, W.I. 98144
PH: 323-6283
Attn: Stan Saloy
Electrician: Minority Subcontractor
Wright Inc.
3700 So. Genesse
Seattle, WA 98116
PH: 723-1362
Attn: Ivan or Harold
reinter: Minority Subcontractor
Minority Paint Contractors
217 - d40th St. S.E.
Bothell, VA 98011
PH: 485-7433
Attn: Roger
Seamless Floor:
Surfacing N.W.
179...16 HWY 99
Lynnwood, WA 98036
PC: 74.5-3256
Attn: Ed Sole
rluid Applied Roofing;
Pioneer Mason•, g Restoration
P.O. Box 70110
Seattle, WA 97107
PH: 782-4331
Attn: David
Asphalt:
Red-D Inc.
11728 - 21st S.W.
Seattle, NA 98146
PH: 244-8246
Attn: Fred D'Orio
Landscaping:
Not defined at this time
e
IlivTURES
=NC.
POST OFFICE BOX 4245 • FEDERAL WAY,WASHINGTON 98003 4 TELEPHONE:1209)941-1550
March 26, 1981
Traffic Engineering Department
200 Hill Ave. So.
Renton, WA 98055
Attn: Paul Lumbert
Dear Mr. Lumbert,
Enclosed is the proposed traffic control plan for the So. Talbot Hil!
Pump Station for jobsite excavatian and surplus material haul off. We
anticipate starting Monday, March 30, 1981.
Si terely,
Richard W. Mathias
cc: Joe Miller - CH2M Hill
Ron Olson - City of Renton
QLDM�
"�as� 0
.!!� fiVG1ryELR7NQ 0
N)Slpy
fI1
e
i
r
I
r --
i
till
TRAP C ENGINEERIt4G DEFY
4
�•c -
1
F'n
INK
TEEM �
ENTURES P 0. Boa<2a5
Federat Way.WA 1003
=N C. 1206I 941 1550
LETTER OF TRAA'SMITTAL
l" —CH2M Hill. lnc. Date .Meech 27. 1981
1500 - ll.th Ave. S.E. Job So. Talbot Hill Nr.n 5tdtian _
Bellevue, We 98004 Citv of Renton
Attention. Joe Miller
Enclosed are 5 copies of submittal literature and 2 samples for the Seamless Fle Inc
ao osr section 09721 - Seaetleaa 0uartz Floorina.
For Approval Approved as noted
_ Returned for corrections as noted.
_ Approved Please resubmit;
For your file, For your further action
Per your request
Remark, CC: Cite ,f Renton - Ron 0lson
leon Venture.,Inc
By
H2M •
NH
•
engineers
planners
economists
scientists
April 3, 1981
513631.A2
Mr. Ron Olsen
City of Renton
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
Dear Ron:
Subject: South Talbot Bill Pump Station
This is in response to your question regarding the size of
the tap tc be made on the 16-inch waterline. It is not
recommended that it be reduced to 12-inch so that the City
can make a wet-tap. Reduction to 12-inch would cause a 5-psi
pressure drop at a 5,000-gpm fire flow. This is not acceptable.
If the City cannot wet-tap, then a dry-tap with a 16-inch
tee should be made.
Sincerely,
oat
Vdoseph R. Miller
ken
cc: Bill Kullberg
l..rlk alk.
tGU iN,n a�rnu 51 1446.„y Nad,Mltw4 4*4s,"U
TEEM
ENTURES P O.Box 4245
Federal Way.WA 98003
INC. (206)941-1550
LETTER OF TRANSMITTAL
I^ _ City of Renton Date Aar. 8. 1981
200 Rill St. Job So. Talbot Hill Pump Station
Renton, WA 98055
Attemum Ron Olson
F.nclo"ed is the "-pro-ed. Statement of Intent to Pay Previa,Lag Wages form or Teem
Ve..tures Inc.
_ For At,, oval Approved as noted
__ Returned for tmrrectlons as noted.
_ Approved Please resuhmw
�AL For your files
For your further action
--
Per your request
Remark,
1'eem Ventures.Inc. 1
H> iG'C7
DEPARTMENT OF LABOR AND INDUSTRIE5 4& ST*EMF.NT OF INTENT
INDUSTRIAL RELATIONS DIVISION TO PAY PREVAILING WAGES
ola, WA eese4 qW
gtaC+�.rA
ON PUBLIC WORKS CONTRACT
pPR Awarding Agency City of Benton _....._..-..........
Contract Number..GAC017-81...
Date Contract Awarded....1fATch.U....1"L......_...._...._..._._....._.
Due Work Commencing.._.....MiECA...71a...19$,i._..._.._._,..... ..
STATE OF WASHtNGTON County in Which Work Perfonead..un._ ._,
ra,s l.ncation Within County.. rltv..of-P.Mtnn.._..,
County of 4_ _ ._.._...._ _ .. .._...
prime Contractor TgIaI,Vat,.uFes_IfICs.___ ..._ .._..........
Do You intend to Use Subnontraetnn". Yea= lio D
In compliance with RCW 39.12,040 I, the undersigned, being a duly authorized representative of
.Teem_VCUtugee_Lnc.. P.Q. Box 4245, Federal Way,.VA...180C' _........__......._.
dd.aul
do hereby certify that the o ow ing rates of hourly wage and hourly fringe benefits will be paid to
a:l laborers, workmen and mechanics employed by me upon the public works project described above
and that no laborer,workman or mechanic will be paid less than the "prevailing rate of wage" as de-
termined by the Industrial Statistician of the Department cf tabor and Industries.
CRAFT ANO rLAEa1FICATfON Or LABOR RATR OF RATR OF HOURLY
HOURLY PAY FRINGR RENFFITB
Carpenter 14.93 1.78
Laborer 12.93 2.33
NOTE: Attach additional sheets as needed. Subscribed and sworn tto� before me
_.Ie�ot_Veatuclta.._lzic.._. .. this..-- �......-..... dey of/.J.!/'Lt1/.�4�. 1+ 1...
I Oamatay Hemel .. .
c R6gACOPY vA•APWa r 4UBCONTRAROpp
eUARRV rR—INOVSTRIAL RTA'ryRTICUN �r'W. by
W IV,nm M1vi�a.„
tMgrtmenll
1.�
DEPARTMENT OF LABOR .4ND INDUSTRIES STOE tENT OF INTENT
INDUSTRIAL RELATIONS DIVISION TO PAY PREVAILING WAGES
oIY R. WA 99M
ON PUBLIC WORKS CONTRACT
pl a
pPR 2 1981 Awarding Aaency._City._Qf.ElRff»l._..
Centred Number_CAG012.-81...,...._._ ......._..,.............__..._...................
Date Contract AwetdLN...MarCfl..Ik,_1.4@1,_._ ._................................»..
Date Work Commenting-,__,Marrh..31,...1981__........_.__...._....._._...
STATE OF WASHINGTON County it, Which Work Partorawd.4111,. .. ,.
Location Within County .__.. Cit)r ryf Ream,._..
County of Klag .._... prime Contmd.r Teats Ye&turea Inc.
Do You Intend to UK- SubcnntxetooT Yea= No p
In compliance with RCW 39.12.040 I. the undersigned, being a duly authorized representative of
Tam VItaturea Inc., P.C. Ban 4245, Federal Hay...HA._S8f103
m.mractur u. �Adm.wl . .. _..
do hereby certify that the rates of hourly wage and hourly fringe benefits will be paid to
all laborers, workmen and mechanics employed by me upon the public works project described above
and that no labomr,workman Or mechanic will be paid less than the "prevailing rate of wage" as de-
termined by the Industrial Statistician of the Department of Labor and Industries.
CRAFT ANU CLASSIFICATION OF LABOR RATE OF RATE OF HOURLY
HOURLY PAY FRINGE BXICITI 8
Carpenter 14.93 1.18
Laborer 12.93 2.33
NOTE: Attach addition,] a1uYL,as retch]. Subscribed and sworn tto�,,before me
_.._. ... Team.Venture&..Inc.
this, j....��._•....day of/aTf/7G!J..4.... 19�...�...
1 TmP,na'Nam,] ''1�a.Z�^��✓��! GA��rr
C3 9
BY -t;:'e ri iy,�/f Nobry hbHe M oM for the seam of waMiRploR,
usnwuea RtPrwyAqu'e, xeldlap M tp01MRBiaa.
The purpose of this statement is to provide evidence of intent to comply with the prevailing wage
requirements of Chapter 39.12 RCW, IT IS A PRELIMINARY FILING ONLY and cannot be
construed as application for certification by the Director of Labor and Industries that the prevailing
wage requirements as set forth in RCW 39.12.040 have been satisfied,
Fa.La I lw air
APPIQVIKD
#nemn
Labor a Indwtrla,
W a
BEFORE FINAL SETTLEMENT CAN BE MADE mh auv u6bc works project it will
be necessary for the contractor, and any subcontractor to produce evidenty of certification by the
Director that,prevailing wages including fringe benefits have been paid to each classification of
laborers, workmen or mechanics employed Go said project. Form S. F. 9843 "Affidavit of Wages
Paid", or a similarly constructed form should be submitted for the Dirac-or's certification. These
forms am available upon request from any office of the Detartment of Labor and Industries,
PROGRESS PAYMENTS: Each voucher claim submitted to an owner by A contractor for payment
on a project estimate shall state that prevailing wages have been paid in accordance with the pre-filed
statement or statements of intent to pay prevailing wages on file with the public agency.
COMPLETE AND MAIL ENTIRE SET FOR APPROVAL TO:
Industrial Relations Division. Department of Labor and Industries,
General Administration Building, Olympia. Washington 985W
yCaEO�I,,N.pT�EY�pAl�CTORri, D19T M ViD UM APHO STATEMENTri Aa F04LOW91
PINK
]Atha Nfi � A .AP AR SIN t'EN-YxAT111IQAN ObnalMn by MV.rV,mt�
MrAw
�� • Fro1nC_ - A,,—
To: & S/ W..Alt OurFtojotllto. 3
__.._
--- T0-vi— -- If MATd11AM RRtNtD 13 NOT Atl 4RTfD.
4 U EME*"Y US AT ONCE
Attn:.-_&cA%--44�---YAPotS_
R.:- S. 7-"t-_Pump__- .-. -
WE ARE SENDING YOU
K ATTACHED ❑UNDER SEPARATE COVER VIA
G SHOP DRAWINGS ❑ TRACINGS
A PRINTS ❑ CATALOGS
In DOCUMUNTS ❑ COPY OF LETTER
D SPECIFICATIONS D
COPIES DATE ITEM _-
1s.1.
REMARKS S qn tAG P�crenr���SL'i0-9�•!/t•-. m,,.Y�f -i
CenG�� Lwl dwfi �___Tl��-_.�lifi_Yb•��s,_.s_
�c me, Am one __Lle Ciy�'i• v .�.4f� k �rre�v/
COPY TO �•l _ 'Ev 3177
l
Preconstruction Conference Minutes
City of Renton
South Talbot Hill Pump Station
Date: March 24, 1981
Time.: 1:00 P.M.
Location: Renton Municipal Building
Fourth Floor Conference Room
I. ATTENDANCE
Owner: City of Renton
Represented by:
Ron Olsen - Utilities Engineer
Bill Kullberg - Utilities Engineer
Les Phillips - Surveying
- Finance
- Traffic
Engineer: CH2M HILL, Inc.
Represented by:
Joe Miller - Project Manager and Resident Engineer
Contractor: TEEM Ventures, Inc.
Represented by:
Dick ;lathais - Project Manager
Fritz Bright - Project Field Superintendent
Utilities:
Represented by:
Jim McDonald - Washington State DOT
II. COMMUNICATION
Correspondence
All correspondence should be to the engineer as the owner's
representative, with a copy to the City. The prime contractor
will be the only direct point of contact for the engineer.
Any correspondence from the subcontractors should be transmitted
to the prime contractor. As appropriate, the prime contractor
shall submit the information to the engineer. Any instructions
or interpretations regarding subcontracted work will be
transmitted to the prime contractor.
Oral Directions
The resident engineer has the authority to make interpreta-
tions of the plans and specifications and to authorize
additional work, but not the authority to authorize additional
Payments. Additional payments will be handl
orders. ed using change
Field Coordination
Coordination of the various subcontractors and portions of
the work is the responsibility of the prime contractor and
not the resident engineer.
Communication
The contractor shall keep the engineer informed as to when
different trades will be on the job site so that unnecessary
inspection trips are avoided.
Matters involving equipment purchases, shop drawing submittals,
payment, and contract negotiations will be communicated
directly between the contractor's and engineer's home offices.
All specific items of important should be communicated in
writing. The requirement for notification by registered
mail is not waived. However, for matters not under dispute
or for sending items of time value, first class mail may be
used.
Contractor Responsibilities
Fritz Bright will be the contractor's on-site superintendent
for this project. During periods light work the superin-
tendent may not be on the site ever, day. However, at all
times when work is being done an authorized contractor
representative must he on the site. The resident engineer
should be notified whenever the designated contractor
representative is changed.
Subcontractors
The contractor shall one week. submit a list of subcontractors within
III. SCHEDULING
Beginning of Work
The contract begins March 20, 1981. The contractor intends
to begin work March 30, 1981.
Scheduling
^.e contractor submitted a preliminary construction schedule.
i core definite one will be submitted when delivery of pumps
is known.
Completion of Work
By September 16, 1981, as stated in the contract.
IV. SURVEYING AND STAKING
The city will stake the site property lines. All subsequent
surveying and levels shall be by the contractor.
SITE SECURITY, ACCESS, AND PARKING
The contractor shall provide his own parking. Parking
adjacent to the site will not be permitted unless the owner
gives permission. Securing the site after normal business
hours is the contractor's responsibility. The contractor is
responsible for protection of his equipment and materials.
VI. ITEMS POSTED
Building permit and any other oermits the City of Renton
require.
VII. CO-TRACTOR'S FIELD OFFICE
The contractor's office at the to will be a trailer. It
will be installed after initial earthwork is completed. Telephone
and power to the office are the contractor's responsibility.
VIII. RESIDENT'S FIELD OFFICE
There will not be any.
IX. SHOP DRAWINGS
Address to: Joe Miller. Anv amount may be submitted. The
engineer will retain two copies. Only shop drawings from
the prime contractor w111 be submitted. Shop drawings will
be accompanied by thi contractor's standard form indicating
the applicable specifications sectic, s and contractor review.
In general, shop drawings consist of catalog cuts and informa-
tion that allow the engineer tc juoie conformance with the
specifications. Contractor shall review and approve shop
drawings from subcontractors prior to submittal. Contractor
responsible for dimensions, num:,er, etc. Engineer approves
for general compliance only. Contractor ,hall read the
engineer's shop drawing stamp.
X. TESTING
All testing will be paid for by the contractor except con-
crete testing. Testing includes such thing: as specified
for grout in Section 4230.
XI. UTILITIES
Contractor responsible for utilities. See GENERAL REQUIRE-
MENTS and General Notes on Drawings. Contact Puget Power
2 weeks prior to when the buried cable is wanted. There is
buried 3;4-inca conduit parallel to it and it could be
placed in the same trench.
XII. WORK ITEMS OF SPECIAL IMPORTANCE
The City does not have an casement on the west side of the
property. The contractor shall keep equipment away frcm.
this side as much as possible.
The highway department wanted a physical ba-rier to prevent
access to the freeway by dogs. Now there is a barb wire
fence and bushes.
The contractor must obtain a building permit from the City.
There has been a change in the earthwor.c on the DnT right-of-
way. The contractor was given a drawing of this
Spec Section 07540-6 was modified to exclude reference to
traffic bearing areas for the roof coating of the pump
station.
Contractor shall coordinate with the City the connection to
the existing 16-inch waterline. The Cite may request the
contractor to tap the pipe. Prior to beginning this work
the ccntractor shall submit in writing the proposed construc-
tion procedure.
XIII. MONTHLY PAYMENTS TO THE CONTRACTOR
Fritz Bright and Joe Miller will agree to percent completes
by the 24th of each month. Joe will submit to Ron Olson
recommended percent complete by the first of each month.
Attention must be made to the City's "Wednesday cut-off"
date, which must be met in order to have recommended payments
submitted to the City Council meeting. Effort will be made
to submit percent completes to Ron, Olsen 2 to 3 days prior
to the Wednesday cut-off date. Payment to the contractor
will he by cash warrants. A copy of each pay estimate sent
to the City will be mailed to the contractor's offico.
XIV. CONTRACT PAYMENT RETENTION
en percent of the first $100,000 and 5 percent of any
mounts over $100,000. The contractor shall request in
writing that the City place the retention in an interest-
bearing escrow account.
XV. PAYMENT FOR STOCKPILED MATERIALS
Only materials stockpiled on the site or in a local bonded
warehouse will be eligible for paymelt. Invoices must be
presented.
XVI. SAFETY
Special attention to traffic safety shall be made because
work will be done adjacent to an extremely busy street/bridge
crossing. Contractor is responsible for safety at site.
Engineer is not responsible for and will not inspect for
safety compliance.
XVII. MISCELLANEOUS
He sure and follow specified procedures when filing charge
orders, claims, time extensions, or disputes.
Record retention is important 'or auditing purposes.
Accidents should be reported ismediately to the State and
resident engineer. There is r hospital east of the freeway.
Record (as-builts) drawings shculd be developed by the
contractor. Special attention should be paid to the electri-
cal drawings. The resident engineer will also keep a copy.
A final inspection will be made and a final inspection
report will be filed.
Insurance is required as stated in the contract J )cuments.
NOTED AND CONCURRED WITH, but understood not to be a modifi-
cation of any existing cortracts, pe, _ts, or agreements.
contractors s apreaad ntative Date
ng user s Represen at ve Date
e a-Ee- �(
C pr Res Res presen L.trve� "—'
iL7ry-�! OAILY INSPECTION'lDIAFIY p.,—m oAv _7'M6 eS DATE. O T O Z 8 1 WORK PERIOD vV® .� 33
WEATHER CLOUDY TEMP. MAX SS° aaIICC REPORT No.
F: MIM1L'P. PRECWITATION.1h.. nwrnia
jf
121NUM"R AND CLASS OF PERSONNEL EMPLOYED: Ill hr O noon
G3�; Meat —Jre,c
IS MAWR EOUINKENT ON PROJECT AMD AMOUNT OF
EECR MTION SI2 ACM wRE.OPER.
/ ' 9zo GsC /oe%P► 93o�c !�
pum trvck� — /2c 4
W WORK ACCOMPLISHED TODAY:
�tmvred R.ODfDx, ey p� GdvflE 5'a� a vcks
3P. e t / /m ecaare 'f' ty_wu� mud
r d,?
-- /off fitc r-A.T
u Z n Ire f
_—�.t sus--�►s— s�/ � �l,rs T_ „F�S�_� :1 ..�sE. rrna�ala/
�oofh
Fr;fr WE n how
donne. i �lo -th ii' u/. �; °.l oi'nn
m � Q
REVE(T9 FORM 71A
® DAILY INSPECTION 440
DIARfY p��,
IIIMY: —�-�E�.�-�j DATA:10•'0? &, MAK PERIOD`z 0'R TD !!Rd DEPOII, I M
MMTNAN TMM,rAN may: "W S E oRFLIRiTAT1DN
IMMUMMN AND CLAM DP PMMDIMIAL ArIAYEO
AIII I'SIoR- F94 tF _
Asy,sriislT -JAGK
_ YApPI MUlMAMT DM PR%@-;T ANQAMDUNT Of USE
DAACNIKIDN _ SISE/CAI 1T1• Mm— N.
WVMK ACCQIIPLMMfO TODAY:
AE oaf / RoEI•_. GY—� ��M[_ .�SL
AALaff w.atAro bar
tFA4.___7!! SHttL._Qoa+d_ AT . 3 ao 6F*Ause 17P 4sw --
Ut1 iTFD s AM swo Ay,¢,*) A/7).
�_ '4� �_aGJ dt,56A1 ✓iJ/rEl? Sp.O ld�M _Of7tiH6S.
__7M0 "IA4 PtWr scopC *A)4LeST siE L�o�1 J 4N —
A*�D t�MT w F}s ALL- HE rAW 14 w H.S A 02 cC
WhlDLE Ar � - -A4pc.v
al �
RT twsi• P9_�wATu11t -"-- oN —_.._._
REY V/A PDAY 11A
DAILY INVECTION DIARY
MOPS
IMM"UP AM CLALE OF PQRBDWUL UPLOWNW.
7 A494 OAAMM
-4 44^04vt 0
MAJOS RQUIPORIMM 004 PROACT AND M!%W OF UM
vim MIGMAPAC"Y MM WIN—.
ro
pt-mom .lf&l powj)
41WORK ACCOWLI&NEO TODAY
Ift7l"ooew
.5rA97r-4P
J�At 1.4
-i mA—
OAIG
REV V" FORM 21A
A,
DAILY INSPECTION DIARY
1110AY: n�as• _-.- DATE ittvmK nRloD fjs= ro V.r RaoRT Na 1'L"
WEATNUI P1.�LPY TEMP MAX LyA/t�.°p: MINJl•R: MaCMITATgN
IEIN�IIMEERq AND CLASS OF PERSONNEL EMRLOYED:
DAM
DR NAM "UPWMT ON PRC I AMP AMWff OF UN
otmwTmm 812 TY MR&QPML
UIWORK ACCOMPLISHED TODAY
AWOM [tt
�►�FQ_.�+CQZL ShcpoflL_�(etfL_�._�__64�.Nlth1LN�__f�
P�6Ll�.[K_.1L�ilT—LW'k_��!IPLs.E�Y2—�3E4Yell1LE��_--
REYV7E FORM 21A
7CH27M DAILY INSPECTION D1418Y
ILUDAY 1�G.Q __.. DATL A #10 /lf, 1..{y To i�w II�pIR Ip,
WEATHER CtQY TEMP. MA% _iiAFt MMg'R: PAKWTATKIN LAM "A#
12)NUCMBEERR AND CLASS OE PERSONNEL FMKO"D:
455T
MAgll WUMM/FiT oM MOMCT AMD AMWN7.�f
a9molmOnMMACITV I
Hw Ong,
141WORK ACCOM►LIMM TODAY:
�9L6P LOgq�-`-AF�INKLC QfC_/l�T�'i._��'-iELL��-�i0 Ill
OI PE.1 b.tMtti._TN+�_.MM�. wlrt. dE ditD �iF! tiI1F /wit
JJdktLSE /4'Psi avOfY ,srltwrsP AFMO �,�® �tw�B,tiMM.
.__�Q4y.� IN /O c� M �/I' nuw/dJ . TjF�f M�Ft�Ml t cFtl7o
j.Q �IcXJ4+.1. net—mm iAl SWUW I..Tv"o coMlf. ( saw OIg
Act /M.laKiCP ._QlRL._ S_LK_ M !4 fTR �O NAridf w�Ar_ {,_
�_11tlPPMCs o�u �tIE._
2 Kattt_1N �"__ oN 44_ cutAW 7ltMFlc c�6MF.
S�elL�_.8i�3L> —LL�I._iX�� �'ouoWf�ittllt�L 1L� �MJt ldNwFw1,
�Q toi_¢�1f� OwCE�6ED iU dficcS. !_��_M!�� of
Now MuoM�.1Z unLn.O cosT.._
rCMdjfftj ?b /AV out &ft Afo&j�AAI_4!N37+4w.. Ado
GrJS
IUVOM FORM MA
a
® DAILY INVECTION DIARY - — -- - -
"'DAY: —22�[w w�W�,� a�_yDAM:Pll' "]8 , 11DIIE VINIOD� TO_::»: 11E1d1T NO.
YIEATMER't�1pi/.EMI[ --P: MIN M4: r[ECWlTArwM Nf
91MUMEER AM CLAU Or NIRtONNEL EMKOVED:
Assr - -- — -
n _Miaow EOUxMEMT ow M A
DEICRNTION U2EIDMACITY R.
� s
I �RODR ADCOWLMMD TODAY:
arAg= yiNr+ our �cvs v .�s�,ts _XA46M —
DBALWOUa �AoriBr IEfer�f 7E7D ys�y,--Jo INIEIIT A✓o
-*O7/<RIl71 M LSPY Sine of s dk4a a 4tMW &Aoirve OoO oA*r
wI � 1
wt[I [I F9-TiweTuwt /AT[
REV Ell[ FORM MA
YourseatEk
•
Human Rights Department
Charles Royer Mayor
SeptAnber 17, -1980
S.H. Saloy. Sr.. Masonry 6 Canal Construction
2015 33rd Ave. S.
Seattle, WA 98144
Attn: S.H. Saloy
Re: Status of S.H. Saloy,Sr., Masonry & General COI�strrxtion
Dear_ Mr,Saloy:
Thank you for cangleting and submitting for Out review this Department's
WBE and MBE puestiuma,ire. Based an the innfoinetion you provided, the
above referenced business has been certified undo: Seattle's Women's
and Minority Business Utilization Ordinance 109113 as a born de:
❑ WBE
ME
0 Combination WMBE
Your business will be included in the next WSE Directory issued by
this Departnea• As suchnit will be accessible to contractors, City
contracting d• -ments and tethers requiring the services provided by
your firm.
Please notify this Department's Women's and Minority Business Enterprisc
program of any charges in the information you provided in the question-
naires. You will be notified as updating and recertificatim are
required.
Thank you.
`sly, l
7
ivlan L.
Drraxtor, 1!<tan. is Department
VLCrlb
�<�wu��<mdorTni onw�uner-an„m.,..<snw <Tna�.
Gnr M SNnw-wuwM eel"OW' ' M MW eai-�L'
WRIGHT, LNG EIECTWCAI CONTRACTORS
EarrsclLL R muawn•t C wDu/inu 3700 fouTw GENES r
■urn(,w•5N. lei
A«oMc 723-13 a
MARCH 31, 1981
TEEM VENTURES, INC
PO BOX 4245
FEDERAL WAY, WN 98003
RE: TALBOT HILL Pumn /Station
OWNERSHIP CERT. ltr 3/26181
Dear Sir-.
This letter is to inform you, and all concerned, that Wright,
Inc is a certified minority first, doing electrical contracting
business in the State of Washington.
Haruld Wright, is the president of this company, he is a
minority, and owns more than 50% of the company.
We have been certified with all of the local, state,clty agencies
in the area.
Sincerely,
Harold Aright, �\`-. 1 _.. .,
WRIGHT,INC EEL
HGW/mw
u=v
141NORITY PAINT CONTRACTORS, INC.
217 - 2401° Street Southeast
Bothell, Washington 98011
.4arch 27, 1>81
This is to certify that Minority Paint Contractors, Inc.
is a minority enterprise with a black male owning in
excess of 50% of the corporation.
C ❑ 1600 Wft,. i, has it,Orgon 97 3 ❑515 W N�n Ligh Blvd. AntdOrtg,Alesso 99M
(v _ ❑ Z5 Cwn Sn edd ".CY�lornu 95001 ❑923 D Slr ,.. A4W.99901
./�. ❑ 3B0 Poe Strew San er vrnsco.C.f,r'A Wu ❑711 1051n Ave N E -B.".— Wasn.,,rn 9900g
:1. ❑ M S.W.Mwke St 2a11 Floor VMyrp,Oq.17201❑414 Norm First Street 90iu,Idaho 93701
❑ 12015 Ent A61n Colorado W239 ❑19M ttaac Newton Sg E Paton,V'rg'nia 22M ILL
❑ 555 Caonol MN! Sccramenlo,Cawmwa MNI ❑
leave vwl.� �o • g/
� 109 No S/3b5/.AL
100 .ytFd Q,.c,w�.
R..� cup 9Pcss SL8,«,
.F N AA L a
c�o[6caf..0 r`' 0 arc(! Ate,
4a two .e�<.nl sh..J LAIVt^ .ens( tJu t Ot�,w A t 4k t
tfnt who >vo- ,� �^ 41v, A A
A
7 � A1r a� , Cs+�aoaezNs+� , ,
i
I
� A&�
IM1n�nl..rlmAl lCltt4hPW]N.N.`Cnl^eYl Ir.pp.n edn[M AlM titan It,CO!'1.1rWr�rt Alnan IMI N'�I'ti111�IA I4iM m¢gyR qWV]yld rydyC,p(n6li
TEEM
ENTURES P 0 dox4245
Federal Way,WA 98003
2 NC. 12081 941 1550
l.P:rIERor 14AAn,AIITIAL
To — City of Renton )ate -Apr t 1 ,1981
200 Mill St. Juh So. Talh.,t HI11 Pump Station
Renton, WA 980S5 `Renton
Attention: .-G .1--a.
Enclosed is the approved Statement of Intent to Pay Prevailing Wages form for Minority
Paint ^gntrArrora. Thag will 1>a dnip�rha �atnrin� nn Ue j,ph.
_ For Approval Approved as noted
_ Returned for corrections as noted.
Approved Please resuhlnit;
ction
? For your files For your further a
Per your request
Remarks _
I •om Censure//,IJnc.
1W
tR RECEIVED
wD RTATE OF WARRINGTON
APR 15 1981 DARTMENT OF LABOR AND INDUS R S
STATF.MC"P OF INTENT TO PAY PREVAILING WAGES
ON PUBLIC WORKS'CONTRACT
AwaNlna Aselxy City, A X"ton
Contract Nunlher... CM'CA. 1'e81..._._....
Date Werk CM,, ncma. f TrIX-l1a.1981 _. _..
Date Contract Awarded March 16,. 1981
STATE OF WASHINGTON CountY in Which Work Pertarmed King
City of Renton
i701/9t1/ Of Ring liRatlon \Yilhin County y.
None contreeto. Team Ventures Inc.
In compliance with RCW 39.12.040 1, the undersigned, being a duly authorized representative of
Minority Paint Contractors, 217-240th st. S.E., Bothell, HA -98i111
.b�rrYaer aupmn41abr1 IAEpreY)
do thereby certify
tth8dattll the following rates of hourly wage and iiourly fringe benefits will be paid to
all laborers, workmen and mechanics emuloved by me upon the public works project described above
and that no laborer.workman or mechanic will be paid less than the "prevailing rate of sags" as le-
lermined by the Industrial Statistician of the Department of Labor and Industries.
CRAFT AND CLASSIFICATION Or LABOR RATE OF RATE Or HOURLY
HOURLY PAY" FILROr SKNUITS
Painter 14,92 1.69
Foreman 15.67 1.69
NOTE: Attach additional ahecta as needed Subscribed and sworn in before
me P
Mina ity faint Contractors this � �ay of(,.{rl/lt
-tee �
TEEM
ENTURES P Box 4245
Fedetal Way. WA 98003
T.N C. 12081 941 1550
LETTER OF TRA\SW'PI AI.
10 _ City of Renton Date April 23, 1981
200 Mill St. J,,h So. Talbot HIll Pump Station
Renton, WA 98055
Attention. Bon 01aon
Enclosed is the approved Statement of Intent to Pav Prevailing Wages torm for Pioneer
Hasonry 6 Restorntion. 'there doing, the Fluid Applied Roofing.
For Approval approved as noted
_ Returned for cormctions as noted.
Approv" Pleww resubmit;
Fur your files For your further action
Per your mquest
Remark:
Teem \witwe,. In,.
kecervEo
DEPARTMENT OF LAP IR AI&DUfSTIAW 1 1984 Statement of
EMPLOYMENT STANDARDS DIVISION INTENT TO PAY
Olympia,WA986o4 PREVAILING WAGES
ttEC r4t.A (Public Works Contract)
YW0r
pPRlg 1981
Awstdina Agency City of.Rea[tm_._..
Contract Number CAGO17-31
fJate Contract Awarded Hatch 16r...lggi....._._.. . ...
County in Which Nort Nrforttnd Ling
C.:¢atlon W.Wtn County City u: henton _
STATE OF WASHINGTON trine Contactor testa Ventures Inc.
Counrl of °8
_-.-........ .._ _.. 1)u You Intend To Uae Snbcon4acMrv" fen❑ No❑
In corn nce with RCW 39.!2.040 I, the undersigned, being a duly authorized representative of
Pioneer Haealry A Restoration P.C. Soz 70110, Seattle, WA 98103
do hereby certify that the following rates of hourly wage and hourly fringe benefits will be paid to
all laborers, workmen and mechanics employed by me upon the prriblic works project described
above and that no laborer, workman or mechanic will be paid less than the "prevailing rate of
wage" as determined by the Induetnal Statistician of the Departm nt of Labor and Industries.
PLEASE NOTE. If apprentices are to be used they must be rcitistered with the State Apprentice
ship Council or they moot he paid prevailing journeyman wages.
CRAFT GATE Or R/Te DYHOI'RLY
HOURLY PAY PRINCE AKNRrirTN
Waurproofare $15.00 0.111,11
N,T Attach Addini nAl Shwa.as Needai Pione ifaeoary d Restoration
Subscribed and sworn to before me By 7� �
Hobart 9. Yield, Presidert :ntµ:
We C' -Lc° day of riLr L a 1 t.e ttalr
19..17. , C, meetyof Labor a Inwlstr..
.Att'.JtvL 1 94 an
AoAtry 1ublir. ne A"tdr Sate//WaaA.na.on, y„/,.i/
trio(,'a on. Clan
BEFORE FINAL SETTLEMENT can he made on any public works project,the prime contractor
and each and every subcontractor must submit form LI-700.7 "Affidavit of Wages Paid" to the
officer charged with the disbursement of public funds. EACH AFFIDAVIT OF WA =S PAID
MUST BE CERTIFIED BY THE INDUSTRIAL STATISTICIAN OF THE DEPAP 'ENT OF
LABOR AND INDUSTRIES BEFORE IT IS SUBMITTED TO SAID OFFICER.
PROGRESS PAYMENTS:Each voucher claim submitted to an owner by a contra Tyment
on a project estimate shall state that, revailing wages have been pail.in accords .c wu.,: the pre-
riled statemett or statements of intent to pay prevailing wages on rill with the public agency.
CG"PLETE AND MAIL ENTIRE SET FOR APPROVAL TO:
Employment Standards Division, Department of tabor and Industries,
General Administration Building, Olympia, Washington. 98504
VONTRACTORB, UISTRINUTE APPROY"EO STATEMENTS AS FOLLOa'h:
I PINK COPY ORIGINAL-AWARDING AUENt'Y
tBLURVOPY1 DUPLIt'ATF-PRIRR(Y-9TRAt TI)R
:iMY LL LOW(Y)PY) TRO'LICATR-SUap)NTRAlT1RR
GEN COPY1 QUALIRMICATIC-INMIaMK At.RTATon%'IAN IR.Y�p.d Yr Vp a.m a0
1.14N0 Russ is Pa. a" +.
W-600 SOUTH TALBOTHILL PUMP STATION WTR-10 2+
#6A Cons ruction Correspondence
�� � • From:
Date:__...
To:.- _1 4— rt&
Our Project No.
a� MnTEHinL RECEIVED IS NOT AS LISTED,
PLEASE NOTIFY US AT ONCE
Re:_. J'Ltrt'L(E8_lvt.�aak•-_�QSS
WE ARE SENDING YDU
A ATTACHED M UNDER SEPARATE COVER VIA
O SHOP DRAWINGS O TRACINGS
jIL PRINTS O CATALOGS
D DOCUMENTS 3 COPY OF LETTER
O SPECIFICATIONS
COPIES DATE rtEV
REMARKS
Co" TO FOAM t
"--" Rev SIFF
DAILY IPMECTiON DIARY
L�
I11011T: DATE. �.YI./=�. 71 t/, "am MmD • To 7�/.n wa rnoo, /6
ARATN[A 7Ml.MAi �� •R Mw�M1 PROM TATNMI Akw�
AANINIftM AND CLAN Of M11110111NL (IKOT@
JAa_
�[nn is
MAXM EOUPUM-T ON M_pIRCf AND AUgUMT �f
140. OEACAMTIDN NXIMMACITV HAL OA.
_ I
N111MAK ACCOMKIMAD TODAY:
RtmovE� Arm-, PC,f a
KI •.01 T a" mat N•M•TY..
11EYWM PONY 21A
-YHLL DAILY INSPECTION DIARY .
i,ioAr: �oAn:L. �'j t / WOI1K nRNq�•.".
�Y .... RtPDRr Na—Z
WEATHER I -'-10"P: MIN-n"F: PRtCOTTATION B�[V
121RUM"ft `AND CLAW DF PERSONNEL ER/LDVLD:
1 7
IS _ MAJOR tOUPUMT ON PROTECTAL
OltCRWIM MiE/CAPACRV HRIL GPM.
141VJMK ACCarL1O4ED TODAi: If
...-
06
w[Le[HT iwcu[ noww7�w[ 'oA
REV NK FORM 21A
RMOAlty
INSPECTION DIARY
I11DAr: GATE: ® .�2. IF/I WORK IERIOO Q _we TO 4-y����ARE ORT Oft
WEATHER TER►.YAMP: WM-k9o*s. PRECIPITATION—
IIIRUMEER AANO OF PERSONNEL EM+LOVED:
131 MAJOR EOUWEEWT ON PROJECT AND AMOUNT OF UN
i --- DEWMWTXW M2EMMACITY MIS.MR.
W WAX ACCOWLIEWEO TODAY:
W11120, u l 9Eia. , /ItaarAa i�t.1
zn&L A .ne mau.. e..• aA11. --
a-m� S4eA.t pis f r",
L = D h�, Ztx IZ xiiS •I7Koo +� •t Y /1r er 12d .;
%are ww un%I6,
_A Told �s.l
ox" k B S
wezm,.R• aMlw.aw• awwmwa Dw+a
REV WA FORM 21A
'L"� DAILY INSPECTWO DIARY �.
111DAY� RSDgy pATE:L�.�1 �011� I w.r.
WOIIK PEKgO_F•M, TO_i r KVOKT Ift
WEATIIM yA/M TEM►.MAXP: IINI.�i►: PRIMTATION
121NUMNIER AND CLASS OF FEMI - L YSFUNW..
MAJOR EOUKMENT ON MDA" AND
OEECAIPTION MZVCAPACITY NNK OPEK.
1
1
MI WOKK ACCOWLIENEO TODAY:
&Ot&' Z ANo .Nas V-Wr $I "*s M Iu�6rr �nA/E /ER
cayJErsj�TIaJ_y,�/ Ggl_��a�yA�NS
a.
a
i
NI
-------------
w"'Dawi sNa1Na wY 11aN11 u1H owT[
NEV WIE FORM 21A
DAILY INSPECTION DIARY
05
n1wr: H aTE: / gtrg11K rERlm_.::; To RMNIIIT Nd t0
""ATNLR TEII.NAIL�•r: MIN�•r- MLCIrITATM AGrrr,
171NlMDER AND CLAM Or PERSONNEL EMPLOYED:
/Tow
13 No MAJO11 EOUOMENT ON rKOJ/Df AND
SRE9MAP_ LLCRIrT10N
ACITY MKa OqR.
1/1EKINK ACCOEWLREKO TODAY:
wauoawa aww�reaRy a�aw»uwt aAra
REV KN "m 21A
'^ DAILY liq•ECTNM DIARY-. .__. •-
tuonr: , "rig:, xG'fiai wom J-2
WIAT'Iiw -Tire s MW 'P: MECNITATIpw Aet�-
ILw11M IN A CLAN OF Pgrjo wliL OI/LOriD:
MIAJOII iOYiW[NT OM MOIfCT •Mb w110lIRT OF_
O[iCRlIT1011 i1ZLICYACYTY NIq.OiiR.
141WORK ACCO//LOWD TOOAVi
IF
_�+ �fit., ,it d•:•�•�E1 .�..� � �,..�. -
AF
Jr
rol f f-a�
• + wwi wTj' ewri
Raven FORM MA
Jim DAILY INSPECTION DIARY
,nw-.:�� _ wn:o from t I .�1�.iNro1 wa Ta �C �nawT MIX
rIEATMEA _ TAN.IEwX �u�N: NMI N: NAtCPITATIOM_J�/
IIINIANIEA AMMO C 0[ P[AiDIINI NrlIOYM.
rAd00 EOUPYENT ON MOIlM AND AI UM
NT w..
NTIOM YIAWACITY Nlli OMEN.
IF Cad.
Ill MOAN JMAD W%D To"V.
_flx�fla� �ir�d �n
VX� or st(sF
a
•1 Ei w[LD T { 6�Y[[ '\ yMATYii Otli
NEW VIA PoNN 71A
TEEM OF
!VENTURES P,O. Box 4245
Federal Way,WA 98003
INC. (206)941 1550
LETTER OF rRANSMITTAL
To City of Renton Dae `lay 5, 1981
2nn Mi11 St, Job So. Talbot Rill Pump Station
Renton_A 98055 Renton, 6'A
Attention: Ron Olson
Enclosed please find our Monthly Manpower Utilization Report for the month of April, 1981
_ For Approval Approved as noted
_ Returned for corrections as noted.
_ Approved Please resubmit:
gug For your files XXKX For your further action
_ ter your request
Remarks
l'cenr A..narn Iro
1{v
CONTRACTOR/SUBCONT CTOR `�Y rj
REPORTING PERIOD
MONTHLY MANPOWER UTILIZATION REPORT �' R' Month: April Year: 1981
To be submitted to the City's project �, Goals and Timetables as co®itted
Engineer during the let week of following r� `'N in Contractor's Affirmative
nth while contract is in progresr. Prima ANT Action Plan k
Contractor is responsible for obtaining and
or per City's Plan 9.1 $
submittinq all Subcontractor Reports.
To: (lama aM location of Compliance Aaeacy Der From' (Mar aad location of costracterl
City of Renton Teem Ventures Inc.
Public Works Dept. P.O. Box 4245
200 Mill St., Renton, WA 98055 Federal Way, WA 98007
This report is required y Executive Order 11246, Section 201. Failure to report can
result in sanctions which include suspension, termination, cancellations or debarment of
contract.
.
mSno- Total rtal
Work Yours of Employment (See footnote) rity number unD+r
wA of Of
of
C laael a' mtnofit EmPby-
Hlo- mer. Aelan/ ,oUl total
^fade fSce- Tote I+lack ndtan Poeffte ?e- rmDloy- ens
ComDary•'e Name (I.G) clone rants 7Qand _tl+ v/h Pee
Teem Ventures Inc. rA
- - - - - 0 0
Carp. _
Teem Ventures Inc. TeamsterTeem Ventures Inc. ahr
A
Ti
A _
Tr
C
A,
Tr
t
A
Ir
Tr
Tr
Tr
7. ecmpany C Solo 1'a .18 na urn an a pate S16ned u Telephone 6umber
(Include Area Code)
al l�/C[Glr�.(sO' V� 5-5-81 (206) 941-1550
Rev. 11177 (-males 6 Females, --minorities S Non-minorities) Page / of
7;60 (Submittal Requirements 6 City'a Goals/Timetables) --
INSTRUCTIONS FOR FILING EMPLOYMENT UTILIZATION REPORT (CITY OF RENTON)
The Employment Utilization Report is to be completed by each subject contractor
(both prime and subcontractors) and signed by a responsible official of the
company. The reports are to be filed on the day required, each month, during
the term of the contract, and they shall include the total work-hours worked on
the project for each emplovee level in each designated trade for the entire reporting
period. The prime contractor shall submit a report for its work force and shall
collect and submit reports for each subcontractor's work force to the Compliance
Agency that is funding their construction project.
Reporting Period . . . . . . . . . . . Self-explanatory
Compliance Agency . . . . . . . . . . City of Renton (administering department)
Contractor . . . . . . . . . . . . . . Any contractor wno has a qualifying
construction contract with the City of
Renton.
1. Company's Name . . . . . . . . . . Any contractor or subcontractor who has a
qualifying contract.
2. Trade . . . . . . . . . . . . . Only those crafts covered under applicable
EEO bid conditions.
3. Work-hours of Employment . . . The total ,camber of hours worked by all
employees in each classification; the total
number of hours worked by each *minority
group in each classification and the total
work-hou- for all women.
Classification . . . . . . . . . . The level of accomplishment or status of
the worker in the trade. (C - Craftworker -
Qualified, Ap - Apprentice, Tr - Trainee).
4. Percent of minority work-
hours of total work-hours . . . . The percentage of total minority work-hours
worked of all work-hours worked. (The sum
of columns b, c, d and a divided by column a.)
5. Total Number of Minority
Employees . . . . . . . . . . . . Number of minority employees working in
contractor's aggregate work force during
reporting period.
6. Total Number of Employees . . . . Number of all emplovees working in contractor's
aggregate work force during reporting period.
• Minority is defined as including Blacks, Hispanics, American Indians and Asian
and Pacific Islanders - both men and women.
DAILY INSPECTION DIARY
u ItIDAY: ArAl DATE. 0{t /0 ,8/ � WORK NAM-!-r� 10-1—M RSPWT MO7
MIEATNEIII, `_WTE. MA% 1LO°F: mm 50-p: mustvATIDN �
12IMLaAEEA AND CLAN OF PERSONNEL EMAPLOYED:
fts T- revels
MA" EOIIE'MMET ON PROAD? AND AMDUER OF UM
FIG. DIESCRO'"m EImcApACITY NIEE ONA.
i Atilt 4i"A&vsW joW
IAIwDIEK ACCOM►LRWEO TODAY:
EKaT /4' q+vp wNeRE STa-QA4 _ W60W —
L�l1�lAllt� S71eCEt'_ roJ ._i(o 7 o
Co�rR_..sfDBlylE_.Yh�F_..�1�i�1_IR��IS11_ 7o IE v� --
��oE+e 7�_�1MP s�,rraAt,_/iEoua� 7CBIr�J ,; - �za'cE�a�
_*oc !I, " D/ i/AG M+O 0IF791 /4' MJ IM. 77MM ARE m 6Q,--
USED_ r-o4 CQAt uEcPoPJ %D Ex sr /_6", BuTTQC [ Y ✓�-Jt - mu, 8�
al e�/'I$wt1
� wnixxT axaixaara uwxATuwa _--- awn
DAILY INSPECTIONDIARY
IEIOAY: SVAI DATF 7 d
TO 1.WMI _ .r — . . MQOIFT "M
NIEATMEM TEW. MAX _'R: NM—'i: MWWTTATI M
WOKO MM AM CLAN OF PEMOMMEL [FILOV§W.
(31 FFANM E w"m OM MIOIgC!No
gawwrm ollitAWAOTY MM OMFI.
WMOMR ACCOWLIS EO TODAY
tTy �c0 �AISPEctxoTv. DFp Nof__ TAlSPEILJ Rr 4W*VV%y or
41y, WRe 1w- L-CrrC4 TO crrj _044A10,44 rw $6
M ♦ aMs wl MAMATuwa oAiE "--
MYYN ►e11M 7fA
DAILY MWECTION DIARY
It1oAV: A -4. DAri: 0 7' / 9; OR
1/ MI{ R2RIOD-A=To i0-19t Rapm? an
NREAMIR S%W&*V TOM.MAa ."F: WIN" OF: M2CINTATI M
121N{M Nlt AND CLAD OF N:RfON11lL aMLOVEW
quo" o9g tee-- —
Assr— v2JN(s
12 MA OR touwmm ON"MAC?AFI�AYQ�IST Of L«a
1AIEIOIIR ACCORILMMM TODAV _-
-AlA`O 640 &.DEWAUC 4+JP c✓[Q� tAfv AsPNAcT Fb� .7t�Nl _
_Q��vEy _LApp our s00116 �_c sR/ v
_#AU4&Fr POW&-e woRK-yo Arc 40ft 14v*1J Ale CAjJf Ado ..
Sox. 4*1) _C AdC5 To -rYIE Srprcfr__eAprw/u.E32 T�.e'aN e
NArtUlf_AKAT`t. . co�2l c+F6t2_r� --WA0e&.
G+jp_;At"_Ne coNA+,'r fAJ sue. 4ww.r
r
wauwuV wao aewy a •TuwT oAVa --
REVa/l9 FORM 21A
L� DAILY INSPECTION DIARY rA1
tl10Av: _7V&S. DATE:'. 0'/1 /y IJ` NONE TENNIO!A.N. 6rN
TIGMEII SVNN `` •� N _.r. MI011T MO.-��
-�TEM�MA><�'h MIN_2IC'F: .NECNITATN711-
*11K EN AND CLAW OF .ENEONNEL EEMLOviO:
Asti- R`A/4/K
13 MA_gN lOU1MY(NT ON MO,IECT ANO
Of
NER E/CA►ACITV NNE,OM11.
CAWd9sKrbs 'Yia A7
IAINONA ACCOAYLISHED TODAY: _
_Aw4er Powell LAEPAcK
F_SeiN �re.cry 4A __Lo_ �IAI
_LNSrAt4eV Me FvNE �� A1v_�,V/►7€� wlss
"2. -ZoL'_�__ew A/ wit yooQ`_c�or►�r tyr
ARevA.a AU.
pi NnI t IN •\ NENgYNE O r'
a
NEW un
WRIGM9 INC. EtECTOM CONTRACTORS
WnaMdEl {( esawnw {( wwEmw 3700 GOUT"GENESEE
SEATTLE.WAS". Salle
PHONE 723.1362
APRIL ?4, 1981_
date
TO: r.M OF RENTON
BD OF PUBLIC WORKS
CITY HALL.
WASH,
NOTICE THAT LIEN MAY BE CLAIMED
Gentlemen/Madam:
We are advised that you are the owner, or reputed owner, of
property situated at or near the following address:
SO TALBOI HILL PUMP STATION-
This is to notify you, that on the 17tb day of APRIL
1981, we commenced delivery of materials and supplies/and or
rented equipment to be used upon the real property and 311
improvements owned or being constructed by you, at the above
address. These materials and supplies, or rented equipment were
ordered by TEEM VENTURES INC-PO BOX 4245-FEDERAL WY WN 98003
These materials E. supplies, or rented equipment consist of:
Glee materials
THIS NOTICE IS NOT A CLAIM OF LIEN, AND DOF4 NOT IMPLY THAT A
LIEN MAY BE NECESSARY. However, We are required by statute to
furnish this notice to the owne" if all property to which we'
deliver materials and supplies, f,.ving them notice that in the
event of non-payment of our account, a mateiialmen's lien may
be claimed by us.
truly yours,
--- /WRIGHT,INC -EL.EC CONT
by: l
title
i •
/DEPARTMENT OF LABOR .AN•INDUSTRIES' STATEMENT OF INTENT
INDUSTRIAL RELATIONS DIVISION TO PAY PREVAILING WAGES
• Olympia, WA SB504
tiFarEwL`^A ON PUBLIC WORKS CONTRACT
APR9 1981 AwardinE Agenen _9R...R411104......_......._...
RECEIV Cn
cu-a.r.o .rA Contract Number....CASM-41_............................_..........._.._..._._.........._..._
APR241981 note Cuntravt Awarded... eh.JA1_ .........._ _......._............_.........
Date Work Commencing_WreA.111 1 I,__,.� _
STATE OF WASHINCrON County in Whkh Work. Performed
County of &inR. Loeauon Within County._.4i 1Y. 94.RPrtog... ....
._........_........................
Rime Contractor...'�OAtp.YRR-4.9=41...TA9............__..__._._.......__.............
D(I You Intend to Use Subcontracton? Yn ❑ No Cl
In Compliance with RCW 39A2.040 1, the undersigned, being a duly authorized rt-presentative of
Stan Sa],oy.Rttaonry,.2015 - 33rd So., Seattica.V4__98144
.n or 9upmurncMrl (Add-.,
do hereby certify that the following rates of hourly wage and hourly fringe benefits will be paid to
all laborers, workmen and mechanics employed by me upon the public works project described above
and that no laborer.workman or mechanic will be paid less than the "prevailing rate of wage" as de-
termined by the Industrial Statistician of the Department of Labor and Industries.
CRAFT AND CW881FICAT1oN OF LABOR RATE Or RATE Or HOURLI'
HOM-Y PAY TIONOE BENErns
�Vr`k4i�<v /.41L as/
PrPPR� wr,�� asr. iyr4 soi
J{.1 r6A►vl a a Fir
>� 3 All
NOTE: Attach additional sheet. as needed. Subscribed and sworn tto/ -
o, before
me
�
....._....S. a Salay liasioncy_... ..........._ thus sal./J day Df..<:`
' ` comvonr�i ��J
By _- NotaW PwbRe in and for the Stele of WwAlnatow,
1Aatnonrad De�l aFal "vidirra in W"Jul won.
The purpose of this statement is to provide evidence of intent to comply with the prevailing wage
requirements of Chapter 39.12 RCW. IT IS A PRELIMINARY FILING ONLY and cannot be
construed as application for certification by the Director of Labor and Industries that the prevailing
wage requirements as set forth in RCW 39.12,640 have been satisfied,
Iar L a 1 14e Dab
APPROVE[)
M of Labor a Induatrka
94ttlal n
BEFORE FINAL SETTLEMENT CAN BE MADE inf� ect with any ublic works project n will
be necessary for the Contractor, and •any subcontracduce evidence of certification by the
Director that prevailing wages including fringe benefits have been paid to each classification of
laborers. workmen or mechanics employed on said project. Fora S. F. 9843 "Affidavit of Wages
Paid", or a similarly constructed form should be submitted for the Director's certification. These
forms are availaole upon request from any office of the Department of Labor and Industries.
PROGRESS PAYMENTS: Each voucher claim submitted to an owner by a Contractor for payment
on a project estimate shall state that prevailing wages hive been paid in accordance with the tire-filed
statement or statements of intent to pay prevailing wages on file with the public agency.
COMPLETE A"D MAIL ENTIRE SET FOR APPROVAL TO:
Industrial Rel.: Division, Department of Labor and Industries.
General Administration Building. Olympia, Washington 98504
p NTRALTORa. DISTRMUTE "PROVED 9TATEMENTR AS FOLLOWa:
�41aSE rRCOPY /IJf-0AH--MG1MT R TtanC1AN iH.Wided to M",U ,,du
LIMP labl r tlp com
L I DAILY iNVICTM DIARY
nIo•r: �!i,>�jt_ wn;.}i i.1�I t / MOMM nRm .'.:`:To-,4--•`.: REPORT
WEATHER_—%M~ THY,M&X_r: mw—M ro
: VNICIPIT�TR xww
171RIIMMa AND CLRr Of nRROMMRL rrLOYM.
r•/� MAJOR ROu0M�N7 OR PR*JW&MO AM_QjW V _
.9 WRILICAPACM MRLOPEN.
(4)WORK ACCOM►LMIIRO TOOAr: — �L_ • y ..._._
emu .
tew.t•�r Ai_ sw at an as._
S 7�Pf✓ lrJfM�
v
wanoa aw a w`wtuwc ems+ —
�tNS►ECTWN./MARY f /�
Vomit PGRIODJL::.�i TO-4i:W hope"t ra
'ZIWJM-f�e'AD CLAN aO! nWMMI WIWWM
_._. W100 fOOOOMT ON ronA�CT YID AMOIOIT a
Rol" rlOy �tx6CA1 n NOl ONO.
11 WOM ACO�O�MUM�SO TODAY,
--�'�ld+{tll�aC_��et drii t tiL
0lV NA POML 31A
DAILY INSPECTION DIARY
REPORT on
wEATNER TEI�.4Wt •r: MMi�M: PRECIPITATION
121RUMEEP AND OF MREOIMIL NIPLOVtP.
-�rr tj
Town - —
y -___MAJOR tWEM IT ON FROA[R ANO AMDRM[4F
.. Of WTI" Elt ACITV MRE.O►ER.
MINOR ACACCOINLRRED TODAY: _
Eft • .2s.,
Ay�RI {NOIN[{R•l {gNAIYN{ y—Tj
REVN/E FORM 2IA
+I
j�`'ti0.11 DAILY INSPECTION DIARY
IIID,Y: _"Q5aft_ Mrs:,Ar is.1 �/ I RRIRIf Nx�roD-�+E�ro T!. REroR, Ro. Z.
WFA211ER/l SiMr/ TEE..Y,R yS'�� RwF.�•r: wKgnY�nen w0�
WNUMEER AND CLAW OF FEREOWNIL OIFLOYIEW
fti rib
leEa
tahm Ealwmm DR FIwncr , AAVM OF
rr M:erc,► Ir RRa onR.
RIIMOIIK RCCOEMLMMID TODAY: _-
/�O
R+r p4aMyne _ffgft _PAC poor CAs•_N44. Jar
E�strw a� tlExo�lt_L3�lIi w �}�7Bn voT lV
�AIA+fIC 7E MAILF �EyR -. _
winos«+ a«u�•s na«Aruwe -- Re+a—
REV WW FORM 2-A
DAILY #NY[CT10N.HAPIV
I110AV: piGOoW DATE:Lot y f 7 I' I WORK
WlATN[R-.WM�nr. W ,p, MD_°R. Now
MEONTAipIM
(]INUMEER ANO CLAW OF PERMMML II/LOT#O;
IW6M NUMAINT ON MOST
ITY RR6 R.
MI WORK AOOCRlEMIRo TODAT: --- —.
bro_DID NO wmm -
1FWiCt. �<iT�tlu�J _sGF/0 Ovr 40&ay f A M OAi - AIMUA
G1R�
rot - Lm )j. mE_r " eN f�,ew G�[9v.yn
Pipe. —
M,� AIM we" pL*o RIM —
I�EEIDEN ERDINEE -f A UNE
DATE
REV&" FORM 21^
TEEM
ENTURESP 0 Box 4265
TT Federal Way,WA 98003
INC. (2061 941 1550
%ETTER OF TRANSMITTAL
I City of Renton Date April 30, 1981
200 Mill St. job So. Talbo 4111 Pump Station
Renton. WA 98055 Renton, WA
Attention: V..n nl a...,
'losed is an Approved copy of the Statment of Intent to Pay Prevailing Wages for
the Mason - Stan Salov Masonrv.
For Approval Approved as noted
_ Returned for corrections as noted.
— Approved Please resubmit;
For your further action
%%% For your tiles
Per your request
Remarks
Teem Veenntttuurreee ,In,.
8y
TEEM
ENTURESP O Box 4245
INC.
Federal Way. WA 98003
INC. (206)941 1550
LETTER OF TRANSMITTAL
1 City of Renton Date ma'. 5, 1981
200 Mill St. Job So. Talbot Hill Pump Station
Renton, EA 98055 Renton. 'nA
Attention. Ron Olson
Enclosed is an Approved copy of the Statement of intent to Pay Prevailine Wages tot
the Seamless Floor applicator - Surfacing N.M.
_ For Approval _ .%pproved as nond
_ Returned for rnrrevtions as noted.
_ Approved PMaseresuhmd:
_ For your further action
X7C For your filet
_ Per your request
Remarks _
teem Venture. nr.
By wW. " //��LiLl�✓
DEPARTMENT OF LABOR ANONDL'STSIES SMEMENT OF INTENT
�INDUSTRIAL RELATION'S DIVISION TO PAY PREVAILING WAGES
4taw+FA". WA 98594 a
'APR16 1981 ON PUBLIC WORKS CONTRACT
Annudina AV." City of gaIItm_....__..___..._.....,..__....._..,__.__.
Contract Nurnter CAGO17-81.._...._..._....._.�._--.._..._�.,_.._.._.._�_-
Date Coitus" Awarded . arch...14..),403..__....._._..._........._
Date Work Coe tar eiva_Itarch..,31,..19.g1...._.._.._....._...___,...—._.
STATE OF WASHINGTON 1 County in Which Wan Performed y,.fU
} Location Wiudn County_._City Of BMtnII .,.._.._.-__.___.__........
County of gin: ) Prime contracmr....--TUM 4antutaa Inc.........._.. _.
Do You intend to Use,Sutxrontraeton' Yea ❑ No
In compliance with RCW 39.12.04 1, the undersigned, being a duly authorized representative of
Surfacing N.W., .JW 17926 INy, 99, Lynnwood. RA 98036.. P.O..fdua 3197
l ur IIuecunir,ebr� 1ALare9d
do hereby certify that the following rates of hourly wage and hourly fringe benefits will be paid to
all laborers, workmen and mechanics employed by me upon the public works projEct described above
and that no laborer,workman or mechanic will be paid less than the "prevailing rate of wage" as de-
termintd by the Industrial Statistician of the Department of Labor and Industries.
CRAFT ANo CIAWITICATtON Or LARDS RATE OF RATS Or NOORLY
NOt91LY PAY FRINGE lfER
Goaposition Finisher $ 1 $ 2.55
General Laborer 12.93 2.33
NOTE Attach additional sheete as needed. Subscribed and sworn to before me
sudec3ni.Hill._"" . this � day of.. /. 19.-1
�
By y.� .)Ltd (. /.2,LLi N91M Public in and for the Slate of a',Shngga ,
` And,. annrewmaneU RMAina in watu inaton.
nN tiR.t.e..19
IYM.Wa YA ene1
The purpose of this statement is to provide evidence of intent to comply with the prevailing wage
requirements of Chapter 39.12 RCW. IT IS A PRELIMINARY FILING ONLY and cannot be
construed as application E\r certification by the Director of Labor and Industries that the prevailing
wage requirements as set forth in RCW 39.12.040 have been satisfied.
M Lf llr rwb
VED
of Im►aP&Iaaaa4Na
t�
BEFORE FINAL SETTLEMENT CAN BE MADE in c nec a with an ublic works project it will
be neces
sary for the contractor, and any subcontraclu to produce evidence of certification by the
Director that prevailing wages including fringe benefits have been paid to each claseificatioa of
laborers, workmen or mechanics employed on said project. Form S. F. 9843 "Affidavit of Wages
Paid". or a simdariv constructed form should be ,ubmitttd for the Director's certification. These
forms are available upon request from any office of the Department of Labor and Industries.
PROGRESS PAYMENTS: Each voucher claim submitted to an owner by a contractor for payment
on a project estimate shall state that prevailing wages have been paid in accordance with the pre-filed
statement or statements of intent to pay prevailing wages on file with the public agency.
COMPLETE AND MAIL ENTIRE SET FOR APPROVAL TO-
Industrial Relations Division, Department of Labor and Industries.
General Administration Building, Olympia. Washington 98504
pON'RAig"R&OEa7tsoltFTE APPILOYHD aTATEMYNTS AS FOI.WWa:
i t ' aA — iflal N
Ot' C4R� CY
T aaTATi3nC1AN thN+med M nrpartmeaU
�r
% DAILY INSPECTION DIARY
JI
IIIMr: E DATI:.O 7�2•o�b�' MD[if nAloo—J—..�' TO %C APO117 ND.JZE[—
TNlATN[A T[M►.MAX Jr-Pt MWW MECMITATIOM
ItIN NM C 01 MRWNWt gf$PLGVW-
Cal mum WYMYNIT ON M _
[ ACITV NM.OEER.
I
NIIIpRt AOWrI* W T0"V:
X41111A CAMP MC
41 MAD
s,2e-e�
REV OM FORM VA
7(}{
■HILL D�/AIkI�1 (�
L�YINSPECTION DIARY
111DAY� --.__ DATE .O WOIIR PERIM P.kNi: TO M1011r
WEATHER TEW MAX 'i: IMN__°/: PRECNITATIOR
(2jWjppm
AA D CknSt OF vE R50NNkL EMPLOYED: _----
I "M EOUMMEIIT ON PROJECT AND_ Oft LIZE _
ONSCRIPTOOlk M VCYACRY NR R.
MIIYORR ACCOVOL1E11E0 TODAY:
MI
MkN s Nwruw[ eAr
REV VIE P011M E1A
low
i
■h:L DAILY INVECTION DIARY
NIDAY: 4n � �ZZ d/ 4
wn: w011N r[NlOD1".'.: To L::.: araNT Np .34C
00"T"n nil.NA%__F: MIN—Opt PRECNgTATM_
tr A"cur OF waODWAIL WftoTaD:
MAgll [OYNYUR Wi ►NOdfCT A —_
UCMACITY NNL o"p.
WIVOWK ACCOM►LO WD TODAY:
ton C .-Q�- .�.�C AIv let iIl IYwu
W • roaw IN wti w*uwa w�
■ , DAILY INNSPECTION MAfRY
1'01
IIIGAY: J. CATE w.r.
W�.O/RN PEg1Ce.,. = TO w�yw. Mpo�ol N0.
WMATNt11--O IW. MAX ! MIN eps 049colT�Tg11__ ywsi/
• � 0 Cl ltNTONNK FMP4CYt0�
4
131 MApll teYllMtNT Oh M
ACITY NM ona.
ax
f4IW* X ACCW^MN p To"yt
_ ram ___ Ail 4 wat _�flPure�y� ' /1�r�eea/ /off
dr
w or
OltlG��y'A/� ttl�Mlt r? ON dfei+yl• kJ:Ii
�'"► ,�e�---w,--�n�-rttt-�i�at J7 S Cd►1�'a.�s
OIOb fb Ntf9 bbXMN11f bA ---
nDAILY INSPECTION DIARY
1110AY: _.W . DATE 0 S 27_9 I 1�W(40�11R HAIOp�P.rA.r.. TO�•A.r.r. IIlfpIT 11D
WEATNEA TEW. M4r1._'R: IIDE-M41"R: M/CIMTATIDN
I71N ER AND CL OF PERSONNEL EMRLO SD:
NAM lausu IT OM PROMW A
M! TT rµ ORID.
141 WORN ACCOWL0440 TODAY:
_ r
1l1 iFauo4RT l w .9 ^TUw
REV 617 F q
ALL DAILY INSPECTION DIARY
ITICAV: -, DATE OSL 'MOB[ KIIWO� wW,ZO�.rM� :¢
WIA7Ml# 1�yaa
nM1 MAX �fvF MNt PRECIPITATION
IMMA4M A PERSONNEL EMPLOYEDlit
IS
--"--'— W� EOY�WOT ON""Cl NO AMOUNT OF USE
��e`_ ACtTY MRl �•
NIWOMB WomplLomm TODAY:
d-mot me 2P
� M -xwt,
E-!w-M4+�---
KI Poi . .na�N u'a • ATM --
FroEEt4_--c/��c --
'L�i
Our Project No.-41-��z_-
IF MATERIAL RECEIVED 1S NOT AS LISTED.
PLEASE NOTIFY US AT ONCE
_ �/SLdL-YJ'G_YfllJ N M/
WE ARE SENDING VW
❑ ATTACHED O UNDER SEPARATE COVER VIA
In SHOP DRAWINGS ❑ TRACINGS
p PRINTS p CATALOGS
C DOCUMENTS O COPY OF LETTER
p SPECIFICATIONS
COPIES OATS ITEM
REMARKS
PORM S
COPY TO_._._
REV 3M
! DAILY INSPECTION DIARY
MDAY: DATE:'G SI 1�;18./I WORK PERIOD..�r TO JVT M OET NEL
WEATHER AM.TE MAX_5C_'PI MM�°F. PR CIFITATION
WW MNR AND CLASS OF PERSONNEL EMPLOYED,
'PdMif -
&AWNN
MUWI EOUMMENT OM M A F
ACITY R.
MIWORK ACCOWLIMED TODAT: �-
_ a#i���� ••/ .tMtJ .vd�
OF
�t T .ram .:✓. --
LN wiuoiwr oMi[�E fiowiTe wR DATE
REV tl1E FOAM E1A
• ea wn roan nw
DAILY INSPECTIO_ N ARY
II)DAY: _p4'�� jv DATE D
WEATNNS/WTEMR ��, ,1 NDIIR MRNq A.r.,TO�!^'yyt7�� Rt�ORT Iq.
SEA
MAX °h MIN`O•r: pMgMTAnw AWO
12IMUMIM AND CLASS OF PERSONNEL EMRLOVED -- -
c 'Ydk
ll* --
IS MAJOR EDUPWRT ON PROACT A AY�LIIR
NO. DEECRIRION sasicAPACITV NM.amp.
MIWORR AC'COMPLONED TODAY:
_lad ♦
ATirT wIN I//iiO�a uwE i— DATE
REVG179 FORM 2IA
DAILY INSPECTION DIARY[ 4
(tIDAV: -,'�yCy DATE:I � T� I WORE PERIOD -f !�� IIEMRT Na
FgATHEM TEM.MAN_°F: MIN__°F: PRFCIPITATHM
WNI ,M_E_R`AM CLAN OF PERSONNEL EMROVED:
LIMA;&
MAAII EQUIPMENT ON PROM CT AND AMQUN� _
r- DMCRIPTNII/ MI' r•ACTT\' MRE.DPlR.
IAIRIOIIK ACCOWU640 TOOAV: ---_-_---_--
� �� �✓ .Ert� ec�e.;.Er
REV SIZE FORM MA
^•••V••• / y^•- RFV SIM FORM 31A
DAILY INSPECTION IARY
I1IMY: DATE.O. . _• �.�.� WORN PCR:OO�M�TTO REPORT NO._��_
WEATHER TEMP. MAX ..._.. 'FL. MIN—'F: PRECMITATION. __
ItINUMVK�AMC CLASS OF Pr RSONNEL EMPLOVEO —
NAM "WOMEMT ON PROMOT ANp AMOINIT
� wouL OPlR
MI WORK ACCOI/EEMED TOMY:
—�k �. fm/� �isG •1
MI -
_.. •11i - � Aw Iwt�w�P 1NIIATYN sArE
REVGM PORN E1A
REVM FORM 21A
`H 41 DAILY INSVECTIOAARV •
YH0.L
I11DAV: _, '�i�/ Oil. � f� 11`011R FlIIN70_Ar. To_�'M. IU/'OIIT N0.
WEATV[R ��F TEFL.MAX.Ti°F: wv F: MICw4TATM /A
12IMFIMEER AND CLA/OF FEIFEOMMEL EFILOVfo:
tq/1 i.5
t3l 1M1M E [!EMT Old__OYR M/I
RIFT/OM MR&OPEN.
I[IWOIFR ACCOI Ul 10 TWAY
✓�/�dopt _ _.---- - -- -
_ ii1lfi� ,'ns,'z�c conc . u1a/Lt_-.ram—.__
Sara- {r cs..s_ a/.cb. dirt _
w vo�N� •ai A wwliuit` -o�♦
REV[JlV FORM 311A
DAILY INWECT�•IARY •
DAY A REPORT NO �J
I11DAY: _ DAtE::_.—_. I `�M�MK MIIMID w.r. TO^^r�- /'�._.
WMAMIN G TBw.m" —&wh AMOI?°F. FIICCIfITATMMI__
I"WJM IN AND CLAN OF►BMONMIt BN'LOYED:
I.l NAM lOUPMM ON PIWACT AND AM! IMT�i _
Dawmwnom41lICAFACITY MNt aflll.
MITNMIN ACCOMLMM[D TODAY:
��L4 ��w'�►.�_C��4Gft _t Sl�l�/. TYT I iJ --
/'t;n�ifunq t{eeT 1' sa:4 l -iw— J—A o Agmm a
_ L GKClGle- ko►'lo�iow, �1r,�fAl tft &,i—
N) w• • �ne:w6wti MM1w wfuN T��
N!V IM FORM VA
DAILY IN!►ECTIDN DIAISY -_
!'wwoRR IMPORT Ra—i_
wEAiweR-,f�G-7- y �SF: MIM `0'F: FREMTATRRE
13"RA7W" UID CLAN OF FEREDNIEL ONLOVED:
SYILaC1S<n`nlj -
1 _ - UAM EOUMUW ON P"%WT AND
OUNIPTHIMEu[ HILL R.
. UIENNR ACCOMPLISHED TODAY:
- 91 0
_—• RtllOf fNOUMff rYRE D��t— _
REV EM FORU EIA
-------------
F�I�I DAILY INSPECTION 1DIARY IIIOAr: "��6Ap�OATl:I �.�'0.7 d / woKK PEKIOD '�ai To eL. K[FOIIT No.�1F
wurNEn_1! Te1�. MAX--Y: aw_4: nlp'wTAnaN—_ --
1[1NLI MIEK AND CL OF PERSONNEL IMPLOYED:
431
__.. MAJOK lOUMM[NT ON PROaCT AIO AYOUKT OP
DlSCRNTION MZVWACIrV NAS.OP[R.
141 WORK ACCO`MPLMN@o TODAY:
all wtlTpt b [tw•t tl NbYM 1 _
KEY!/f0 FORM 21A
JJHEL DAILY INYECTIDN DIARY
filmy, 050 91l
°ATE'I . ,
�//- /�w_oRR fERlao 7 :�;TO :.; RErwT Na .?S
wuTNu TEM►.MAR _-•bl_•f: MINY4°f; TO
u1NUMre-�I� OLAi 01 flRtpllNEl EMKOVED:
D MAM EOIINMENT ON rRalEeT A f
MINIM" VZMAl ACIry NRE.OfER.
M WORR ACCOWL042D TODAY:
MI
Nl[10[Mf [N{IN[[RY tl{NRfYRt OAft
REYE77E FORM EtA
(WMLI l DAILY INSPECTI IAEEY .
It1oAV. /4 DAYS;[��L/#I Y./ WDIIX PER10O NRC TO ..w N. "PORT REX
WEATHER ELl. MAX_oP: MIM_Y: P"CMITAVESS
WNWRER AND CLASS Of PERSONNEL SMPLOYSO: 7.
1>�nni3
IS _ 1111SDR SOUMMeNT ON MOXiOT AND AI�{jNT Oj _
SCRMPTNXI SISS/CAPACITV NRS.afta.
NIWORX ACOEILMIISO TODAY: IF
—
Oiar�/ SYz sy e� ��► ,rs,.�st Us.J
SII Fnl o:hvwq uwwA uwt '-- •t .�. -
REV UIS FORM !IA/
. • q Cl sI.1 ..SC
�.a—al. �\r Q+.il. ��• �
-� JOf,
Key 13, 1901
813631.A9
Mr. Pon 01"n
City of Renton
Municipal Buildlne
200 Mill Avenue South
Penton, Washington 98055
Dear Ron,
Subject, Engineering Services - South Talbot Pill Water
lmprovesents Projects
This letter is written to clarify, for the record, the level
of our involvement in the construction phase of the Talbot
Hill Pipelines Project, one of two projects in the South
Talbot Hill area.
The agreement between the City and CHZk RILL is written to
provide for CH2k RILL's performing •services during construe-
tion• (defined in Article l.C) and *on-site inspection
services• (defined in Article 1.D) on the projects sulject
to prior specific authorization by the City.
Our letter dated March 23, 1961 (copy enclosed for reference),
states that CH2M HILL will provide services during construc-
tion for both the pump station and the pipelines but on-site
inspection services for only the pump station. We would not
he involved in any way in the inspection of the pipelines.
Since early April, however, we have been acting under a
vertal agreement that we will not provide either services
during construction (S.D.C. ) or inspection services on the
pipelines except as specifically requested on a task-by-task
basis. We understand that the primary reason for the City
(vs. CH2M HILL) to take on overall responsibility for S.D.C.
and inspection is cost of our services. Under these circum-
stances it 1s necessary, for the protection of both parties,
that the degree of reeponsibility of each be defined.
By taking the responsibility stated above, the City in
responsible for the interpretations and implementation of
the contract documents. Our responsibilities will be limited
Mr. Ron Olson
Page 2
May 13, 1981
913631.A9
to the scope of service• requested on specific tasks. The
services will be provided as 'OTHER SERVICES• as defined
under the tens of our agreement.
Inassgch as this letter constitutes a change in and clarifies
our responsibilities under the existing agreement, I or
asking that you return a signed acknowledgment as an attach-
went to the agreement.
Sincerely,
James L. Butt
Acknowledged and agreed to by the City of Renton
Director of Public Works
Date,
Is
TEEM 0
ENTURESP 0 Box 4245
Federal Way,WA 98003
INC. (206)941 1550
LEI IER OF IR.U- AMl k IAt,
1 City of Renton Date ,May 29, 1981
200 Mill St_ ,1i1, So. Talhot Pill Pump Stnticr•.
Renton, WA 98055 Renton, WA
Attention. Ron Olson
F.nclo.+ed Intent to Pay Prmailine Way jjaizvs for the 1 ri San _
Wright Inc.
For Approval _ \Pproved as noted
_ Returned for corrntion:as noted.
ApprovedPlow Rauwil;
For your[ilex "'—
For your further action
)0IX
Per your request
Rrmarks
DEPARTMENT OF LABOR AND 1kDVSTRIES STIF.MENT OF INTENT
INDUSTRIAL RELATIONS DIVISION TO PAY PREVAILING WAGES
RYA 1MSN
Ign4
0119 A991 ON PUBLIC WORKS CONTRACT
Awarding Agency_._...Q.ty_af. RentoD....._.._........�,_................._.....
_...
Contract Number__. .CAM17-81 .....___............_......._.._._._......
Date Contract Awarded._._.Much 16. 19,81, __ ..._.._..._............_._.
Date Work Commanelna_......Merth.31,..198,1._......_.........._._......._..___...
STATE OF WASHINGTON 1 Counts in Which Work PertormM_ ....T.... ...._..........................._._...............
y��,.� Locao,m Within County City..of.Beataa__..
JA& ......_._....._.....�.._.._...._
County of _...-_ Prime Contractor.... Te.® Ventures.Inc. ..__...._...
IN'You Intend to One Sub,,unuactora7 Yee ❑ No❑
In compliance with RCW 39.12,040 1, the undersigned, being a duly authorized representative of
Wright Lac. 3700 S. Gennease, Seat 514a,_WA__.,,98118
ietinn.etor„�subamnear' udana
do hereby certify that the following rates of hourly wage and hourly fringe benefits still be paid to
all laborers, workmen and mechanics employed by me upon the public works project described above
and that no laborer,workman or mechanic will be paid less than the "prevailing rate of wage as de-
termined by the Industrial Statistician of the Department of labor and Industries.
CRAFT AND CLASaiFiCATiON OF LABOR RAT OF RATa OF noon.Y
HOURLY PAY FRINGE aliNtFr19
JOURNEYMAN- ELEC 18.62 3.63
NOTE- Attach additional.hecti,its ncM(vl. Subscribed and sworn to before me
/3 this
flit.
_.. . ter:y,ut [tie:. _.... - day of./x ...... t8�.
r n nwn,�
By on and Tor the State of Washington,
Autnnnea Reyre..ol residing to Washington
The purpose of this statement is to provide evidence of intent to comply with the prevailing wage
requirements of Chapter 39.12 RCW. IT IS A PRELIMINARY FILING ONLY and cannot tie
construed as application for certification by the Director of tabor and Industries that the prevailing
wage requirements as set forth in RCW 39.12.040 have been satisfied.
ti 1 aa. __ l
Do of Lobw Y Induatrha
!4 ,,aa✓� j�
Is. O /
BEFORE FINAL SETTLEMENT CAN BE MADE in t ect with any ublic works project it trill
be necessary for for the contractor, and any subcontracto to produce evidence of certification by the
Director that prevailing wages including fringe benefits have been paid in each classification of
laborers, workmen or mechanics employed on said project. Form S. F. 9843 "Affidavit of Wages
Paid", or a similarly constructed form should be submitted for the Director's certification. These
forms are available upon request from any office of the Department of Labor and Industries.
PROGRESS PAYMENTS: Each voucher claim submitted to an owmer by a contractor for payment
on a project estimate shall slate that prevailing wages have been paid in accordance with the pre-filed
statement or statements of intent to pay prevailing wages on file with the public agency.
COMPLETE, AND MAIL ENTIRE SET FOR APPROVAL TO:
Industrial Relations Division, Department of Labor and Industries,
General Administration Building. Olympia, Washington 98504
CtlNTlAe'r0RS- DISTaIer'TE AEXRQ D STATEMENTS AA IrOLLOME;
1 UE�PING C(Wy }�IP41rAT�aA-PR aU1NGAC N'Yn
ITYi Ve'AbeUAPYI'A 1 D �aTATUITICIAN iMWma OF URanxxnll
DRae I.M m 0.y HaN�
•
1EVENTURES
0 Box4245
Federal Way,WA 98003
INC. (206)941 1550
L t,f l ER 01, 1RASa,H I-IAL
L City of Renton _ _ Daft June 5, 1981
91710 Mi II Br. _. ._. Job Ro T,lh,r n411
Renton, WA 98055 Renton, WA
lttention, Ron Olson
Ewload please find [he Monthly Hangover Util iza[ion Reports for_ Teem Ventures Inc and
Wright Inc, - the elect r lcian.
_ For Approval Approved as noted
_ Retumed for comvtions as noted.
_ Approved Please rrwlhmil.,
7 C For your files For your further action
Per your request
Remark.
1 rem Voquu'rv,Inc.
CONTRACTOR/SUBCONTRTCTOR `Q y Q
� REPORTING PERIOD
MONTHLY MANPOWER UTILIZATION REPORT �' Month; Mae Year;1981
To be submitted to the City's Project Goals and Timetables as committed
Enqineer durinq the 1st week of followinq in Contractor's Affi native
nth while contract is in progress. Prime NT Action Plan t
Contractor is responsible for obtaininq and or per City's Plan 9.1 8
submittingall Subcontractor Re -rte.
Tot (Mss e,A Ietatim of Camplleato Aaasty OW f From; (east tad letatlas of tontracaoel
City of Renton Teem Ventures Inc.
Public Works Dept. P.O. Box 4245
200 Mill St., Renton, WA 98055 Federal Way, WA 98003
This report is required by Executive r =46 Section 203. ailure to report can
result in sanctions which include suspension, termination, cancellations or debarment of
contract.
2.
i 1 nlno. Total rotai
Work Hours of Employrent ISet footnote` rity number ivabor
of of
C Aesi w o• • tors of minorit Employ.
fico- • 61e- ne r, t.a pan( .oral total _
conpatly'o Nome (I.f.) Trade tic's Tote Black panic ndlan feel t .47, wT eeiluy e•e
Teem lentures Inc. Carp C An n
A
Tt
Teem Ventures Inc. Team- I C 6 1
r
7r
Teem Ventures in,-. Labon 136
Tr
A,
IT
l'.
A,
1'r
A
An
An
rr
An
Tr
r
T
7. Cr..Pany Cf ft cle l'e ., na ore en .e ;a to Signers 9. Te ephe ne I•umber
(Inoluae Area code)
.� �/�t�l�� :.. V� 6/5/81 (206) 941-1550
Rev. 11.77 (•Males E Females, --Minorities c Non-minoritieal page f of -L
7/80 (Submittal Requirements i City's Goals/Timetables)
INSTRUCTIONS FOR FILING EMPLOYMENT UTILIZATION REPORT (CITY OF REMN)
The Employment Utilization Report is to be completed by each subject contractor
(both prime and subcontractors) and slgued by a responsible official of the
company. The reports are to be filed on the day required, each month, during
the term of the contract, and they shall include the total work-hours worked on
the project for each employee level in each designated trade for the entire reporting
period. The prime contractor shall submit a report for its work force and shall
collect and submit reports for each subcontractor's work force to the Compliance
Agency that is funding their construction project.
Reporting Period . . . . . . . . . . . Self-eaplanatory
Compliance Agency . . . . . . . . . . City of Renton (administering department)
Contractor . . . . . . . . . . . . . . Any contractor who has a qualifying
construction contract with the City of
Renton.
1. Comnanv'i Name . . . . . . . . . . Any contractor or subcontractor who has a
qualifying contract.
2. Trade . . . . . . . . . . . . . . Only those crafty covered under applicable
EEO bid conditions.
1. Mork-hours of Employment . . . . . The total number of hours worked by all
employees in each classification; the total
number of hours worked by each *minority
group in each classification and the total
work-hours for all women.
Classification . . . . . . . . . The level of accomplishment or atatus of
th worker in the trade. (C - Craftworker -
Qualified, AD - Apprentice, Tr - Trainee).
L. Percent of minority work-
hours of total work-hours . . . . The percentage of total minority work-hours
worked of all work-hours worked. (The sum
of columns b, c, d and a divided by column a.)
5. Total Number of Minority
Employe". . . . . . . . . . . . . Number of minority employees working in
contractor's aggregate work force during
reporting period.
6. Total Number of Employecs . . . . Number of all employees working in contractor's
aggregate work force during reporting period.
a Minority is defined as including Slacks, Hispanics, American Indians and Asian
and Pacific Islanders - both men and women.
1
'C H,%i F►wEEa__
pHlll ------
Dsto: L e
To: 1�O(7-} 01 seL7 ---- ....-_. Our Projuat No.
D, tlpt / V4k' OrA5 IF MATERIAL RECEIVED IS NOT AS LISTED.
1y/ �I PLEASE NOTIFY US AT ONCE
Attn: eGI7rA t
Re:
WE ARE SENDING YOU
)(ATTACKED D UNDER SEPARATE COVER VIA
❑ SHOP DRAWINGS ❑ TRACINGS
0 PRINTS CATALOGS
❑ DOCUMENTS COPY OF LETTER
0 SPECIFICATIONS Z)iQ7
COMS DATE If h-
co �._ - nSArca, _ r,� .33 �09v
REMARKS
COPY TO FORME
REV 3177
/F7R1 DAILY INSPECTION DIARY
HIOAYI F OATE: G Ste,(ZED V I EARN PEPIM-_.[_,r M. TO i.r. REPORT NO.
EIEATNE11 TEEM. MA% TJ fl: Mlk%qtE*f PRECIPITATION _-
MAR! Or PEeEoEMN.. EMEaOTEO:
MA.IgI Et1Y11E1ENi ON nroMcr_�_A�1Ntsf�r_
nem NEI �.
1/11RIMIL ACCOMPLOM TOwr:
--- - i
rot
finni •af fl AruA —_-____, s
HILL
DAILY INSPECTION DIARY
i � a ate/
DAY: 7Vfl DATE: 0JI �1I Q, MDMK 'EKIOD�r.r. TO�i'y. KEMIIT ND.✓7
WGTNER_ —____TEMP. MAX^t: "Ma, PRECIPITATION_
171 K A40 CLAN OF PERSONNEL EMILDY§M
IS _ IAAJOR EDUKMGMT ON PROJECT AND AMOUNT OF
DEECRERIOM W2LKAIACITY MRt OPER.
I4IWOOK ACC''OWLMNEO TODAY:W� A �.rs /L`♦ /eat /
of -----
iatl twalwttwt uowAwRt owr
DAILY INSPECTION DIARY NIOAY: 4 DATE: I / Eplll( MI1pD�P.r TO r. REPORT NO. ✓11P_..._
EMATNtR TEMP 'M% °F: °F: MNIMTATION—_
M!1 EN AND CLAY M PEIEEONNEL EMFLOYED:
1E NAM EOUDMENT ON F1IOJE91 AND AMOUNT OFUN _
DEECRNsT1ON M2"AC1TY NIIE,OFlll.
MIEIKM ACCOWLINSM TMAVz
/Ara✓ DA � �1L/-�2..
NI womawi un.cce v si ++uwc _-- wT „_,—
REV ME fORM 21A
OHN1 DAILY INSPECTION DIARY
�J� MO/RK IERIOD M TO P.r. REPOIIT ND. ��
WEATNlR flMF. MAX AZY'P; MIN-(F PRECIPITATION ,—
121 KA�NDCyyLASS F pERSONNEt EMPLOYED:
MAJOR EQUIPMENT ON PRONCT AND AMD Iff DFuse _
Rio" ITR)N SIZEKA►ACITV NIIE OPER,
-- 1
IAI EY011E ACCOMPIMNED TDDAV: 1
o11t1� /EZ'/Z_
I
If
dr
i n/S�__w_L�OE�' / INtr�S �i) i• � I L i
�? OM drtiw/ ltl�/l
I
E11 wino ♦ •e w ucAeruw DA '
REV EIA FORM MA
DAILY INS►ECTION DIARY
MDAYwolwreMlOD�::inf�:'.`.. �«�
wa • T ne [Ir,tYM�_• � T M0._Y_L_-
�: Nw4sT: M[CMTAY M /JAB.
I71 A AMD C OI NwgNNlL NILMq:
two
1 YA1DA IDUMY[NT ON MOACT AMp
4► __
O►!R
14IwDlw ACCOWLIW[D TODAY:
NWM 7DMN tiA
DAILY INSPECTION DIARY
OHILL
iODAv y� _ OATS �.�.��}L �. W*ORR RERIODl- a"i0 I--'.w RR.EPPCAT NO
WEATNEA TEMP MAX -jor MIN "IF FRECIPITATION
41NUMlER AND 11A OF PERSONNEL EMPLOYED.
_-_. EIARMI 60yMR{gT OM PI1_l�KftT A-1�_,_
NM
MIMDIIR ACCDNPLI.IEp TODAYI
- •rR -
_ �f. C!/il/ �_�v�4n �•G.cErE�/ e�wn,i o--
�oft
I
06
191 w.ai r ancnuws s�cNnrvw• ------ o��� 79 FORM ]1p I
REV
MLvbl7v DORM 7,A
DAILY INJECTION MANY
Illwr —J�� DATE: O S.A1 i S. raaEo�a: To= REPORT No.
wuTNM TEr.MAIN �•s: rn.jj•s: E�a1TATwN
WFOOI�EE AND PERSONNEL MlLOTEO:
NAM MOMENT DM MgAW AND1 _AMDIINT W IAE _
NO. ENT E IMMACITY NEE QMR.
IEIwOM ACCOIlLM11M TOOAY:
�Lfr4 via some /I," P44fed --
_-- F.! woo cL.+ ra►s! _ �«t+_�,rls._ -
---_ adc �Y �►v c�rLk- uk
•uloTrit awo�waaaa Nebwwws '—'— sA
DAILY INSPECTION DIARY ]J
IIIDAV: DATE. _�„-... .� F D%% FIRMS, TO REPORTN0. O
WEATHER______ TEMP MAX ._—°f MIN_°�; MiCMTATION___
12INUMBER AND CLASS OF PERSONNEL EMPLOYED:
IS fWOR [OUMM[NT ON MOl[CT AMD AMOUNT OF
Q[1i.RIPTNIN P2UCABACITV NRi OR[R.
NI WORK 4
IM1[O TODAY:
t-- Ne- week -
-- wo.-tt
llAer�t
L72
all !
wa -
RBY[/IB FORM HA
I(HILL, FroEnti._.� _MiIIG"
Y
Date:--- 6�.46/8� —
Our Project No.
IF MATERIAL RECEIVED IS NOT AS LISTED,
-'-' PLEASE NOTIFY US AT ONCE
Attn: _ �_._-----
a.: 00 S
WE ARE SENDING YOU
❑ ATTACHED D UNDER SEPARATE COVER VIA
O SHOP DRAWINGS ❑ TRACINGS
O PRINTS ❑ CATALOGS
O DOCUMENTS O COPY OF LETTER
❑ SPECIFICATIONS O
COPIES DATE ITEM
REMARKS
FORM 4
COPY TO . REV WIT
DAILY INVECTION DIARY
nIDAY: DAM i ..... .... ��
woRR p[RIOD
W[ATN[II TEM.MAR __°!: MIN_°f: MlCN1TAT10N
12MMUR AND Cur or ►[RSONMI. [unoY[o:
431 MAJOR-lourrENT ON MONCT AND sr
I SIZ91CAPACITV I NRa Oa[R.
NIWOIIK 0 TODAY:
77
s
tAt a, *
�—_—eat •i 0!e?b .�_� .
ro 1! W —_A10 worm! lvftv _
wiflu A, $raw It . soofte if;�� a.,( v�/� f. s•�—..
wmeewr twoiwi[wt ii[Rwruw[ owii'
DAILY INSPECTION DIARY
InoAV: _—Wed OATS: 0,6i/7 il/ i Ro�K n�ao��Tu� y/
��//�� ���� �� `_ RnDEIT Ra
WEATNERQpLj`tyT ,,, MAX 1QL\E; MMI�Pl; nlCIMTATIDII NM1t
121NUMEA AND CCEAIM��OF PERSONNEL EEII,OVM;
1 MAAOR OOYMMMT oR -�`T AM4�MS3S_.Ilg_ _ __
/� �P M2E/CNACITT Mll(l/DnR.
MIWOIEX ACCOMPUb1E0 TODAY: -.. -
Sfs�f•d /A in Lo-ruts. - —
to Es sus,(
N t0\NT PN •fN'\ t10N\♦ Nt --'- �--�
OA X
REV VEE FORM HA
DAILY 1N3►ECTiON DIARY --
ItIDAY: DATI:I wD11M M11gD_i w TO_i.. wIIDDT m..
wane! Tlr.MAX _•v wM-4: nnxwTATMMr
131"Mlt/l AND CLAN OF ►IMIOM IL WAKOTID:
-- MAJOI louw�rleT OM►IWICT A1q AW I-PJW Of U"_
r—iuuwAcrcr �a anl.
I4Iw01 K ACCOMKMMID TQ"Vt -,�- ��-
DAILY INSPECTION DIARY -�"-
1110AY— DATE OG NOAI! n11100._.:�: TO_n REfO11T NO�
[/ _
MTM[Ip?CO� T[M. MAX _°f� MIN—°I: PRECIPITATION��
+NNIIAYEN AND CLAY Of PEE[ONNEL EMLOYED:
17 N•!ON Eou.rENT oN[BORN AI(D ANDINR
ITr
ININDII% ACCOWL0490 TDOAv
04 Q*J{ G.N, 1 Lo.�l
�fCr / i/Yzk xef 141,d fn lit -wtLt
i
Yllltl DAILY INSPECTION DIAIIV -"-
:IIDAY /•� ATE �� 2a r.IR NMOD�I�Tp RBROIIT Eq.
W EATMFR� �G A)/ TEIM. MA% -°.: EBUE��•P MK`MIT,.TIOR-lIf//Yl•
12:NUMBER AND yCLAS. OF .ER.ONNEL ENDLOV66I
q _._ ___- Na2DR �OYMM�IIi ON MG�1 CT_ANy YApUNT OP_5fj(_.. _
.� 7CM ITV MAL 01IIIII.
III WORK ACCORIKIWIp TODAY -
Aught
R..IC. .N.INftll'�I�INAWR. C.,.
REV 8179 FORM 2IA
Il10Ar: ._ ! OATEN 0,�� �7 Tp11N n11NM)�i.�. TO� REWRT NO.
WEATXEN_ _TEM. MAR ES NIN °R: pmonTAT"m
MAUNDER AND CLASP OF EER.RONNEL EMLOVEO:
IE NAM EOUMNENT A ON M
OAt�T 11D AYOIINT G
D NNTION ACITV XIIE. A,
441*M/N'A"CCOOM►INNEo VG"V, _
.79ININ Rq • E ��
�Etai DAILY INNECTION Duey --
IIIOAr: pAn:.SIP P�� �/� WONN FERIOO ? f Piro
Ref"T No.--
WN7MtN� 11w IRAI{"F: MIN °F: PRECIPITATION_
171N1Ral A�N0 CUT.. PIR ILMF EEOYEO:
F��" �- milt
17 MAIOII IOUNAUNT ON PROJ79 ANO AMOINWT of tw ---
ACITv NR7.OflR.
NIW011_R'AC_OW`APIL
OF
ii.�,E
d1 --
Nwo NT♦ tNtlNt�wY tNR11 uM e11TN —�—
Nov NTH FORM 71A
1SVENTURES
0
P 0 Box 4245
Federal Way,WA 98003
INC. 12061 941 1550
IXI TER OF l R.UaAli I IAL
I CSty of Renton Date July 6, 1981
200 Mill St doh So. Talbot Hill Pump Stacinr
"0
Attention. Ron Olson
Envlo9al are the nonthly manpower utilization reports for Teem Ventures, Inc., Wright Inc.
And cyan q.l--MY
For Approval _ Approved as noted
_ Returned for rormvUun,m nolnl.
_ ApprovedPlva resuhmlt
For}ourruahoraeuon
7IX F'nr your filer
_ Per your wyuea
dtmmrk,
l vom Venture'
CONTRACTOR/SUBCON•TRACTOR ` Y r�
� RF.FORTI4G PERIOD
MONTHLY MANPOWER UTILIZATION REPORT Month: J'me Year:l9Fl
To be submitted to the City's Project 1 Goals and Timetables as committed
Engineer during the 1st week of following r -N, in Contractor's Affi rtaative
nth while contract is in progress. Prime V'CL- Action Plan 6
Contractor is responsible for obtaining and or per City's Plan 9.1
submitten all Subcontractor Re rts.
To: (lots, W Ixatlm of Compliance Apaer per From: Imam, ma leeetlm a/ sarwreater)
City of Renton Teel Ventures Inc.
Public Works Dept. P.O. Box 4245
200 Y111 St., Penton, WA 98055 Federal Way, WA 90001
This report is re,-aired y Executive Order 11246, ec !-- 20;. tailure to report can
result in sanctions which include suspension, termination, cancellations or debarment of
contract.
2• T.
xlno- Total total
Mark Hcurs of Employment (See footnote) -ity number Nujob er
or 0f
C 1&eal a. a.• • a/h of minorlt empbY-
ftce- Rie- •er. Asun/ .041 total
ComparW'e cane lLe.l :re le done 'ote nLck panic ndlan P&CL'te le- w�h eefloy- eee
VLM .e le
Teem Ventures Inc Car;.
C 76
AD I
Tr
lh
Teem Ventures Inc. Labo
cr Tr
Tr
t'
1r
f
A
_ Tr
C
A
ir
Tr
f
Ap
Vr
Tr
T'-
7. Wponr crticia 'a .lane yre N e h. Pete Signed 9 Telephone Luabe+•
1/ /// /n� �,r� `' •+ (Include Are& Code)
` a L / r-= �- ✓ ����.t 71A1B1 (206)9.1-1"C'
Fr :. 1, � •' ,.s s Females, --minorities c Non-minorities) Page j of /
eo :tral Requirements 4 City's Goals/Timetables)
CONTRACT03/SUBCONTR.ACTOR ��t , REPORTING PERIOD
1404THLY KAMMER UTILIZATION REPORT �'' Month: ,tun. Year: 1981
To be submittal t< the City's Protect � Goals and Timetables as committed
Engineer do-in: :he )st a*k of folloadng �� L1' in Contractor's Affizmative
,nth while mntrr,l .s in progress. Prime `'��'� Action Plan
'contractor is responstrle for obtaining and
sibmittin all Subcontractor Re rts. or per City's Plan 9.1
To: (mow, And lecatim of CWII",* As a ' DaM From'. la,m, r.a leemtioe of eastreata
C7.r! ,t Renton Stan Salov Ma'- zv
Public Works Dept, 2015 - 33rd So.
200 Mill St, Renton, WA 98055 Seattle, UA 98144
--,,is report is required by Executive Order 11206, Section 205. al ure to report can
exult in sanctions whir.`, include suspension, terein::'ion, cancellations or debarment of
contract.
t ' S. Y. ♦ 5. a.
mine- Tetal .eta:
j" �• work Xcur, of Em lo'^en[ rity numoler u¢c•r
D 5- l><e Cootn:t of
cleaai a• o. - wT of minorit E pbi.
• NSe- �e r. ne ur; .o!il total
r, Trade rlea_ Tots nLck .nil tar, !aettl< ?e-
Coapaeiy'e frame li 7 tions Gar..c relarl .a i^ u?
C
qvP. A"
A
Tr j _
Tr
AD
Tr
C _
Tr
C
A _
T
C —
A
I Tr
T'.
Tr
7. Company _feral;Signature na ILie fat. 313n.n T. .yh.ne hest e.
lode Are, Cnde)
7 C y / 4 6 5.2 JC 6 2,j 3
Rev. ll/-.7 (-males s Femiles• --Minorities 6 Non-minorities) rase of
1/80 (Submittal Regairements a City'S Goals!Timetables) —'
SO TALEOT PUMP STA- CAG017-81
OMB AnDrova No. 44-R1396
Feportirw Period
STANDARD FORM - 257 MONTHLY EMPLOYMENT (Month, Year)
(Aug. Ig76) UTILIZATION REPORT
As ,11selibed by the Dept. of Lab.- (CPCCP) (gee reverse for inetmrctions! JI-IE'1981
This report is required by Executive Order 11246, Section 201. Failure to report can
result in sanctions which include suspension, termination, cancellations nr debarment
of contract.
To: (Name and 3ocatl• If C.mpllane- Agency! From: (Fames and location of contractor!
WRIGHT,NC
3700- SO GENESEE
SEA, WN Q811q
. a
mino- T•:tal ota:
Vork Hours of Repleyment (See footocte) rlty ^umber umber
of or
c Lea1 a• • T of minor:t E-Wy
f Soa- Hfa. r. Aa tan/ . tai total
-aae T.ta Alocx Indian raet!le e- `m-my Loy- eea
rmPam'a Name I1.' tlor.a Genic � lana air .'h •^a
1
91- 'lip;' elec A
AD I
AID
A
C
A
C:
Tr
AD I
IT
A.
AD
Tr
? C ^aLi an .. F. Date Signed 9. 'e.ephone r
1 I ilnclude Area Code)
JUINE M 1981 ""' -723-1362
TEEM
E/I.7, ,nrra
P.O.Box 4245
TT Federal Way,WA 98003
it\C. (206)941.1550
LETTER OF TR.\\S\IITT.AL
'G+ CH,M Hill, Inc. Date July 9. 1981 _
1500 — 114th Ave. S.B. Job So. Talbot Hill Pump Cation
Rwtlwvu, WA 98005 Rwnfnn, WA _
.\'irnuon Joe Miller
Enclosed is Change Order No. 1 completely filled in and copies of calculations used to
arrive at the total we did.
_ For Approval Appmved as noted
_ Returned for corrections as noted.
_ Approved Please resubmit;
]pp�For your tiles For your further action
-ICL
Per your request
Remarks
I,cn) \'rn It rr+. I...
Hyk Ll
FROM: CHILL. INC.
i
Np ,
DATE 7//./p/
PROJECT NO 5/3 I-V A 2
SUBJECT 5. TaLG.a ebb P.J:
to- a a� r � . zt.M
,1 J-t4k -U-.t Ot e-.F- C�z a/,-&AAJ
B 4�'a,, y-e0 yn�.4�,n,.-�..+�i /J 1,,,, 2.,..•...,� .aao-..,,,.�
roil +worm:;; ;«tinrne.Mf wax xcim+ee ter w. n 6endwrltlen 4pm of o.nmen vaFon d+a+ wlll Mtn ivr IP mevew awed and rMw:e cwb
{ I • From:-
Date,
To: �h.J Our Project No. 5i36VIf2
IF MATERIAL RECEIVED 15 NOT AS LISTED.
PLEASE NOTIFY US AT ONCE
Attw �
Re: .� Ti1.ffi.7 Asiy P`V�_---
WE ARE SENDING YOU
JIL ATTACHED ❑UNDER SEPARATE COVER VIA
O SHOP DRAWINGS 0 TRACINGS
A PRINTS 0 CATALOGS
O DOCUMENTS ❑ COPY OF LETTER
0 SPECIFICATIONS 0
GIDIhS DATLL ITEM
REMARKS------__--------------...__..------
COPY TO EORM 0
RSV SM
g I DAILY INWECTION DIARY
M DAY: � DAit:.oi„AA..y��G'''d/ WORK R0.!K P%nm TO_l.Q NV�oR. _ —
R[ATN[R mp. "AAL.'f: A .."RN I. MWWATION
121RAM�MA[A�A�N�D C[A[[Of Pt ILENROTID:
MMOP9li AE1�pR [OU�YHrt ON MPI[CT 11M�A[ _, Qf. _
NO. DE[DRIKNR R'
m WORK ACCO LISNED YOCAv .._.._.._....—
F'n 1 sh od /y , 6i,ut'. T1oP/'� s�f _Gpe►t�Y_�/��_.__G�I�yE[�
(/� /ICQ 2/m✓nA� ��'� yf1[.tibn cA..r( ` ���___�!!uC.RS_.F-_�.
/s�vt� /�o pttcLE 4«.cc✓ wo.�E., .___--'—�.�.__._..__._.._.....--
ISI
. � a •wei.uw a •row.Yu.• . ._. _ ..e�M
REY[/K fORM T1A
ti�
DAILY
11 OA /V# (-Pl J"
Nf4TMFl rEW MAX--V ' To RlPwT W& 44P
: MW
Z'NUMBER AND CLAW OF P,,'Ow*sL Wourrob,
----------
ACRY IL
MORK ACCoWtl$.Fo TODAY
Qe4F",A1 y
or
......W.2Wa
REVG,?ng F'
DAILY INSPECTION DIARY
I110A�Y DATE
*amPamaD—P.M. TO—P.mmPL:E�mMIET 'm
AEADIEX_.TEMP MAX _°F: MIN—PP: PIWCMITATION—_L"�!___..__
q1N�BERND CLASS OF PERSONNEL EMPLOYEDpow"' —
MMpN tOYMMtMT OM MOACT AMD AYQUyT {1ff t1�.. _ _MTION
iMt.OPtN.
I4I*00" ACCOMPLI101E0 TODAY:
-.� 1`07 .
NL.�
REt 6 79 FORM 21A
L_ I DAILY INSPECTION DIARY
IEIpAY: / f
_. DATE:.�__/Li/ WORK TO TO_ •,r. R, amNO. Sc+
RNATNlR �.N. ��,y,
7[MF.YAR_._°/: MIN_.—•F; _
M [A AND CLA&OF FBR[ONNlL lWtaygD:
12 --
-"--_. --. �IWYMINT ON
NOT _
111WORA ACCOMILISHED TODAY '
DAILY IN!►ECTION DIARY — _---
moAr: m�_0 71 O X,t / PORN PiNNNI—R.M. TO_P M. NEPOAT NO._...
WlATN/11 TMI,MAX _"P: ANN—°P: PUCIPRATNNI -- �—
INIAJIMM AND OP M11"WIL MKOrtD:
MAJOR IDUDMINT ON MOACT Wig AMWNT Of tAk
ampoPTION SIZIMAPACITr NNI OMIT.
IUPIOIOC ACCOMPVTMEO TODAY-
pef cm
0
NlY WM POW]IA
Ask Adik
DAILY INSPECTION DIARY �p
IIiOAv: ��[I AE/ DATE 1 6G it / I VMK PEKIDD
�t`E!-L•'���T�P��� Lr TD—� ILEMKT Na
WEATNEK- v_TEM. MAX ' °F� NIN SLAP; PNECIpTATgN Mom{/
01MUM8E4 AND CLASS OF PERSONNEL EMPLOYED
1E
IrTtOM EIIGCYACIry NNl oPER.
W WO11K ACCOMLIEIIEO TODAY
wei10 -_.__—
Cmmy ONPWTOM DIAOEV
07 qf/ To
W E , DATE;*,�, - —07 WORK M*100-,L ICA.
a 11W MAX rt-'h MIN 70-F, PNgcwjjATjoft
f2l"UMOMP ANO C%AMl OP"POKINOWL INIPLUVED:
jd4eA
131 MAJOR laumata 04-
PROJG
placot"-
141 WIAK ACCOMPLIM420 TOOAV:
9 ej*A �m;j fie. concrete Put vp ;n4r,,aw- ime-ht'gi
Afto"5 &..d 44,p
e).c. fw-
In 71jl& l
RFN'GJP9 FORM 21A
DAILY INSPECTION DIARY ---- _
))
MOAT: -��DATE 0 7 O 8.8�. xoRR PEAlppg iw:To. }�1:ter . PAPORT MO,
WEATHER TENSE. MAX sari; EARN-&wP. po"Mm TATRm •�"�
IIINUMISIN AND CLAN 09 PERSONNEL EERILOTED+
r 1
OF
'] MAJOR EOUMMENT ON PROJECT ANO AMOUNT OF VN
NO. OESCRMTIOM _- -�SM91CAPACITY IMLL OP(R.
IUWORR A,I L13NEO TODAY
70
44.
5�
w•Sa INLIXClX1i Fwfuw• �_.._p ��'_ -'--�����`
REV E179 FORM 21A
}
L
• 1, i
E )
ti 1 y�. Nt
II DAILY INSPECTION DIARY
liw
�J
I11DAV: _— DATI: Q 71 0,11p� ����NO-RK MIII00_�.M. TO—w.M. PHIPORT MP
INIATINI TW.WAX?r'!: NIN->tY: NNCMITATION
Ii1M111MEA AND c NIO/ON al. IMKOVW: ----
MAJOR TOUIFMENT ON MOACT AND AMQUW--Q?-Ifs,
--__- _--- OFSCAITTION 1i AOIiV Nlll ONII.
IAi NOEII ACCOINKISHHIM TODAV:
OI wnluiR♦ omjiwa �o.Aruw� _ - nA�`! _ ---
A,V M'19 FOAM 21A
IflFlILLI DAILY INVECTMN DIARY tt
40 "Ta:LO 7 to to
YNATNEm—�, -yaw.MAX WfTATIM
lZiNtAftift AND CI�Op PgrANDIMIL EMPLOYED:
Ar—ol t ---
L be I
JX4
M AN AMQYWT Of
a:
141WORk ACCOMPLISHED TODAY
----------
- E
TEEM
ENTURES
XNC.
POST OFFICE BOX 4245 • FEDERAL WAY,WASHINGTON 98003 • TELEPHONE: (206)941-1550
July 22, 1981
CH2Y Hill, Inc.
1500 - ll:th Ave. S.E.
Bellevue, WA 98004
Attn: Joe Miller
Re: South Talbot Hill Pimp Station
16" Tapping Sleeve 8 16" Cate Valve
Dear Joe,
I have attempted to correlate the originsl bid pricing and that supplied in
the proposed change order. As you are aware, the bid for this job was not
assembled by me, an,, I am cttempting to pick up the "paperwork pieces" and
handle administration of the project. Assembly of the information contained
in the proposed change order represented a significant effort and some of
the original pricing information was difficult, if not impossible to re-
construct. As a result there continues to be a level of confusion on my part.
After much digging and price checking I have come up with slightly different
pricing Information on the two items:
Original Bid Pricing
16" Tapping Tee $ 650.00 (best guess)
16" Gate Valve $1615.00
Prices Listed In Change Order
16" Tapping Tee $ 650.00
16" Cate Valve $161D.71
The difference between prices for the same item stems fro& keeping and
communication eathin this +ffice, ie: estimate by one ind4 .dual record-
keeping, communication and chage order by another individual.
Actual prices today, would be somewhat higher, due to supplier price increases
and inflation
Prices Today
16" Tapping Tao $ 715.25
1
Ib" fate Valve S1712.00
Since the City of Fenton is requesting a credit for these items, it 1s
not realistic to give credit at todays prices For something that was
nriced in Januarv. Therefore ve feel iustifled in offering credit for
the value used in the original bid estimate.
Our information and pricing has been obtained from the follwine source:
H.D. Fowler Co. 746-8400
Terry Blattman - Waterworks Sales
Sincerely,
Richard C'. "arhias
a,.
W-600 SOUTH TALBOT HILL PUMP STATION WTR-10 3+
#6A Cons:.ructi on Corrpoj dense
N.D.FOWLER CO,INC. 414ILLCwR wY. IYYr SA.am r aa.,n.nrr .�ESTIMATE rwa�DAnI
rAuwnY
�•�c - z3iG - 0770
ami"ca I -
r11 CT
ri0 0.19
11CY
Z WAY' DCscm.". Y DYE♦
r111CC TOTALMIfY L
iz -/7<� xis
�o
N.D. F(AYLEN CC,..INC. [[uavoa.wN .wasa.[aa.aw-rwa(N Iwoa _
ESTIMATE OAT{ ]-AA
w
{NPIN(lw
Iwoucr uo owrz
<_wuscs:
rt[r WwN_ O(xw1IT,ON UNrr rorwi rw lC[ Nar lw K[ soN AIc FT FACTO"Iwtrowr l916" "L.COST AMO/11
Np. Iw6l COUNT IwIC[ Iw4ON1 Iw{IONi
�� x.lfT
FROM (19 HI11 . IN( •
i,
DATE
PROJECT NO
Q �� SGq
SUBJECT [.iH ids
li
P �, a.�,,. .��✓ /S o o
cry.,,... --'� �.t �T..¢c�.-�4J ,YN.a�•.. .rV.,�I�,P.:V�.� ��.•,.�.
Y G o
:.nnW :. � •3^^^.mICaFM tNt will ooM inl'1YY rMmyn v:v.a CJ .xpuz cMla
COP
SOUTH TALBOT HILL PUMP STATION
INITIAL STARTUP OPERATION
DOMESTIC PUMPS
General
There are two eestic pumps. One has a capacity of 200 gpm
at 200 feet and the other 600 gpm at 200 feet. The pump
head is for filling a future reservoir. Until the reservoir
is built the pump head will be limited by a pressure
reducing feature on the pump discharge control valve. The
pressure wiil be limited so that the domestic pumps allow
primary pumping operation in the 350 zone by th_ variable
speed pump located at the North Talbot Hill Pump Station.
The two domestic pumps will operate only when the variable
speed pump cannot meet demand in the 350 zone.
Starting
Normally pump starting will be automatic. Starting will be
initiated from a pressure switch after an adjustable 0 to
30 minute time delay. The time delay prevents unnecessary
starting of the domestic pumps on low pressure. After the
MISC11-C (1) D2
time delay times out, t' e pump starts. The pump control
valve pilot solenoid valve energizes and the valve starts to
open with a 60-second time delay starting. The control
valve slowly opens. valve opening time is adjustable and
may be varied from 30 to 60 seconds. The valve limit switch
closes its contacts when the valve is 5 percent open, and
the pump remains running. The 60-second time delay shuts
down the pump if the limit switch contacts do not close,
indicating the control valve did not open.
Stopping
Normally pump stopping will be automatic. Stopping will be
initiated from an adjustable low flow reading from the flow
meter. The ` ,w flow reading is adjustable. After the low
flow cccurs, the control valve pilot solenoid valve is
le-energized and the control valve starts to slowly close.
A 60-second time delay starts. The valve limit switch opens
when the control valve is 5 percent open and the pump motor
is turned off. The 60-second time delay shuts off the pump
if the valve limit switch did not open before 180 seconds
occur, indicating that the valve did not close. After the
Pump shuts off, an adjustable 0 to 30 minute timer starts
which pre,•ants the pump from automatically starting until
the delay time occurs. This prevents the pump from cycling,
that is, coming on again immediately after shut-off.
MISC11-C (2) D2
FIRE PUMPS
General
There are two fire pumps. Each has a capacity of 3,500 gpm
at 210 feet and 5,000 gpm at 140 feet. The pump head is to
provide sufficient flow to fight a fire either at the top or
extremity of the 350 service zone. One pump serves as a
backup. Both cannot operate together. Each pump has a
control valve to bring the pump on or off line smoothly.
Normally, a fire pump will be started on low pressure in the
system. Once a fire pump is on, it must be turned off
manually. T.ye principle reason for manual shutoff cf a fire
Pump is to eliminate automatic pump shutoff during a fire.
Presently, the tire pump will cause high pressures in the
system when the pump is producing low flows. The proposed
solution is to provide a pressure reducing feature to the
control valve.
Starting
Normally pump starting will be automatic. Starting will be
initiated from a pressure switch. The pump control valve
Pilot solenoid valve energizes and the valve starts to open
with a 180-second time delay starting. The control valve
slowly opens. Valve opening time is adjustable and may vary
MISC11-C (3) D2
from 45 to 180 seconds. The valve limit switch closes its
contacts when the valve is 5 percent open, and the pump
remains running. The 180-second time 9elay shuts down the
Pump if the limit switch contacts do not close, indicating
the control valve did not open.
Stopping
The pump will be stopped manually. When the switch is
placed in the off position, the control valve pilot solenoid
valve is de-energized and the control valve starts to slowly
close. The valve limit swtich opens when the control valve
is 5 percent open anC the pump motor is turned off. The
180-second time delay shuts off the pump if the valve limit
switch did not open before 180 seconds occur, indicating
that the valve did not close.
MISC11-C M D2
Initial Pump Station Contre' Settings
The following will be the initial control settings for
startup of the pump station. Field ad3ustments will have to
be made prior to fi,jal Settings.
Equipment Description Control Setting
Variable Speed Pump Constant Pressure at 360 feet
Domestic No. 1 Pump Start Pressure Switch to turn on pump
at 340 feet
Domestic No. 1 Pump Time delay before startup -
Startup Timer 3 minutes
Domestic No. 2 Pump Time delay before startup -
Startup Timer 5 minutes
Domestic No. 1 Pump Control 345 feet
Valve Setting
Domestic No. 2 Pump Control 305 feet
Valve Setting
Domestic No. 2 Pump Start Pressure Switch tun on pump 330
Domestic No. 1 after Time delay after shutoff -
shutoff timer 2 minutes
Domestic No. 2 after Time delay after shutoff -
shutoff timer 2 minutes
Domestic No. 1 Flowmeter Low flow pump shutoff - 50 gpm
Domestic No. 2 Flowmeter Low flow pump shutoff - 100 gpm
Fire Pump Start Pressure switch to turn pump on
at 9e0 feet
Pi,V e .a ! zbc�
Pd,j ro z: ''
MISC11-C (5) 02
TEEM
ENTURES P 0 Box 4245
Federal Way.WA 98003
INC. i20619411550
Lvi,i FR OF 'rR:IVSSIIT rAL
I - City of Renton. Data August 3. 1981
200 Mill St. don So. Talbot Rill Pump Station
6wnrnn- Ys Wass
Attention: Ron Olson
Enclosed are the monthly manpower utilization reports for Teen Ventures Inc 6 Wright
Inc.
Fir Approval _ ,%ppruvi,d as noted
_ Returned for currtv2ions as noted.
_ Approved Please resubmit;
%XX For your tiles For yourturther action
�
_ Per your request
Remarks ..
l,rm Pntur, Inn
CONTRACTOR/sacaNTRTCTOR (Y
rJ� REPORTING PERIOD
MONTHLY MANPOWER U1ILIZATION REPORT �� Month: .lull. Year: 1981
To be submitted to the City's Project Goals and Timetables as comitted
Engineer during the lot week of followino r J in Contractor's Affirmative
nth while contract is in progress. Prire N� Action Plan
Contractor is responsible for obtaining and
submittingall Subcontractor Reports. or per City's Plan 9.1 -
To: (Raw and leeatten of Oa+llaaea ANq 08P 1 From: (Rase and lecatien of eaaeteetwl
Citv of Renton Teem Ventures Inc.
Public Works Dept. P.O. Box 4245
200 Mill St., Renton, WA 98055 Federal Way, WA 98003
This report is required by Executive order 112A6, Section 203. Failure to report can
result in sanctions which include suspension, termination, cancellations or debarment of
contract.
2.
r,1no- Total ace:
work Hcurs of E:mplcyment (see footnote) rlcy number umter
or or
;I:
L eat a. <. . .. wM °f elnorlt Emp'uy•
a- • Fla- Men Asian/ ,°a I total ploy- eee
Company's Fame (I.E. Trade [tone Total Bieck panic ndlen ?ae L1e Pa1e a T eee
❑IDn1
C 64
Teem Ventures Inc. Carp.
Tr
ll3
Teem Ventures Inc. Labor A
er If
8 )'
Teem Ventures Inc. Opera Ap
tor Tr
A
Tr
C
A
C
A
T
C
A
Tr
C.
Tr
Tr
7. ccmparly Ctfteial's signature and Title :ate si,n,, 4. Te ephone Ilunbe
(Include Area Code)
8/3/81 (206)941-1550
Rev. 11/77 (-Males i Females, --Minorities a Non-minorities) Page / of /
7/80 (Submittal Requirements b City's Goals/Timetables)
Station UMB A .oval N,, as-R1 J96
Reporting Fertod
STANDARD FORM - 257
MONTHLY EMPLOYMENT (Month, Year)
(Aug. 1976) UTILIZATION REPORT
AS preeerLbod by the nept, or Labor (oPGCFI (See reverse for lnetmctlons) 7�61
This report is required 6y Executive Order 11246. Sertlon 203. Falluce to report
.edit In sanctrons vhith includt suspension, Lerminatton, cancellations or debar i
of cntr,ct,
To: (N. and lueP.lsn u. Compllsnee. Aaenev! From: (Same and In Cation or cnnt rs etorl
Wright Inc.
3700 South Genesee
Seattle,WA 98118
a. { n.
m ltw- Trtal otel
Work Nwre of Employment ISee foctnote) rlty °umLer weber
a. • C. • • • N Cr of
Glael /h of minor It Em 'y
f lca- Nle- .e r, na:an/ oral total D
fade done Tota Nlsck ndian ractIIe Pe- Employ- see
panle to]in le Y/h see
91-0885577 Joe A
Tr
A
I'r
r
A
I'r
f _
rT
A,
rt
A
�t
C
A
T
AD
AD
An
Tr
mpg Gf Clcla l'e lgna ore an s mate Slg netl 9. Te ept-ne Number
flee late AreY �a Jr!
_--
TO: Our Projdmt No..
I MA
TERIAL ATERIAL RECEIVED I$ NOT AS LISTED,ncYS/�_7 IF MAT NOTIFY US AT ONCE
Attn:�, �
Ro:_ TPA�.
WE ARE SENDING YOU
jK ATTACHED OUNDER SEPARATE COVER VIA
D SHOP DRAWINGS O TRACINGS
L PRINTS p CATALOGS
DOCUMENTS p COPY OF LETTER
p SPECIFICATIONS p
COPIES DATE ITEM
REMARKS
COPY TO_ ----- — RFOR�6
• CITY OF RENTON •
wt I of PUBLIC WORKS DEPARTMENT Dana!
CHANGE ORDER [hoer 1
rte 4-13-81 h[s,ber
Ordered by Ina,nccr uWcr lis�oL Sct.oa Ll<LYr Contract �. C,AG 017-81
CT.nde promscJ by Convector To
J
ndoreeJ by TEEN VENTURES, INC.
0 of aN After
Sian Non[,
utt r,de,al Add b. _
rtle —Y_ sL Me ecl Till,
nA<,f Slvu by 4.aUY' lehea "Qp tdl
. . . . _ . . . . . . . . . . . . . DSSCAlleTIOM Or HORN . . . . . . . . • . . . . . .
ou ,ew ordered to ptrf,n the followiry descrlMd wA Lyon ncetpt of en epprov,d cony of tete then. order
1. Revise the earthwrk to that required by the Permit issued by the
Washington State Department of Transportation. Deduct S 822.97
2. Add a chain link fence as required by the permit issued by the
Washington State Department of Transportation.
Add $ 973.10
3. Obtain a project permit as required by the City of Renton
Building Department. Add $ -0-
4. Revise connection to existing 16-inch to a 16-inch ri7 tee and ADD
solid sleeve. 7pamm $ 901.68
5. Revise gate valve at existing 16-inch to a 16-inch butterfly valve.
Deduct S 91.36
6. Conceal all electrical conduit in the brick of the pump station.
The contract time will not be increased. Add $ 265.62
All wri. resteruL end wasurwrxt to sw in accordance with the provision, of the stendard Specification, And Special
Provisions for the type of cmatruction lnvolved + tax 2 S..X >• 66,26 + 122 .C'
a a [U UT RDCR TOTAL ARSR CMAMGEORIGINAL MWaaC RIINT CONTRACT CSTIMT[D NET CRANGE SSTINATED CONTRACT
AMOUNTTMIS
271 271,881.40
a 1293.27 1 $ 273,174.67
AGENCY USE AGENCt USE
App"AL Necmw mu APPRMED
C'IfZ.sJNrc.� �i/
,1NNtr1 /1t PAU" , VZ"CtOl �
VP"Al NECOaENDED ANPROVED
DISTRICT STATE-AID
ENGINEER
Do ,
1LM
/ENTURE S P 0 Box 4245
Federal Way,WA 98003
INC. 2061 94. 1550
LETTER OF TRAICSNIf1TAL
To City of Renton ').'4 August 14, 1981
200 Mill St. doh So. Talbot Rill Pump Station
gantnn�WA 9RMS
Attention. Ron Olson
Enclosed —is the approved Affidavit of Wages Paid for Stan Saloy Masonry for the above _
referenced job.
For Approval Appruved as nuteel
_ Returned for coron-tiun a n urd
_ Approved Please resutmdl,
XX For your further w tion
_M For your file;
1'rr , At request
Remarks
1—m A rutuAr".In,.
BY -
'• • rrECEIY�D
l\I-at1mY.
DEPARTMENT OF LABOR AND INDUSTRI���L 1981 AFFIDAVIT OF WAGES PAID
INDUSTRIAL RELATIONS DIVISION r.tcltY_
(lymph,WA "%4 "''g ON PUBLIC WORKS CONTRACT
)UL 2 B yAw,arding Agency Gity.nF aenr ro
Contract Number SACQ17-91—___ .. _..._ ....._._
Date Contract Awarded sarih_.1b,. 19l71 _. _-----._..--
Date Contrac. Pompleted
STATE of WASMGTON County in Whim Work Performed 11pR
Location within County City of Rloton .,
COUNTY or _.__.-JIiBB..-. _.—_ .. ))) Was a Statement of Intent Filed? Ynfj No
In compliance with RCW 39.12.040 I, the undersigned, being a duly authorized representative of
-__.. _...S.Laa_$a1w210aonry. 2015.- 33rd Sit, Seattle. wA 96144
�Chour y w a�1h`e'a`btl AC ,
do hereby ttttfy that the following rates of hourh• wage and hourly fringe benefits have been paid to the
laborers, workmen and mechanics employed by me upon the project described above and that no laborer,
workman or mechanic has been paid less than the "prevailing rate or wage' as determined by the Indus-
trial Statistician of the Department of Labor and industries.
Ust below each classification of labor employed by you upon the project described above and the rate of
hourly pay and hourly fringe benefits paid to each classihcation. If apprentices have been employed, list
their names and or registration numbers, their stages of progression• the rate of hourly pay and the rate
of hourly fringe benefits paid to each apprentice.
Craft and Classification of labor Rate of Rate of Hourly
Hourly Pay Fringe Benefits Paid
Bricklayer 17.42 3.12
Apprentice 85% 14.46 3.12
iiodcarrier 14.78 2.60
Apprentice Burnette Saloy 452839
Social Security #537-68-4841
_ � y
® • 1"act V E D •
l\I-WY.--w.
DEPARTMENT OF LA60R AND INDVSTR1 gVL 7 1981 AFFIDAVIT OF WAGES PAID
INDCSTRIAI.RELATIONS DIVISION ail ...
Olympia,'AA 9b5 ea.:.r,
0e ON PUBLIC WORKS CONTRACT
JUL?.8 1581
Awarding Agency City. af.Rentna..
Contract Number CAG.0l7-8L._-._.
Date Contract Awarded..MUC11.16, 1981 _....._.._�_.
Date Contract Completed -- - ----
STATE or WAsNrNGToN County in Which Work Performed Krnwo --..-.--
Location within County"tY.._of,Renton, ... _-
CouNrT or _- Ki" _ _. . Was a Statement of Intent P91ed' Yeaik No C
In compliance with RCW 39.12.040 h the undersigned, being a duly authorized representative of
__.Saaa.Salay Claeoncy,..2415_-.33zd_So-a, Seattle. WA_9.5144
. 'emuarter or auhmntrarmn rAama.�
do hereby certify that the following rates of hourly wage and hourly fringe benefits have been paid to the
laborers, workmen and mechanics employed by me upon the project described above and that no laborer,
workman or mechanic has been paid less than the "prevailing rate of wage" as determined by the Indus-
trial Statistician of the Department of labor and Industries.
List below each classification of labor employed by you upon the project described above and the rate of
hourly pay and hourly fringe benefits paid to each classification. If apprentices have been employed, list
their names and or registration numbers, their stages of progression, the rate of hourly pay and the rate
of hourly fringe benefits paid to each apprentice.
Craft and Classification of labor Rate of Rate of Hourly
Hourly Pay Fringe Benefits Paid
Bricklayer 17.42- 3.12
Apprentice 85% 14,46. 3.12
8odcarrier 14.78- 2.60
Apprentice - Burnette Saloy #52839
Social S.curtty 1537-68-4841
Norr: Altaeh Additional Sheets w Needed. SLa Sa/l�^v 3Jlaaeeeonry
Subscribed
and sworn to I before me C rma'
LFlta,_._ `. day of J o U e. 1 bane)mndi that11INDIUSTRIAL
ttorJmX to the a,Xr roes rn0 Innae heMLu Mrtm
enom to rhr prnuaae rtywrtnnnu nl Rt N 19.❑.t40 hase horn an%red
19...}R�.�. STAT19TiCIANsDEPARNT Or LADOR Aia'0 13a4i t tutn
fGt sand
Notora p to w la and for the State of Waahinpton. {
reaidlne in WaMnplon. Date Ot / � ..-./... Rr:.V • , _
TIW ar»sp rtaerrrd for reect s ce,ofleation
INSTRUCTIONS:
1. Pursuant to RCW 39.12.040 copies of this form must be completed by the contractor and each of his sub-
contractors.
2. Complete this form in triplicate and have it notarized.
3. Submit all forms for certification to: Industrial Relations Division, Department of Labor and Industries,
General Administration Building, Olympia, Washington 98504.
4. File a certified copy with the Awarding Agency.
CONTRACTORS ARE RESPONSIBLE FOR OBTAINING AND FILING AFFIDAVITS of the SUB-
CONTRACTORS. This is required by law and payments can not lawfully be made until such affidavits
are filed.
L-N ' aRk,�n M Nar.10.tP1
!VENTURES
=NC.
POST OFFICE BOX 4245 • FEDERAL WAY,WASH INGTON 98003 • TELEPHONE: 120W 941 1550
August 20, 1981
CH M - Bill
1590 - 114th Ave. S.E.
Bellevue, WA 98004
Attn: Joe Miller
Se: South Talbot Hill Pump Station
Dear Joe,
The original shipping date for the Motor Control Center was 8-14-81. The supplier,
turns Electric, did not ship on that date, but now states he will ship on 9-4-81.
Tan dave should be allowed for delivery, making availability of the MCC on the job at
9-14-81.
This untimely delivery date poses a threat to the scheduled contract completion date
of 9-17-81. We request a contract time extension of two weeks, or 10-1-81, based on
MCC availability of 9-14-81. If the supplier slips the shipping date further, addi-
tional time extension will have to be requested.
Sincerelv,
/�000�-
Ricbard V. Mathias
TEEM •
ENTURES
INC.
POST OFFICE BOX 4245 • FEDERAL WAY,WASHINGTON 98003 • TELEPHONE: (206)941 1550
August 24, 1981
City of Renton
Public Works Dupt.
200 Mill Ave. So.
Renton, WA 98055
Attn: Ron Olson
Re: South Talbot Hill Pump Station
Dear Ron,
On Thursday, August 20th, site work at the project site was halted at the
request of the City of Renton. The city is evidently going to institute
a change order that revises the yard and connection piping. We have been
requested by the city to provide several cost estimates for different
piping configurations.
At present we have not been instructed to proceed with anything, ar' have
had to cancel the appointments for paving and landscaping of the v- d
area. We are still able to proceed witit work in the Inside of the pump
station, but this is nearly complete anyway.
In accordance with section 60 of the general conditions we notify the
City of Renton that this delay is of their doing and a contract time ex-
tension may have to be granted, once the extent of the proposed change is
identified.
Sincerely,
W, &/ OWA%4 %
Richard W. Mathias
Copy to: CH2M Hill
Joe Miller
oe o • • •
6 o
«06,885-90;5.90; -
Stead and Baggerly inc. 2795152 Avg-ME RetIrne"d bennyretr�eerr
August 28, 1981
City of Renton
200 Mill Avenue South
Renton, Washington 98055
Attention: Mr. Ronald Olson
Water Engineer
Subject: South Talbot Hill Pump Station Telemetry
Gentlemen:
In accordance with our discussion, we are pleased to enclose our bloc', diagram
showing a proposed control and telemetry for the South Talbot Hill Pomp Station.
In this concept we would propose to measure pressure in the dlbtribition system
being served by the pump station. As the variable speed pump, which also feeds
the same system, is unable to keep up with demand, a pressure drop would be sen-
sed and displayed at the Water Shops. Through the control logic at this location,
the first pump at the South Talbot Hill Pump Station would be called to run and
the variable speed pump would back off until the system demand was met. This
would continue until such time as the amount of water pumped from the South Talbot
Hill Pump Station was less than that which could be supplied by the variable speed
pump. At which time the flow recorder, equipped with trip switches, would cause
the pump at South Talbot Hill to be turned off. This system would work similarly
for the: other pumps which would be staged on by pressure and off on flow.
Telemetry between the Water Shop and the South Talbot Hill Pump Station would allow
not only for monitoring status of all of the pumps and the combined flow from the
two (2) meters, but would also vllow for hand and automatic control from the Water
Shop. All of this equipment at the Water Shop would be housed in a free-standing
cabinet, approximately 83 inches high by 28 inches wide and 24 inches deep.
The price for this system would be $22,460.00.
While this system would be consistent with your final telemetry and control require-
ments, we recognize that at the present time you are primarily Interested in the
p6mp operation itself. Therefore, we have an alternate proposal which will include
hand-off override control of the four (4) pumps from the Water Shop anu run-status
from each pump. The price for this minimum system would be $9,800.00, and at the
headquarters location all of the equipment could be contained in a wall-moun'ced
cabinet, approximately 24 inches high by 24 inches wide and 12 to 14 inches deep.
Prices include the equipment, together with our services for installation super-
vision and start-up.
CONTROL , SYSTEMS , METERS VALVES INSTRUMENTS
O Sfy of Renton • • • •
Mr. tonald Olson
August 28, 1981
Page 2
We hope this will provide you with the information you need at this time and we look
forward to an opportunity of serving vou.
Yours very truly,
Ivan W. ,l
Presider.
Stead and 8aggerly, Inc.
IWS:pc
enc. a/s
TEEM
ENTURES P O Box 4245
Fades' Way, VC 98003
INC. 206) 941 1550
LF.1 MR OF"rRAN5911TT:U.
_ Clts It Renron D.Itr ¢{.plwm r R 14A1
200 9i11 St. Job co. :,]hot Hill Remo cratlnn
Aaor.ro- UA 4Anis
Attention. Run Olson
Endowd I,, h., nrhl, r rr.. fnr ToemT..,-
and Pioneer Rasonry fi Restoration
_ For Approval Approved au noW
Returned for correvt lonI,as noWd
_ Appnovyl Pleae resabnut.
XX For your furthar ration
For your tile,
Per your request
Remark.
I rcm A rntnrr..!n
HN �V✓r IAI�LY.R7
CONTRACTOR/SURCONT 91TOR Q Y
REPORTING PERIOD
MONTHLY MANPOWER UTILIZATION REPORT V Month: August Year: 1981
To he submitted to the City's Project Goals and Timetables as cosmfitted
Engineer during the let weak of following �• in Contractor's Affirmative
nth while contract- is in progress. Prime NT Action Plan t
Contractor is responsible for obtaining and
submitting Al' Subcontractor Rewrts, or per City's Plan 9.1 S
To: (Nr and localtaa of Oweltseea AO=KY OW From: (aer ue loeattaa at eeetr"ImQ
Citv of Renton Teem Ventures Inc.
Public Works Dept., 200 Mill St. P.O. Box 4245
Renton, WA 98055 Federal Way, WA 98003
This report is required by Executive Order 11246, Section 21)3, Failure to report can
result in sanctions which include suspension, termination, cancellations or debarment of
contract.
l '• mtne- total rtal
Work Kure or Employment (See footnote) rtty number umbe,•
0 of
Claaal a• o. • . • W/h of minorlt Empby-
riq- • Nle- ear. A.tan/ Total total rmploy- to,
Coepany'e Rome (I.C.1 'cede Lions Tot. Rlr.', pu+lc Indian ramie Pe- w/h eee
ielend ..ale
Treat Ventures Inc. Carp. C
1't
1 Uh f1
Teem Ventures Inc. Labor
JA,
T
C
Ap
Tr
Tr
empatw Cfticialls ltgnMur, and 71tle R. T+a to 3ie man o. Itleph.r, Lunt e.
(Include Area Cude)
9!8/81 1206)941-1550
Rev. 11/77 (-Males 8 Females, --Minorities l: Non-minorities, rage of
7/80 (submittal Requirements a City's Goals/Timetables) ---
CONTRACTOR/SUBCONT CTOR Y
� J� REPORTING PERIOD
MONTHLY MANPOWER UTILIZATION REPORT Month: Aupost Year: 1981
To be submitted to the city's Project Goals and Timetables as comitted
Engineer during the 1st week of following �, ll' in Contractor's Affi native
nth while contract is in progress. Prime ItiT Action Plan i
Contractor is responsible for obtaining and --
submitting all Subcontractor Re rts. or per City's Plan 9.1 1
10' (%l end Ixatton or Mlle- e Agency ace,. from (ages, and letetim of taetreetet)
City of Renton, Public. Works Dept. Pioneer Masonry S Restoration
200 Mill St. P.O. Boa 70110
Renton, WA 98055 Seattle WA 98107
This report is recut r• y Erecutive r er II24b, Section 203. failure to report can
result in sanctions which include suspension, termination, cancellations or debarment of
contract.
1'PIONEER MASONRY 1' a• f 5, dTotal ial
RFSTOPATION CO. rainya. numter ,umber
work Ncura of Employment (See footnote) rtt
t or
ol—nE73410 cla.ei •• •• e. • e/h °r mtnorit Emplcy-
Nle- Imer. Astan/ oral total
eomparv's Name (I.t.) rode ftea- *oral 91aek ndian Paetme P•- Employ- sea
tions panic bLni .a/• v�h ees
CLFnN!RR, CACLFFPS 1987
r: 137 i'
6 nnl..',rsj n
fr
n ATI1TP:RF
Tr
aq n 5
Tr
r,A gnnr•n
c T
A _
T
Tr
AD
Tr
AD
7.
r
1Y
mpany CfftCiAV;-Tqnsture and 7VIe 0. Pete 5lgned o e eDho ne !,umber
(Include Area Code)
ttrRT W. FTFI.D - ?RrFIDFN n/1/81 ('-nr) 782-4331
Rev. 11/77 (-Malls a Females, --Minorities 6 Non-minorities) page 1 of 1
7/80 (Submittal Requirements 6 City's Coals/Timetables) ---- ---
CONTRACTOR/SUBCONTRACTOR ` O
REPORTING PERIOD
MOAYNLY MANPOWER UTILIZATION REPORT Month: 1 Year:
To be submitted to the Ci ty's Project Goals and Timetables as committed
Engineer during the 1st week of following �, in Contractor's Affirmative
month while contract is in progress. Prime N Action Plan _!
Contractor is responsible for obtaining and or per City's Plan 9.1 A
submitting' all Subcontractorrts.
To: (ear ana Ixation of cswltmnct Aae•ee ow 1 From. (case ana lecatlaa of ewntraetae)
WRIGHT,INC ELEC CONT
3700- SO GENESEE- SEA, WN98118
This report is require y Executive Order 1124i. Section 203. Failure to report can
result in sanctions which Include suspension, termination, cancellations or debarment of
contract.
i WRIGHT ,INC }• mino- Total otal
ELECTRICAL work Haura of Employment (see footnote) rity nuebar umter
91-0885577 claeu •• e. . �/h or nc or
• mSne rlt Em D><'Y
H le- er. Aston ,o to total
^ode flea- Tote' Black ""also netfte Pe- Employ• Bee
Ceaparty'a Name (I.C.1 clone D•nle tabnd .aln v/n eee
C
91-0995577 elec Tr
AD
Tr
Tr
Tr
c
A
Tr
C
T
C
T
Tr
7. ccrparnY c.ficla 'e 71171EF, en M _ e i. fate Stgnen 4. a ephone Fumber
(Include Area Code)
M WRIGHT SECTY 9-h_Q -1361
Rev. 11/77 (*types s Females, --Minorities i Non-minorities) Page of
7/80 (submittal Requir♦sownts F City's Goals/Timetables) -� —
41 KIAUSE & SCHEELAR, INP
0 DOOR SYSTEMS
:�2>5 IglbTAYF NE RE.Ut,K)NV d.Aw•-[NG?UN96052.
W3-"43
September 9, 1981
City of Renton
Utilities Engineering Division
200 Mill Avenue South
Renton, Washington 98055
Attn: Ronald L. Olsen
Subj: South "lalbot Hill Pump Station
Dear Mr. Olsen:
We are advised that the City of Renton is the owner, or
reputed owner, of property at or near the following address:
South Talbot Hill Pump Station
S. 43rd at E. Valley Highway
Renton, Washington
This is to notify you that on the 30th day of June 1981,
we commenced to deliver materials to be used upon the
real property and all improvements owned or being constructed
by you, at the above address.
The materials were ordered by Teem Ventures and consist of
Finish Hardware and Hollow Metal Materials.
We ar^ required by law to furnish this notice to the owners
of all property to which we furnish materials, so they may
have notice in the event of non-payment, a materialman's lien
may be claimed by us. This notice is not a claim of lien, nor
does it imply in any way that a lien may be necessary. This is
sent only because we are required by law to do so.
Sincerely,
KRAUSE 6 SCHEELAR, INC.
DULL. SYSTEMS
JUDY SCHEELAR
JS:jmh
cc: Teem Ventures
P.O. box 4245
Federal Way, Washington 98003
TEEM 0
ENTURES
INC.
POST OFFICE BOX 4245 • FEDERAL 1�—) WASHINGTON 9M3 a TELEPHONE: (206)941-1550
September 29, 1981
CH2M Hill, Inc.
1500 - 114th Ave. S.E.
Bellevue, 4A 98004
Attn: ,loe Miller
Be: South Talbot Hill Pmy
Dear Joe,
Enclosed is the adds a ca anon far completing the discharge
main connection in S S Please be advised that one labor,materials and rental on o het required by the basic contract
are "a led. D1 rR c i ing and furnishing some Items of material
are included in on sic contract.
Please begin process is mount of $1473,39 as Change Order U. If
You have any questions, ase contact me.
Sincerely,
Bi, hard W. )atl,ln,.
CG% $ 3 /r��3oT f/iLL /PunrP non)
!`+ 01r/G�L Wo2lL
ZT-
6oNo
r a�lRfFNcC (.niS)(1371 . IQ) i6�', a � •s0
TA 60-T- �l Ir` Qu neP J7 A,.,
Co#3 �P"eo2
r
1 �p, n .Ju.'�'C.Z`ti7F�Acu„-(3f'z�(�, (,• ,,�
�, S 33
ice, . , r.r.; �I �r Ba,3l�yK ` 39
7b3,1(�
T��OoT N«l- PUMP S;-IC070,3
Co#3 /j1,4rt�1i q cS
I O A.
ul�
TFhBar I-�t��. �umP S;�rro�J
�7 -t .. ! :,:/.,-_;� •�/R� (m'ram, ,-,_.� i -.
14
u61 dry(j C�.��..J 14 •'!V
Duar'TR/u'<V.- C MJ e.t.a I�. OJ
' ��,�G��/� �, V✓�, III , A U
0 #3 ft5pr�r /lRe� /Q�3�RRf70�J
c.
SuPc�9ju*c�ioenuT
C Ca.
A/k
Y.
u, sy •'
iuY
A.f w
1
1- � � � TIC_ f� r� .'.!I•!i�"�J�
l_.-i.V- l.•a �.1�c..! �`<�'r.,�R� �. r`Y'Y. �CvatR.�,f�^ro�J�
i 1
v 8 O@kA-7TrJ 6 O-X-t Je�P—YL,S •
I
Y
P .
r ,
��r -
F�r� • � I ,4c�
oe
Co .,,
I po• +` etiu,.iei TV, (�ahrK•6..i�rc,.J}
�lq�ac�
t ® 040 0
S
Stead and Baggerly ins.
September 29, 1981
Hr. Ron Olson
City of Renton
Dear Mr. Olson:
As per your recent telephone onversation
with Mr. Ike Stead of our firm, please
find enclosed another copy of our letter
to you dated August 28, 1981 regarding
the South Talbot Hill pump Station
Telemetry, as well as the block dirgram
which was inadvertently not included
with .he original letter.
If you should have any questions regarding
the attached, please do not hesitate to
contact our office.
�Vtthank you.
Pat Chitty �ary,
TEEiW
ENTURES P O Box 4245
r Federal Way,WA 98003
INL 206)941.1550
LE'1'1'EH OF TH ANSM11-1
1., City of Renton Date October 5, 1981
200 Mill St. J-dI So. Talbot Hill Pump Statiop
,n�Wa 98055
\ttention. Ron Olson
F:nclo.ed .r,., Monthly Hanpcwer Utilization Reports for Teem Venhrres Inc., Wright Inc.
and Minority Paint Contractors, for the month of September.
_ For Approves .\pproved as noted
_ Retwl*d for correponns as nuo+i.
_ Approved Please resulnnit;
_ For your fi:ra
7IXiX. For your further action
Per your Mqueel
Hpmarks
feern YPnturv,Inc
He
TALBOT HILL POMP STATTAL . -
CONTRACTOR/SUBCONTRACTOR ;(Y
REPORTING PERIOD
%ONTNLY MANPOWER UTILIZATION REPORT Month: SEPT Year: 1981
To be submitted to the city's Project e. Goals and Timetables as coaelitted
Engineer durin; the 1st week of followlnq �� '1• in Contractor's Affi rmative
leonth while contract is in progress. trine Action Plan S
Contractor is responsible for obtaininq and or per Cit s Plan 9.1 a
submitten, all 5.Ibro r cto Pa r P )-
Tor (ram am leeettee of Owl leave A1wF 8,m 'rom: (aaaa ewe levatlee of vmany"tN)
WRIGHT,INC
3700-SO GENESEE- SEA,WN 98118
this report is required by Executive :.r er 1 )46, Section -03 allure to report can
result in sanctions which include suspension, termination, cancellations or debarment of
:entract.
5. ►.
WRIGHT INC mle°- Total r.tsi
York soars of F.aPloyaont (gee footnote) rity nu.bor Yob.-
91-0885577 tot or °f or
C3ue1 a minor It Fmpby
NS e. Me"
Aa tin! is tal total
Con a Sere mr.1 -'vie fi`e- TotA 81e:k •ndlm teettie e- rapl°y- sea
Derv' Clene Fem^ ieL.vf ..Ale vT sea
f,
lec Tr
A _
Tr
AD
Tr
r
1r
C
A
Tr
AD
c.
A
A.
It
Tr
AD
Tr
t Tr
. cpanp Crfleie i'e :lF rot-re m s pate Stgne° o. Te epmono >maber
(Include Area Code)
M WRIGHT, SECTY * • 9-30-81 (206) 723-1362
Rev. 11/77 ;-Males w Femalt:, ••Mlnon ties Non-minorities) Page of
7/80 (Submittal Requirements a City's Goalsl Timetables) —
CONTRACTOR/SUBCONTRACTOR
REPORTING PERIOD
MONTHLY MANPOWER UTILIZATION REPORT �' �' Month: September Year: 1981
To be submitted to the City's Pro)ect Goals and Timetables as coamlitted
Engineer during the lot week of followinq r�`� in Contractor's Affinitive
nth while contract is in progress. Prime Action Plan %
Contractor is responsible for obtaining ard
s tnt all Subcon ractor Re r s. or per City's Plan 4.1 F
To: (mat• aM Ixatla of ra,llaoco Aawer best.( From. (aaea aae location of aestrattse)
City of Renton - Public Works Dep.t Teem Venture. Inc.
200 Mill St. P.O. Box 4245
Renton, WA 98055 Federal Wav, WA 98003
This report is required by Executive Or er 6, Section 203, Failure-to report call
result in sanctions which include suspension, termination, cancellation or debarment of
contract.
% 5. 6.
m tno- Tetal rotai
4 ry rtours of EMpItymant (See fcotnctel rlty nuvber ueDrr
w n of of of
;e .. .. mInoric gnpby.
Hie- 'e.r. Atlary ,otal total
'e came .. 1 :ra:e f" rote aU rk anlc naian pectrt ?e- .1, gas
rsa
ComDatty Slam P lalar1 �4
-teem Ventures In,. CarP.
1 L''
Teem Ventures Inc. labor _
er
TrIDeem Ventures Inc. opera
_ ter Tr
f
Tr
t.
r l
C
A
C
An
TT
Ile
Tr
7 C$$$rrrDany ieia 's . nature an a ;uto signea ST ephone la.aber
/ (Include area code)r,`v' LL,u�•'�. V / 5E<_ (1,sober 1, 1981 (2(16) 9»1-1550
Rev. 11/77 (-Males a Females, --Minorities G Nor.-minorities) Page of
7/80 (Submittal Requirements G City's Goals/Timetables) —
CONTRACTOR/SUBCONTRACTOR (Y r
REPORTING PERIOD
MONTHLY MANPOWER UTILIZATION REPORT k' J�, Month: Se tember Year: 1981
To be submitted to the City's Project ��j Goals and Timetables as committed
Engineer during the 1st week er following L' in-Contractor's Affirmative
nth while contract is in progress. prime Action Plan 4
Contractor is responsible for obtaining and
Isubmitting all Subcontractor Reourts. or per City's Plan 9.1 b
TO: (ales end lecatlm of Govionce r Ogt.l From: (IYee ass ilomis, of sontrstter)
City of Renton - Pubiic Works Dept. Minority Paint
200 Hill St. 217 - 240th St. S.E.
Renton, WA 98055 Bothell, WA 98011
lhrs report is required by Executive Order 1124,. Section _07 ar ure to report can
result in sanctions which include suspension, termination, cancellations or debarment of
contract.
t. 1.
P.lno. Total rat.1
Mork Noure of EMIIOYment (See footnote) rity nuber ias or
of of
Cla sei
e. • • w/n of mindrtt am Ploy.
ryL. eor, Alien/ Total total
.-rode Tle•- rt4 Plack nd ion P•et•le ye. Tsp1oY' eeP
CO.,Pany's Roma Mr.) bans Panic Ie!srl •.ale w/n ees
Minority Fain-
in' .
r
Ti
,
Tr I i I _
C
Tr
C
Tr
AD
Tr I
Tr
AD
Tr
emparyr era l'e N Y, , • .at• 5lgnen '+ 'rle Ph one �eMr
(Indiude Areo :ode)
Rev. 11/77 (•Males 6 Females, --minorities 6 Non-minorities) Page cf
7/80 (Submittal Requirements i City's Goals/Timetables) -- `—
!!VENTURES
0
P Box 4245
Ii�pp Federal Way.WA 98003
NE. (206)941 1550
LEI IF,R OF TRANS%IIit Al.
'1'0 City of Renton Deli, October 5. 1981
200 Hill St. Juh So. Talbot Hill Pthnp Station
R.M.', Ge 4sn%s
Attention: Ron Olson
Enclosed is the Approved Affidavit of Wages Paid for Pioneer Masonry b Restoration
the Fluid Applied Roofer.
_ For Approval Approved as noted
R^turned for corm"ions as noted.
_ Approved New resubmit:
%R For your files
For your further action
--'
_ Per your request
Remarks
l erhl \mitui//n``��,Im
Hv dldldfe; � —_
4Fi.�1 MEETING NOTES 17-17:7
ID +O INITIALS
SUBJECT. 5. Ta�kf gill P.S. _
DATE. ID/TA/df U)CA" (SON u+ mm itt (0,4 Q,w.
ATTENDANCE ?� Okse
Bill Gilber, . ..-. .
l.e Wier-
TOPJ p DI6 IJUM _ ACT",
Opv.,t� s{ domes�L p.+MPa � vKia�b LPeed
ff��
;?On W1�a.J-S 46W/ pvnP WrJes >kNy;�
W rat t h.•ppHTQ at V%4-1 PI! clwxa.w�
}tr c pv TTf �""t',7• R 1 T sc,ft,w
p
st&L. "rw ,,ftA...#1. p.11,r tC c r
Re- W4.Y-Z2 C.� 4 {or a C.J. T
3. C1A4 n..( QA. t t- P. S G,
O�csed C. 0 . 13
?2 n Cii-e%wveu tu/ cenfr. Glci7m . Zd" Sol,
W"to be i n e.0. 4 Z. ARM W; LI M.JLC JRM
40,.E prove, claim tau, �rvs&J �. ui•� ,
1
EDPIM tft
I'IW11!MYllff PAf,
TRACY J OWEN,Dial No.1 • King County Cou•R ^ '
SCOTT BLAIR Dist No 2
BILL REAMS,but No.3 Paw n Ba,oen Cna"Ma
LOIS NORTH,Dist No.A Mary MANCa JOMN,Couoav Adm^sthlp
RUBY CHOW,Din.NO 5 Gerais A Pete•a0n,
BRUCE LAING.Oht.No Do"Council Adm,oinrata
RWL BARDEN,Dist No. Rouen 402 K,np County courthouse
908 GREIVE,Dist No.B Seanle.VJaahmpion 9810s
GARY GRANT,Dist.No.9 (2M)3" 7445
October 22, 1081
Daily Journal of Commerce
83 Columbia Street
Seattle, WA 98104
Gentlemen: a
Attached please find a copy of a Notice of Rearing for the
application of The City of Renton for a franchise, which
is for publication in your paper on November 3 and 1, 1981.
Please forward three (3) Affidavits of Publication to
this office; however, please bill:
Public Works Department
City of Renton
Municipal Building
200 Mill Ave. So,
Renton, WA 08055
C/O Ronald L. Olsen, Lead Engineering Specialist
Very truly yours,
Do�t�. Owen
Deputy Clark
Ja
Attachment !/
cc: City of Renton v
81-646
COUNTY COUNCIL NOTICE OF HEARING
ON FRANCHISE APPLICATION OF
CITY OF RENTON
NOTICE IS HEREBY GIVEN that an application has been filed with
the King County Council by the City of Renton-for a franchise to
construct, maintain and operate a water system for public and private
purposes on certain county roads and streets in King County, Washington,
for a period of fifteen years.
A public hearing will be held upon said application before the
King County Council. Room 402. King County Courthouse, Seattle,
Washington, on the 9th day of November, 1981 , at 9:30 A.M.
The area to be sei .ed by this franchise is described as follows:
Talbot Road South (Springbrook Road) from South 192nd Street and
continue south for approximately 800 feet.
DATED at Seattle, Washington, this 22d day of October, 1981 .
KING COUNTY COUNCIL
KING COUNTY, WASHINGTON
DOROTHY M. OWENS
DEPUTY CLERK
cc: Post
Real Property
City of Renton ✓
0
TEEM
ENTURES P 0 Bo•424u
federal Way.WA 98003
INC. i20619411550
LETTER OF FRASSMI I TAI.
fo City of Renton Dab• 0ctabar 21 1981
200 Mill ST. $o. Talbot Hill Pump Station
Renton, WA 98055 Kenton. WA
Attention. R..n 01sou
Kncloti.•d is the approved Atfidavit of waxes paid for Minority Paint Contractors. The
painters on the above referenc d ob. _
_ For Approval _ -\pproved as noted
Returned for vorteBions as noted.
Approved 19euse rewfimit.
%X For your further action
.yy For your fills --
_ Per your request
Hrmnrk�
I e.•m \wnt n/,//. Inc ,7�/_�.
itsa'�� /Q
• nE CEIVE�
lU.atanx.
DEPARTMENT OF LABOR AND INDUSTRIESpCT 2 1�8i
INDUSTRIAL RMATIONs DIVISION . AFFIDAVIT OF WAGES PAID
Oy®Pia,NA 91M4 ON PUBLIC WORKS CONTRACT
Awarding Agency City of Renton
Contact Number CAC017-81.
Due Contract Awarded. Hatch 16,. 1981
Date Contract Completed
8fA7'a WaAMR4TOR County in Which Work Performed Ring
LocaWn within County . C"Y Of_Raatou.
COURrr o► Y40 JJJ Was a Statement of Intent Filed! Yealgl No 1-I
In compliance with RCW 99.12.04o I, the undersigned, being a duly authorized representative of
..Ilitto[fty_Paiit Contractors, 217-240th St. S.E., Bothell, WA 98011
1proour v O agttand h benefits
do hereby certify that the following rates of hourly wage and hourly Cringe benefits have been paid to the
laborers, workmen and mechanics emoloyed by me upon the project described above and that no taborer,
workman or mechanic has been paid less than the "prevailing ate of wage" as determined by the Indus.
trial Statistician of the Department of Labor and Industries,
List below each claasifleation of labor employed by you upon the project described above and the rate of
hourly pay and hourly fringe benefits paid to each classification. If apprentices have been emploved, list
their names and or registration numbers, their stages of progression, the rate of hourly pay and the rate
of hourly fringe benefits paid to each apprentice.
Craft and Classification of labor Rate of Rate of Hourly
Hourly Pay Fringe Benefits Paid
minter-Journeyyn, '
Foreman
Nort: Attach Addltimai Sheets ae Needed Illneicy !Y int CUern( t T
N
_.
Subscribed and sworn before me Ry
�... �� . ` . ./
/ ` v
thls✓/ day of �/` E'1 RertW enAr iMr xav»J n m M
���111 I xxar ntr.xN 1 hrryle hirl�l. Arrtin
n.vn p ih<rrtwynp aye rtemrtmenu of RCA W I l sal ho' seen ou�awl
9i._ s
.�yrJ IAN
DF.PARTMR INDOF[ RAL l)�RTI� IN'9TRlf:S
Notary pahirr iw and for tar'lab of A'whiwaton. 1
rending in A'aahiwptmi. ; �.
Date: •�.
This mace rnereed fw 15(tecierd cerufletiwn
INSTRUCTIONS: ✓
L Pursuant to RCA' 99.12.041)copies of this form must be completed by the contractor and each of his sub.
rontractors.
2 Complete this form in triplicate and have it notarized.
;t. Submit all forms for certification t,,. Industrial Relations Division, Department of labor and Industries,
General Administration Building, Olvmpia, Washington 98504.
4. Fite a certified COPY with the Awarding Agency,
CONTRACTORS ARE RESPONSIBLE FOR OBTAINING AND FILING AFFIDAVITS of the SUB,
CONTRACTORS. This is required by law and payments can not lawfully be made until such affidavits
are filed.
1FRe! 1aNnnM Ayn la ni �>
0
• C1 o ' V
TEEM
ENTURES
INC.
POST OFFICE BOX 4245 a FEDERAL WAY,WASHINGTON 98003 a TELEPHONE: 1208I 941-1550
October 27, 1981
CH24 Hill, Inc.
1500 - 114th Ave. S.E. ,
Bellevue, WA 98004 V 14'�•
Attn: Joe Miller
Rat South Talbot Hill Pump Static,
Dear Joe,
Enclosed is a copy of the cost generation paperwork for Chan 00,d,, at
you requested.
Change Order 04 proposal includes the following:
14 Connect motor heaters
install flashing red lite
p install PR1' feature on each fire pump control valve
remove two bowls from pump 02
remove bowls from pump is
gree!
The cost generation paperwork packape is enclosed for your study and review.
Approval of Change Order sG w111 necessitate an extention of contract time of
72 days. The accounting of this anticipated extension is as follows:
Production of the pump shafts will t.ke 50 days,
and typical time for freight will be 10 dapa to 2
weeks. Mother week should be allowed for scheduling
of the shaft installation. The actual installation
should take only several days, but cooperation of the
electrician and the painter are expected to complicate
the procedure and two weeks is not an unreasonable time
to allow for this. The. testing and adjustment 1s expected
to be completed within the next week.
Your immediate decisions are required to enable this contract to be completed in
a cost effective manner. Please advice.
Si eraly,
t a/./�%��
Richard W. Mathite
FROM t 1111I 1Von •
I (GIJV�J
.._._.__
I
i
A•lr. eon 61ser „�„ Io�A9�Dl
{ Mi� Pudlc V�ork� 5 136ji. RQ
U 4oA 6t Il.Ad Rslh.
Ron
�w'. oun. C�Rn.w1.u. A Gwwarv�o�'t.,on tfi,l,or o�n.r>,.o-.,,J
04 u,�r.L ��u� j� 'V�:.G..�on.a� a+•dL ftA�. .eKavn To
,,u-�U. A.� ...P. a� X......c 'Ce � -tlr. d..,•�..d4c. �.,,.�w
CAP OW c, 1u CC t3
top �n1oM1,�m Ioi1Flnsll WYLL OeWTMU to M s numtwtittrn r,xm� of �rvmrvunkiton inNt wiil bolo i��nwxie �nw�y fPNwf fn0 1Mt1?Y! rWry
NHILL • •
"1111 en
plannerx
eronomtst,
suentut,
October 29, 1981
513631.A2
Mr. Ron Olsen, Utilities Engineer
City of Renton
Department of Public Work
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
Dear Ron:
Subject: Talbot Hill Pump S ion - Ch a Order No. 3
Teem Ventures has submitt a c 'm fo extra work requ _red
for connection of the 16 n di ar line to the existirg
24-inch line. They be h . r cl n the fact that while
the connection is show he e1r ngs to be beneath the
sidewalk it actuall s at the street cur They claim
that this caused the x out in the t hich
they would not h h t o if the connec been
made as shown.
With the tra c ro ms pres� on So 3rd Street, the
contractor we have ade a effor oid any work in
the etr er it t ed ut th connection had
to be a ben e th no choice but to
do w k out in a stree belt t is a legitimate
cl ai Ind we commend t t the ci reimburse the contrac-
tor fo ilia ra ;he..Ron, you h sd he c ractor was supposed to in-
clude in h bi th fire rant installation the extra
cost for the str t k. well be that this is what
you wantedr howe I th t if you review the contrac-
tor's originati.,wr ten bi esented to l,ou, you will dis-
cover that he k tually performed the contractor
submitted a or th re hydrant installation only and
the street woft was as e. This fact is present in the
wording of Change Or r 3, which deals with the fire
hydrant installation Therefore, I believe that the
contractor has acted i good faith on this matter and that
the claim is legitimate.
s..af,
an..
t1 Y1 11.11E i\.'n,. \f n�F�.\n N.I.hInMF'n WYYN :i Y 1,0 ,101
Mr. Ron Olsen
Page 2
October 29, 1981
S13631.A2
Remember that the contractor has already performed excellent
work and has turned some gate valves around in the pump sta-
tion and replaced the concrete driveway without making ex-
cuses or putt_ng up a howl. I think we need to be fair and
seek continued cooperation by all so that this project is
suc.assfully concluded.
Sincerely,
/ Joseph R. Miller
Project Manager
18
cc, Teem Ventures
CONTRACTOR/SUBCONTRACTOR Y r
MONTHLY MANPOWER UTILIZATION REPORT REPORTING PERIOD
y Month: October Year: !9,.-•
be submitted to the City's Project Goals and Timetables as cosmitted
Engineer during the let week of following r`.v in Contractor's Affi rnetive
nth while contract is in progress. Pri>, Action Plan S
Lontraotor is responsible for obtainin,t arei
submittlr. all Sub=nt ractor Re rts. or per City's Plan 9.1 c
To: Does a W location of cool lance Asaemr law From: (nmae aed I."," of ramsmtar)
City of Renton Teem Ventures Inc.
Public Works Dept., 200 mill S P.O. Box 4245
Renton, WA 98055 Federal Way, WA 98003
This report is required by Ezecutive Order 11246, Section ]o. . Failure-to report can
result in sanctions which include suspension, termination, cancellations or debarment o;
contract.
i. T• k. R 5. 6.
m SnO_ Total otal
Work Mc ure of Employment (See foot n:[e) rity number mumber
of of
Clmaai •• - e. . tot o7 n:�o rtt Employ.
Dar (t.r.) rior.e • Paac mien raelfle se�l total rMploy. eae
fa: v'a same 'ra le fate Bla ek
D TOLr,I a v^t eae
C 'O
Tuem Ventures Inc. Carpet-
ter Tr
Teem Ventures Inc. ab,rei C
AD
Tr
An
h,
lr
f
_ l'r
it
S
A
AD
Tr
C e�pany ^f!l cla 'a to v+t.^r an I. .e 'ate yne. y. Te ephu ne l:uebe:
Mae coeq
i'C6)6) 941 941-I550
Rev. 11/77 (`males 6 Femals. "Minorit,es 6 Ner.-ml noritles) Page of 7/80 (Submittal Requirements 6 City's Goals/Timetables) -- —
C01.1kAC10N SUbCONT E&P .\�} f�
OkTIVr, Pt X!W
MONTMLY MANPOWER UTILIZATION REPORT ♦ A '� Month: Octoter Year: 198,
7c Le suLclt tra to the City-5 twlect � .� Coals and Timetables as committed
Engineer during the fourth week of each E'N in Contractor's Affirmative
month while contract is in progress. Frime Action Plan . . .......
contractor is responsible for obtaining and
5aremitting all Subcontractor heports.
To: (Laze and location of Compliance Agency) From: (Bane and loeatior. of contractor)
Department of Public Nerks M.A. Seqale, Inc.
200 Mill Avenue South PO Iu,x BB050
Fenton, hash 98055 Tukwila, Nash 98188
This report is required by Executive Order 11216, Section 203, Failure to report can
result in sanctions which include suspension, termination, cancellations or debarment
of conttart.
3. k. f
,.Inc. trial retel
M.A. Segale, In, York Xoura of Employment (See footnote) rlty ^ofer umber
91-0714103 u/n of of
C1a+s1 °• c. a .. e. • elnorit, E"loy
_ Asian tot.,
S ra de f.es- Total Black Xis ndlan Pac Late ?e�l Employ- ees
Co:party'• ::ace (I.D.) tions Panic Is lanA -ale vA es
C 0 1
dCS A
Tr _
C
An
Tr
A
Tr
C
A
Tr
C
A
Tr
C
A
Tr
C
A
r
Tr
C
AD
It
Tr
7.Cc7pany CffiHal'a ]1L na tare V. Date Sisneo 9. Teleptcne ).umber
(Include Area Code)
. ._o D. Graziano, Pap toll Nov 4, 1981 206-""1200
st:.11/77 (•stale% 6 Females "Minorities S Non•niaorities) Page or
FONT CAG 017-81 •
O 44- 9
STANDARD FORM - 251 Report ng er o
(Aug. 1576) MONTHLY EMPLOYMENT (Routh, Year?
t. o. UTILIZATION REPORT
As vreeeribed by the Oc
v r %ator (oPcCP) (gee raver ee for lnetru it lone) OCT 1981
This report is required by Executive Order 11246, Section 203. Failure to report can
result in sanctions which include a apension, termination, cancellations or debarment
of contr,c�
Tn: (Name and location of Cemplianae AReney) From; (Name and location oP eentraetor)
WRIGHT,INr. -
370G- SO GENESEE-
SEA, WN 98119
3' c s. 6.
minor Total otal
Work Nrura of amplaynent (9aa too[note) rity number umber
e11 1 of er
flea- a nib- Amer. Asian; ^ tai totalf minerit Empk:y
r arl:'e car.^ 11.'.. ?ratle t1on, Tot. ?lack ;:ar.ic ndian ?- Ctrle ,,- Employ- bee
Island al,. w^: .-n
L
91-0885577
lac Tr
A
"r
r
1'r
A
Tr
C
A
Tr
rr
Au
Tr
AD
AD
'ompany 0 fioia a no we and TItIe ato 9i",t 9. `.e.ephone Number
(Inclede Area Cede)
-
(+ Males 6 Females e+ tnorities 8 non-minorities) Page
TEEM
ENTURES P 0 Box 4245
�1 r Federal Way,WA 98003
NC. (206)941 1550
LETTER OF TRANS\11Tf.\L
To Citv of Renton Date November 6, 1981
200 Mill St. Job So. Talbot HI11 Pump Station
Renton, WA 98055
Attention Ron Oisun
Encloa•d is the Mcnthlv Manpower Utilization Report for Teem Ventures Inc., and Wright Inc.
yh, wlertrlrinn. _
_ For Approval Approved as noted
_ Returned for,oRections as noted.
_ Approved Please resubm it:
XX For your further action
ja For your tiles
_ Per,your request
Remark,
Hv �
FROM. i I+HILL, INC.. e
PATE
PROJECT NO
SUBJECT
CIv,�L off/ Ale. w4tt. t Qpft� 4�J
mod' w-ac
�o �o�flP.carL !tv 0 ��yy' /vv.
'' tby Inlornret rettwtaa 7 wua :higep ro x n naMwrinan e>.r. .n c..r�_.,.utm tnat w01 trtt� inrruw nw.u4._w uwq >r{ .. '
SHILL •
7enineers
nn'e
kononssts
scientists
November 17, 1981
513631.A2
Mr. Ron Olson
City of Renton
Municipal Bailding
200 Mill Avenue South
Renton, Washington 98055
Dear Ron:
Subject: Engineering Services - South Talbot Hill Water
Improvements Projects
This is written in response to your recent questions regard-
ing engineering fees associated with the operation of the
pump station. Specifically you asked if CH2M HILL should
bear the cost of engineering the changes now called Change
Order No. 3, that is, (1) adding a PRV feature to the fire
pumps, (2) adding a flashing red light to the exterior of
the pump station and, ( 3) removing bowls from the pumps.
As such, there was no engineering design involved. Rather,
I acted in an advisory role to the City, who proposed these
changes. I considered the City's proposed changes from an
engineering standpoint and advised the City as to the effect
on the original design. Since I was responding to the City's
request for assistance, this is under the scope of our engi-
neering agreement for services during construction. Als^,
any time spent in discussion on the operation of the pump
station was preparatory work on the operations manual .
you also had questions regarding the total services-during-
construction fe•e for the pump station. Specifically you
asked about a etter dated September 2, 1981, which esti-
mated the remaining engineering fee to be $6,600. It is true
in retrospect ;:hat this estimate is low. However, the reason
it is low is that subsequent events have caused more engineer-
ing effort that was beyond our control. These are (1) adding
a fire hydrant and isolation valve to the pump station discharge
line, (2) late arrival of the MCC and subsequent problems
with its operation, (3) the City's request for changes in
pump station cperation which resulted in Change Order No. 3
and time extension of 4 months. With respect to engineering
fees for the pump station, we refer the City to the letter
s..me O"k.
1 U01141h Mrew•f1 IL @•.u• \b.F.nQI(•n%b, tu•R4'..,n
Mr. Ron Olson
Page 2
November 17, 1981
513631.A2
dated March 23, 1981, which had a budget figure of $36,000.
This figure is still valid and should be used for future
budgets. As this figure is approached, the City will be
advised as to how such effort remains and the estimated cost.
We appreciate the City's concerns for engineering costs and
have made effort to keep them to an absolute minimum. if
you have any further concerns, I will be happy to discuss
them with you.
Sincerely,
Joseph R. Miller
Protect Manager
ga
sY+an,O.pirnrwnt
6tYtM l[quiry L rMr TyV
MYY WAv WMnplan
TnTrr]M PAS IFIC INSURANCE COMPI►NY
OM\ene NvmM. - NNI.n.:,M1 OnyVfYl CenM1K\MK. "IA� r +
Cbab<wr�NYr�.\AeerAi IOWnr[fOWiPr --_
?ems veatw1m. lat. C11W as LCty
7*48ral Yy, VA 98003
I
Beau rfaltat KU !Ie "mum
r— A81Wl.
Wr :uV. 1.}awre ,o reu• [oaaer.len .n prer�efny ryw IVaeW�ny
Clt- Of Renton -rw•niuon. a�Rut fo rav uafi,n.nl naie Delay
Renton
Ya\Einttm o8055 mint rou. ^ r
Ls.
IF THE CONT HACT HAS\FFN COM..ETEO.vLEW STATE
F u C I Y.n,.
— D.I.aiCwww a'of :4cfMWnri Dil+ I ,nDC —
IF THE CONTRACT
NtNACT IS LRiCOM►LETED,PLEASE STATE
(�Apuf of ?w i 1M DudA,-
_---•. •. _.� I I[0'INtw Wt diVMVIV_-_—.a—..--_
nI ConHsr Curve +Vd - ,�(,{i�„y�S I �•a(gcpyl
OTHER
Fkf rau the r"+•min nl`�H.min.IclV�mo �YrJY[W.H o•cony:4Uraf
I It"V W" Ma e a in
0114,
I
H . .:::Y f It•' • 1 a - nr•1i . e .• fum rMal n a f nln' ]�n v u• 1 . f fl dMl,l +W VI ina 94f1\Y Y"1-a nN'rrlY J1
r.f'mnnn a u ..,• I _+ x„p flnwe Ma• � f .nG Iny .::n iryLV of .x n
• n M�un aNv f Lwnvinwa mieY e•d n
nal w�. nr rar a.w aF pey rVra^i DY nya!:ehlh mG nii•Y
rf,.,V over o-. � J1nr
UNITED PACIFIC
:MrNSU NM'A hl6 C01N.\Nr '� 'f fi' Ogna•.Op:.yn /
T.O. i0a 30"
8aattle. VA "Uh -----U51.1_v_ CwG
ur.
,Y1op rtaCE.-„/4 S_-_�A,�Ya�AA I�. M[iiK�
4dene
BJu 2119 FD 9 76 •Tq ungapr VI Inn la-m n M[an1Yl4 m m.every Aiw:.aoon D!Anvuu
_0
• CITY OF RENTON •
PUBLIC WORKS DEPARTMENT
SA«t -� of 1_ tAugr
Date 11/17/81 CHANGE ORDER Oder r 3
u Change ordered by owner con,nu Mo ��-81
nChange proposed by Cmerener To
EndoneJ b TEEM Ve�ntyras.Y 04TW t��v —
Z4�C� — O _ Sign buts
`/yJ /uAt t reMrei Aid Wa.
Title /f(,;z— Prefect Tltle
ti twit gavtw, be Sweety: lithe tetwAtdl
sr.
•uey-u- — Tat— _�_ _
. • • • . . . . . . . . . . . . . . DRSCRIPTIOII Or WC" . • . . . . . . . . . . . . . . . . .
You an ordered to perfon the following described wort upon "crept of en eppmved copy of this change order:
I. Connect motor heaters S 502.23
2. Install flashing red light 605.24
3. Install PRV feature on fire pump control valves 765.65
4. Remove 3 bowls from Domestic Pump No. 1 3,430.14
S. Remove 2 bowls from Domestic Pump No. 2
Subtotal 5,303.26
5.4 Sales Tax 286.37
TOTAL $5,589.63
The contract time will be increased f�a, months to February 16, 1982
411 000, rbnals " sraSureaebe to Oe In .ccordence with :he pmv,srons of the Standard Spoc,ffonon, and Special
Provul«s for the tvp, of c«etructt« en"lved.
ORIGINAL COMr RACT CURARMr CONTRACT ESTIRATED NET CKAHZ7 ESTIMATED CONTRACT
ANDVNT AMOUNT THIS ORDER TOTAL AETER CHANGE
s 271,881.40 is 176,220.73 s
'�,'tflo.6' g 2R1 ,P10.36
urea umgaN APPROVED
APPROVAL, RECOMMENDED yPWnD
DISTRICT STATE-AID
Edcn¢u
Date
CH,)M 0
:CHILL
engineer.
p(afM1lY5
economists
Scientists
November 17, 1981
S13631.A2
Mr. Dick Houghton
Director of Public Works
City of Renton
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
Dear Dicke
We do not have in our files a signed copy of the revised
engineering agreement as stated in our letter of May 13,
1981. (Copy attached(. Please provide us with one for our
files. Thank you very much.
Sincerely,
Joseph R. Miller
Project Manager
ga
. - else.
nW 11Nh Asenw%1 Wh,vw W iahmpmn W %R AMo 45I illwi
t ; PUBLIC WORKS DEPARTMENT
DESIGN,'UTILITY ENGINEERING 0 235-2631
R
MUNICIPAL BUILDING 300 W Ll AVE.50. RE NTON.WASH.911056
b
�P
1rr0 SEPL EN,9
BARBARA Y. SHINPOCH November 30, 1981
MAYOR
Stead and Baggerly Inc.
2795 152 Ave. N.E.
Redmond WA 98052
Attention: Ivan Stead
Subject: South Talbot Hill Pump Station Telemetry
Gentlemen:
This is to confirm your informal proposal to the City in vour letter
dated August 28. 1981, for the following:
A. Base Bid
Furnishing the equipment, installation, and stb t-ur of the telemetry
(run status) and hand "On-Off"override control at •he watershop of the
two domestic and two fire pumps of the South Talbot Hill Pump Station
for the lump sum of Nine Thousand Eight Hundred and No/190 Dollars,
$9.800.00 not including Washington State Sales Tax.
B. Tax
Thye above figure does not include applicable taxes. Washington State
Sales Tax will be added to the final contract price.
C. Overhead and Profit
The above lump sum bid includes overhead, profit, and all other expenses
involved.
D. Performance Rood
Upon acceptance of this agreement and receipt of the purchase requisition,
the undersigned agrees that he will deliver a performance bond as specified
with good end sufficient s -ety or sureties all within ten (10) days after
receipt of the purchase requisition.
E. Public Liability and Property Damage Insurance
The Contractor shall obtain and keep in force during the term of the
contract public liahttit and property damage insurance in companies
and In form to be appr„vri by the City. Said Insurance shall provide
coverage to the Contractor, any subcontractor performing work pruvided
by this contract. andthe City. The City shall be named as an additional
Stead and beggarly Inc.
November 10, 1981
Page 21
insured on said policy insofar as the work and obligations performed
under the contract are concerned. The coverage so provided shall
protect against claims for personal injuries, including accidental death,
as wel! as claims for property damages which may arise from any act or
omission of the Contractor, or the subcontractor, or by anyone directly
or indirectly employed by either of them.
The minimum policy limits of such insurance shall be as follows:
Bodily inj v liability coverage with limits of not less than $100.000 for
bodily inju. -, including accidental death, to any one person, and subject
to that limit for each person, in an amount not lass than $300,000 for each
accident; and property damage coverage in an amount of not less than
50.000 for each accident.
A copy of the insurance policy, together with a copy of the endorsement
naming the City as an additional insured, shall be provided to the City
within a reasonable time after receiving notice of award of contract.
F. Date of Commencement and completion
Work shall commence within five (5) working days of date of notice to
proceed.
Work shall be corpieted within forty-five (45) working days thereafter.
The working days shall be Monday thru Friday.
C. Hours of Work
The corking hours for this project shall be during the period from
8:00 A.M. to 5:00 P.M.
H. Coordination with Other Contractor
It shall be the Contractor's responsibility to coordinate with the
Prime Contractor of the pump station, Teem Ventures, Inc., in Federal
Way, (Phone 941-1550). for access to the pump station and the testing
of the control system.
1. Ctilities
It shall be the Contractor's responsibility to coordinate with the
telephone company for the propor telephone circuitry required for this
installation.
J. Site
The Contractor shall be responsible for leaving each site neat, clean,
and in such condition as is considered safe by the Project manager.
K. Construction Drawings
The Contractor-Supplier shall submit construction drawings and product
Information sheets for approval prior to any installations.
Stead and Baggerlv Inc.
November 30, 1981
Page J
L. Maintenance and Operations Manual
Upon completion of the pro_ect, the Contractor shall supply onto the
City five (5) Maintenance an- ^';-.ations Manuals with "Aa Constructed"
lnformatior. included.
M. Guarantee
It shall be the responsibility of the Contractor-Supplier to guarantee
the equi; tnt and system operati.n for a one-vear period from the date
of final acceptance by the City.
N. Contractor's Signature
STEAD AND BACCEv'1' INC. 2795 152nd Avenue N.E.
Bidder Street Address
Redmond WA 98052
By City I State Zip
(206) 885-9078
Title Telephone Number
Date
State of Washington Contractor's License No.
City of Renton Business License Number
0. Acceptance By City
Richard C. Houghto -- Date
Director of Public Works
CIF RA
J L.
„y f PUBLIC WORKS DEPARTMENT
DESIGN/UTILITY ENGINEERING 0 215-2631
WL MUNICIPAL BUILDING 20O MILL AVE.SO RENTON,WASH.98055
9 e
Ep
I tEp sE oiEM0
BARBARA Y. SHINPOCH December 3, 1981
MAYOR
STEAD 6 RAGGERLY INC.
2745 152nd Avenue N.E.
Redmond WA 98052
Attention: Ivan Stead
Subject: South Talbot B111 Pump Station Telemetry
Dear Ike:
Attached herewith Is the proposal. Please execute and return to the City
of Renton. Address "Attention Line" to me.
If you have anv questions, please contact me at the number listed above.
Very truly yours,
Ronald L. Olson
Utility Engineer
:ckd
Attachments
Form Nu. 102
CITY OF RENTON
BUILDING DIVISION -
PUBLIC WORKS DEoARTMENT
235-2540
LaECl1- a ffa
JOB LOCAT!q AT -So/ W f, E' r , P , / t_ } d/
The following wo&k doordinaes not comply with City cod and
forth*
end moat ba CORRECTEDa and INSPECTED before
further work is accomplished on this building or before •
equipment is put into service.
/ p
AVa //uK / 1 /_�
ftalpr �TF
p S
DO NOT OCCUPY HS BULDIN
i
---_
UNTIL ABOVE CORRECTIONS HAVEIBEENIMADEGAND APPROVED
Inspector
Date11-� �i
Q4I�7L!3E T�$ ►NICE
CH2M • •
:HILL
Pn�ineerl
t]�dnnlVs
economists
scientists
December 9, 1981
513631.A2
Mr. Ron Olsen
City of Renton
Municipal Building
200 Mill Avenue
Renton, Washington 98055
Dear Mr. Olsen:
Subject: Operations and Maintenance Manual for South Talbot
Hill Pump Station
Our existing engineering agreement dated March 3, 1980,
requires that we furnish the subject manual. We propose a
manual that would have main topics as outlined below.
I. INTRODOCTION
1. Location and purpose of the pump station
1I. OPERATION
1. How the pump station operates
2. List of pump station control settings
1. Figure of puml, station pump curves and control points
4. Domestic pump operation
5. Fire pump operation
III. MAINTENANCE
1. Reference to contractor-supplied data bound separately
2. Discussion of routine maintenance
The manual will be written in draft form and presented to
the City for review. Final presentation would occur after
pump station startup. Estimated budget range for the manual
is $2,500 to $3,000. This figure is dependent on how many
revisions are made and to what extent the City may want the
text expanded.
We wish to discuss this subject manual with you prior to our
beginning work
on it.
�Sincerely,
y�V{'W.u'V
Joseph R. Miller
Project Manager
nla
feanl.011ie.
firp1 11411+a..n,. I 1 B.Ilrvrre.NarAmppm WIIN4 !@r 4i 1 YODU
ue-
• MEUIN(o HELD WITH THE FOt.L04J)uG,
NA"IE CO, f--�HWE
�u/1r1+ffts
Jim Uwr � clF$», ���r.V �s3 • sboo
J
o{,
I YM.)
I�I23/81
a, pa ..red r,K. Ato&eel
S%tM V - was 56N T An Z e rc-cK„(C.
Boot- tLEc pmv C.Wog- NOT nro-mo
.�{,. �i+rtct+u►ML.-.• GOER-aTON - tN Dd�iul
•
I
., �. � ,
' Y
^r '
r�
.�
- 1
v
.. _ yi-
DIcuen 10, 1981
,in11
TEEK VZWrURES
PO 80E 4245
FEDML WAY, WASH 98003
NOTICE IS HEREBY GIVEN that the underai,p... WR10Br.YNC -
F.I.EC 0DWRACTOMas a claim in the bum of . OM IMNM0
TWRM Cr1E A 90/I09o11ara($ 14,12L90 ) ab..ir, t the
retained percentage and bond taken trom TIRM V
as princ4pal, and , as surety,
for the work of 90 TALROT RILL PW STATIf./ RMON, WN
41tF of Rastas prj. OW-600
NAME of CLAIMANT: WRIM.Iff. - RLLC 0M.
ADDRLJS: 3700- /o ORNBYER-
SRATTLR, WASH 98118
by:
ITS: PRRSIOIIR
._. � FROM. C HILL. INC. -- . --�-_.___--- -
C.
of `
37L1J JO.' yd, DATE
RROjECT NO S1363/- A
SUBACT
A f s�- �sc?~iucclJ
� ce u tr
T
C H 2 Xj (tij- A-YI •+) d-er-61 -V,, *.11.0 15'
ea.� ,,, .1 .
C A~
a-ec
�ow 7 vUi,. un. u s,., ntf Lc�
�ppy to d.-I a",2� .L W 7L�M ✓a fuu✓ +� Noy`.
:, lUl rrx newRrAse ��a Waikef, rEENI
Mh mhrrra: NtmgW wu Gti�O^t•T ID b- . .. .. ,... . .. ,.. ... ...... .,.. .ills
TEEM
ENTURES
=NC.
POST OFFICE BOX 4245 • F1 U1 HAL ty A Y.WASHINGTON 98003 • TELEPHONE: (206)941 1550
December i8, 1981
Wright Inc.
3700 S. Genesee
Seattle, WA 98118
Attn: Harold Wright
Re: So. Talbot Hill Pump Station
Dear Mr. Wright,
We are in receipt of your notice of claim sent by certified mail December
` 10, 1981. We are sorry that you feel that this type of action was necessarv.
The claim is for an incorrect amount. The amount on your claim should have
been $13.165.17. (See attachment)
Your intract is to furnish and Install the electrical system in accordance
with the project plans and specifications. At this time the materials
furnished and work performed is not in full accordance with the plans and
specifications. Until the system is supplied in conformance with the plans
and sp, . '.ficatlons no further payments will be made to vw. If you desire
to continue to receive payments, place the system to exact conformance with
the plans and specifications by December 28, 1981. If you fail to make this
accumpl:shment by that date, 'ream Ventures will initiate steps to finish
construction of the referenced contract without further efforts from you.
the cost to accomplish the work that you are responsible for will be closely
tabulated and accounted for, and charged to you.
Deviations of the as installed electrical system from that called for by the
plans and specifications include, but is not limited to the following:
1) Supplied "as built" drawings are not the same as
the equipment configuration actually installed
2) Automatic pump control valves do not operate properly
3) Timers s,nplled are not as specified, and are not set
properly to enable the systcm to operate
4) There ate additional relays ine Called in the control
system and nobody has been able to explain their
function or even where they are wired In.
1
r • "
i r
2
5) Wiring changes have been made during, the attempted
control system "shake down" that are not properly
refle.ted on the "as built" drawings
6) Exhaust fan thermostat operates backwards
7) Plow system and pressure system control of PIMPS
has apparently never been attempted
8) etc...
The electrical engineer for CH214 Hill has spent considerable time reviewinv
the original plans ah d apeciftcations for this electrical system. He insists
on receiving a system exactly as he originally specified. Then if changes
are required they will be performed In an orderly manner and corresponding
.,as built" drawing changes will he made.
Please give this matter your immediate attention, and if I can he of
assistance please contact ma. If you do contact me by telephone I expect
to close the telephone conversation with a "good-bye" from both parties,
rather than abruptly hanging up.
Sincerely,
00
,Q111
Richard W. tlathias
enc 1.
cc: C112H Hill - Jna Miller
City of Renton - Ron Olson
Marsh 6 McLennan - Ken Hours
TEEM
ENTURES
=NC.
POST OFFICE BOX 4245 • FEDERAL VV;0 WASHINGTON 98083 • TELEPHONES. i2U6�94116'.rtl
December 29. 1481
Wright Electric
5700 S. Genesee
Seattle, WA 98118
Attn: Harold Wright
Re: So. Talbot Hill Pump Station
Dear Mr. Wright,
The electrical system at the South Talbot dill Pump Station is still not
in satisfactory operation. In order for the contract to he completed,
minor changes and adjustments mast be made to the electrical system.
One way or another we must provide a workable system acceptable to the
engineer and to the City of Renton. We ask your assistance in providing
this system.
At thic time the Renton City Attorney has established that the switch-gear
is City of Renton property. It has also been discovered that the switch-
gear supplier, Furnas Electric, has an amount of $17.424.00 past due 90
days on this project.
We feel that it 1s in everyone's hest interest to settle this situation as
quickly as possible. We want to once again request your assistance in
several intense days of trouble-shooting that should result in an operati.,nal
system. The engineer, City of Renton and Teem Ventures will willinSly con-
tribute in whatever manners necessary to achieve this goal. Your refusal
to participate in this type of an effort will result in your official
discharge from this project. If you are discharged, a different electrician
will have to be retained to complete your work, and all costs thus resulting
will be deducted from the funds still owed you for this project.
We are attempting to be as truthful and straight forward as we feel is possible
in dealing with this situation. Upon receipt of this communication please
contact me to coordinate this troubleshooting efforts.
Sincerely,
llell *�1
Ricaard W. Mathias
cc: CH2M Hill, Inc. - Joe Miller
City of Renton - Ron Olson
!Sk/ENTURES
INC.
POST OFFICE BOX 4245 • FEDERAL WAY.WASH INGTON 98003 • TELEPHONE'. 1206)941 1550
!k:.nher 1961
City of Renton
Dept. of Public Works
200 Mill Ave. So.
Renton, WA 98055
Attn: Ron Olson
Re: Sn. Talbot Hill Pump Station
Dear Mr. Olson,
Your acceptance of Change order 03 to the above referenced project has
extended the contract time to Pe Sruary 16, 1982. We feel that .:is exrenticn
is still required to successfully complete Change Order v3. This time ex-
tention should also be ample to allow resolution of anv electrical problems
that may exist at this time.
The electrical situation has developed as f(illows:
1) Hanv main circuit breakers have been removed from
tht motor ctntrol center by unknown people. No
physical damage has resulted.
Y) The lock core on the door has been changed. The only
kev is available from 'eem Ventur,,A upoo reauexr. In-
creased police surveillance has been formally requested.
)) The initial time limit flY-2b-81) given to Wright
Flectric to establish proper o?eration of the electrical
system has passed without positive results.
a) The swatch-gear supplier (Furnas Electric) has not been
paid for over 90 days. The witch-Rear coat is S17,524.00.
5) The Renton Cit- Artornev has stated that the svltch-Rear
la City cf Renton property.
6) :(either Teem Ventures or City of Renton Dept. of Public
Works, City Clerk, or Dept. of Purchasing has received a
"notice of right to lien" from the switch-pear supplier,
Furnas Electric.
1
2
At present we have consumed the days since the 28th dead:ine re-evaluating
the situation. We anticipate that once &Rain we will request that Wright
ClecL - properly complete their electrical subcontract and provide a func-
tiuna system. We anticipate oftering our assistance on the lohsite durint,.
their debugging efforts and still feel that everything can be operational
after several days of trouble shooting. We do not anticipate releasing, any
further funds to Wright Electric until the system is operational and only
if we are satisfied that the supplier, Furnas Electric, will also he paid.
We are attempting to obtain the "least painful" but still satisfactory
solution to this situation. We will keep you informed of further develop-
ments, but in the wantime if you can provide any guidance or tnmrts, they
would be greatly &pprectated,
Sincerely,
/elm
Richard b'. Mathias
ct : CHyM Hill, Inc. - Joe Miller
• • jlbw�
OF RF+
OFFICE OF THE CITY ATTORNEY• RENTONMASHINGTON
y � � Z .051 p•rQ 1p.lM 100 s iM flp(!i • .fwlp w•Snn•^,l
p! g LAWRENCE I WARREN, o<r o.pxt• DANIEL KELL0GG, •ssn•ui cr.l•llp l
ppe DAVID M DEAN, •ays.wl c+r•npw.
'�09
TEo SEEiEMO MARK E BARBER, •sss.wl a*.•+*ass.
ZANETTA L FONTES, 175is,wl olr input.
MARTHA A FRENCH.•ssnlwl c...•+.a•+!•
January 3, 1985
T0: DICK HOL'GHTON, PUBLIC WORKS UI 'FCTOR R' '
l S
tmuc Wu. '
FROM: L.AWRENCE J. WARREN ,,INOFRk, .
RE: WRIGHT V. TEAM VENTURE SUBPOENA
On January 3, 1985 I was able to contact Katherine Ca-`iin
concerning the Wright, Inc. vs. Team Venture subpoen . I
told her that we would do our best to respond to the subpoena
as quickly as possible and told her we would be shooting for
Friday, January 11. I think we should be able to make that
deadline from conversations I have had with Ron Olsen, If
the amount of material necessary to respond to the subpoena
is not large, we should simply xerox two copies of the material
and send it 1 the respective attorneys. If it is large, we
should zero 'ie loose items and indicate that the other items
can be viewe .t the Citv.
It is therefore not necessary to respond to the subpoena on
the subpoena date of January 4, 1985. If you cannot make the
date of January 11, 1985 please let me know as soon as nossible.
Lawrence J. Warren
LJW:ds
cc: Ron Olsen
1
2
3
4
6 IN THE SUPERIJR COURT OF TdE STATE OF WASHINGTON
IN AND FOR THE COUNTY OF KING
6
WRIGHT, INC. )
7 ) No. 82-2-15292-7
Plaintiff, )
8 ) SUBPOENA DUCES TECUM
VS. )
9 )
TEEM VENTURES, INC., and )
10 UNITED PACIFIC RELIANCE COMPANY )
11 Defendants. )
12
13 THE STATE OF WASHINGTON, TO: Records Custodian, Public Works
Department, City of Renton,
14 Washington
15 YOU ARE HEREBY COMMANDED to be and a,pear at the
16 offices of Davis, Wright, Todd, Riess S Jones, 4200
17 Seattle-First National Bank Building, Seattle,
Is Washington 98154 on Friday, January 4, 1985 at the hour
19 of 11:00 a.m. of said day, then and there to testify
20 as a witnesu at the request of Wright, Inc. , plaintiff
21 in the above-entitled cause and to remain in attendance
22 upon the undersigned or other notary public until
23 ) discharged; and
24 TO BRING WITH YOU:
28
SUBPOENA DUCES TECUM - 1
I
DAVIS WRIGHT. TODD. RIESE • JONES
•.A t Y, NN,1 tl it.
14 ♦ M1�wIM0♦ON�M„tl
163vb 6i!lN
1 All documents and records that refer or
relate to that public works improvement
2 project number 513631.A2 for the City of
Renton at the South Talbot Hill Pump Station
3 which project was awarded to Teem Ventures,
Inc. , general contractor, in approximately
4 February of 1981, including, but not
limited to:
5
(1) correspond,ance between the City
6 of Renton and Teem Ventures, Inc.
and/or Wright, Inc. concerning
7 the electrical system installed
in the pump station
8
(2) maintenance manuals
9
(3) record drawings
10
(4) correspondence with CH2M Hill,
11 its agents or representatives
12 (5) records of repairs and/or
maintenance to the electrical
13 system prior to and following
acceptance of the pump station
14 by the City of Renton
15 (6) records of modifications or
changes to the electrical
16 system prior . and following acceptance
of the pump station by the City of
17 Renton
15 (7) operations manual for the pump
station
19 �'by��fyl.
20 Dated thisl2fr ay of December, 1964.
21 DAVIS, WRIGHT, TODD, RIESE 6 JONES
Attorneys for Plaintiff Wright, Inc.
22
23
24
Kathryn Fir Cashin
25 it
SUBPOENA DUCES TECUM - 2
i
DAVIS'WMMMT.roam, RIESS a JO I$
42.sunk ra sr h.-grval I.,.nvc
[[1r1LL 1M1MM[fg1[[I[.
su saa sew
LA*09MV, 421REATTL[3AST Nf M1ONIL NANA WILOtNG
DAVIS. WRIGHT. TODD. RIESE III JONES SCATTL.S WASHINGTON NNis1
.+.IIIN[I<fw[uCLLNYNP eyP OYIONY:oRroM•noN> 12",[[a IT'A
T[t[f [>K.[
Nu wsunr wifr• i vtiue ua'rwa[+ N�•:yyLu• T[t[CON[N �2001 G[[4[][
CNu'r w'M',c• a YNr[ +MW+ riV,<N 4Cu,.(w
w.��•Nw i • :.•:`�. m•:c`4NVN.
`[ M.rN•. uP L sm[[l
•. ew KLM
�• Pyuu N.•y.. SNf[ P!wnLUN a •�wt. 1rw[ 4
c"tWf[f f • , • ANCMONAO (ALASKA1[M11
AA.. Rt .fON iTA..AA
Nr w.1O I.,AI • q µ4 wa• t(wtGONFN [Pn ilf�l4�
�i.pyN'Llr 1•u�4•cr�<oy rCwti. ,
_ •�aM•U •Np[[ �`'eqp � �lf!N f<N(t N
ua[• • ,xY.My+wl N,NN•t rNyy d y
•.< ANt b•Nf4xM fllt[[LV
—A.: It t ASLfINQTQN.O C.awl,Yq< pU
L MN[[4 A= MG<e1�q «U4+ YtUNx[tryt0 • M[U,rMf wtl lMl.'A fllf
'At
•N Wp Mu.4�[u•.[o K+eS.Kw,µ{pA .•y[[•wP [LfG ( Nl iN.f�M
y�uxv,wV< .q enr cw r•[u f•R�nr. ��`
11P 11.Otn•V(HJ[N[
n •y pm.. N wcv<. Y•a. EVT(l0P
�<< IELL[YU[ WA[MNBTON[[PO{
iN14[4N� f�NM
•u..�.rw W,.w.+N•M.0 +••++n�.r �i V[w f[L[CMW l[wl
DWI+T RIKf N41,40 f(•ttl[PvlKf
Kw
December 28, 1984
Records Custodian.
Puulic Works Department
City of Renton
Renton, Washington
Re: Wright, Inc. v Teem Ventures, Inc., and
United Pacific Reliance Insurance Company
South Talbot till Pump Station
Project for City of Renton
Project Number S13631.A2
Dear Records Custodian:
We represent Wright. Inc. , an electrical sub-
contractor on the South Talbot Hill Pump Station
for the City of Renton. Although your department
has been served with a subpoena ducts tecum
requiring someone's presence and the production of
documents on Friday, January 4, 1985, it is not
really necessary for anyot.e to physically appear aL
our offices so long as all of the documents referenced
in the subpoena are produced to me prior to that date.
If you wish any clarification or require additional
information regarding the subpoena, please feel free to
contact me. Thank you for your cooperation and
courtesy.
Very truly your3,
DAVIS WRIGHT, TODD, RIESE 6 JONES
KECir4 Kathryn Cashiu
Enclosure
C�: Mr. Harold Wright (w/encl,)
David C• Groff, Esq.
Roger L. Barbee, Esq.
1
2
3
4
5 IN THE SUPERIOR COURT OF THE STATE OF WASHINGTON
IN AND FOR THE COUNTY OF RING
6
WRIGHT, INC. )
No. 82-2-15292
Plaintiff, )
8 ) NOTICF OF DEPOSITION
VS. )
9 )
TEEM VENTURES, INC. , and )
10 UNITED PACIFIC RELIANCE COMPANY )
)
1! Defendants. )
12
13 TO: Teem Ventures, Inc. and United Pacific Reliance
Company, Defendats
14
AND TO: Roger Barbep, Esq. , their attorney
15
16 YOU AND EACH OF YOU WILL PLEASE NOTICE that the
11 testimony of the records custodian of the Public Works
18 Department, City of Renton, Washington, will be taken
19 at the instance and request of plaintiff Wright, Inc.
20 in the above-entitled and numbered action before
21 a notary public at the offices of Davis, Wright,
22 Todd, Riese a Jones, 4200 Seattle-First National Bank
23 Building, Seattle, Washington 98154 on Friday,
24 ,E January 4, 1985 commencing at the hour of 11:00 a.m.
25 said oral examination to be subject to continuance or
i
NOTICE OF DEPOSITION
I f
' O+V q. WRIGHT )ODD 11I[[[ • JON(f
I • .r.•-.e ♦' � ..a r..:.
U+ 4� wN�wee�
1 adjournment from time to time or place until completed,
2 and to be taken on the grcund and for the reason that
3 said witness will give evidence and material to the
4 establishment of plaintiff's case.
3 Dated this _day of December, 1984.
8 I DAVIS, WRIGHT, TODD, RIESE 6 JONES
Attorneys for Plaintiff Nricht, Inc.
7
s �,�,�, E Cta•�1�.,
By
10 at ryn E. Cas in
11
12
13
i . 14i
18 (�
18
17
18
19
20
21
22
23
24
23 �.
I
I
owls wsIs"T. rood s19sc s iowcs
Nun. wNM.M Nn.
y
,City of Renton 101 An
Building B Zoning Department
InapeCtion Record ryJltl4;NO %'FRMII
PERMIT 810
Job Aotlreas 501 _-- JOB 8104-
Owner N PEFIIILTER RE)
CITY OF RFNTON Tenant
Contractor M.11. M(W)w r n
T
Natwe of Work CONSTRUCT PL.IMP gTAITON Total Fee
Installer
. --- — Issued 9' 6^3•8:{
B
DATE INSF Y -
1 FOOTING �� —�_ DATE INSP �—
/! 2 FOIIN'AI ION DATE INSP
' -! Wil.t I J FRIWING`-
4 Pt aSTERB(J:iRD
5 SI IFfiRt.V111_
Io Tf J`Sl" ATTtYI
7 aa�Fs
8 RE-STFF1 T—
00 NOT POUN CONCRETE UN-IL A OVED
DO NOT COVER UNTIL Ai D pPR NOUR NOTI
00 NOT OCCUPY UNTIL FINAI INSPECTION COMPLETE I e L5I N
C r, O2352 /
0
1ILrs7 11 N FRI AY
+a♦crtl. � r-� � �
firm
Building & ZoniniLDepartment
Phone: 235-2540. % MITI DING isrrit PERhITT B10482
Peimiss40L s hereby given to do the following described work,according to the�cndi- ISSUED 07%23/84
bons hereon and according to the approved qlens and spec,hcations pertaining
thereto subject to compliance Ytilh the Crdinances'Of the C ty of Renton.
CONSTRUCI Pu"P STATT(IN
Job Address $01 W PERIMETER�RD ' Tenant
Suite
OWNER
Name CT of RENTON VOID IF WORK Value of Construction Ic .000.00
Address c MIki AV S
RE,.rON NA Q905S IS NOT COMMENCED Permit Fee 483.00
Phone 206 235 263 t t IN IRO DAYS
OR IF Flan Check Fee
CONTRACTOR DISCONTINUED
Name M.C. MOORE Co IfIc• FOR MORE THAN Add-on Fee
Address 136SP 8E 107111 PI. 180 DAYS
RENTON NA 48056 Other Fee
Phone P06 2SS b076
Conti.Lic • hDI'p0I+i2233t TOTALFEE ` 483.00
Tax No• 60013.84240
Use District M P Sewe(/dapbc Special Restrictions —
Construction Type 2N Vacant Site Occupancy Group B-4
Building Square Feet 800 Site Coverage Occupancy Load
Size of Elec Service 600 Shell Of building Height Limn
Flood Plain Elev Sprinklers Required DwePing Count
Lowest Floor Elev CO Required Parking Count
Flo proofing Elev Temporary Story Count
Temporary Days Misc Code t
• Revocable - I Mtsc.Code 2 '
rRevocable Days
THIS PERMIT DOES NOT AUTHORIZE ANY WORK IN P""'-IC RIGHT-OF-WAY OR ON UTILITY EASEMENTS.
• I HEREBY CERTIFY THAT NO WORK IS TO BE DONeEY.CFPT
_ AS DESCRIBED ABOVE AND IN APPROVF-D PLANS dND SPECI-
FICATIONS AND TVAT ALL WORK IS TO CONFORM TO RENTON
CALL FUR INSPECTION CODES AN t p1NANC€S
Before Work is Concealed
or Pouring Concrete �—
• EJECT T• 'OMPLMNCE WITH THE ORDINANCES OF THE
Phone 235.2540 T° N AN?INFORMATION FILED HEREWITH THIS
Olm
6UILDING DIRECTOR
i • By-- _
4
W-600 SOUTH TALBOT HILL PUMP STATION WT _1
#6A Cons-Lruction Corre�„Qndence
City of Rentog
Building &Zoning Department
Inspection Record PLUMBINGPERMITPERMIT P00183
�- IOR 810982
Job Address 501 W PERIMETER RO —
Owner CITY OF RENTON Tenant
Contractor MOORE CONST CO Suite
Naturt of Work INST HOSE RIB
Total Fee $15.00
Installer
Issued 12/10/94 By
DATE INSP, DATE INSP.
1 LR�DERGROLIFp ' DATE INSP.
W & V 2 WATER SERVICE 3 ROUGH-IN
W & V
4 ROUGH-IN �7
WATER 5 GAS PIPING 6 IRRIGATION
SYSTEM
7 SEPTIC SYSTEM 8 FINAL,
DO NOT POUR^ONC
DO NOT RETE UNTIL APPROV
COVER UNTIL APPROVED ED /q NO R NICE REQUIRED FOR ALL INSPECTIONS
P T TNI
DO NOT OCCUPY UNTIL FINAL INSPECTION COMPLETE INSPECTION PHONE 21V12540
RQ AT IT HOURS 8 AM TO 5 PM
CoanECriuNg i,r}y y�j._, y i ON Y T OUGH FRIOAY
l ,y
/c
°, City of Renton
Building & Zoning Department
Phone: 235.2540 PLUMBING PERMIT PERMIT POOW
T0B B104B2
Permission is hereby given to do the following described work,according to the condo- ISSUED 12/10/B4
tions hereon and according to the approved plans and specifications pertaining
thereto,subject to compliance with the Ordinances of the City of Renton.
INST HOSE BIB
Job Address 501 W PERIMETER RD Tenant
Suite
OWNER
Name CITY OF RENTON VOID IF WORK ! Value of Construction 56.00
Address
IS NOT COMMENCED Permit Fee 15.00
Phone IN 180 DAYS
OR IF plan Check Fee
CONTRACTOR DISCONTINUED
Name MOORE CON5T CO FOR MORE THAN Add-on Fee
Ado,ess 6264 1365 SC 107TH FL 180 DAYS
RENTON WFi I Other Fee
Phone 206 255 3290
Cont, L.c. MDMOOI+22331 TOTAL FEE 15.00
Tax No
Use District Sewer/Septic Special Restrictions
Construction Type Vacant Site Occupancy Group
Building Squara Feet Site Coverage Occupancy Load
Size of Elec.Service Shell of Building Height Limn
Flood Plain Elev. Sprinklers Required Dwelling Count
Lowest Floor Elev. CO Required Parking Count
Flood proofing Elev. Temporary Story Count
Temporary Days Misc.Code t
Revocable Misc.Code 2
Revocable Days
THIS PERMIT DOES NOT AUTHORIZE ANY WORK IN PUBLIC RIGHT-OF-WAY OR ON UTILITY EASEMENTS.
I HEREBY CERTIFY THAT NO WORK IS TO BE DONE EXCEPT
-------- AS DESCRIBED ABOVE AND IN APPROVED PLANS AND SPECI-
FICATIONS AND THAT ALL WORK IS TO CONFORM TG.AENTprT
CALL FOR INSPECTION CODES AND ORDIN9NCES
Before Work is Concealed Applicant ",(l/11�jrC �/
or Pouring Concrete
SUBJECT TO COMPLIANCE WITH THE ORDINANCES OF THE
Phone 235-2540 I CITY OF REt:TON AND INFORMATION FILED HEREWITH THIS
PERMIT IS GRANTED.
BUILDING DIRECTOR
By _ _ �,r_
a
0 `
l2061 614-1700
Stead and Baggerty inc. '3700-A SE 30rh Si. Believu, Washington 98005
January 30, 1985
0ity of Renton
200 Mill Avenue South
Renton, Washington 98055
Attention: Ron Olsen, Utilities Engineer
Subject: South Talbot Hill Pump False Start Problem
Dear Ron:
In reviewing the letter written by CHZM-Hill on June 1, 1984. wherein on page 3,
there is an inference made that the possible cause of the false starting of the fire
pump Is due to a telemetry interference problem. I would like to respond as follows.
The equipment applied on the telemetry system is neither AM or straight FSK tone.
This equipment utilizes a scanning technique and is the DAQ Model DST-30 and IBR-30
series. This equipment utilizes a coded signal to prevent false operation. Th
proper serial format must occur to cause a relay operation to occur on the receive
end at the pump station. One of the strong attributes of this type of equipment
is that it doe. not falsely respond to noise which mignt be prevalent on the tele-
phone lines. Likewise, if there Is a telephone line failure, the receiving equip-
ment stays in the last mode of operation it was in when it received its last valid
signal format. If the malfunctions at the pumry station are occurring frequently
enough, the following technique for isolatin,; the problem might be utilized.
Item 01
If the relays. Q. K4, K6 and K8, were removed from the telemetry cabinet at the Fume
station site, It would disable the telemetry system from being able to work in the
hand operation from the remote control center. If with these relays removed the
pumps still periodically false start, then we have disproved the assumption that the
telemetry is causing a false start in the hand operation.
Item #2
In studying the electrical drawing, Sheet 8, it would appear that there are some
tther possibilities for false starting of the pumps at this Talbot Hill location.
If the limit switch located on the pump control valve on each pump were manually
deflected or moved the slightest when the pump was in the OFr position, CR2 relay
would energize and would start the motor. The pump control valve will, however, not
open because the solenoid for same is controlled by CR1. Thus the motor would run
and the valve would remain in the closed position.
CONTROLS SYSTEMS METERS VALVES INSTRUMENTS
• City of Renton • •
Attention: Ron Olsen
January 30, 1985
Page I
Item $3
If the contact shown on the drawing as CRS located in the PCP panel were to inter-
mittently close, the pump would start and would go through ne anal operation with the
pump control valve opened. This would mean that there was a malfunction or at least
a requirement in the PCP for this pump to run.
In summary, if it were ascertained that the limit switch on the control valve were in
fact the problem, this limit switch could be wired in such a way as to use an auxiliary
contact on the motor starter making it impossible to pull in CRS unless the motor
starter itself were pulled In.
If we can be of any further assistance in resolving the problem at the Talbot Hill
Booster Station, please feel free and contact our Bellevue office.
Yours very truly,
/p
64 f,
Ralph L. Baggerly
Vice President
Stead and Baggerly, Inc.
RLB:pc
. + City of Rentoro
Building 8 Zoning Department PERMIT M11164
Phone: 235-2540 MECHIANICAL PERMIT JOB B10482
Perm,ss,on is hereby given to 00 the to;lowmg described work,according to the condi- ISSUED 11/07/85
bons hereon and zrcording to the approved plans and specifications pertaining
thereto subject to compliance with the Ordinances of the City of Renton
INST 2 UNIT HEATERS
Job Adnress 501 W PERIMETER RD Tenant
Suite
OWNER 1,000.00
Name CITY OF RENTON VOID IF WORK Value of Construction
Address 200 MILL AV S 26.50
RENTON WA 98055 IS NOT COMMENCED Permit Fee
Phone 206 235 2631 IN IBO DAYS
bR IF Plan Check Fee
CONTRACTOR DISCONTINUED
Name M D MIOOFiE CO INC FOR MORE THAN Add-on Fee
Address 13652 107TH PL 1B0 GAYS
RENTON WA 98056 Other Fee
Phone 206 255 6076 TOTAL FEE 26.50
Contr L,c MDM QI*22331
Tax No
Use District SewenSepl c Special Restrictions
Use District
Type Vacant Site Occupancy Group
ConstrBuilding Square Feet Site Coverage Occupancy Load
Sire of Elec.Service Shen of Building He1ght Limit
Flood Plain Elev Sprinklers Required Dwelling Count
Lowest Floor Elev CO Required Parking Count
Flood proofing Elev Temporary Story Count
Temporary Days Misc,Code 1
Revocable Misc.Code 2
Revocable Days
THIS PERMIT DOES NOT AUTHORIZE ANY WORK IN PUBLIC RIGHT-OF-WAY OR ON UTILITY EASEMENTS_
I HEREBY CERTIFY THAT NO WORK IS TO BE DONE EXCEPT
AS DESCRIBED ABOVE AND IN APPROVED PLANS AND SPECI-
FICATIONS AND TIJAT ALL WORK IS TO CONFORM TO RENTON
CALL FOR INSPECTION I CODES AND 9FAN ES
� �
Before Work is Concealed Applicant
or Pouring Concrete
SUBJECT TO COMPLIANCE WITH THE ORDINANCES OF THE
Phone 235-2540 CITY OF RENTON AND INFORMATION FILED HEREWITH THIS
PERMIT IS GRANTED
- --- BUILDING DIRECTOR
By
t
w City of Renton
Building 8 Zoning Department MECHANICAL PERMIT PERMJOBIi B11164
Inspection Record
Job Address SOS W PERIMETER RD Tenant
Owne CITY OF RENTON Suite
Contractor M D MOORE CO INC
Nature of Work INST 2 UNIT HEATERS Total Fee $26.50
Installer. __ Issued 11/07/BS By
Sign rere
DATE INSP DATE INSP DATE INSP
1 GAS PIPING 2 FURNACE 3 HEAT PUMP
4 GREASE HOOD 5 WATER HEATER 6 BOILER
7 WOOD STOVE 8 UNIT HEATER 9 FINAL
/t
DO NOT POUR CONCRETE UNTIL APPROVED 0 HOUR NOTICE REQUIRED FOR ALL INSPECTIONS
DO NOT COVER UNTIL APPROVED I INSPECTION PHONE 255-2540
DO NOT OCCUPY UNTIL FINAL INSPECTION COMPLETE I MQHOURS 8 AM TO NDAY THROUGH 5 PM
T THIS RECORD AT JOB SITE —
CORRECTIONS --
l orm No. 102 •
CITY OF RENTON
BUILDING DIVISION
PUBLIC WORKS DEPARTMENT
�����,pDD��2335�-225�540 TT'�,�r�
'e+�l.isdl�yflu
JOB LOCATED AT .S e� -,� _ �cy�
The following work does not comply with. City codes
ordinances and must be CORRECTED and INSPECTED before
further work is accomplished on this building or before
equipment is put into aery ice.
/A:
e4GS✓ieLc /ii eDO sjlac3�#SS �/f�Cld
UNTIL ABOVE CORRECTIONS OCCUPY I BUILDING
G
ECTIONSHAVEBEENMADEAND APPROVED
Inspector �//�(�(�j9y/��, Date
�L
1� f�tlT RF?WF THI I�TI F
Form No. 102 ' •
CITY OF RENTON
BUILDING DIVISION
PUBLIC WORKS DEPARTMENT
235-2540
URECTION MCE
JOB LOCATED AT -VVk,kdo, fi^b�a'ti2ff / OS/f'L
The following work does not comply with C T 4ff
ity codes and
ordinances and must be CORRECTED and INSPECTED before
further work is accomplished on this building or before
equipment is put into service.
DO NOT OCCUPY THIS BUILDING
UNTIL ABOVE CORRECTIONS HAVE BEEN MADE AND APPROVED
Inspector %4CI�+ 'J''/ Date ...9
DO CDT R➢'X THIS NNICE
S1098.11
(20/17)
Engineering
April 29, 1986
Mr. Chris Funk
M. D. MOORE COMPANY
P. 0. Box 2603
Renton, Washington 98056
Subject: City of Renton
West Hill Pump Station
Request for Warranty Service
Dear Chris:
This letter is to notify you that the electric motor for Pump No. 2 at the
West Hill Pump Station is in need of eervice. We suspect that the motor
may have a defective bearing.
Please respond to this request in accordance witf: the terms of the original
contract. You may contact Mr, Ray S,,d at the City Shops (253-2646) for
additional information and access to the pump station.
Please call if you require additional informtion. Than you for your
consideration,
Sincerely,
RH2 ENGINEERING, P.S.P.
Daniel R. Ervin, P.E.
cc: Mr. Ray Sled, City of Renton
Mr. Ron Olsen, City of Renton
Mr. Dick Bangs, Byron Jackson
%V#A rket Street,P.O.Box 1180,Kirkland YANhO an gMMQW 827-84(r)
PUMP s1hQ'h0o.vs
ENDING
F FIL
FILE TITLE
S.
AMP SfatialU
4-l!�p Oootl �UCf?o .?�